INPUT DATA
Vegetal soil:
denomination: 9. Compacted vegetal soil with or
without roots
mechanical excavation by bulldozer: Soil category I
volumetric weight in situ [kg/m
3
]: 1600...1700 kg/m
3
loose after digging (swelling) [%]: 14...28%
Foundation soil:
denomination: 39. Compacted marn clay
mechanical excavation by bulldozer: Soil category III
volumetric weight in situ [kg/m
3
]: 1800...2000 kg/m
3
loose after digging (swelling) [%]: 24...30%
cohesivity: very cohesive
manual digging: very hard
Storey height:
H
s
2.7m
Bay:
B
23
B
67
3.8m
3
1. EARTH WORKS
01.01.Ts C 18 A1
Mechanical digging using a 65-80 hp type bulldozer, including pushing of the
soil up to 10m, in terrain of category I.
hundreds_m3 100m
3
:
hundreds_m2 100m
2
:
UM
01.01
100m
3
:
NTi
01.01
2.21
hr
100m
3
:
L
SV
30.625m : total length of the dug area
l
SV
20.268m : total width of the dug area
h
SV
0.3m : thickness of the vegetal layer
V
01.01
L
SV
l
SV
h
SV
1.8621 hundreds_m3 :
Round_V
01.01
Ceil V
01.01
0.01hundreds_m3 ,
( )
:
Round_V
01.01
1.87 hundreds_m3
01.02. Ts C 22 A1
Extra-hours for the article Ts C 18, for the transportation of the vegetal layer of
soil on each extra 10m, over the estimated distance (using a bulldozer of 65-80 hp). The
computed volume of soil is multiplied by the swelling coefficient 1.24 and by the
coefficient 3, for the carrying distance of 30m.
UM
01.02
100m
3
:
NTi
01.02
1.33
hr
100m
3
:
V
01.02
V
01.01
1.24 3 6.9271 hundreds_m3 :
Round_V
01.02
Ceil V
01.02
0.01hundreds_m3 ,
( )
:
Round_V
01.02
6.93 hundreds_m3
01.03. Ts C 04 F1
Mechanical excavation using the chain-excavator of 0.71-1.25 m
3
, with internal
combustion engine and hydraulic command, in soil with natural humidity, with
discharge in auto vehicle, in terrain of category III. One computes the volume of the
under-taken soil, until the protection masonry.
UM
01.03
100m
3
:
NTi
01.03
1.35
hr
100m
3
:
L
SGI
27.325m :
l
SGI
13.668m :
h
SGI
2.50m 1.20m 1.3 m :
V
01.03
L
SGI
0.6m 0.6m
( )
l
SGI
2 0.6m 0.5m + ( )

1
]
1.3 m 3.8948 hundreds_m3 :
Round_V
01.03
Ceil V
01.03
0.01hundreds_m3 ,
( )
:
Round_V
01.03
3.9 hundreds_m3
01.04. Ts C 04 C1
Mechanical excavation with the chain-excavator of 0.71-1.25 m
3
, with internal
combustion engine and hydraulic command, in soil with natural humidity, with
discharge in deposit, in terrain of category III. One computes the volume of soil to be
excavated and reused at the fillings after finishing of the infrastructure.
UM
01.04
100m
3
:
NTi
01.04
1.40
hr
m
3
:
L
SGS
28.625m :
5
l
SGS
16.268m :
V
SG
L
SGS
L
SGI
+
2
l
SGS
l
SGI
+
2
h
SGI
5.4435 hundreds_m3 :
V
01.04
V
SG
V
01.03
1.5487 hundreds_m3 :
Round_V
01.04
Ceil V
01.04
0.01hundreds_m3 ,
( )
:
Round_V
01.04
1.55 hundreds_m3
01.05. Ts E 01 B1
Manual leveling of terrains and platforms, with dislevelments of 10-20cm, in
middle terrain. One determines the surface of the foundation to be leveled.
UM=100m
2
NT
i
=14.04 hours/100m
2
UM
01.05
100m
2
:
S
01.05
L
SGI
l
SGI
3.7348 hundreds_m2 :
Round_S
01.05
Ceil S
01.05
0.01hundreds_m2 ,
( )
:
Round_S
01.05
3.74 hundreds_m2
01.06. Ts A 02 E1
Manual digging in narrow spaces, having under or over 1.00m width, done
without vertical bracing, at foundations, channels, drains, in middle terrain.
UM
01.06
1m
3
:
NTi
01.06
1.19
hr
m
3
:
Axis A: V
A
L
SGI
0.6m
( )
1.2 m 0.4 m 4 0.1m 0.3m + ( ) 1.7 m 0.4 m + 13.916 m
3
:
Axis B: V
B
L
SGI
0.6m 1.4m
( )
1.5 m 0.6 m 22.7925 m
3
:
Axis C: V
C
V
A
13.916 m
3
:
Axis 1: V
1
l
SGI
2 0.6m 1.2m + ( )

1
]
1.4 m 0.4 m 5.6381 m
3
:
Axis 4: V
4
V
1
1.5m 1.2 m 0.4 m 4.9181 m
3
:
Axis 5: V
5
V
4
4.9181 m
3
:
Axis 8: V
8
l
SGI
2 0.6m 1.4m + ( )

1
]
1.4 m 0.6 m 8.1211 m
3
:
V
01.06
V
A
V
B
+ V
C
+ V
1
+ V
4
+ V
5
+ V
8
+ 74.2199 m
3
:
Round_V
01.06
Ceil V
01.06
0.1m
3
, ( ) :
Round_V
01.06
74.3 m
3

01.07. Ts D 02 B1
Spreading the soil coming from terrain of first or second category, using the 65-
80 hp bulldozer, in layers with height of 21-30cm. One computes the volume of the
space that needs to be filled (V
01.04
) and corrects it using the swelling factor of 1.24.
UM
01.07
100m
3
:
NTi
01.07
0.9
hr
100m
3
:
V
01.07
V
01.04
1.24 1.9203 hundreds_m3 :
Round_V
01.07
Round V
01.07
0.01hundreds_m3 ,
( )
:
Round_V
01.07
1.92 hundreds_m3
7
01.08. Ts D 05 B1
Mechanically ramming-up the fills in successive layers of 20-30cm height, with
the ram of 150-200 kg, the fills being made of cohesive soil. One computes the
geometric volume of the space to be filled (volume computed at article 01.04).
UM
01.08
100m
3
:
NTi
01.08
10.88
hr
100m
3
:
V
01.08
V
01.04
1.5487 hundreds_m3 :
Round_V
01.08
Ceil V
01.08
0.01hundreds_m3 ,
( )
:
Round_V
01.08
1.55 hundreds_m3
01.09. Ts D 01 B1
Spreading the soil in uniform layers of 10-30 cm height (using the shovel),
including the cracking of boulders. We compute the volume of soil to be spread
between the pedestals and we must take into account the swelling coefficient of 1.24.
UM
01.09
1m
3
:
NTi
01.09
0.55
hr
m
3
: very hardsoil ( )
V
01.09
V
01.06
1.24 92.0326 m
3
:
Round_V
01.09
Ceil V
01.09
0.1m
3
, ( ) :
Round_V
01.09
92.1 m
3

01.10. Ts D 04 D1
Ramming-up the fills done in horizontal layers, having the slope up to 1/4, using
the manual ram, including the wetting of each layer in part, having the height of 20cm,
in cohesive soil. One determines the geometric volume of soil spread between the
pedestals, by dividing the soil volume computed at article 01.09 by the swelling
coefficient, 1.24.
UM
01.10
1m
3
:
NTi
01.10
0.75
hr
m
3
:
V
01.10
V
01.09
1.24
74.2199 m
3
:
Round_V
01.10
Ceil V
01.10
0.1m
3
, ( ) : Round_V
01.10
74.3 m
3

