Apr 2012 Planning, Design & Construction -- Project Status Report - Capital Improvements Environment and Natural Resources

Phase 2
DESCRIPTION
This addition on the east side of the existing Dennis DeConcini Environment and Natural Resources Building will further interdisciplinary research in earth, environmental, natural resources, atmospheric, mathematical, and related sciences. The building will primarily provide faculty offices, conferencing and support spaces with some related research and instructional dry laboratory and work space. A large classroom addition will meet the UA's critical need to teach an increasing number of students with decreasing State funding for faculty support.

Page 1 of 18 03-8526
D - Design CMR Carr TBD Andrew Comrie

Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative:

DP: G L H N Architects And Engineers Contractor: STATUS


Schematic Design revisions to include the large classroom/auditorium are underway.

NASF: Current Budget: Projected Budget: Bldg:

85,140

GSF:

150,410 $4,086,047 $75,000,000

Residence Life Building Renewal Phase III


DESCRIPTION
This project will extend the useful life of aging residential facilities and reduce the risk of potentially disruptive system failures that would affect both the health and safety of the occupants at Cochise Residence Hall by replacing the fire sprinkler systems, and Coronado Residence Hall by replacing mechanical, electrical and plumbing systems, and renovating bathrooms.

04-8537
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: C - Construction CMR Helentjaris Kraft Corral

DP: G L H N Architects And Engineers Contractor: Lloyd Construction Co Inc STATUS


Solid surface shower pans are being installed as they arrive from China. Finish work, plumbing, mechanical and electrical improvements are in progress. Floor tile, wall framing, solid surface shower walls and wardrobe installations are in progress.

NASF: Current Budget: Projected Budget: Bldg: 31

131,652

GSF:

191,070 $27,865,215 $27,865,215

85

Engineering Innovation Building


DESCRIPTION
A new interdisciplinary research-center focused building to provide critically needed infrastructure to support student recruiting and retention, to provide a foundation for growing research and innovative discovery programs, and to consolidate key research and support functions into a single location for increasing effectiveness and branding.

05-8623
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: DP: Contractor: D - Design CMR Vos TBD

STATUS
The project has been placed in the first year of the FY 2013-2015 Capital Improvement Plan. An RFQ for NASF: Design Professional Services is being finalized and will soon be released to initiate the consultant Current Budget: selection process.

GSF:

0 $100,000 $60,000,000

Projected Budget: Bldg:

Sixth Street Residence Halls / Likins Hall & Arbol de la Vida


DESCRIPTION
This project provides new on-campus housing for 1,088 undergraduate students. The buildings are on two sites along 6th Street; one at Tyndall Avenue (Arbol de la Vida), and one at Highland Avenue (Likins Hall).

07-8770
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: DP: AR7 Architects P C Contractor: Core Construction O - Occupancy CMR Johnson Marsh Jim Van Arsdel

STATUS
Buildings are substantially complete and occupied.

NASF: Current Budget: Projected Budget: Bldg: 131

212,025

GSF:

328,365 $156,700,000 $159,300,000

132

133

Apr 2012 Planning, Design & Construction -- Project Status Report - Capital Improvements Bryant Bannister Tree-Ring Building
DESCRIPTION Project Status: The Laboratory of Tree-Ring Research (LTRR) has been housed in the West Stadium for more than 70 Project Delivery Method: years, with minimal improvements to their facilities. This project will provide new laboratories and offices to house the LTRR's diverse array of research programs, as well as public outreach and support spaces. PDC Design Project Manager: The project is the first phase of a long-term effort to relocate the entire LTRR into contemporary facilities. PDC Fac Project Manager: Minor renovations of space at the Math East building is included in the project. User Representative:

Page 2 of 18 08-8826
C - Construction CMR Mackey Kraft Tom Swetnam

DP: Richard & Bauer Architecture Contractor: Martin Lang Construction LLC dba Lang Wya STATUS
Building pad is about complete. Gas line relocation and temporary water line are complete.Permanent water line relocation review is in progress at C.O.T. Elevator pit and basement level stairwell walls are complete. Caissons are complete. Structural steel frame and metal deck work is in progress. Design work and delta pricing is nearly complete.

NASF: Current Budget: Projected Budget: Bldg: 45

17,300

GSF:

28,200 $12,039,000 $12,039,000

45.02

Health Sciences Education Building


DESCRIPTION
Addition of a new building, named the Health Sciences Education Building, on the Phoenix Biomedical Campus (PBC) is to include flexible classrooms and state-of-the-art educational facilities, such as, simulation laboratories, gross anatomy facilities, preclinical training, learning resource center, student services and faculty office administrative space.

09-8900
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: C - Construction CMR Mackey Bagnoche Tierney

DP: CO Architects Contractor: D P R / Sundt (A Joint Venture) STATUS


The construction of the superstructure has was complete in October. Mechanical and electrical rough in is complete through the 5th floor. Exterior skin of the building has started.

NASF: Current Budget: Projected Budget: Bldg: 3004

151,000

GSF:

265,000 $135,998,801 $135,998,801

Arizona Stadium, North End Zone Expansion


DESCRIPTION
Construction of the new north end-zone facility at Arizona Stadium will provide upgraded premium seating and fan amenities, relocate and provide new facilities for the football program and provide new concourses cross connecting access to the east and west stadium seating section.

09-8902
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: DP: Heery International Inc Contractor: Mortenson Construction C - Construction CMR Vos Dolan

STATUS
Demolition and site clearing work complete. Foundatiion caissons are complete. Site utility work, foundation grade beams and underground electrical rough-in is onging.

