POLYTECHNIC UNIVERSITY OF THE PHILIPPINES

COLLEGE OF ARCHITECTURE AND FINE ARTS

DEPARTMENT OF INTERIOR DESIGN


PUP Engineering and Architecture BuildingNDC Compound, Anonas cor. Pureza Sts., Sta. Mesa, Manila Tel: (632) 713 9304

BS INTERIOR DESIGN OJT REPORT

Daily Log of Training Experience


Date: Name of Student: MARTER ,
Family Name

APRIL 16 RAMOS

, 2012

MARK BONI
First Name

Middle Name

Office/Company Name: Address: Project Title: Project Location: ASANTEKS

CWC INDUSTRIES INC. Project Description:

#2 CWC BLDG., ZARAGOSA ST.,COR PALANZA ST., QUEZON CITY

Assigned Work Task: PREPARING THE SWATCH BRDS. pls. specify Time In Time Out : : 8:00 AM 5:00 PM SUNNY

Office

Site

Others,

Total No. of Hour/s Spent: Site Condition:

8 HRS.

Weather Condition:

Work Activities Performed: PREPARING THE SWATCH BOARDS

Personal Observations at the Project Site:

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 1 of 2

Report/s Submitted, if any:

Lesson/s Learned: I LEARN THE TEXTILES TECHNICAL SPECIFICATION

Picture/s Taken, if any:

Certified True and Correct by:

Noted by:

Mentor
(Signature above Printed Name)

IDr. Billie Jean Dumlao-Dela Cruz, piid


Faculty OJT Coordinator

Date: _______APRIL 16_________, 2012

Date: ________________ , 2012

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 2 of 2

POLYTECHNIC UNIVERSITY OF THE PHILIPPINES

COLLEGE OF ARCHITECTURE AND FINE ARTS

DEPARTMENT OF INTERIOR DESIGN


PUP Engineering and Architecture BuildingNDC Compound, Anonas cor. Pureza Sts., Sta. Mesa, Manila Tel: (632) 713 9304

BS INTERIOR DESIGN OJT REPORT

Daily Log of Training Experience


Date: Name of Student: MARTER ,
Family Name

APRIL 17 RAMOS

, 2012

MARK BONI
First Name

Middle Name

Office/Company Name: Address: Project Title: Project Location:

CWC INDUSTRIES INC. Project Description:

#2 CWC BLDG., ZARAGOSA ST.,COR PALANZA ST., QUEZON CITY SYMPHONY MILLS

Assigned Work Task: PREPARING THE SWATCH BRDS. pls. specify Time In Time Out : : 8:00 AM 5:00 PM SUNNY

Office

Site

Others,

Total No. of Hour/s Spent: Site Condition:

8 HRS.

Weather Condition:

Work Activities Performed: PREPARING THE SWATCH BOARDS

Personal Observations at the Project Site:

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 3 of 2

Report/s Submitted, if any:

Lesson/s Learned: I LEARN HOW MANY YARDS OF FABRICS DO YOU NEED FOR UPHOLSTERY BASED IN FABRIC WIDTH, FABRIC REPEAT, RAILROADING, AND THE RIGHT WAY.

Picture/s Taken, if any:

Certified True and Correct by:

Noted by:

Mentor
(Signature above Printed Name)

IDr. Billie Jean Dumlao-Dela Cruz, piid


Faculty OJT Coordinator

Date: _______APRIL 17_________ , 2012

Date: ________________ , 2012

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 4 of 2

POLYTECHNIC UNIVERSITY OF THE PHILIPPINES

COLLEGE OF ARCHITECTURE AND FINE ARTS

DEPARTMENT OF INTERIOR DESIGN


PUP Engineering and Architecture BuildingNDC Compound, Anonas cor. Pureza Sts., Sta. Mesa, Manila Tel: (632) 713 9304

BS INTERIOR DESIGN OJT REPORT

Daily Log of Training Experience


Date: Name of Student: MARTER ,
Family Name

APRIL 18 RAMOS

, 2012

MARK BONI
First Name

Middle Name

Office/Company Name: Address: Project Title: Project Location: Assigned Work Task: pls. specify Time In Time Out : : 8:00 AM 5:00 PM SUNNY SOLAIRE MANILA