01.11. TRA 01 A 05 P
Transport of soil with trucks on distance of 5 km. One takes into account the
volume of the manually dug soil and of the volume of soil mechanically dug, and the
result is multiplied by the specific weight of the soil (1.9t/m
3
).
UM
01.11
1ton :
M
01.11
V
01.03
V
01.06
+ V
01.09

( )
1.9
ton
m
3
706.1714 ton :
Round_M
01.11
Ceil M
01.11
1ton ,
( )
:
Round_M
01.11
707 ton
2. FOUNDATIONS
02.01.C A 01 B
Casting the B50 concrete in continuous foundations of volume over
3m
3
. One
computes the volume of concrete to be poured in the blocks of the continuous
foundations.
UM
02.01
1m
3
:
9
NTi
02.01
3.05
hr
m
3
:
V
02.01
V
01.06
74.2199 m
3
:
Round_V
02.01
Ceil V
02.01
0.1m
3
, ( ) : Round_V
02.01
74.3 m
3

02.02. C B 10 B
Concrete formworks for bearings, glass foundations and continous foundations for
simple machines with regular form, including the bracing of reusable panels with
plywood of 8mm. One determines the surface of the panels to be used for bearings.
UM
02.02
1m
2
:
NTi
02.02
1hr
m
2
:
Axis A: S
A
2 0.3 m L
SGI
0.6m 0.3m
( )
0.3m 0.3m 0.2m + 0.3m + ( ) 3 0.3m 0.7 m
2 0.3m 0.3 m ( ) 4 +
... :
S
A
15.645 m
2

Axis B: S
B
2 0.3 m L
SGI
0.6m 0.3m
( )
2 0.3 m 0.3m 0.2m + 0.3m + ( ) 3
4 0.3m 0.35 m ( ) 4 2 0.3 m 0.7 m +
... :
S
B
15.675 m
2

Axis C: S
C
S
A
15.645 m
2
:
Axis 1: S
1
2 0.3 m l
SGI
2 0.6 m 2 0.8 m
( )
0.8m 0.8 m 5.8808 m
2
:
Axis 4: S
4
S
1
5.8808 m
2
:
V
Aa.
0.3m 0.8 m L
SGI
0.6m 0.3m
( )
0.2m 1.1 m 0.3 m 4 + 6.606 m
3
:
Axis 5: S
5
S
1
5.8808 m
2
:
V
Ba.
0.3m 0.8 m L
SGI
0.6m 0.3m
( )
2 0.7m 0.35 m 0.3 m ( ) 4 + 6.93 m
3
:
Axis 8:
S
8
S
1
5.8808 m
2
:
V
Ca.
V
Aa.
6.606 m
3
:
S
02.02
S
A
S
B
+ S
C
+ S
1
+ S
4
+ S
5
+ S
8
+ 70.4882 m
2
:
V
1a.
l
SGI
2 0.6 m 2 0.2 m 3 0.8 m
( )
0.8 m 0.3 m 2.3203 m
3
:
Round_S
02.02
Ceil S
02.02
0.1m
2
, ( ) :
V
4a.
V
1a.
2.3203 m
3
:
Round_S
02.02
70.5 m
2

V
5a.
V
1a.
2.3203 m
3
:
V
8a.
l
SGI
2 0.6 m 2 0.2 m 3 0.8 m
( )
0.7 m 0.3 m 2.0303 m
3
:
02.03. C A 02 D1
Pouring the B150 concrete in construction elements, excluding the ones done in
sliding formworks, in continous foundations with volume up to 3m
3
and thickness over
30cm.
V
02.04.
V
Aa.
V
Ba.
+ V
Ca.
+ V
1a.
+ V
4a.
+ V
5a.
+ V
8a.
+ 29.1332 m
3
:
UM
02.03
1m
3
:
NTi
02.03
4.15
hr
m
3
:
Axis A: V
Aa
0.3m 0.8 m L
SGI
0.6m 0.3m
( )
0.2m 1.1 m 0.3 m 4 + 6.606 m
3
:
Axis B: V
Ba
0.3m 0.8 m L
SGI
0.6m 0.3m
( )
2 0.7m 0.35 m 0.3 m ( ) 4 + 6.93 m
3
:
Axis C: V
Ca
V
Aa
6.606 m
3
:
Axis 1: V
1a
l
SGI
2 0.6 m 2 0.2 m 3 0.8 m
( )
0.8 m 0.3 m 2.3203 m
3
:
Axis 4: V
4a
V
1a
2.3203 m
3
:
Axis 5: V
5a
V
1a
2.3203 m
3
:
Round_M
02.03
kg Round_M
02.03
Axis 8: V
8a
l
SGI
2 0.6 m 2 0.2 m 3 0.8 m
( )
0.7 m 0.3 m 2.0303 m
3
:
V
02.03
V
Aa
V
Ba
+ V
Ca
+ V
1a
+ V
4a
+ V
5a
+ V
8a
+ 29.1332 m
3
:
Round_V
02.03
Ceil V
02.03
0.1m
3
, ( ) : Round_V
02.03
29.2 m
3

11
02.04. C C 01 C1
Fixing the reinforcement steel OB37 and PC52 in the continuous foundations.
UM
02.04
1kg :
NTi
02.04
0.02
hr
kg
:
M
02.04
V
02.03
60
kg
m
3
1747.99kg :
Round_M
02.04
Ceil M
02.04
5kg ,
( )
:
Round_M
02.04
1.75 10
3
kg
02.05. C Z 01 02 G
Preparing the B50 concrete, with aggregates having the granulometry up to 71mm
and prepared with M30 cement. For the determination of volume of concrete for
continuous foundations, the volume of concrete 02.01 is multiplied by the specific
consumption of concrete extracted from the table of C A 01 B.
UM
02.05
1m
3
:
NTi
02.05
0.085
hr
m
3
:
V
02.05
V
02.01
1.008 74.8136 m
3
:
Round_V
02.05
Ceil V
02.05
0.1m
3
, ( ) :
Round_V
02.05
74.9 m
3

02.06. C Z 01 05 C
Preparing the B150 concrete, with heavy aggregates having the granulometry up to
31mm and prepared with M30 cement in centralized installations.
UM
02.06
1m
3
:
NTi
02.06
0.085
hr
m
3
:
V
02.06
V
02.03
1.008 29.3663 m
3
:
Round_V
02.06
Ceil V
02.06
0.1m
3
, ( ) :
Round_V
02.06
29.4 m
3