NASF: Current Budget: Projected Budget: Bldg: 58

140,589

GSF:

183,683 $72,300,000 $72,300,000

Vivarium Phase I - Phoenix


DESCRIPTION
The new facility, funded from a Federal Stimulus grant awarded by the National Institute of Health (NIH), is essential for the advancement of the biomedical research at the Phoenix Biomedical Campus (PBC). The Vivarium and research core will support research activities currently being performed at the first Arizona Biomedical Collaborative (ABC1) building.

10-8988
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: C - Construction CMR Mackey Bagnoche Tierney

DP: CO Architects Contractor: D P R / Sundt (A Joint Venture) STATUS


Construction Documents are complete. Comments from the City of Phoenix and NIH are being incorporated.

NASF: Current Budget: Projected Budget: Bldg:

12,100

GSF:

22,000 $18,996,000 $18,996,000

Apr 2012 Planning, Design & Construction -- Project Status Report - Capital Improvements University of Arizona Cancer Center - Phoenix
DESCRIPTION Project Status: This new facility will provide the highest quality cancer research and care with an evidence-based, Project Delivery Method: multi-disciplinary model, along with the modern technologies, and a compassionate patient-centered approach. The building will be located at 625 N. 6th St, on the northwest corner of Fillmore and Seventh PDC Design Project Manager: PDC Fac Project Manager: Streets on the downtown Phoenix Biomedical Campus. User Representative:

Page 3 of 18 10-9001
D - Design Design/Build Carr Bagnoche Tierney

DP: Hensel Phelps Const Co / Zimmer Gunsul Fr Contractor: STATUS


Design Development is in progress. St. Joseph's has been brought into the design process and design verfication continues. Site Develpment planning in close coordination with the City of Phoenix continues.

NASF: Current Budget: Projected Budget: Bldg: 3005

164,614

GSF:

250,000 $10,038,500 $135,000,000

Old Main Renovations


DESCRIPTION
Old Main is the University's historic icon. Over the years the building has received incremental remedial improvements and continues to require signficant attention as it ages. The building will undergo a complete rehabilitation and be reprogrammed for administrative functions.

11-9023
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: DP: Contractor: D - Design Galda TBD

STATUS
Selection process is underway for facilities programming.

NASF: Current Budget: Projected Budget: Bldg: 21

GSF: $43,000 $0

Bioscience Research Laboratories


DESCRIPTION Project Status: Construct a research facility that will bring together the University's basic scientists and physician Project Delivery Method: researchers for collaborative translational research that will advance our understanding of the molecular PDC Design Project Manager: basis of human health, aging and disease. This building will provide cutting-edge laboratories for pioneering interdisciplinary research in many health science disciplines relevant to the people of Arizona. PDC Fac Project Manager: User Representative: DP: Contractor: STATUS
Selection process for Design Professional is underway.

12-9134
D - Design CMR Johnson TBD

NASF: Current Budget: Projected Budget: Bldg:

GSF: $60,000 $85,000,000

Infrastructure Phase 7
DESCRIPTION
Campus infrastructure improvements will support the development of the new Engineering Research Building, Bioscience Research Labs, and other campus growth to occur north of Speedway Boulevard. This infrastructure project will include the development of critical sewer and electrical system capacity increases in the specified area.

12-9135
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: DP: Contractor: D - Design CMR Banks TBD

STATUS
RFQ for design services is being prepared.

NASF: Current Budget: Projected Budget: Bldg: UTIL

GSF: $0 $32,000,000

Apr 2012 Planning, Design & Construction -- Project Status Report - Capital Improvements Bear Down Gymnasium, Renovations and Addition
DESCRIPTION
The Bear Down Gymnasium is a significant West Campus National Historic District structure that requires considerable repairs and upgrades. This project includes the adaptive reuse of the historic facility, as well as a south-side addition. The project could include a variety of health and wellness, research and classroom uses.

Page 4 of 18 12-9151
D - Design Banks TBD

Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: DP: Contractor:

STATUS NASF: Current Budget: Projected Budget: Bldg: 56 GSF: $0 $30,000,000

Apr 2012 Planning, Design & Construction -- Project Status Report - CDP Tyndall Avenue Enhancement
DESCRIPTION Project Status: Tyndall Avenue Enhancements is a joint project with the City of Tucson to improve multi-modal circulation Project Delivery Method: on the street. Extent of the project is from 6th Street to University Boulevard. Reconstruction of the PDC Design Project Manager: campus street will include new pavement, curbs, bicycle lanes, sidewalks, pedestrian crossings, and PDC Fac Project Manager: landscape. The Tucson Dept. of Transportation is managing this project. The project is funded by a federal transportation grant. The University budget is for matching funds. User Representative:

Page 5 of 18 01-8316
O - Occupancy Design/Bid/Build Novak Kraft

DP: Contractor: Borderland Construction Co Inc STATUS


This project is completed and open to traffic.

NASF: Current Budget: Projected Budget: Bldg:

GSF: $136,100 $543,291

Solar Energy Initiatives


DESCRIPTION
A solar energy initiative is underway that is being facilitated through the University's partnership with APS Energy Services to advance solar technology awareness on campus and throughout the community. Through this initiative solar installations are planned for Second Street Garage, Student Recreation Center, McClelland Hall, McClelland Park, and Hillenbrand Aquatic Center. In addition a PV/Solar Thermal System will be installed at Villa del Puente and funded through a Tucson Electric Power/Federal agreement.