CWC INDUSTRIES INC. Project Description:

#2 CWC BLDG., ZARAGOSA ST.,COR PALANZA ST., QUEZON CITY

FABRIC MATCHING

. Office

Site

Others,

Total No. of Hour/s Spent: Site Condition:

8 HRS.

Weather Condition:

Work Activities Performed: SOLAIRE MANILA FABRIC MATCHING PREPARING THE SWATCH BOARDS INSPIRATIONS

Personal Observations at the Project Site:

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 5 of 2

Report/s Submitted, if any:

Lesson/s Learned: I LEARN THE DIFFERENT TYPES OF ARMS AND OTHER FURNITURE HARDWARE.

Picture/s Taken, if any:

Certified True and Correct by:

Noted by:

Mentor
(Signature above Printed Name)

IDr. Billie Jean Dumlao-Dela Cruz, piid


Faculty OJT Coordinator

Date: _______APRIL 18_________ , 2012

Date: ________________ , 2012

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 6 of 2

POLYTECHNIC UNIVERSITY OF THE PHILIPPINES

COLLEGE OF ARCHITECTURE AND FINE ARTS

DEPARTMENT OF INTERIOR DESIGN


PUP Engineering and Architecture BuildingNDC Compound, Anonas cor. Pureza Sts., Sta. Mesa, Manila Tel: (632) 713 9304

BS INTERIOR DESIGN OJT REPORT

Daily Log of Training Experience


Date: Name of Student: MARTER ,
Family Name

APRIL 19 RAMOS

, 2012

MARK BONI
First Name

Middle Name

Office/Company Name: Address: Project Title: Project Location: INSPIRATION

CWC INDUSTRIES INC. Project Description:

#2 CWC BLDG., ZARAGOSA ST.,COR PALANZA ST., QUEZON CITY

Assigned Work Task: PREPARING THE SWATCH BRDS. pls. specify Time In Time Out : : 8:00 AM 5:00 PM SUNNY

Office

Site

Others,

Total No. of Hour/s Spent: Site Condition:

8 HRS.

Weather Condition:

Work Activities Performed: PREPARING THE SWATCH BOARDS UART PREPARING THE SWATCH BOARDS

Personal Observations at the Project Site:


PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 7 of 2

Report/s Submitted, if any:

Lesson/s Learned: I LEARN THE DIFFERENT TYPES AND VARIETY OF FABRICS IN THE MARKET

Picture/s Taken, if any:

Certified True and Correct by:

Noted by:

Mentor
(Signature above Printed Name)

IDr. Billie Jean Dumlao-Dela Cruz, piid


Faculty OJT Coordinator

Date: _____APRIL 19___________ , 2012

Date: ________________ , 2012

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 8 of 2

POLYTECHNIC UNIVERSITY OF THE PHILIPPINES

COLLEGE OF ARCHITECTURE AND FINE ARTS

DEPARTMENT OF INTERIOR DESIGN


PUP Engineering and Architecture BuildingNDC Compound, Anonas cor. Pureza Sts., Sta. Mesa, Manila Tel: (632) 713 9304

BS INTERIOR DESIGN OJT REPORT

Daily Log of Training Experience


Date: Name of Student: MARTER ,
Family Name

APRIL 20 RAMOS

, 2012

MARK BONI
First Name

Middle Name

Office/Company Name: Address: Project Title: Project Location: Assigned Work Task: pls. specify Time In Time Out : : 8:00 AM 5:00 PM SUNNY

CWC INDUSTRIES INC. Project Description:

#2 CWC BLDG., ZARAGOSA ST.,COR PALANZA ST., QUEZON CITY SOLAIRE MANILA

PRODUCT LISTING

Office

Site

Others,

Total No. of Hour/s Spent: Site Condition:

8 HRS.

Weather Condition:

Work Activities Performed: SOLAIRE MANILA, PRODUCT LISTING

INSPIRATION PREPARATION OF SWATCH BOARDS PREPARATION OF SWATCH BOARDS UART

Personal Observations at the Project Site:


PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 9 of 2

Report/s Submitted, if any:

Lesson/s Learned: I LEARN HOW MANY FABRICS ARE USE IN VARIOUS FURNITURES.