02.07. C Z 03 01 A
Manufacturing the OB37 reinforcement of diameter 6-8 mm for foundations, in
centralized shops. Following the bar list, it results 40% of total quantity of
reinforcement in bearings.
UM
02.07
1kg :
NTi
02.07
0.033
hr
kg
:
M
02.07
M
02.04
0.4 1.01 706.19kg :
Round_M
02.07
Ceil M
02.07
1kg ,
( )
:
Round_M
02.07
707 kg
02.08. C Z 03 01 B
Manufacturing the PC52 reinforcement of diameter 10-16 mm for foundations, in
centralized shops. Following the bar list, it results 60% of total quantity of reinforcement in
bearings.
UM
02.08
1kg :
NTi
02.08
0.022
hr
kg
:
13
M
02.08
M
02.04
0.6 1.01 1059.28 kg :
Round_M
02.08
Ceil M
02.08
1kg ,
( )
:
Round_M
02.08
1060 kg
02.09. TRA 01 A 05
Transportation of the B50 concrete with the traveling concrete mixer on a 5 km
distance. One computes the mass of B50 concrete necessary to prepare the continuous
foundations by multiplying the volume of concrete prepare at article 02.05 with the
specific weight of concrete.
UM
02.09
1ton :
M
02.09
V
02.05
2.4
ton
m
3
179.553 ton :
Round_M
02.09
Ceil M
02.09
0.1ton ,
( )
:
Round_M
02.09
179.6 ton
02.10. TRA 06 A 05
Transportation of the B150 concrete with the traveling concrete mixer on a 5 km distance.
One computes the mass of B150 concrete necessary to prepare the continuous foundations by
multiplying the volume of concrete prepare at article 02.06 with the specific weight of concrete.
UM
02.10
1ton :
M
02.10
V
02.06
2.4
ton
m
3
70.479 ton :
Round_M
02.10
Ceil M
02.10
0.1ton ,
( )
:
Round_M
02.10
70.5 ton
02.11. TRA 04 A 05
Transportation of reinforcement, with an auto-trailer of 20t, on a distance of 5km.
UM
02.11
1ton :
M
02.11
M
02.07
M
02.08
+
( )
1.01
1.927 ton :
Round_M
02.11
Ceil M
02.11
0.01ton ,
( )
:
Round_M
02.11
1.93 ton
3. BASEMENT STRUCTURE
03.01. C B 12 I
Reinforced concrete formworks in walls and diaphragms, including the vertical
bracing, from reusable panels with plywood having the thickness up to 15 mm at
constructions with the height up to 20 m, having reinforced concrete slabs. One compute
the formworks area for diaphragms and walls.
UM
03.01
1m
2
:
NTi
03.01
4.04
hr
m
2
:
H 1.93m 0.1m + 2.03 m : height of the basement
t
wb
20cm : thickness of basement wall
Axis A: S
Ab
2 L
SGI
0.6m 0.6m
( )
H 8 0.5 m H 97.9475 m
2
:
Axis B: S
Bb
2 L
SGI
0.6m 0.6m
( )
H 6 0.3 m 2 0.2 m + ( ) H 101.6015 m
2
:
Axis C: S
Cb
2 L
SGI
0.6m 0.6m
( )
H 6 0.5 m 2 0.45 m + ( ) H 98.1505 m
2
:
Axis 1: S
1b
2 l
SGI
2 0.6 m 2 0.5 m
( )
H 0.284m 0.2m + 0.4m + ( )H
0.2m 0.3m + 0.084m + 0.25m + ( ) H +
... :
S
1b
46.4586 m
2

15
Axis 2:S
2b
2 0.2m 0.5m + 0.2m + ( ) 0.605m 0.3m + 0.605m + ( ) + [ ] H 9.7846m
2
:
Axis 3: S
3b
S
2b
9.7846 m
2
:
Axis 4: S
4b
2 l
SGI
2 0.6 m 2 0.5 m
( )
H 0.284m 0.2m + 0.4m + ( )H
2 0.084m 0.15m + ( ) 0.15m 0.20m + ( ) + [ ] H +
... :
S
4b
47.1366 m
2

Axis 5:
S
5b
S
4b
47.1366 m
2
:
Axis 6: S
6b
S
3b
9.7846 m
2
:
Axis 7: S
7b
S
2b
9.7846 m
2
:
Axis 8: S
8b
S
1b
46.4586 m
2
:
S
03.01
S
Ab
S
Bb
+ S
Cb
+ S
1b
+ S
2b
+ S
3b
+ S
4b
+ S
5b
+ S
6b
+ S
7b
+ S
8b
+ :
S
03.01
524.0283 m
2

Round_S
03.01
Ceil S
03.01
1m
2
, ( ) :
Round_S
03.01
525 m
2

03.02. C B 23 B
Formworks in black metal sheet, for creating the voids in concrete walls. One
determines the voids' surface in the walls.
UM
03.02
1m
2
:
NTi
03.02
0.45
hr
m
2
:
S
03.02
9 0.9 m 1.66 m 13.446m
2
:
Round_S
03.02
Ceil S
03.02
0.1m
2
, ( ) :
Round_S
03.02
13.5 m
2

03.03.C A 02 G
Pouring the reinforced concrete in construction elements, only the ones executed in
sliding formworks, mark B200, at constructions with the height up to 35m, including the
walls and diaphragms with thickness up to 30 cm. One computes the volume of concrete
to be poured in diaphragms and walls, taking into account the existing voids.
UM
03.06
1m
3
:
NTi
03.06
4.04
hr
m
3
:
V
03.06
S
03.01
2
S
03.02

,
t
wb
49.7136 m
3
:
Round_V
03.05
Ceil V
03.06
0.1m
3
, ( ) :
Round_V
03.05
49.8 m
3

V
03.05.
S
03.01
2
S
03.02

,
t
wb
49.7136 m
3
:
03.04. C C 02 B
Fixing the OB37 reinforcement bars, having the diameter up to 8 mm in
construction elements, solely the ones cast in sliding formworks, with polymeric
spacers. Following the bar list, it results a consumption up to 50 kg of reinforcement to
each cubic meter of concrete poured in diaphragms and walls.
UM
03.03
1kg :
NTi
03.03
0.048
hr
kg
:
17
M
03.03
V
03.05.
50
kg
m
3
2485.68 kg :
Round_M
03.03
Ceil M
03.03
5kg ,
( )
:
Round_M
03.03
2490kg
03.05. C C 02 B
Fixing the PC52 reinforcement bars, having the diameter of 10-12 mm in
construction elements, solely the ones cast in sliding formworks, with polymeric
spacers. Following the bar list, it results a consumption up to 30 kg of reinforcement to
each cubic meter of concrete poured in diaphragms and walls.
UM
03.04
1kg :
NTi
03.04
0.041
hr
kg
:
M
03.04
V
03.05.
30
kg
m
3
1491.41kg :
Round_M
03.04
Ceil M
03.04
5kg ,
( )
:
Round_M
03.04
1495kg
03.06. C B 44 A
Metallic extensible props, type PE 3100R, to support, when pouring the
concrete, the monolith beams, slabs and plates with total amount of 500 daN/m
2
, at
constructions having up to 20 m height. Each extensible beam is sustained by 2
extensible props.
piece 1 :
N
03.07.
20piece 4 9piece 2 + 98 piece :
UM
03.06
piece :
NTi
03.06
0.44
hr
piece
:
N
03.06
N
03.07.
2 196 piece :
Round_N
03.06
Ceil N
03.06
1piece ,
( )
:
Round_N
03.06
196 piece
03.07. C B 45 B
Metallic extensible trusses, to support, when pouring the concrete, the monolith
beams, slabs and plates with total amount of 500 daN/m
2
, at constructions having up to
20 m height. In each cell will be put 3 trusses sustained with extensible props and for
each concrete beam will be put a metallic one also sustained with 2 extensile props.
UM
03.07
piece :
NTi
03.07
2.31
hr
piece
:
N
03.07
18piece 4 9piece 2 + 90 piece :
Round_N
03.07
Ceil N
03.07
1piece ,
( )
:
Round_N
03.07
90 piece
03.08. C B 13 I
Formworks for reinforced concrete in slabs, beams and columns, excluding the bracing
from reusable 15 mm plywood panels, at constructions having up to 20 m height, including the
slabs and the beams.
UM=m
2
NT
i
=0.88 h/m
2
UM
03.08
1m
2
:
NTi
03.08
0.88
hr
piece
:
S
03.08_slab
L
SGI
0.6m 0.6m 0.15m +
( )
l
SGI
2 0.6 m 2 0.5 m 2 0.15 m +
( )
:
S
03.08_slab
309.2042m
2

19
S
03.08_beams
4 2 5.574m 5.494m + 2 0.2 m 2 0.605 m ( ) 0.25m 2 0.47 m + ( ) :
V
03.10_slab.
S
03.08_slab
0.13 m 40.1965 m
3
:
S
03.08_beams
90.0402m
2

S
03.08_fascia_board
2 L
SGI
1.2m 0.15m + l
SGI
+ 1.2m 1m 0.3m +
( )
0.13 m : V
03.10_beams.
4 5.574m 5.494m + 2 0.2 m 2 0.605 m ( ) 0.47 m 0.25 m 4.4453 m
3
:
S
03.08_fascia_board
9.8912m
2
V
03.10.
V
03.10_slab.
V
03.10_beams.
+ 44.6418 m
3
:
S
03.08
S
03.08_slab
S
03.08_beams
+ S
03.08_fascia_board
+ 409.1355m
2
:
Round_S
03.08
Ceil S
03.08
1m
2
, ( ) :
Round_S
03.08
410 m
2