08-8847
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: DP: Contractor: C - Construction P/DBF Banks Banks Blandeburgo

STATUS
Installations at Student Recreation Center, McClelland Hall, McClelland Park and Mary Roby Gymnastics NASF: buildings are operational. Current Budget: Final design is documentation for the Villa Del Puente solar project is being reviewed.

GSF: $73,500 $85,500

Projected Budget: Bldg:

Arizona Bioscience Park Infrastructure Phases I & II


DESCRIPTION
Grant funded project for on-site infrastructure improvements at the new Arizona Bioscience Park including roads; water systems; dry utilities for gas, electricity and telecommunications; and perimeter landscaping.

10-8958
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: C - Construction P/DBF Banks Banks Bruce Wright

DP: Wood, Patel & Associates Inc Contractor: S Q P Construction dba Safety Quality Produ STATUS
Phase II construction is in progress.

NASF: Current Budget: Projected Budget: Bldg: INFRA

GSF: $8,580,000 $8,580,000

Campus Enterprise GIS


DESCRIPTION
Create a cross-departmental, state-of-the-art Enterprise Geographic Information System (GIS) for managing shared spatial data about the University of Arizona campus.

10-8983
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: DP: Contractor: D - Design McCormick McCormick

STATUS
Draft GeoDatabase completed and work is underway on revised version; data elements from collaborating departments being integrated. Design for internal Interactive Web Map is underway, building on prototyping for a public web map. CAD integration tasks have begun.

NASF: Current Budget: Projected Budget: Bldg:

GSF: $60,000 $60,000

Apr 2012 Planning, Design & Construction -- Project Status Report - CDP Park Student Union
DESCRIPTION Project Status: The Park Student Union has been serving the southwest quadrant of campus since the mid-1960s. The Project Delivery Method: on-campus residential population of this area is continuing to increase and evolve. A recent expansion of PDC Design Project Manager: the Park Union provided additional space, but was not successful in re-positioning the PSU within the PDC Fac Project Manager: market. Additionally, the original 1960s facility remains in need of significant improvements. User Representative:

Page 6 of 18 10-8990
D - Design Gajdorus TBD Joe Sottosanti

DP: Line and Space LLC Architects Contractor: STATUS


The University Division of Student Affairs has developed a broad vision of what the Park Student Union wants to be, as well as potential University units which might participate in bringing that vision to reality. An initial facility analysis has been completed. The project is complete.

NASF: Current Budget: Projected Budget: Bldg: 87

GSF:

0 $90,000

McKale Memorial Center, Renovate Locker Room/Corridor


DESCRIPTION
To facilitate recruitment, renovate approximately 2,000 gsf of obsolete locker rooms and showers facilities, and provide upgraded corridors with graphic displays to showcase the historical achievements of the basketball program at McKale Memorial Center.

10-8991
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: O - Occupancy Job Order Contract Vos Dolan

DP: NTD Architecture Contractor: Division II Construction Co Inc STATUS


Locker room project is complete and occupied. Corridor upgrades and Graphics package also complete. NASF: Project closeout will be underway soon.

GSF:

Current Budget: Projected Budget: Bldg: 96

2,000 $1,500,000 $1,500,000

1st and 2nd Streets, Traffic Conversion-Modern Streetcar


DESCRIPTION
Provide an analysis of the impact of converting 1st & 2nd Streets from their current one-way configurations to a two-way configuration to accommodate the planned modern street car route

10-9016
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: C - Construction Mackey Wilt Heineking

DP: Kimley-Horn and Associates, Inc. Contractor: STATUS


The analysis is complete and construction is pending the start of the modern Streetcar project.

NASF: Current Budget: Projected Budget: Bldg:

GSF: $31,625 $0

Martin Avenue Surface Water Analysis


DESCRIPTION
Preliminary study to define in detail the facilities and features recommended for storm drainage flow reductions and water storage and reuse along Martin Avenue north of Sixth Street between the newly refurbished Jimenez Practice Field and Sancet Field.

11-9024
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: DP: Contractor: D - Design McCormick TBD

STATUS
A project consultant has been selected and a project scope is being refined.

NASF: Current Budget: Projected Budget: Bldg:

GSF: $12,000 $12,000

Apr 2012 Planning, Design & Construction -- Project Status Report - CDP Mathematics Facility, Planning Analysis
DESCRIPTION
Planning study to review the space requirements and explore alternatives for accommodating the Department of Mathematics and related departments. The review will include campus planning and growth options within the context of the University's Comprehensive Campus Plan.

Page 7 of 18 11-9025
D - Design Galda TBD

Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: DP: Contractor:

STATUS
Program is substantially complete, with administrative review pending.

NASF: Current Budget: Projected Budget: Bldg:

GSF: $25,000 $25,000

South Campus Edge Enhancement


DESCRIPTION
Landscape improvements to vacant lots along the campus planning boundary on the south side of campus.

11-9028
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: DP: Contractor: D - Design Novak Novak

STATUS
Developing landscape treatment options.

NASF: Current Budget: Projected Budget: Bldg:

GSF: $45,000 $45,000

CALS Agricultural Centers, Development Plan


DESCRIPTION
Provide a study for the University of Arizona Campus Agricultural Center that revisions and rearticulates the existing vision for the Center. Identify uses to be maintained, disposed or further developed on the east side of the Campus. Provide market analysis of excess property. Develop disposition process and provide offering documents for initial offering. Develop long-term recommendations and design guidelines for property development and disposition.

