PROVINCE-WISE
PUNJAB BALUCHISTAN NWFP SINDH TOTAL
2.
Department,
Sindh Coal Authority established under the Sindh Coal Authority Act, 1993 governs through a Board headed by Minister for Mines & Mineral Development, Sindh. Task Force headed by the Prime Minister, Islamic Republic of Pakistan.
4
1. Functions: Exploration of Coal include: Exploration Development Mining Processing Utilization Research and Development. Coordination of Infrastructure Development Conduct problem oriented research. Development of indigenous technology. Promotion of foreign investment. 5
2. Objective:
Exploitation of indigenous coal, which will lead to: Self-reliance Contain shifting of people from rural to urban centres. Poverty alleviation Sustainable power generation programme Contain de-forestation Gasification, liquefaction, briquetting, pulverization of coal.
3. Strategy:
Geological investigations and studies Infrastructure development Promote private investment Appropriate coordination Assist the investors.
5. Exploration & Evaluation of North Lakhra Coalfield has been sponsored with an estimated cost of Rs.38.516 7 million. The study is at the stage of award.
6.
Coal Quality Moisture (AR) Ash (AR) Volatile Matter (AR) Fixed Carbon (AR) Sulphur (AR) Heating Value (Av.)
10
C A
12
Self All the coals are the self combustion types combustion trial of coal Stripping Ratio 5.30 upwards
4.
13
Other useful mineral and raw elements in Thar 1. 2. 3. 4. 5. Germanium (Ge) Gallium (Ga) Uranium Humic acid Benzene Extract 338 samples from 32 drill holes. 357 samples from 32 drill holes. 193 samples from drill holes 278 samples from 33 drill holes. 228 samples from 28 drill holes.
The calorific value is 11.10-17.64 MJ/Kg averagely 13.22 MJ/Kg belonging to low-medium calorific value, easily grinded, poor thermal stability, strong reactivity to CO2, strong clunker, rich Tar and high humic acid. Other uses: gasification, liquefaction, power generation, and humic acid extraction.
14
Lignite - Products
Electricity Briquettes Pulverized lignite Fluidized-bed lignite Coke 860 kWh 400 kg 360 kg 380 kg 250 kg 190 m3 160 l 580 m3
1,000 kg
15
Production
(In Million Tonnes)
168 64 64 60 51 37 26 25
16
Power Generation
78% 69% 66% 66% 56% 40% 34% 34% 30% 28% 26%
17
Source: World Coal Institute, London, December, 2002. Share of coal in Electric Power Generation in Pakistan 18 is less than 1%.
Projects identified
For Development of Sindh Coal Resources
Shenhua Group has completed a Geologic Report under DCGI and submitted to Govt. of Sindh, which is positive. As a result of meeting of the President of Pakistan during his recent visit to China with Shenhua Group, they deputed a team of 170 members for conducting the hydrological survey. 20 members advance arrived on 11.12.2003 for hydro geological study remaining team of 150 members are expected in last week of December. They are in the field. Hydrological studies would be conducted over an area of 650 sq. km. under a contract provided by them. 21
Continued Presently, in Sindh, coal is being mined from Lakhra-Metting coalfield. Lakhra coal has high content sulphur and ash. For cement use low ash, low sulphur coal is prerequisite. GOS has signed MoU with Shahzad International of Lahore for establishment of Coal Washing Plant at Lakhra. The pre-feasibility study report submission period has been lapsed. The sponsors have requested for extension.
24
Continued - BFS
Study awarded to M/s. Rheinbraun Engineering of Germany at a cost of Euro 2.930 million in February, 2003, is to be completed within 18 months. Steering Committee headed by the Minister for Mineral Development, Sindh is monitoring the scheme.
The study inception report has been submitted, which presents the design and specification of the exploration programme and the power plant, lignite pre-drying and water treatment plant, shows up the scope of work for the next period and gives the yearly lignite demand and the implementation schedule. The report concludes that water & lignite are available.
Continued - BFS
The mine area outlined and located in block-I shows up about 520 million tons of lignite, which is quite sufficient to feed 1000 MW power plant for more than 50 years. The coal overburden 1:6 striping ratio. RE suggests to operate with closed cooling circle process with covered coolers to minimize the water losses for the power plant operation.
Two water sources are available in the Thar desert area: First the drying and recondensation/recovery of water from the raw lignite. Second the water withdrawn from the different aquifers for a dry mine operation.
27
Continued - BFS
Most of water for operation of 1000 MW will be derived from the lignite with the drying process. The data, calculations and considerations give a clear picture that the 1000 MW power plant and the mine can be operated in the Thar desert area without any problem. A delegation headed by the Minister for Mines & Mineral Development, Sindh visited Germany for demonstration of the technology for converting the excessive moisture from coal as a source of water for power plant by lignite drying technology already being experimented by the RWE Rheinbraun.