03.09. C C 02 C
Fixing the OB37 and PC52 reinforcement bars having the diameter up to 10 mm in
slabs and up to 18 mm in beams and columns, excluding the ones cast in sliding
formworks, with polymeric spacers. An amount of 110kg of reinforcement is included in
each cubic meter of concrete.
UM
03.09
1kg :
NTi
03.09
0.033
hr
kg
:
M
03.09
V
03.10.
110
kg
m
3
4910.6kg :
Round_M
03.09
Ceil M
03.09
1kg ,
( )
:
Round_M
03.09
4911 kg
03.10. C A 02 J
Pouring the reinforced concrete in construction elements, excluding the ones executed
in sliding formworks, mark B200, at constructions having the height up to 35 m, even in
slabs having the thickness over 10 cm. One computes the volume of concrete to be poured
in the plate over the basement. For the stairs area, we consider that the volume of the
concrete from the stairs is equivalent to the volume of a fictitious plate having the surface of
the void.
UM
03.10
1m
3
:
NTi
03.10
3.54
hr
m
3
:
V
03.10_slab
S
03.08_slab
0.13 m 40.1965 m
3
:
V
03.10_beams
4 5.574m 5.494m + 2 0.2 m 2 0.605 m ( ) 0.47 m 0.25 m 4.4453 m
3
:
V
03.10
V
03.10_slab
V
03.10_beams
+ 44.6418 m
3
:
Round_V
03.10
Ceil V
03.10
0.1m
3
, ( ) :
Round_V
03.10
44.7 m
3

03.11. C Z 01 06 A
Preparing the concrete mark B200 with heavy aggregates having the granulometry
up to 16mm, for reinforced concrete in elements with reduced section, with cement M30
in centralized installations.
UM
03.11
1m
3
:
NT
i
0.085
hr
m
3
:
V
03.11
V
03.06
V
03.10
+
( )
1.008 95.1103 m
3
:
Round_V
03.11
Ceil V
03.11
0.1m
3
, ( ) :
Round_V
03.11
95.2 m
3

03.12. C Z 03 02 A
Preparing OB37 reinforcement having the diameter 6-8 mm, for concrete in
construction elements cast in formworks, excluding the ones executed in sliding
formworks. We take into account the reinforcement quantities to be placed in the
volumes of concrete computed at articles 03.05 and 03.10.
21
UM
03.12
1kg :
NTi
03.12
0.036
hr
kg
:
M
03.12
V
03.06
30
kg
m
3
V
03.10
60
kg
m
3
+

,
1.01 4211.62 kg :
Round_M
03.12
Ceil M
03.12
5kg ,
( )
:
Round_M
03.12
4215 kg
03.13. C Z 03 02 F
Preparing PC52 reinforcement having the diameter 10-16 mm, for concrete in
construction elements cast in formworks, excluding the ones executed in sliding
formworks. We take into account the reinforcement quantities to be placed in the
volumes of concrete computed at articles 03.05 and 03.010.
UM
03.13
1kg :
NTi
03.13
0.025
hr
kg
:
M
03.13
V
03.06
V
03.10
+
( )
50
kg
m
3
1.01 4764.95kg :
Round_M
03.13
Ceil M
03.13
5kg ,
( )
:
Round_M
03.13
4765 kg
03.14. TRA 01 A 05
Transport of B200 concrete with traveling concrete mixers on a distance less of 5 km.
UM
03.14
1ton :
M
03.14
V
03.11
2.4
ton
m
3
228.2647 ton :
Round_M
03.14
Ceil M
03.14
0.1ton ,
( )
: Round_M
03.14
228.3 ton
03.15. TRA 04 A 05
Transport of reinforcement with an auto trailer of 20t capacity.
UM
03.15
1ton :
M
03.15
M
03.12
M
03.13
+
( )
1
1.01
9.797 ton :
Round_M
03.15
Ceil M
03.15
0.1ton ,
( )
:
Round_M
03.15
9.8 ton
03.16. C G 32 C
Fills in compacted layers, made of crushed rocks and sand, compacted by manual
methods. We compute the geometric volume of the drainage layer of gravel with
thickness of 10 cm, under the basement floor.
UM
03.16
1m
3
:
NTi
03.16
0.92
hr
m
3
:
V
03.16
2 0.1 m 9.8m 2 0.3 m ( ) 5.574m 0.6m ( ) 2 2 0.1 m 0.35m 0.6 m 0.2m 1.1 m + ( )
2 0.1 m 9.8m 2 0.3 m ( ) 5.494m 0.6m ( ) 2 2 0.1 m 0.35m 0.6 m 0.2m 1.1 m + ( ) +
...
0.1m 4.3 m 5.574m 0.6m ( ) 5.494m 0.6m ( ) + [ ] +
...
:
V
03.16
22.0564 m
3

Round_V
03.16
Ceil V
03.16
0.1m
3
, ( ) :
23
Round_V
03.16
22.1 m
3

03.17. C G 18 B
Concrete floors, cast on site, mark B100, having the thickness of 10 cm and a 2 mm
plastering.
UM
03.17
1m
2
:
NTi
03.17
0.48
hr
m
2
:
S
03.17
2 9.8m 5.574 m 0.2m 0.3 m 2 0.2 m 0.5 m 0.2m 0.15 m 2 0.3 m 0.605 m ( )
2 9.8m 5.494 m 0.25m 0.084 m 2 0.2 m 0.5 m 0.2m 0.15 m 2 0.3 m 0.605 m ( ) +
...
4.9m 5.574 m 2 0.2 m 0.15 m ( ) 4.9m 5.494 m 2 0.15 m 0.084 m ( ) + +
...
:
S
03.17
268.5468 m
2

Round_S
03.17
Ceil S
03.17
1m
2
, ( ) :
Round_S
03.17
269 m
2

03.18. C C 02 F
Fixing the STNB reinforcement made of welded meshes having up to 3kg/m
2,
in
construction elements, in walls and diaphragms, excluding the ones executed in sliding
formworks, with polymeric spacers.
UM
03.18
1kg :
NTi
03.18
0.031
hr
kg
:
M
03.18
S
03.17
3
kg
m
2
805.6404kg :
Round_M
03.18
Ceil M
03.18
1kg ,
( )
:
Round_M
03.18
806kg
03.19. C Z 01 04 A
Mixing the concrete mark B100 with aggregates having the granulometry up to 31 mm,
prepared with F25 cement, in centralized installations. One computes the volume of B100
concrete, considering the thickness of 10 cm.
UM
03.19
1m
3
:
NTi
03.19
0.085
hr
m
3
:
V
03.19
S
03.17
0.1 m 1.008 27.0695 m
3
:
Round_V
03.19
Ceil V
03.19
0.1m
3
, ( ) :
Round_V
03.19
27.1 m
3