11-9030
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: DP: Contractor: D - Design Mackey Mackey

STATUS
Consultant has been selected.

NASF: Current Budget: Projected Budget: Bldg:

GSF: $46,000

La Aldea, Code Assessment / Improvements


DESCRIPTION
Conduct an accessibility assessment of the La Aldea Complex and implement ADA improvements.

11-9031
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: O - Occupancy Job Order Contract Helentjaris Kraft

DP: Burns Wald-Hopkins Shambach Architects Contractor: Martin Lang Construction LLC dba Lang Wya STATUS
The project is complete.

NASF: Current Budget: Projected Budget: Bldg: 85.01

GSF: $57,000 $57,000

Apr 2012 Planning, Design & Construction -- Project Status Report - CDP Steward Observatory, IT Closet Upgrades
DESCRIPTION
Project will upgrade the existing IT Closets in rooms 251, 353A, 453 and 551. Consideration is under investigation to add rooms 208, 314 and 420. This work will include Cooling, Outlets and Grounding.

Page 8 of 18 11-9032
O - Occupancy Job Order Contract Cousy Cousy David Lane

Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: DP: Contractor: Sturgeon Electric Co Inc

STATUS
The project is completed

NASF: Current Budget: Projected Budget: Bldg: 65

GSF:

300 $193,000 $193,000

Highland Housing, Install PV Solar Panel System


DESCRIPTION
Provide a Photovoltaic Solar Panel System at the Highland Housing Complex on the Posada San Pedro Residence Hall.

11-9033
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: DP: Contractor: O - Occupancy Banks Banks Blandeburgo

STATUS
Construction is complete.

NASF: Current Budget: Projected Budget: Bldg: I122

GSF: $94,000 $94,000

Engineering, Equipment Removal


DESCRIPTION
Removal of equipment at the Engineering building.

11-9034
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: O - Occupancy Design/Bid/Build Banks Banks

DP: Turner Structural Engineering Co Contractor: LVI Environmental Services Inc STATUS
Equipment removal is complete.

NASF: Current Budget: Projected Budget: Bldg: 20

GSF: $1,654,894 $1,990,686

UA Downtown, 44 N Stone Avenue Tenant Improvements


DESCRIPTION
Tenant Improvements to the County-owned historic downtown 2-story building designed by Roy Place, also known as the Roy Place Building located at Stone & Pennington. This project initiates a downtown presence with new community-minded graduate level programs. The first phase of improvements primarily located on the first floor include 2 classrooms, CALA graduate studios, MPA Honors, misc. office & office support space, student spaces and UA Bookstore/retail space

11-9036
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: O - Occupancy Job Order Contract Carr Carr

DP: Burns Wald-Hopkins Shambach Architects Contractor: Hickam Arnold and Associates LLC dba Hick STATUS
Construction Documents for Phase 2, Second Floor are in progress. Security camera installation and exterior lighting resolution is underway.

NASF: Current Budget: Projected Budget: Bldg: 336

20,600

GSF:

20,600 $622,000 $1,051,000

Apr 2012 Planning, Design & Construction -- Project Status Report - CDP Cannon-Douglass House, Rehabilitation
DESCRIPTION Project Status: Historic preservation of the Cannon-Douglass House located at 1189 E Speedway Boulevard. The Project Delivery Method: Cannon-Douglass House is on the National Register of Historic Buildings and will be restored for use for PDC Design Project Manager: CALA. Offices, student and program space. PDC Fac Project Manager: User Representative:

Page 9 of 18 11-9038
O - Occupancy Job Order Contract Carr Carr

DP: Burns Wald-Hopkins Shambach Architects Contractor: Division II Construction Co Inc STATUS
Project is completed, Close-out is in progress.

NASF: Current Budget: Projected Budget: Bldg: 199

1,545

GSF:

1,545 $420,000 $450,000

Police Department, Renovate Communications Room


DESCRIPTION
The University of Arizona Police Department will be installing new radio equipment as part of an initiative to provide inter-operability of communications among law enforcement entities throughout Pima County. Future upgrades will include enhanced 911 service as well as computer-assisted dispatch capabilities. The existing UAPD communications room will require modifications to provide adequate support for the new equipment.

11-9049
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: D - Design Job Order Contract Banks Banks Robert Sommerfeld

DP: Burns Wald-Hopkins Shambach Architects Contractor: STATUS


Construction documents have been issued for University review.

NASF: Current Budget: Projected Budget: Bldg: 100

GSF:

0 $235,000 $404,000

AHSC, Renovate Surgery Offices 4th & 5th Floors Phases 3 & 4
DESCRIPTION
Conversion of old lab and office space into offices on the 4th floor of Clinical Sciences at Arizona Health Sciences Center (AHSC) for the Department of Surgery Transplant, ENT and Plastic Surgery sections will improve space efficiency, provide much needed space for recently hired researchers and faculty, and consolidate office and support for several surgery programs.

11-9051
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: C - Construction Job Order Contract Carr Kraft Souza

DP: Dave Diebold Architect Contractor: Division II Construction Co Inc STATUS


Demolition and abatement are completed. Framing is nearing completion. Drywall is in progress. Electrical and mechanical rough-in work is in progress.

NASF: Current Budget: Projected Budget: Bldg: 201

GSF:

8,530 $1,680,000 $1,830,000

Computer Center, High Performance Data Center Upgrades


DESCRIPTION
Renovate existing rooms 122, 126, 126A and 126B, to provide a centrally supported High Performance Data Center. Also, provide new 30-ton data center air conditioners to be installed in existing Rooms 214 and 215.