28
Extract water for other utilisation Nearly doubling calorific value Raise efficiency of power stations
30
Continental power generation based on lignite and hard coal, nuclear energy, gas, hydropower, wind, photovoltaics and biomass, lignite upgrading and production of energy resources, i.e. lignite and hard coal, mineral oil and gas
33
Continued
Hambach Coal Mines One of the biggest lignite mines operated by RWE since 1984. Annual production is 40 million tonnes of lignite Coal utilized at NeiderauBem plant (3900 MW); Neurath (2250 MW) and Frimmersdorf (2400 MW). Coal is being transported by railway system. Overburden 240 million tonnes Stripping ratio 6:1 (m3 t) Depth 350 meters Bucket Wheel Excavators installed Dewatering aspect Dewatering before mining. Annual quantity of some 600 m3 of groundwater. Keeping safe from water inflow. Stabilise the slopes of mines.
34
Bankable Feasibility Study of Thar Coal Mining (80:20) Assessment of Water Resources of Thar Coalfield Town Planning at Islamkot
First phase has been completed. Second phase is in progress. Similar studies conducted by Chinese & German. This assessment will be based on the reports from them. An amount of Rs.1.040 million has been released. Scheme is executed by Local Govt. Deptt. (Town Planning).
2.
70.000
50.000
3.
2.352
2.080
36
Continued
4. Construction of Airstrip at Islamkot (including feasibility study) 120.000 5.656 SCA in consultation with Civil Aviation Authority has invited the Technical & Financial proposals through press. After evaluation of the proposals, the Technical Committee has submitted its report. A Steering Committee is being constituted for selection/award of the contract. The scheme has been approved. Works & Services Department as Executing Agency. Administrative Approval issued. The scheme has been approved. Works & Services Department as Executing Agency. Administrative Approval issued. The scheme has been approved. Works & Services Department as Executing Agency. Administrative Approval issued. This scheme to be funded by Federal Govt. PC-I being prepared by Works & Services Department as Executing Agency. 37
5.
Construction of road from Wango to Modhar (21 kms.) Construction of road from Modhar to Rohiro (21 kms.) Construction of road from Rohiro to Mithi (21.5 kms.) Improvement of road from Hyderabad to Kantio (185 kms.)
145.508
45.000
6.
144.553
10.000
7.
153.994
45.000
8.
130.000
1.000
Continued
9. Improvement of road from Kantio to Chachro (30 km) 96.709 1.000 PC-I has been forwarded to Federal Government (M/O Finance) seeking their financial support as announced by the President of Pakistan during the presentation on 16.05.2003. A. A. has been issued. PC-I has been forwarded to Federal Government (M/O Finance) seeking their financial support as announced by the President of Pakistan during the presentation on 16.05.2003. A. A. has been issued. PC-I has been forwarded to Federal Government (M/O Finance) seeking their financial support as announced by the President of Pakistan during the presentation on 16.05.2003. A. A. has been issued. PC-I has been forwarded to Federal Government (M/O Finance) seeking their financial support as announced by the President of Pakistan during the presentation on 16.05.2003. A. A. has been issued. 38
10.
149.999
1.000
11.
157.467
20.000
12.
105.610
20.000
Continued
13. Up gradation of MithiIslamkot Road (40.23 km) New Scheme 140.041 25.000 PC-I has been forwarded to Federal Government (M/O Finance) seeking their financial support as announced by the President of Pakistan during the presentation on 16.05.2003. A. A. has been issued. The scheme has been approved by PDWP and is reflected in ADP 2003-04. The PC-I has been forwarded to Federal Government (M/O Finance) for financial support. A. A,. issued. PC-I has been forwarded to Federal Government (M/O Finance) seeking their financial support as announced by the President of Pakistan during the presentation on 16.05.2003. A. A. has been issued. PC-I is being prepared by Works & Services Department.The scheme is not approved.
14.
95.868
100.000
15.
139.779
1.000
16.
36.00
36.00
39
Continued
17. Construction of Bye-Pass for Jhudo (New Scheme) Construction of new road from Islamkot to Airport Road (New Scheme) Pipeline water supply scheme Mithi to Islamkot Pipeline water supply scheme Islamkot to Coal mines (Thario Halepota) Water Supply Line from Naukot to Islamkot upgradation. Exploration & Assessment of Coal Resources of Northern Lakhra Coalfield 15.179 15.179 The PDWP approved the scheme in principle on 31.03.2003. PC-I/PC-II is being prepared by Works & Services Department. The scheme is not approved. The scheme is executed by Local Govt. through D.G. (Tech.) LGD Hyderabad. Work in progress. The scheme has been approved and is under tender process. PC-I is being Department. prepared by L.G.
18.
19.
20.
113.675
130.00
21.
13.00
22.
31.114
Approval to award of the study to M/s. Northeast Coal Geological Bureau, China has been pursued. An amount of Rs.15.557 released on 30.10.203. 40