Picture/s Taken, if any:

Certified True and Correct by:

Noted by:

Mentor
(Signature above Printed Name)

IDr. Billie Jean Dumlao-Dela Cruz, piid


Faculty OJT Coordinator

Date:

APRIL 20

, 2012

Date: ________________ , 2012

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 10 of 2

POLYTECHNIC UNIVERSITY OF THE PHILIPPINES

COLLEGE OF ARCHITECTURE AND FINE ARTS

DEPARTMENT OF INTERIOR DESIGN


PUP Engineering and Architecture BuildingNDC Compound, Anonas cor. Pureza Sts., Sta. Mesa, Manila Tel: (632) 713 9304

BS INTERIOR DESIGN OJT REPORT

Daily Log of Training Experience


Date: Name of Student: MARTER ,
Family Name

APRIL 23 RAMOS

, 2012

MARK BONI
First Name

Middle Name

Office/Company Name: Address: Project Title: Project Location: UARTS

CWC INDUSTRIES INC. Project Description:

#2 CWC BLDG., ZARAGOSA ST.,COR PALANZA ST., QUEZON CITY

Assigned Work Task: PREPARING THE SWATCH BRDS. pls. specify Time In Time Out : : 8:00 AM 5:00 PM SUNNY

Office

Site

Others,

Total No. of Hour/s Spent: Site Condition:

8 HRS.

Weather Condition: Work Activities Performed:

PREPARING THE SWATCH BOARDS FOR UART SYMPHONY MILLS NV

SOLAIRE PRODUCT LISTING FOR SUBMISSION

Personal Observations at the Project Site:

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 11 of 2

Report/s Submitted, if any:

Lesson/s Learned: I LEARN THE NATURE OF LEATHERS IN WHERE IT CAME FROM?, MADE OF?, THE PROCESSES, HOW IT SOLDS AND HOW TO MAINTAIN IT.

Picture/s Taken, if any:

Certified True and Correct by:

Noted by:

Mentor
(Signature above Printed Name)

IDr. Billie Jean Dumlao-Dela Cruz, piid


Faculty OJT Coordinator

Date:

APRIL 23

, 2012

Date: ________________ , 2012

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 12 of 2

POLYTECHNIC UNIVERSITY OF THE PHILIPPINES

COLLEGE OF ARCHITECTURE AND FINE ARTS

DEPARTMENT OF INTERIOR DESIGN


PUP Engineering and Architecture BuildingNDC Compound, Anonas cor. Pureza Sts., Sta. Mesa, Manila Tel: (632) 713 9304

BS INTERIOR DESIGN OJT REPORT

Daily Log of Training Experience


Date: Name of Student: MARTER ,
Family Name

APRIL 24 RAMOS

, 2012

MARK BONI
First Name

Middle Name

Office/Company Name: Address: Project Title: Project Location:

CWC INDUSTRIES INC. Project Description:

#2 CWC BLDG., ZARAGOSA ST.,COR PALANZA ST., QUEZON CITY MODERN LIVING SPACE

Assigned Work Task: PREPARING THE SWATCH BRDS. pls. specify Time In Time Out : : 8:00 AM 5:00 PM SUNNY

Office

Site

Others,

Total No. of Hour/s Spent: Site Condition:

8 HRS.

Weather Condition:

Work Activities Performed: PREPARATION OF SWATCHES FOR MODERN LIVING SPACE

Personal Observations at the Project Site:

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 13 of 2

Report/s Submitted, if any:

Lesson/s Learned: I LEARN TO MAKE SWATCH BOADRD IN SPECIFIC TIME ALLOTED

Picture/s Taken, if any:

Certified True and Correct by:

Noted by:

Mentor
(Signature above Printed Name)

IDr. Billie Jean Dumlao-Dela Cruz, piid


Faculty OJT Coordinator

Date:

APRIL 24

, 2012

Date: ________________, 2012

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 14 of 2

POLYTECHNIC UNIVERSITY OF THE PHILIPPINES

COLLEGE OF ARCHITECTURE AND FINE ARTS

DEPARTMENT OF INTERIOR DESIGN


PUP Engineering and Architecture BuildingNDC Compound, Anonas cor. Pureza Sts., Sta. Mesa, Manila Tel: (632) 713 9304

BS Interior Design On-the-Job Training ON-THE-JOB TRAINING WEEKLY ACCOMPLISHMENT REPORT


Name of Student: MARTER,
Family Name,

MARK BONI
First Name

RAMOS
Middle Name

Student No. Address:

2009-05309-MN-0 Employed by:

CWC INDUSTRIES INC.

#2 CWC BLD., PALANZA ST. COR ZARAGOZA ST., QUEZON CITY 16


Month

Reporting Period from:


Day

APRIL

2012 to
Day

20 APRIL
Month

2012

Item No.
1

Project Title/Description/Location

Field of Practice (Brief Description)


PREPARING BOARDS PREPARING BOARDS PREPARING BOARDS PREPARING BOARDS SWATCH

No. of Hours
3 HRS

Percentage of Assigned Work Completed

100% = Full Completion


90%

INTERWALL COVERING

ASANTEK LEATHERETTES

SWATCH

8 HRS

100%

SYMPHONY MILLS NV

SWATCH

5 HRS

98%

INSPIRATIONS

SWATCH

9 HRS

100%

SOLAIRE MANILA

FABRIC MATCHING AND PRODUCT LISTING PREPARING BOARDS SWATCH

7 HRS

100%

UART

8 HRS

98%

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 15 of 2

Item No.

Project Title/Description/Location

Field of Practice (Brief Description)

No. of Hours

Percentage of Assigned Work Completed

100% = Full Completion

TOTAL NO. OF HOURS

40 HRS

97.6%

Recommendations for the Trainees further growth and development:

Checked and Approved by:

Conforme:

OJT Faculty Coordinator


(Signature above printed name)

Student Trainee
(Signature above printed name PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 16 of 2

POLYTECHNIC UNIVERSITY OF THE PHILIPPINES

COLLEGE OF ARCHITECTURE AND FINE ARTS

DEPARTMENT OF INTERIOR DESIGN


PUP Engineering and Architecture BuildingNDC Compound, Anonas cor. Pureza Sts., Sta. Mesa, Manila Tel: (632) 713 9304

BS Interior Design On-the-Job Training ON-THE-JOB TRAINING WEEKLY ACCOMPLISHMENT REPORT


Name of Student: MARTER,
Family Name,

MARK BONI
First Name

RAMOS
Middle Name

Student No. Address:

2009-05309-MN-0 Employed by:

CWC INDUSTRIES INC.

#2 CWC BLD., PALANZA ST. COR ZARAGOZA ST., QUEZON CITY 23


Month

Reporting Period from:


Day

APRIL

2012 to
Day

24 APRIL
Month

2012

Item No.
1

Project Title/Description/Location

Field of Practice (Brief Description)


PREPARING BOARDS PREPARING BOARDS SWATCH

No. of Hours
2HRS

Percentage of Assigned Work Completed

100% = Full Completion


100%

UART LEATHERETTES

SYMPHONY MILLS NV

SWATCH

2HRS

100%

SOLAIRE MANILA

PRODUCT LISTING

3 HRS

100%

MODERN LIVING ROOM

PREPARING BOARDS

SWATCH

8 HRS

100%

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 17 of 2

Item No.

Project Title/Description/Location

Field of Practice (Brief Description)

No. of Hours

Percentage of Assigned Work Completed

100% = Full Completion

TOTAL NO. OF HOURS

16 HRS

100%

Recommendations for the Trainees further growth and development:

Checked and Approved by:

Conforme:

OJT Faculty Coordinator


(Signature above printed name)

Student Trainee
(Signature above printed name) PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 18 of 2

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 19 of 2