03.20. C Z 03 02 XD
Preparing the reinforcement for construction elements cast in formworks,
excluding those cast in sliding formworks. Preparing the welded meshes of 4-5 mm
made of STNB, in centralized shops.
UM
03.20
1m
2
:
NTi
03.20
0.055
hr
m
2
:
M
03.20
M
03.18
1.01 813.6968kg :
Round_M
03.20
Ceil M
03.20
1kg ,
( )
:
Round_M
03.20
814 kg
25
03.21. TRA 06 A 08
Transport of B100 concrete with traveling concrete mixers on a distance less of 5
km.
UM
03.21
1ton :
M
03.21
V
03.19
2.4
ton
m
3
64.9668 ton :
Round_M
03.21
Ceil M
03.21
0.1ton ,
( )
:
Round_M
03.21
65 ton
03.22. TRA 04 A 08
Transport of reinforcement with an auto trailer of 20t capacity.
UM
03.22
1ton :
M
03.22
M
03.20
1
1.01
805.6404 kg :
Round_M
03.22
Ceil M
03.22
1kg ,
( )
:
Round_M
03.22
806 kg
4. SUPERSTRUCTURE
04.01.C B 12 I
Formworks for reinforced concrete walls and slabs, including the bracing, from
reusable plywood panels with 15 mm thickness at constructions having up to 20 m height,
with cast-in-place slabs.
UM
04.01
1m
2
:
NTi
04.01
0.88
hr
m
2
:
H
s
2.80m : storey height
h
p
13cm : slab thickness
h
w
H
s
h
p
2.67 m : wall height
Ground floor:
Axis 1: S
1c_gf
2 10.668 m h
w
2 0.29m 0.396m + ( ) h
w
+ 60.6304m
2
:
Axis 2: S
2c_gf
2 2 0.5m 0.396m + ( ) 2 0.625 m + 0.25m + [ ] h
w
17.5793m
2
:
Axis 3: S
3c_gf
2 2 0.6m 0.396m + ( ) 2 0.625 m + 0.25m + [ ] h
w
18.6473m
2
:
Axis 4: S
4c_gf
2 h
w
5.12m 0.17m + ( ) 2 h
w
5.12m 0.17m + ( ) + 2 0.5 m h
w
+ 59.1672m
2
:
Axis 5: S
5c_gf
S
4c_gf
59.1672m
2
:
Axis 6: S
6c_gf
2 2 0.55m 0.396m + ( ) 2 0.625 m + 0.25m + [ ] h
w
18.1133 m
2
:
Axis 7: S
7c_gf
S
2c_gf
17.5793m
2
:
Axis 8: S
8c_gf
S
1c_gf
60.6304m
2
:
Axis B: S
Bc_gf
2 27.2m 2 0.16 m ( ) h
w
143.5392m
2
:
S
04.01_gf
2S
1c_gf
2S
2c_gf
+ S
3c_gf
+ 2S
4c_gf
+ S
6c_gf
+ S
Bc_gf
+ 455.0534 m
2
:
Current floor:
Axis 1: S
1c_cf
S
1c_gf
60.6304m
2
:
Axis 2: S
2c_cf
S
2c_gf
17.5793m
2
:
Axis 3: S
3c_cf
S
3c_gf
18.6473m
2
:
Axis 4: S
4c_cf
S
4c_gf
59.1672m
2
:
Axis 5: S
5c_cf
S
5c_gf
59.1672m
2
:
Axis 6: S
6c_cf
S
6c_gf
18.1133 m
2
:
Axis 7: S
7c_cf
S
7c_gf
17.5793m
2
:
27
Axis 8: S
8c_cf
S
8c_gf
60.6304m
2
:
Axis B: S
Bc_cf
S
Bc_gf
143.5392m
2
:
S
04.01_cf
2S
1c_cf
2S
2c_cf
+ S
3c_cf
+ 2S
4c_cf
+ S
6c_cf
+ S
Bc_cf
+ 455.0534 m
2
:
S
04.01
S
04.01_gf
4 S
04.01_cf
+ 2275.27 m
2
:
Round_S
04.01
Ceil S
04.01
5m
2
, ( ) :
Round_S
04.01
2280 m
2

04.02.C B 23 D
Frame-formworks in black metal sheet for creating the voids in concrete walls. We
determine the voids' surface in walls.
UM
04.02
1m
2
:
NTi
04.02
0.53
hr
m
2
:
S
04.02
5 6 0.9 m 2.09 m 2 0.6 m 0.6 m + ( ) 60.03m
2
:
Round_S
04.02
Ceil S
04.02
1m
2
, ( ) :
Round_S
04.02
61m
2

04.03.C C 02 A
Fixing the OB37 reinforcement bars, having the diameter up to 8 mm, with
polymeric spacers, in walls and diaphragms, excluding the ones cast in sliding formworks,
in buildings up to 35 m high.
V
04.05.
S
04.01
2
S
04.02

,
0.16 m 172.4166 m
3
:
UM
04.03
1kg :
NTi
04.03
0.048
hr
kg
:
M
04.03
V
04.05.
30
kg
m
3
5172.5 kg :
Round_M
04.03
Ceil M
04.03
1kg ,
( )
:
Round_M
04.03
5173kg
04.04.C C 02 B
Fixing the PC52 reinforcement bars, having the diameter of 10-12 mm, with
polymeric spacers, in walls and diaphragms, excluding the ones cast in sliding
formworks, in buildings up to 35 m high.
UM
04.04
1kg :
NTi
04.04
0.041
hr
kg
:
M
04.04
V
04.05.
50
kg
m
3
8620.83 kg :
Round_M
04.04
Ceil M
04.04
1kg ,
( )
:
Round_M
04.04
8621kg
04.05.C A 02 G
Casting the concrete in construction elements, excluding the ones executed in
formworks, mark B200, at constructions with height up to 35 m, in walls and slabs up to
30 cm in thickness. We compute the concrete to be poured in diaphragms and walls,
taking into account the existing voids.
UM
04.05
1m
3
:
NTi
04.05
4.04
hr
m
3
:
29
V
04.05
S
04.01
2
S
04.02

,
0.16 m 172.4166 m
3
:
Round_V
04.05
Ceil V
04.05
1m
3
, ( ) :
Round_V
04.05
173 m
3

04.06.C B 44 A
Metallic extensible props, type PE 3100 R, to support, for pouring the monolith
beams, slabs and plane plates with total amount of 500 daN/m2, at the construction
having up to 20 m height. In each cell we put 3 beams sustained by 2 extensible props
and for each concrete slab we put a metallic one also sustained by 2 extensible props.
UM
04.06
piece :
NTi
04.06
0.44
hr
piece
:
N
04.06
N
03.06
5 980 piece :
Round_N
04.06
Ceil N
04.06
1piece ,
( )
:
Round_N
04.06
980 piece
04.07. C B 45 B
Metallic extensible trusses to support, when pouring the concrete, the monolith
beams, slabs and plates with total amount of 500 daN/m
2
, at the construction having up to
20 m height. In each cell will be put 3 trusses sustained by 2 extensbile columns, for each
concrete beam will be put a metallic one also sustained by 2 extensiles columnes.
UM
04.07
piece :
NTi
04.07
2.31
hr
piece
:
N
04.07
N
03.07
5 450 piece :
Round_N
04.07
Ceil N
04.07
1piece ,
( )
:
Round_N
04.07
450 piece
04.08. C B 13 I
Formworks for reinforced concrete slabs, beams and columns, excluding the
bracing, made of reusable 15 mm panels, at constructions up 20 m high
UM
04.08
1m
2
:
NTi
04.08
0.85
hr
m
2
:
S
contour_girder
2 L
SGI
0.6m 0.3m 0.5m 8
( )
2 0.37 m 0.3m + ( ) 46.644m
2
:
S
edge
2 L
SGI
0.6m 0.3m 12.00m +
( )
0.15 m 11.5275 m
2
:
S
balconies
0.995m 0.045m + ( ) 8.06m 2 0.045 m + ( )
0.995m 0.045m + ( ) 7.85m 2 0.045 m + ( ) +
...
2 0.995m 0.045m + ( ) 4.18m 2 0.045 m + ( ) +
...
:
S
04.08
5 S
03.08
S
contour_girder
+ S
edge
+ S
balconies
+
( )
2464.6112 m
2
:
Round_S
04.08
Ceil S
04.08
1m
2
, ( ) :
Round_S
04.08
2465 m
2

04.09. C C 02 C
Fixing the OB37 reinforcement bars having the diameter of 8 mm in slabs and
beams, excluding the ones cast in sliding formworks, in buildings up to 35 m high, with
polymeric spacers.
V
04.10.
5 V
03.10_slab
V
03.10_beams
+ S
edge
S
balconies
+
( )
h
p
+
L
SGI
0.6m 0.3m 0.5m 8
( )
0.37 m 0.3 m +
...

