Sie sind auf Seite 1von 5

MOHSIN SAIF

Objective:

mohsin_rnp@yahoo.com 00966566802937(KSA) 00923345721039(PAK)

To seek challenges in the field of RF Cellular Communication and to exhibit my ability of working as an expert RF Engineer by utilizing my diversified experience, technical knowledge, dynamic & energetic attitude and good communication skills.

Professional Experience:
About 8.5 years of experience as LTE/3G/CDMA 2000/GSM 2G/2.5G/ Senior RF consultant, having skills on Nokia, Huawei, Siemens, Moto BSS equipment.
Team lead LTE/3G/2G NPO on Mobily NSN , New Sites+Swap and HSPA+ Implementation, Madina, KSA [5th Feb 2011 to Current]

Recruiter: AWTG
3G Responsibilities

Vendor: NSN/Huawei/Ericsson/Motorola

Leading LTE/3G/2G NPO team NSN madina(North region). Monitoring 3G KPIs like (accessibility, retainability, mobility, throughput, congestion) and suggest change request to improve the quality of the New Sites in Reyadh. Involved in Dual Cell 42Mbps Role out project, Initially involve in 42Mbps trial and once all Dual Cell parameters are tuned for role out than involved in delivering whole Riyadh 42Mbps role out, main responsibilities in this role out is to suggest parameter for Dual cell like (64 QAM Enable, HSDPA 15 codes Enable, Shared HSDPA scheduler for baseband efficiency Enable, HSDPA 14 Mbps per user Enable, Flexible RLC and CE to be reserved by changing TCell and making FMCSID for DCell). Involved in F2 Upgrades Role out, preparing all parameters required for F2 by keeping F2 for HSPA Traffic and F1 for voice traffic, suggesting RF Module (FRGF,FRGC and FRGE) and System module (FSMD and FSME) changes and parameter recommendation like ( recommending cell weight for HSDPA layers, direct RRC enabling for F1 and F2 Cells, direst RRC for HSDPA layers, cell bar on F2 cells and grouping F1 and F2 cells by TCell and enabling 64 QAM). Daily monitoring new F2 Upgrade site KPIs and suggest changes for and degradation. Involved in F3 Upgrades Trial, provide customer complete study for F3 upgrades suggesting different power settings for F1,F2 and F3, by suggesting upgrades CE on system modules, recommending different cell weight for F1,F2 and F3 and suggesting parameter settings. Successfully delivered Huawei to NSN 3G Swap Project in line with SLA of over 60 NodeBs. Did parameter Mapping from Huawei to NSN on RNC,WBTS and Cell Level and presented to customer. Successfully delivered Ericsson to NSN 3G Swap Project in line with SLA of over 210 NodeB. Successfully delivered RNC Rehoming role out project in one month Duraion. Did parameter Mapping from Ericsson to NSN on RNC,WBTS and Cell Level and presented to customer. Planning New 3G Site suggesting the parameters based on dense urban ,urban and rural areas, planning parameter scrambling code, planning NBRs and Monitoring Intial KPIs. Preparing XMLs through NetACT for all parameter changes, site creation, NBR Creation. Doing Regular Audits on Monthly Basis for all RNCs by self made tools. Currently involve in RNC Dimensioning for upcoming phase. Involve in PTP to PMP Role out project for all central region and is currently on going as well

Senior Optimization Eng LCC (Mobilink swap) Pakistan (2G)(From 15th June2010 to 1st Feb2011)

Currently working as a senior Optimization Eng in LCC Pakistan (Mobilink Swap from 15th June till now).

Major Responsibilities:

Maintenance of KPls for the assigned Huawei Clusters. Making IARs & FARs after achieving the finalized KPIz. Analyzing integration reports of new sites based on Drive Test and neighbor analysis. City level redesigning (tilts azimuth and parameter changes) in order to improve the KPIs and Traffic sharing between the neighboring sites without affecting coverage/traffic.

Being a BSC Responsible I am responsible for maintaining and improving DCR, CSSR, IHSR, MPD, TCH Blocking. Neighbor optimization, Frequency Plan audit, Redesigns and soft Parameter trails to achieve the target based KPIs. Responsible for Frequency plans of newly integrated sites. Frequency audit, BSIC audit, MA List Audit of new sites in order to integrate them into the network.

3G RF Optimization/planning consultant in UAE for SE region in HUAWEI+DU Project (From Nov 28th 2009 15th June 2010).

Responsibilities Monitor & analyze the WCDMA HSDPA+ 3G Radio Network Statistics on daily basis. Checking and Analyzing the most important KPIs (accessibility, retain ability, usage, throughput,
congestion) and suggest change request to improve the quality of the whole network.