11-9054
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: O - Occupancy Job Order Contract Banks Banks Bowles

DP: G L H N Architects And Engineers Contractor: R W Burkel Contracting Inc STATUS


Project Close Out is in progress.

NASF: Current Budget: Projected Budget: Bldg: 73 73.01

GSF:

1,500 $2,700,000 $2,800,000

Apr 2012 Planning, Design & Construction -- Project Status Report - CDP Pharmacy, IT Closet Upgrades
DESCRIPTION Project Status: Upgrades to the Pharmacy building will offer increased telecommunications capabilities. Rooms 221 and Project Delivery Method: 319B will be converted from storage and office space to dedicated telecommunications rooms. Work will PDC Design Project Manager: include electrical and HVAC upgrades, and replacement of a moveable partition wall with a permanent PDC Fac Project Manager: wall. User Representative: DP: Contractor: Sturgeon Electric Co Inc STATUS
Construction is completed

Page 10 of 18 11-9056
O - Occupancy Job Order Contract Cousy Cousy D. Lane

NASF: Current Budget: Projected Budget: Bldg: 207

298

GSF:

298 $101,000 $101,000

Biosphere 2, Landscape Evolution Observatory


DESCRIPTION
Biosphere 2 serves as a center for research, outreach, teaching, and life-long learning about Earth, its living systems, and its place in the Universe. The former Habitat provides an opportunity for the development of large scale specialized experimental systems. The Landscape Evolution Observatory (LEO) will provide a controlled environment to investigate how water is utilized in natural ecosystems and the role of life on landscapes.

11-9057
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: C - Construction CMR Gajdorus Gajdorus Stephen DeLong

DP: M3 Engineering & Technology Corp Contractor: Lloyd Construction Co Inc STATUS
Tray 1 is essentially complete. The irrigation system, the personnel transporter, and the load cells, remain to be installed. Structural steel for Tray 2 has been erected. Installation of steel deck is in progress. Cement board, waterproofing, and soil and intrumentation placement will follow.

NASF: Current Budget: Projected Budget: Bldg: 4000

GSF: $4,845,000 $4,845,000

Student Union Memorial Center, Upgrade Spaces


DESCRIPTION
Upgrade SUMC to improve outdoor dining.

11-9058
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: D - Design Job Order Contract Johnson Wilt

DP: AAD: Fitch Inc. dba Fitch Inc. Contractor: Martin Lang Construction LLC dba Lang Wya STATUS
Patio shade structure and infrastructure documents being completed for final review and pricing.

NASF: Current Budget: Projected Budget: Bldg: 17

GSF: $685,000 $3,825,000

Sixth Street Garage, Long-Term Maintenance


DESCRIPTION
The Sixth Street Garage has been in service for several years and is in need of periodic long-term maintenance to correct any deficiences and protect the functionality and serviceability of the structure.

11-9061
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: DP: Desman Associates Contractor: D - Design Job Order Contract Gajdorus TBD Mike Delahanty

STATUS
Construction documents are complete, and are being reviewed by the University. The selected JOC Contractor is pricing the project.

NASF: Current Budget: Projected Budget: Bldg: 180

228,803

GSF:

576,962 $86,000 $474,000

Apr 2012 Planning, Design & Construction -- Project Status Report - CDP Main Library, Bookends Cafe Renovations
DESCRIPTION Project Status: The proposed project is in the Main Library, Building 55, 1510 E. University Boulevard. The scope of Project Delivery Method: work is to upgrade and expand the Bookends Caf to create exterior dining space on the east side of the caf, enclose a portion of the west patio dining to expand the interior footprint of the caf, add a grill and PDC Design Project Manager: PDC Fac Project Manager: re-organize the food prep and product layout. User Representative:

Page 11 of 18 11-9063
D - Design Johnson Dolan

DP: AAD: Fitch Inc. dba Fitch Inc. Contractor: STATUS


Concept design is under review.

NASF: Current Budget: Projected Budget: Bldg: 55

GSF: $35,000 $975,000

Arizona Stadium, Student Union Food Service Tenant Improvements


DESCRIPTION
Tenant improvements for the development of the Cafe/Kitchen, Concessions and Loge/Club to be located in the Arizona Stadium North End-Zone Expansion. The food services will be owned and operated by the Student Union

11-9071
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: DP: Heery International Inc Contractor: D - Design Vos TBD Sotosanti

STATUS
The project status and schedule mirrors the status and schedule of the Project 09-8902 Arizona Stadium NASF: North End-Zone Expansion. SU Food Service tenant improvements will be designed and constructed to Current Budget: support the larger stadium expansion project.

GSF: $132,000 $750,000

Projected Budget: Bldg: 58

Arizona State Museum, Renovate Basket Collection Space


DESCRIPTION Project Status: Create display and storage space for the Arizona State Museum's Basket Collection in Room 110 located Project Delivery Method: in the north building. Upgrades will accommodate fragile and valuable collections in a secure, improved, visible storage facility. The project is based on Save America's Treasures Award and is a highest priority PDC Design Project Manager: PDC Fac Project Manager: collection need for the museum. User Representative: DP: Contractor: STATUS
Existing structural system assessment complete. Renovation project on hold while ASM persues additional grant funding and extent of utility infrastructure upgrades and funding source is assessed.