1
1
]
259.7977 m
3
:
UM
04.09
1kg :
NTi
04.09
0.033
hr
kg
:
31
M
04.09
V
04.10.
110
kg
m
3
28577.7426kg :
Round_M
04.09
Ceil M
04.09
5kg ,
( )
:
Round_M
04.09
28580 kg
04.10. C A 02 J
Pouring the concrete mark B200 in construction elements, excluding the ones
executed in sliding formworks, at constructions up to 35 m high, including in beams,
columns and slabs with the thickness of the slab up to 10 cm.
UM
04.10
1m
3
:
NTi
04.10
3.54
hr
m
3
:
V
04.10
5 V
03.10_slab
V
03.10_beams
+ S
edge
S
balconies
+
( )
h
p
+
L
SGI
0.6m 0.3m 0.5m 8
( )
0.37 m 0.3 m +
...

1
1
]
259.7977 m
3
:
Round_V
04.10
Ceil V
04.10
1m
3
, ( ) :
Round_V
04.10
260 m
3

04.11. C Z 01.06 A
Preparing the concrete mark B200 with heavy aggregates having the granulometry up to
16 mm, for reinforced concrete in elements with reduced section, with M30 cement in
centralized installations.
UM
04.11
1m
3
:
NTi
04.11
0.085
hr
m
3
:
V
04.11
V
04.05
V
04.10
+
( )
1.008 435.6719 m
3
:
Round_V
04.11
Ceil V
04.11
1m
3
, ( ) :
Round_V
04.11
436 m
3

04.12. C Z 03 02 A
Preparing OB37 reinforcement having the diameter 6-8 mm, for concrete in
construction elements cast in formworks, in walls, beams, columns and diaphragms,
excluding the ones executed in sliding formworks, We take into account the
reinforcement quantities to be placed in the volumes of concrete computed at articles
03.05 and 03.10.
UM
04.12
1kg :
NTi
04.12
0.036
hr
kg
:
M
04.12
V
04.05
30
kg
m
3
V
04.10
60
kg
m
3
+

,
1.01 20967.96kg :
Round_M
04.12
Ceil M
04.12
5kg ,
( )
:
Round_M
04.12
20970 kg
04.13. C Z 03 02 B
Preparing PC52 reinforcement having the diameter 10-16 mm, for concrete in
construction elements cast in formworks, in walls, beams, columns and diaphragms,
excluding the ones executed in sliding formworks, We take into account the
reinforcement quantities to be placed in the volumes of concrete computed at articles
03.05 and 03.10.
UM
04.13
1kg :
NTi
04.13
0.020
hr
kg
:
M
04.13
V
04.05
V
04.10
+
( )
50
kg
m
3
1.01 21826.82 kg :
Round_M
04.13
Ceil M
04.13
5kg ,
( )
:
Round_M
04.13
21830 kg
33
04.14. TRA 06 A 08
Transport of B200 concrete with traveling concrete mixers on a distance less of 5 km.
UM
04.14
1ton :
M
04.14
V
04.05
V
04.10
+
( )
2.4
ton
m
3
1037.3142 ton :
Round_M
04.14
Ceil M
04.14
1ton ,
( )
:
Round_M
04.14
1038 ton
04.15. TRA 04 A 08
Transport of reinforcement with an auto trailer of 20t capacity.
UM
04.15
1ton :
M
04.15
M
04.12
M
04.13
+
( )
1
1.01
46.7061 ton :
Round_M
04.15
Ceil M
04.15
0.1ton ,
( )
:
Round_M
04.15
46.8 ton
5. MASONRY
05.01. C D 07 C
Cellular concrete masonry with M25 mortar in 30 cm thick walls, for constructions
up to 35 m height, included with GBN bloks.
UM
05.01
1m
3
:
NTi
05.01
3.20
hr
m
3
:
C
SI_M25
0.065m
3
:
M25 /
1m
3
wall
C
SBCA
0.975m
3
:
BCA /
1m
3
wall
H
b
0.47m : beam height
V
d_catI
4 0.9 m 2.00 m 0.3 m ( ) 4 5 0.9 m 2.00 m 0.3 m ( ) + 11.34 m
3
:
V
d_catII
1.945m 1m 1.565m + ( ) 0.3 m 1.4967 m
3
:
V
w_catI
2 0.6 m 0.6 m 0.3 m ( ) 5 0.6m 0.9 m 0.3 m ( ) 4 + 1.728 m
3
:
V
w_catII
10 1.5 m 1.2 m 0.3 m ( ) 5 4 1.2 m 1.2 m 0.3 m ( ) 5 +
2.4m 0.6 m 0.3 m 4 +
... 37.368 m
3
:
V
05.01
2 27.6 m H
s
H
b

( )
0.3 m 5 V
d_catI
V
d_catII
+ V
w_catI
+ V
w_catII
+
( )

12.00m H
s
H
b

( )
0.3 m 5 +
... :
V
05.01
182.9313 m
3

Round_V
05.01
Ceil V
05.01
1m
3
, ( ) : Round_V
05.01
183 m
3

05.02. C P 15 C
Placing the cellular concrete strips, 60 cm width and 10 cm thickness.
UM
05.02
1m
2
:
NTi
05.02
3.20
hr
m
2
:
C
SI_M100T
0.0018m
3
:
M100-T /
1m
3
wall
S
05.02
5 4 3.415 0.9 ( ) 4 2 0.7 ( ) + 8 5.12 0.166 0.625 0.9 ( ) +
2 2.795 0.8 ( ) 2 2.795 0.9 ( ) + 1.645 + 2.405 0.8 ( ) + +
...
1.95 0.7 ( ) 5.12 + +
...

1
1
]
m H
s
H
b

( )

4 0.96 1.95 0.7 ( ) + [ ]m H


s
H
b

( )
+
... :
S
05.02
720.669m
2

35
Round_S
05.02
Ceil S
05.02
1m
2
, ( ) :
Round_S
05.02
721 m
2

05.03. C Z 02.09 D
M100-T cement mortar prepared with M30 cement in special installations without lime
admixture.
UM
05.03
1m
3
:
NTi
05.03
0.86
hr
m
3
:
V
05.03
S
05.02
C
SI_M100T
m
2
1.2972 m
3
:
Round_V
05.03
Ceil V
05.03
0.1m
3
, ( ) :
Round_V
05.03
1.3 m
3

05.04. C Z 02.02 C
M25Z cement mortar prepared with F25 cement in non-centralized installations, with
lime admixture.
UM
05.04
1m
3
:
NTi
05.04
0.86
hr
m
3
:
V
05.04
V
05.01
C
SI_M25
m
3
11.8905 m
3
:
Round_V
05.04
Ceil V
05.04
0.1m
3
, ( ) :
Round_V
05.04
11.9 m
3

05.05. TRA 01 A 05
Transportation of masonry blocks and cellular concrete strips by trucks over 5 km
distance.
UM
05.05
1ton :
M
05.05
V
05.01
S
05.02
0.125 m +
( )
2.0
ton
m
3
546.0299 ton :
Round_M
05.05
Ceil M
05.05
0.1ton ,
( )
:
Round_M
05.05
546.1 ton
05.06. TRA 01 A 05
Transportation of mortar by trucks over 5 km distance.
UM
05.06
1ton :
M
05.06
V
05.03
V
05.04
+
( )
2.1
ton
m
3
27.6943 ton :
Round_M
05.06
Ceil M
05.06
0.1ton ,
( )
:
Round_M
05.06
27.7 ton
6. CARPENTRY WORKS
06.01. C K 01 A
Wooden windows, simple, double or coupled, with regular or interior opening
direction, with one or more leaves, for social, cultural or industrial buildings, including
thermal and hydro insulation, in buildings up to 35 m high, for windows with a surface
frame up to 1 m
2
, inclusively.
UM
06.01
1m
2
:
37
NTi
06.01
2.69
hr
m
2
:
S
06.01
2 0.6 m 0.6 m ( ) 5 0.6m 0.9 m ( ) 4 + 5.76 m
2
:
Round_S
06.01
Ceil S
06.01
0.1m
2
, ( ) :
Round_S
06.01
5.8 m
2

