Sie sind auf Seite 1von 18

Process, Power and Marine Division ,

Getting More Mileage out of your Smart Plant Solution

Intergraph

April 14, 2010

Agenda ge da Objective The Topics A Question to you Conclusions Questions & Answers Q ti A

2010. Intergraph Corporation. All Rights Reserved.

Objectives
How a h ti environment can h l your b i H hosting i t help business The Pros and cons of a hosting environment How to set up a hosting environment and who can help

The Presenters
Robbie O'Brien, Host Sure Ltd.

2010. Intergraph Corporation. All Rights Reserved.

Opportunities
Better tili the B tt utilize th products capabilities d t biliti Increase the productivity Learn about the better and easier ways (tips and tricks) Learn about optimizing the workflows Ask the experts at the Intergraph and Partner team p g p And more.

2010. Intergraph Corporation. All Rights Reserved.

The Topics

Why and what is hosting The benefits What about support System availability How to get there The things to watch out for
2010. Intergraph Corporation. All Rights Reserved. 5

SmartPlant Enterprise Configuration


SmartPlant P&ID SmartPlant P&ID SmartPlant P&ID SmartPlant Electrical SmartPlant Electrical SmartPlant Electrical

Site A
P & ID Citrix Server

Site B

Site C

Site A

Site B

Site C

Host Project Site


Electrical Citrix Server

Instrumentation Citrix Server

Project Central Database


SmartPlant Foundation
SmartPlant 3D Work Share

Site A
SmartPlant Instrumentation SmartPlant Instrumentation

Site B
SmartPlant Instrumentation

Site C

Satellite A

Satellite B

Satellite C

4/20/2010 2008. Intergraph Corporation. All Rights Reserved.

Poll Question

2010. Intergraph Corporation. All Rights Reserved.

Hosting in Production at CoP

2010. Intergraph Corporation. All Rights Reserved.

The Pearl project


Qatar Petroleum and Shell launched new Gas to Liquid (GTL) Pearl Project in Qatar July 2006 Build offshore upstream gas production facility and onshore GTL plant Major goal deliver instrumentation data to commissioning personnel earlier to de-risk the de risk project
Chose MW Kellogg as PMC Chose SPI as the design tool 25 Engineering companies chosen for the Design effort

Challenge
Manage the multi-contractor design effort Mitigate the risk of having to merge 25 versions of the design data around the globe

Location of the EPCs

The Result
Infrastructure designed, built, tested and commissioned within 3 months Fi t Engineering company November 2006 N users and EPCs put live within First E i i N b New d EPC t li ithi hours 250 users excellent feedback from end users and EPCs Less than 30 minutes of down time since Go-Live up time of 99.999% Significantly reduced support calls Data amalgamation eliminated Much lower I.T. Costs and I.T. skill set in EPCs Timescales , Costs and Risk significantly reduced - much Improved progress monitoring

Alcoa a global organisation

Alcoa a global organisation

44 Countries 123,000 Employees

Global EDM Network

Host Facility in Nashville

Conclusion
Single Design bases for the Project (best practice) Lower the IT cost Easier to make scope splits Project reviews from one single source Central source for management of change Lower cost and risk of data hand-over to operations hand over Need good infra structure Support around the clock pp

2010. Intergraph Corporation. All Rights Reserved.

15

Q&A
2010. Intergraph Corporation. All Rights Reserved. 16

Additional Information & Recording g

The recording of the webinar and additional information can be found at:

http://www.intergraph.com/ppm/webinars.aspx p g p pp p