11-9073
D - Design Vos Kraft

NASF: Current Budget: Projected Budget: Bldg: 26

1,776

GSF:

1,776 $52,000 $680,000

Parking Lot Improvements 2011


DESCRIPTION
Install two new parking lots on the north side of Campus including landscaping and lighting. Resurface six existing parking lots and repave the entrances to the Sixth Street Garage and the Park Avenue Garage.

11-9074
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: DP: Contractor: Sturgeon Electric Co Inc O - Occupancy Job Order Contract Kraft Kraft

STATUS
The two new parking lots on the north side of Campus are paved and open. Lighting is completed. Resurfacing of six existing parking lots and the repaving of the entrances to the Sixth Street and Park Avenue Garages are completed.

NASF: Current Budget: Projected Budget: Bldg:

GSF: $392,000 $442,000

Apr 2012 Planning, Design & Construction -- Project Status Report - CDP Arizona Stadium, Renovate Suites 224,325B,325C
DESCRIPTION
Install electric operable windows and shades in three skybox seating areas at the Arizona Stadium, including the President's Suite 325B, Rodgers' Suite 224 and Alumni Suite 325C.

Page 12 of 18 11-9087
O - Occupancy Job Order Contract Dolan Dolan

Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative:

DP: Dave Diebold Architect Contractor: Division II Construction Co Inc STATUS


Project is complete. Closeout is underway.

NASF: Current Budget: Projected Budget: Bldg: 58

GSF:

6,000 $350,000 $350,000

Biosphere 2, Falaj Exhibit


DESCRIPTION
PDC will provide inspection services for the construction of a demonstration exhibit consisting of an Omani Falaji water distribution system, ramadas and multi-arch wall systems at Biosphere 2.

12-0574
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: DP: Contractor: D - Design Banks Banks John Adams

STATUS
Structural design documentation is being reviewed.

NASF: Current Budget: Projected Budget: Bldg: 4000

GSF: $2,000

McKale Memorial Center, A Store at McKale


DESCRIPTION
The UA Associated Students Bookstore has maintained a retail outlet on the south side street level of McKale Memorial Center since 1994, offering UA and Athletics themed merchandise. This project will reinvigorate and rebrand the facility as The A Store at McKale, with an updated image and shopping experience.

12-9090
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: DP: Contractor: D - Design Job Order Contract Gajdorus TBD Debby Shively

STATUS
A design consultant has been selected, and the fee is being finalized. Initial image concepts will be developed. An updated layout, fixture package, and budgetary estimates, will be prepared for review by the UA Bookstore and their partners at Intercollegiate Athletics.

NASF: Current Budget: Projected Budget: Bldg: 96

1,500

GSF:

1,500 $475,000 $475,000

Lunar and Planetary Laboratory, Facility Renovations


DESCRIPTION
This facility has most recently hosted the Team which led the Phoenix Mars mission and is now being readied to host the Team which will lead the OSIRIS-REx mission. Office areas will be renovated to provide space for the Principal Investigators and Senior Staff. In addition a Class 10,000 Clean Room will be constructed to faciltate optical equipment assembly.

12-9094
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: D - Design Job Order Contract Banks Banks Dante Lauretta

DP: A B A Architects P.C. Contractor: Martin Lang Construction LLC dba Lang Wya STATUS
Clean Room construction is in progress.

NASF: Current Budget: Projected Budget: Bldg: 500

GSF:

2,352 $564,768 $564,768

Apr 2012 Planning, Design & Construction -- Project Status Report - CDP Wm J Parker Agricultural Research Complex, Finish Shell Space Phase II
DESCRIPTION Project Status: The William J. Parker Agricultural Research Complex was constructed with a significant amount of shell Project Delivery Method: space, so the facility could be quickly adapted to evolving future research demands. Some of that shell space was completed several years ago. This project will finish the remainder of the available space, as PDC Design Project Manager: PDC Fac Project Manager: well as develop new exterior dairy facilities, to address the current needs of the College of Agriculture and Life Sciences. User Representative:

Page 13 of 18 12-9095
D - Design CMR Gajdorus TBD Robert Collier

DP: Merry Carnell Schlecht Inc Contractor: STATUS


PDC is assisting the Department of Animal Sciences in identifying the required improvements, and developing a forecast of anticipated project costs for University administrative and financial approvals. Narrative descriptions of the project scope and construction cost estimats are complete and are being reviewed.

NASF: Current Budget: Projected Budget: Bldg: 2019

55,700

GSF:

55,700 $30,000

Student Union Memorial Center, Einstein Bros Bagels Tenant Improvements


DESCRIPTION
Tenant improvements for existing space at the Student Union Memorial Center for Einstein Bros Bagels store front.

12-9098
D - Design Job Order Contract Johnson Wilt

Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative:

DP: Merry Carnell Schlecht Inc Contractor: R W Burkel Contracting Inc STATUS
Demolition has begun. Construction to start April, 2012.

NASF: Current Budget: Projected Budget: Bldg: 17

1,000

GSF:

1,000 $722,000 $722,000

Hillenbrand Softball Stadium, Renovate Dugouts


DESCRIPTION Project Status: First utilized during the 1993 season, Hillenbrand Softball Stadium has hosted eight NCAA National Project Delivery Method: Championship Softball Teams. Renovation will provide enhanced player facilities, as well as an improved spectator experience. Potential elements of the project include improvements to the dugouts, bullpens, PDC Design Project Manager: PDC Fac Project Manager: batting cage, and fieldhouse. Longer-term plans will address seating, entrance, ticketing, and concessions. User Representative:

12-9099
D - Design Job Order Contract Gajdorus TBD Steve Kozachik

DP: Swaim Associates Ltd A I A Contractor: STATUS


An initial assessment of the potential project scope and budget has been completed. Intercollegiate Athletics is reviewing options for phasing and funding the project. A new lighting system for the batting cage has been designed, and construction documents are complete. Options and timing for implementation will be reviewed with Intercollegiate Athletics.