06.02. C K 01 B
Wooden windows, simple, double or coupled, with regular or interior opening
direction, with one or more leaves, for social, cultural or industrial buildings, including
thermal and hydro insulation, in buildings up to 35 m high, for windows with a surface
frame up to 1 m
2
, inclusively.
UM
06.02
1m
2
:
NTi
06.02
1.25
hr
m
2
:
S
06.02
10 1.5 m 1.2 m ( ) 5 4 1.2 m 1.2 m ( ) 5 + 2.4m 0.6 m 4 + 124.56 m
2
:
Round_S
06.02
Ceil S
06.02
0.1m
2
, ( ) :
Round_S
06.02
124.6 m
2

06.03. C K 04 A
Wooden doors for balconies (exterior), with regular or interior opening
direction, with one or two leaves, made of lumber, for social, cultural buildings,
including thermal and hydro-insulation of the frames, for buildings up to 35 m high.
UM
06.03
1m
2
:
NTi
06.03
1.48
hr
m
2
:
S
06.03
4 0.9 m 2.00 m ( ) 4 5 0.9 m 2.00 m ( ) + 37.8m
2
:
Round_S
06.03
Ceil S
06.03
0.1m
2
, ( ) :
Round_S
06.03
37.8 m
2

06.04. C K 03 F
Wooden doors, interior or exterior, simple, including waterproofing and
thermal insulation of the door frame, mounted on interior, existing, wooden dowels,
type CIL, finished by the producer, with one leaf, on door frame and timber
plankings.
UM
06.04
1m
2
:
NTi
06.04
1.31
hr
m
2
:
S
06.04
4 0.70 2.09 14 0.90 2.09 + 4 0.80 2.59 + 6 0.90 2.59 + ( )m
2
5
9 0.7 2.59 m
2
+
... :
S
06.04
288.617 m
2

Round_S
06.04
Ceil S
06.04
0.1m
2
, ( ) :
Round_S
06.04
288.7 m
2

06.05. C K 14 J
Metallic doors made of rolled steel profiles or corrugated sheet of cold formed
steel profiles or aluminium profiles, including reinforcement and fittings (accessories)
needed for door placing in any type of masonry, aluminum doors for constructions up
to 10 m height with frame surface between 5-7 m
2
, inclusively.
UM
06.05
1m
2
:
39
NTi
06.05
1.31
hr
m
2
:
S
06.05
1.945 1 1.565 + ( ) m
2
4.9889 m
2
:
Round_S
06.05
Ceil S
06.05
0.1m
2
, ( ) :
Round_S
06.05
5 m
2

06.06. C K 09 B
Wooden boards, sills and rods for doors, sills and rods up to 20 mm thickness and 100 mm
width, mounted on doors.
UM
06.06
1m :
NTi
06.06
0.07
hr
m
:
L
06.06
5 4 2 2.09 m 0.7m + ( ) 14 2 2.09 m 0.9m + ( ) + 4 2 2.59 m 0.8m + ( ) +
6 2 2.59 m 0.9m + ( ) 9 2 2.59 m 0.7m + ( ) + +
...

1
]
21 2 2 m 0.9m + ( ) 1m 2 1.945 m + ( ) + 1.565m 2 1.945 m + ( ) + +
... :
L
06.06
1133.045m
Round_L
06.06
Ceil L
06.06
1m ,
( )
:
Round_L
06.06
1134 m
06.07. C K 09 A
Wooden boards for windows, up 30 cm width, mounted on wooden windows.
UM
06.07
1m :
NTi
06.07
0.27
hr
m
:
L
06.07
2 0.6 m 5 0.9m 4 + 10 1.50 m 5 + 4 1.2 m 5 + 2.4m 4 + 118.2 m :
Round_L
06.07
Ceil L
06.07
1m ,
( )
:
Round_L
06.07
119 m
06.08. C M 02 B
Glass of 2-3 mm thickness, with wooden frames, polished, fixed with lute and
nails, in holes over 0.25 m
2
. It is considered that the glass' surface represents
approximately 80% from the windows' and balcony doors' surface.
UM
06.08
1m
2
:
NTi
06.08
0.45
hr
m
:
S
06.08
S
06.01
S
06.02
+ S
06.03
+
( )
2 0.8 268.992m
2
:
Round_S
06.08
Ceil S
06.08
1m
2
, ( ) :
Round_S
06.08
269m
2

7. PLASTERINGS
07.01. C F 01 C
Manual interior plastering for walls and columns on concrete surfaces, small concrete
blocks or cellular concrete blocks with lime mortar, M10-T cement grade, of 2 cm average
thickness, including scafoldings.
UM
07.01
1m
2
:
NTi
07.01
1.12
hr
m
2
:
S
07.01
S
04.01
S
04.02
2 12 m H
s
0.13m
( )
5
V
05.01
0.3m
+ 12m H
s
0.13m
( )
:
S
07.01
2472.5683 m
2

Round_S
07.01
Ceil S
07.01
1m
2
, ( ) :
Round_S
07.01
2473 m
2

41
07.02. C F 03 A
Manual interior plastering for ceilings made of cast in place concrete or prefabricated
elements, hand made with lime mortar, M10-T cement grade, of 2 cm average thickness,
including scafoldings.
UM
07.02
1m
2
:
NTi
07.02
1.03
hr
m
2
:
C
SI_M25T
0.020m
3
:
M25-T/
m
2
S
07.02
S
04.08
2464.6112m
2
:
Round_S
07.02
Ceil S
07.02
1m
2
, ( ) :
Round_S
07.02
2465 m
2

07.03. C F 10 C
Floated plastering on the concrete elements' surface, columns and ceilings, hand
made with plastering paste.
S
09.03_cl.
4 2 2m 2.10m + 0.7m ( ) 3.37 m [ ] 2 2 2.795m 3.07m + 0.8m ( ) 3.37 m [ ] +
2 2 2.405m 3.515m + 0.8m ( ) 3.37 m [ ] +
... :
UM
07.03
1m
2
: S
09.03_gl.
4 2 2m 2.10m + 0.7m ( ) 3.37 m [ ] 2 2 2.795m 3.07m + 0.8m ( ) 3.37 m [ ] +
2 2.405m 3.515m + 0.8m ( ) 3.37 m [ ] 2 2.795m 3.515m + 0.8m ( ) 3.37 m [ ] + +
... :
NTi
07.03
0.38
hr
m
2
:
S
09.03.
4S
09.03_cl.
S
09.03_gl.
+ 1147.4176m
2
:
S
07.03
S
07.01
S
07.02
+ S
05.02
2 + S
09.03.
5231.0999m
2
:
Round_S
07.03
Ceil S
07.03
1m
2
, ( ) :
Round_S
07.03
5232 m
2

07.04. C Z 02.06 A
Lime mortar, M10-T cement grade, made with F25 cement and plastering paste in
centralized installations.
UM
07.04
1m
3
:
NTi
07.04
0.52
hr
m
3
:
V
07.04
S
07.01
0.018
m
3
m
2
44.5062 m
3
:
Round_V
07.04
Ceil V
07.04
0.1m
3
, ( ) : Round_V
07.04
44.6 m
3

07.05. C Z 02.07 A
Lime mortar, M25-T cement grade, made with F25 cement and plastering paste in
centralized installations.
UM
07.05
1m
3
:
NTi
07.05
0.52
hr
m
3
:
V
07.05
S
07.02
0.020
m
3
m
2
49.2922 m
3
:
Round_V
07.05
Ceil V
07.05
0.1m
3
, ( ) :
Round_V
07.05
49.3 m
3

