MECHANICAL COMMISSIONING STANDARD CHECKLIST SHEET 01 OF 02 STATION : NTPC - RSTPS 1 X 500 MW PLANT ITEM: PIPEWORK -STEAM SERVICES.

PLANT NOMENCLATURE : SYSTEM: UNIT NO : 7 ITEM ACTIVITY STATUS REMARKS YES/NO


1 General conditions satisfy the site Standing instructions as listed in the "Plant Item Comissioning Essential Pre-requisites".

( SCL MS1/1 ).
2 The nameplate legend agrees with the approved NTPC Plant Nomenclature is clearly visible, securely fixed, durable and correlates with remote labels. The installation is complete and correct in accordance with the latest approved drawings and specification. Access for adjustments maintenance and repairs is satisfactory. Check that all bosses, flanges and tapping points have been adequately made off. Check that all cold pulls, if approporiate, have been made and records completed. Check that all fittings on the pipework comply to the requirement of the relevant Indian Standard for the system. Check that all pipe falls to drainage points are satisfactory. Confirm that all blanks still required in the system are adequately identified and recorded in the Blanks Schedule. Check that drains are provided at all points on the steam range where water may collect. Check that steam traps are fitted with bypass and test connections. Confirm that all pipework that can be touched from allways etc, and that reaches a temperature of 60 C or over is adequately lagged. Check that the pipework system, including supports, is free to expand and contract within its constraints, including floor collars and wall boxes. Check that adequate number of vents are provided on the pipe at highest points.

4 5

8 9

10

11 12

13

14

STSTION : NTPC - RSTPS PLANT ITEM: PLANT NOMENCLATURE : SYSTEM: ITEM

MECHANICAL COMMISSIONING STANDARD CHECKLIST SHEET 02 OF 02 1 X 500 MW PIPEWORK -STEAM SERVICES. UNIT NO : 7 STATUS REMARKS YES/NO

ACTIVITY

SUPPORTS
15 Check that all supports are undamaged, fixed and mounted vertically, (Except where design requires the support at a specified angle). Check that all support loadings have been correctly set and recorded. Confirm, where possible, that there is a radial clearance between the pipe and the support clip. Check that all roller and sliding supports are clean, free to move and so constructed that dirt and water cannot accumulate. Check that all thrust/anchor points are correctly installed. Check that all the supports as required as per the design have been mounted. Flush the pipe line properly to open drain to clear of all debris from pipe. Test the pipeline hydraulically to the relevant standard in presence of Boiler Inspector, if required. Check that all temporary supports have been withdrawn. Confirm adequate support for small bore, horizontal pipes that may be stood upon (or adequate protection for the pipes and supports for systems not strong enough to withstand additional loads).

16 17

18

19 20

21

22

23 24

Agency NTPC Erec. Elect. Mech.

Name

Signature

Date

C&I

Elect. Mech. C&I BHEL Erec. BHEL Comg.

NTPC Comg.