NASF: Current Budget: Projected Budget: Bldg: 93.03

GSF: $200,000

Student Union Memorial Center, Pinkberry Tenant Improvements


DESCRIPTION
Outlet space tenant Improvements at the Student Union Memorial Center for the Pinkberry yogurt shop.

12-9100
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: O - Occupancy Job Order Contract Johnson Dolan

DP: AAD: Fitch Inc. dba Fitch Inc. Contractor: Martin Lang Construction LLC dba Lang Wya STATUS
Project is complete and closed out.

NASF: Current Budget: Projected Budget: Bldg: 17

960

GSF:

960 $565,000 $565,000

Apr 2012 Planning, Design & Construction -- Project Status Report - CDP Biomedical Research Laboratory, MRI Equipment Installation
DESCRIPTION
Renovation of space at the Biomedical Research Laboratory for installation of MRI equipment for the Department of Radiology.

Page 14 of 18 12-9121
D - Design Job Order Contract Banks Banks Angie Souza

Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative:

DP: G L H N Architects And Engineers Contractor: STATUS


Design development is in progress.

NASF: Current Budget: Projected Budget: Bldg: 209 255

GSF: $50,540 $800,000

McKale Memorial Center, Renovations and Additions


DESCRIPTION
Feasibility study is to be prepared addressing the refurbishment and expansion of the McKale Memorial Center including improved offices, lockers, academic areas, fan amenitites and services within an aging facility. Site infrastructure and building access improvements may also be included.

12-9122
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: DP: Heery International Inc Contractor: D - Design Vos TBD Perrin

STATUS
Pre-finalized draft of Feasibility Study completed and is pending final review and approval of ICA prior to issuing finalized Study.

NASF: Current Budget: Projected Budget: Bldg:

GSF: $123,000

Steward Obs Mirror Lab, Install HVAC System


DESCRIPTION
Installation of HVAC system to replace the existing evaporative coolers at the Steward Observatory Mirror Laboratory (SOML) in support of the Giant Magellan Telescope (GMT) Segment #2.

12-9125
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: D - Design Job Order Contract Lynn Lynn Bruce Hille

DP: G L H N Architects And Engineers Contractor: Sun Mechanical Contracting Inc STATUS
Drawings completed and Construction is proceeding

NASF: Current Budget: Projected Budget: Bldg: 61.02

6,000

GSF:

6,000 $285,000 $285,000

Student Union Memorial Ctr, Lower Level Tenant Imp


DESCRIPTION Project Status:
Ground Level tenants will be relocated to the Lower Level spaces which will be renovated prior to Project Delivery Method: occupancy. The tenants affected by this move will be the Catcard and Meal Plan offices, Post Office and PDC Design Project Manager: Bank, as well as the relocation of the Computer Lab in The Cellar.

12-9126
D - Design Job Order Contract Johnson Wilt

PDC Fac Project Manager: User Representative:

DP: Merry Carnell Schlecht Inc Contractor: STATUS


Design is currently in process.

NASF: Current Budget: Projected Budget: Bldg: 19

GSF: $50,000 $1,300,000

Apr 2012 Planning, Design & Construction -- Project Status Report - CDP Arizona Stadium, South End Zone Seating Expansion
DESCRIPTION
Extension of the existing south end zone seats to replace bleachers (Red Zone) removed to install the new video board.

Page 15 of 18 12-9130
D - Design CMR Vos TBD

Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: DP: Heery International Inc Contractor: Mortenson Construction

STATUS
Construction Documentation and Permitting complete. Construction pricing is pending with construction to be scheduled parallel with the North End-Zone Expansion project's seating expansion.

NASF: Current Budget: Projected Budget: Bldg: 58

GSF: $1,200,000 $1,200,000

Keating Bioresearch Bldg, Renovate GEMM Core Facility Humidity Control


DESCRIPTION
Modification of existing HVAC system serving the GEMM Core facility to reduce the humidity of the rooms during the monsoon season to meet the NIH recommended limits.

12-9131
D - Design Lynn Lynn Ruddy

Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: DP: Contractor:

STATUS
Design Complete - JOC proposal being prepared

NASF: Current Budget: Projected Budget: Bldg: 240

GSF: $185,000 $185,000

Modern Streetcar, 2nd Street Drainage / Crossing Improvements


DESCRIPTION Project Status: This project involves streetscape and storm drainage improvements at two locations along the Modern Project Delivery Method: Streetcar route through the UA Campus. The two locations, Highland Avenue and Olive Road, will be improved to increase accessibility across Second Street to the Modern Streetcar stops and create legible PDC Design Project Manager: PDC Fac Project Manager: and generous paving patterns and shade focused on pedestrians and bicyclists. User Representative:

12-9136
D - Design Gajdorus TBD

DP: M3 Engineering & Technology Corp Contractor: STATUS


The first phase of construction will include underground drainage improvements within the roadway of Second Street, to avoid conflicts with the Streetcar construction. Construction documents for that work are complete. Construction will be coordinated with the Modern Streetcar project.

NASF: Current Budget: Projected Budget: Bldg:

GSF: $11,000 $4,000,000

Eller College of Management, Facility Expansion


DESCRIPTION
Expansion of Eller College of Management to a new facility north of McClelland Hall.