Make KPI reports based on RNC level and NodeB level and cell level on daily and weekly basis. Involve in checking KPIs formulas and accumulating results based on counter level. Making and analyzing worst cell KPIs on daily basis and purpose recommendation for better performance. Involve in reducing congestion and drops, improving the IRAT Handover, Soft Handover, Location Update, CSSR, RRC Connection & RAB Establishment Success rate in designated area for all Voice, Video Packet & High Speed, issuing capacity requests whenever needed. Doing Inconsistencies Checks, Packet Throughput, Parameter changes & Physical changes. Parameter tuning based on quality and problems counter on worst cells. Responsible for the KPIs, Formulas and Counters definition. KPI benchmarking after implementation of any recommendations & major activities such as RNC rehoming, and threshold adjustments. Optimize UMTS network resources (power resource, Channel Element Resource, Transmission Resource, Code Resource), in order to achieve better QoS.Fine tuning of all radio network parameters. Scrambling Code plan review and fine tuning. CS & PS Power control parameter fine tuning. 2G 3G reselection procedure method optimization. Inter RAT Handover parameter optimization. Rectification of alarm related faults. 3G 2G Neighbor audit to improve IRAT HO Success and Call Drop Involve in testing the radio performance for the newly integrated sites. Discuss the Scrambling Code retunes requests with team leader for designated area. Participating in technical discussions with the customer. Perform Radio Network Surveys, i.e. Visit possible sites in order to judge if they are suitable from a radio network point of view (Hardware & Location). Evaluate and adapt new methods and technologies regarding Radio Network Optimization, Features, Trials & Tuning. Troubleshooting and Recommendations identifying issues such as Interference, Overshoots, Call Drop, Blocked Call, Congestion, SHO Failure, Missing Neighbor, Cell barring, Cell Dragging, Faulty Hardware in 2G and 3G. Physical Redesign includes Electrical and mechanical tilts optimization, Azimuths modification, Antenna heights changes, antenna type etc. Audit and redesigning Neighbor plan time to time for the optimal coverage and minimum interference. Site Audits & Verifications: Testing of site in the field to make sure the site design parameters are implemented as planned. Responsible for the optimization of UTRAN CS, PS and HSDPA services. (HSDPA code resource distribution, configuration of HS-PDSCH codes according to traffic model, protection timer for HSDPA when moving, configuration of maximum HSDPA users per cell and Node-B).

Responsible of data analysis on problem areas such as call drops, missing neighbor analysis and call setup failure by analyzing layer messages (AS and NAS messages) on drive test log files and RNC trace log files to improve network performance. Analyze RANAP, NBAP protocols. Tune Inter-Radio Access Technology (IRAT) 3G-2G Handover and vice versa, neighbor relation to improve accessibility and retainability for voice, video and packet services.

Senior Optimization Consultant Roshan Telecom Afghanistan (2G)

Worked as a senior Optimization Consultant in Roshan Telecom Afghanistan (NSN land from 28 Oct 2008 to Nov. 2009).

Major Responsibilities:
Managing swap project of NSN. Maintenance of KPls for the assigned Nokia/Siemens Region and parameter changes audit. Involved in generation of major area KPI plan in accordance with the vendor as well as carrying out the routine and issue based Drive Test of major and remote cities using TEMS Investigation and Troubleshooting problems encountered. Analyzing integration reports of new sites based on Drive Test and neighbor analysis. City level redesigning (tilts azimuth and parameter changes) in order to improve the KPIs and traffic sharing between the neighboring sites without affecting coverage/traffic. Being a BSC Responsible I am responsible for maintaining and improving DCR, CSSR, InHSR, MPD, TCH Blocking. Neighbor optimization, Frequency Plan audit, Redesigns and soft Parameter trails to achieve the target based KPIs. Responsible for Frequency plans of newly integrated sites. Frequency audit, BSIC audit, MA List Audit of new sites in order to integrate them into the network .

Optimization /Planning Engineer (LCC Pakistan) from 16th July 2005 to 1st October 2007 Senior Optimization Engineer

Worked as an Optimization Engineer in LCC on Telenor project.

Daily Responsibilities in LCC:


Parameter Optimization of worst cells for GSM and also GPRS and EDGE Optimization. Dealing with operations and taking timely follow-up with O & M regarding hardware issues like faulty Carriers. Redesign of Clusters like Azimuth, Electrical & Mechanical Tilts and HBA Proposals. Frequency Planning like BCCH, BSIC, HSN and MAIO Planning. Swap Sectors Cable/Diversity swaps identification and rectification. Nominal Planning including Survey for new sites. Traffic, Quality (BER/FER) and major KPIs Optimization like CSSR, DCR and Handover Success Rate. New Features Trials and Implementation in the assigned region. New Site Acceptance and assure smooth Integration Drive Tests with Initial Tuning / Optimization. Routine Drive Test of 2G cell sites using TEMS Investigation v5.1.1 & v8.0.3. Handling QOS and Customer Complaint. Analysis Pre and Post results after Rehoming

Worked as a Project Manager on U-FONE Swap project in all over the Pakistan. Key Responsibilities:
Managing DT teams in all over the Central_Il region. Responsible for all the Swap operations including new sites of Phase_B in Central_Il. Responsible for technical support to all the site engineers. Responsible for Post analysis of DT data and post analysis report. Responsible for analyzing the KPIs of the entire network and trouble shooting. Responsible for Co-ordination with costumer.