07.06. TRA 06 A 08
Transportation of mortar with truck, over 5 km distance.
UM
07.06
1ton :
43
M
07.06
V
07.04
1.9
ton
m
3
V
07.05
2.1
ton
m
3
+ 188.0755 ton :
Round_M
07.06
Ceil M
07.06
1ton ,
( )
:
Round_M
07.06
189 ton
8. FLOORING
08.01. C G 01 D
Supporting layer for floors made of 3 cm thickness cement mortar, grade M100-T.
UM
08.01
1m
2
:
NTi
08.01
0.46
hr
m
2
:
C
SI_M100T.
0.031m
3
:
M100-T/
m
2
S
08.01
17.45m
2
4 5 21.75m
2
4 5 + 2.05 2.795 ( )m
2
2 5 +
2.005 2.795 ( )m
2
2 5 +
... 897.34m
2
:
Round_S
08.01
Ceil S
08.01
1m
2
, ( ) :
Round_S
08.01
898 m
2

08.02. C G 03 E
PVC plastic floorings including sills, cleaned and waxed in rooms with surface up
to 20 m
2
, with wooden sill.
UM
08.02
1m
2
:
NTi
08.02
0.73
hr
m
2
:
S
08.02
S
08.01
897.3373m
2
:
Round_S
08.02
Ceil S
08.02
1m
2
, ( ) :
Round_S
08.02
898 m
2

08.03. C G 07 B
Mosaic floorings cast in place, without pigments, including 3 cm supporting layer
with cement mortar, grade M100-T, including scrubbing and washing, 1.5 cm thickness
for rooms with surface over 5 m
2
UM
08.03
1m
2
:
NTi
08.03
2.23
hr
m
2
:
S
08.03
8.30m
2
2 5 8.20m
2
5 + 8.40m
2
5 + 4.20m
2
4 5 +
2.405m 2.41m + ( ) 5.12 m 5 4.815m 5.12 m 5 + +
... 496.528m
2
:
Round_S
08.03
Ceil S
08.03
1m
2
, ( ) :
Round_S
08.03
497 m
2

08.04. C G 07 B
Mosaic plinth cast in place, without pigments, including support layer of mortar
M100-T cement grade, including scrubbing and washing horizontal plinth or 10 cm
height for walls made of marble.
UM
08.04
1m :
NTi
08.4
1.2
hr
m
:
Axes 1-2: L
12
2 2 5.12 m 0.9m 2 3.415 m + 2 2.10 m + 2m + ( ) 44.74m :
Axes 2-3: L
23
2 2 5.12m 0.9m ( ) 2 4.25 m + [ ] 33.88m :
Axes 3-4: L
34
2 2 5.12m 0.9m ( ) 4 2.795 m + [ ] 39.24m :
Axes 4-5: L
45
2 5.12m 0.9m ( ) 2 4.94m 0.9m ( ) + 2 5.12m 0.9m ( ) +
2 5.12 m 3 4.94m 0.9m ( ) + 4.94m + 2 2m 0.7m ( ) + +
... :
45
L
45
54.86 m
Axes 5-6: L
56
L
34
39.24m :
Axes 6-7: L
67
L
23
33.88m :
Axes 7-8: L
78
L
12
44.74m :
L
08.04
L
12
L
23
+ L
34
+ L
45
+ L
56
+ L
67
+ L
78
+ 290.58m :
Round_L
08.04
Ceil L
08.04
5m ,
( )
:
Round_L
08.04
295 m
08.05. C Z 02.09 A
Cement mortar for plastering M100-T with M30 cement grade, prepared in
centralized installations, without lime admixture.
UM
08.05
1m
3
:
NTi
08.05
0.52
hr
m
3
:
C
SI_M100T.
0.031 m
3

V
08.05
S
08.01
C
SI_M100T.
m
2
27.8175 m
3
:
Round_V
08.05
Ceil V
08.05
0.1m
3
, ( ) :
Round_V
08.05
27.9 m
3

08.06. TRA 06 A 08
Road transport of mortar over 5km distance, by truck
UM
08.06
1ton :
M
08.06
V
08.05
2.2
ton
m
3
61.1984 ton :
Round_M
08.06
Ceil M
08.06
0.1ton ,
( )
:
Round_M
08.06
61.2 ton
9. INTERIOR SURFACE FINISHINGS
09.01. C N 02 B
3 ply interior painting for ceilings and walls in water colours.
UM
09.01
1m
2
:
NTi
09.01
0.31
hr
m
2
:
S
09.01
S
07.03
S
09.03.
4083.6823m
2
:
Round_S
09.01
Ceil S
09.01
1m
2
, ( ) :
Round_S
09.01
4084 m
2

09.02. C N 09 B
3 ply interior painting for doors and windows on wood framings, using oil colours.
UM
09.02
1m
2
:
NTi
09.02
1.14
hr
m
2
:
S
09.02
S
06.01
S
06.02
+ S
06.03
+
( )
3 S
06.04
2.9 + 1341.3493m
2
:
Round_S
09.02
Ceil S
09.02
1m
2
, ( ) :
47
Round_S
09.02
1342 m
2

09.03. C I 06 S
Mounting faience on walls and columns, including the plating of lintels using the
same colour and format plates, using M100-T cement grade, using lime admixture of 2
cm thickness, in rooms less than 10 m
2
UM
09.03
1m
2
:
NTi
09.03
2.72
hr
m
2
:
S
09.03_cl
4 2 2m 2.10m + 0.7m ( ) 4.27 m [ ] 2 2 2.795m 3.07m + 0.8m ( ) 4.27 m [ ] +
2 2 2.405m 3.515m + 0.8m ( ) 4.27 m [ ] +
... :
S
09.03_gl
4 2 2m 2.10m + 0.7m ( ) 4.27 m [ ] 2 2 2.795m 3.07m + 0.8m ( ) 4.27 m [ ] +
2 2.405m 3.515m + 0.8m ( ) 4.27 m [ ] 2 2.795m 3.515m + 0.8m ( ) 4.27 m [ ] + +
... :
S
09.03
4S
09.03_cl
S
09.03_gl
+ 1453.8496m
2
:
Round_S
09.03
Ceil S
09.03
1m
2
, ( ) :
Round_S
09.03
1454 m
2

10. EXTERIOR FINISHINGS
10.01. C B 48 A
Self-lifting metallic scaffold for exterior facade works.
UM
10.01
1m
2
:
NTi
10.01
0.28
hr
m
2
:
H
attic
1m :
H
pedestal
1m :
S
10.01
5 H
s
H
attic
+ H
pedestal
+
( )
2 27.2m 11m + ( ) 1222.4 m
2
:
Round_S
10.01
Ceil S
10.01
1m
2
, ( ) :
Round_S
10.01
1223 m
2

10.02. C F 08 A
Exterior plastering in artficial stone for facade hand-made, using M100-T cement
grade mortar, with lime admixture of 1.5 average thickness, with visible layer of M100-
T cement mortar with the superior layer's thickness of 0.5-0.8 cm.
UM
10.02
1m
2
:
NTi
10.02
2.21
hr
m
2
:
S
10.02
S
10.01
S
06.01
S
06.02
+ S
06.03
+
( )

1
]
1.10 1159.708 m
2
:
Round_S
10.02
Ceil S
10.02
1m
2
, ( ) :
Round_S
10.02
1160 m
2

10.03. C Z 02.09 D
Cement mortar for plastering M100-T with M30 cement in non-centralized
installations, without lime admixture.
UM
10.03
1m
3
:
NTi
10.03
0.52
hr
m
3
:
V
10.03
S
10.02
0.017
m
3
m
2
19.715 m
3
:
Round_V
10.03
Ceil V
10.03
0.1m
3
, ( ) :
Round_V
10.03
19.8 m
3

10.04. TRA 01 A 05
Road transport of mortar by truck over 5 km distance.
UM
10.04
1ton :
M
10.04
V
10.03
2.2
ton
m
3
43.3731 ton :
Round_M
10.04
Ceil M
10.04
0.1ton ,
( )
: Round_M
10.04
43.4 ton