12-9138
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: DP: Rob Paulus Architects, Ltd. Contractor: D - Design Carr TBD

STATUS
The development of a conceptual program and graphics for fundraising purposes is underway.

NASF: Current Budget: Projected Budget: Bldg:

GSF: $50,000

Apr 2012 Planning, Design & Construction -- Project Status Report - CDP Education, World of Words Renovate 4th Flr Library
DESCRIPTION Project Status: Renovation of approximately 5,88 sf of existing fourth floor space (formerly Education Library) into a Project Delivery Method: library for the Colleges' International Collection of Children's and Adolescent Literature (World of Words). Spaces include collection, reading, special collection, art studio and classroom and support spaces. The PDC Design Project Manager: PDC Fac Project Manager: project is funded by the College of Education. User Representative: DP: Contractor: STATUS
The project is awaiting Budget Authority for the Design Phase.

Page 16 of 18 12-9139
D - Design Carr TBD

NASF: Current Budget: Projected Budget: Bldg: 69

GSF:

5,800 $50,000 $628,600

Student Union Memorial Center, U-Mart Remodel


DESCRIPTION
U-Mart convenience store remodel and expansion at the Student Union Memorial Center.

12-9140
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: DP: Contractor: D - Design Johnson TBD

STATUS NASF: Current Budget: Projected Budget: Bldg: 19 GSF: $0 $1,015,000

Kaibab-Huachuca Residence Halls, Building Assessment


DESCRIPTION
Building systems assessment of the Kaibab-Huachuca Residence Halls.

12-9141
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: DP: Contractor: D - Design Lynn TBD Alex Blandeburgo

STATUS
Data collection is proceeding

NASF: Current Budget: Projected Budget: Bldg: 79 79.01

GSF: $50,000 $50,000

Education, IT Closet Upgrades


DESCRIPTION
Upgrade the existing IT Closets in the Education Building.

12-9142
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: DP: Contractor: C - Construction Job Order Contract Marker Marker David Lane

STATUS
Preconstruction Meeting is complete and the NTP has been issued.

NASF: Current Budget: Projected Budget: Bldg: 69

GSF: $150,000 $150,000

Apr 2012 Planning, Design & Construction -- Project Status Report - CDP Schaefer Building, Humidity Control Modifications
DESCRIPTION Project Status: Modification of the Poetry Center Special Collections / Archive Areas at the Schaefer Building to enhance Project Delivery Method: the existing HVAC system capability and performance, and provide more stringent and accurate humidity PDC Design Project Manager: control. PDC Fac Project Manager: User Representative: DP: Contractor: STATUS
Work order issued

Page 17 of 18 12-9146
D - Design Job Order Contract Lynn Lynn

NASF: Current Budget: Projected Budget: Bldg: 150

GSF: $7,000 $7,000

AHSC Traffic Study


DESCRIPTION Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: DP: Contractor: STATUS NASF: Current Budget: Projected Budget: Bldg: GSF:

12-9148
D - Design Galda TBD

$0

Modern Streetcar, Facilitate Campus Development / Improvements


DESCRIPTION Project Status: PDC will work with the City of Tucson representatives and other campus participants in facilitating the Project Delivery Method: construction of a 1.1-mile segment of the Modern Streetcar system extending through the University from PDC Design Project Manager: Helen Street and Campbell Avenue continuing through the Warren Avenue underpass along Second PDC Fac Project Manager: Street to Park Avenue. System elements include installation of requisite tracks and lines, utility relocation, station construction and storm water mitigation. User Representative: DP: Contractor: STATUS
City issued a NTP to the street car contractor, Old Pueblo Trackworks (OPTW). Anticipate construction starting along 2nd Street and Warren Ave. in early April.

12-9149
D - Design Dolan Dolan

NASF: Current Budget: Projected Budget: Bldg: INFRA

GSF: $0

Parking Lot Improvements 2012


DESCRIPTION
Repave Parking Lot #7105 (south of 7th Street. Add lighting and landscaping.

12-9150
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: DP: Contractor: D - Design Job Order Contract Gray Gray

STATUS
The off-cycle Construction Decision Package and the request for funding have been submitted for approval.

NASF: Current Budget: Projected Budget: Bldg: Lot #7105

GSF: $0

Apr 2012 Planning, Design & Construction -- Project Status Report - CDP Red Rock / Campus Agricultural Centers, Install PV Arrays
DESCRIPTION
The department of Planning, Design & Construction will provide design, engineering and inspection services for the installation of photovoltaic arrays at the Red Rock and Campus Agricultural Centers.

Page 18 of 18 66-9673
C - Construction Banks Banks Ryan

Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: DP: Contractor:

STATUS
Installation of Red Rock PV systems and Campus Agricultural Center is complete and operational. PV system for West Campus Agricultural Centers is in design.

NASF: Current Budget: Projected Budget: Bldg: 1000 2000

GSF: $30,000 $0

Campbell Farms, CEAC Greenhouse Installation


DESCRIPTION Project Status:
The department of Planning, Design & Construction will facilitate the provision of design, engineering and Project Delivery Method: inspection services for the installation of two high tunnel research greenhouses that have been donated PDC Design Project Manager: to the Controlled Environment Agricultural Center (CEAC).

68-3842
C - Construction Banks Banks Steve Husman

PDC Fac Project Manager: User Representative: DP: Contractor:

STATUS
Greenhouse construction is complete.

NASF: Current Budget: Projected Budget: Bldg:

GSF: $1,500