Project Manager (HUAXIN CONSULTING PAK)

HUAWEI TECHNOLOGY
Worked as Radio Network Optimization Engineer in Huawei Technologies Pakistan from June

PROJECTS

01, 2004 to June 30, 2005.

PTCL CDMA WLL Project:


Did the site survey for new and existing sites. Did Frequency Spectrum Interference Test using YBT25O to find the source of interference and report generation. Worked as Optimization engineer in South region doing Drive Tests and Traffic analysis to locate the problems in the network and propose to solve them. Did drive tests to optimize the network by modifying down tilt and azimuth of antenna to improve the coverage and modified handoff, access etc. parameters to improve network quality. Did traffic statistics analysis to track down the problems in the network related to call setup, call drop, soft handoff, hard handoff etc and solve them. Worked as a Network Optimization Manager and Technical Support Engineer for South region. Shared my experience with other RNO Engineers to solve the network problems Gave training to PTCL about Drive Test Data Analysis. Did the site survey for new and existing sites in south region. Did Frequency Spectrum Interference Test using YBT25O to find the source of interference and report generation.

World Call CDMA Project:

WARID Telecom GSM Project:


RF survey and cost efficient cell site designing for 30 remote cities and 4 major cities in Pakistan. Coverage & Capacity Planning and validation of cell sites on ASSET for CW Model Tuning of Dual Band Propagation Models for ASSET (20m resolution data). Participated in the preparation of BCCH Frequency Plan of south using ILSA v2.0 Implementation & optimization of Half Rate in the network to overcome high TCH congestion with good QOS Centralized Traffic Trend Monitoring & Expansion Planning to overcome CS TCH Blocking & maintain 2% GOS Development of Network Database software in MS Access & VB and its synchronization with ASSET Enterprise V5.0 for routine update through XML format. Development of a various Software Tools in MS Access & SQL to process Alcatel CSV files and Alcatel Raw Counters and to produce various KPIs on hourly & daily basis for analysis in numeric and graphical representation.

Skill on Tools:

MARCONI PLANET for 2G coverage and capacity planning. ACTIX Analyzer for post processing / reports generation of field data. ACTIX Spotlight- -for recommendations regarding issues of field data. ACTIX Veritune for hard optimization analysis. NETACT Start for performance management of NOKIA. Nortel CT7100 for Statistical Analysis. SPOTS statistical tool for Siemens. NASTER statistical tool for Huawei. GENIX(U-NET) AIRCOM Optima Intermediate User of Optima for extraction of stats via modules and queries. TEMS Investigation v5.1.1 & v8.0.3 for 2G cell sites Drive Test. TEMS Route Analyzer v8.0.3 for post processing of TEMS Log files. MapInfo Professional v8.5 MapBasic Tools Piano, Neighbor Display tool, Gsm application, Mapper and MCOM. MS Access, MS Excel & Visual Basic for development of various tool and statistical/graphical analysis NETACT (NSN) RS(NSN) FDI(DT Analysis Tool)

Sound knowledge of 2G/3G Architecture, RF Propagation, Traffic Capacity Solutions and Frequency Planning

TRAININGS AND WORKSHOPS



Attended CDMA BSS + RF Training in HUAWEI Head office in Islamabad including: CDMA Principle Drive Testing Traffic Analysis CDMA System Messages Optimization Principle Workshop on Pilot Panorama Tool at HUAWEI Office Lahore. Workshop on TEMS (GSM) Tool at HUAXIN CONSULTING Office Islamabad Workshop on M2000 (Traffic Monitoring) at HUAXIN CONSULTING Office Karachi .

FOREIGN TRAINAING

Completed 12 days RNP/RNO training successfully from China. Completed one day GSM/BSS/RNO High Level Training Course from China.

AWARDS & ACHIEVEMENTS:


Topped in CDMA RNP global license exam of Huawei in 2005 & 2006. Topped in GSM RNP global license exam of Huawei in 2005 & 2006. Nominated for GSM Expert level training from China at 4th February 2007 Have been certified as best employee of the organization for year 2006.

References: To be furnished on demand.

Das könnte Ihnen auch gefallen