ARASMETA CAPTIVE POWER COMPANY PVT.

LTD, GOPALNAAR
FATAL INCIDENT INVESTIGATION REPORT

Incidents happened at ACPCPL SITE on 28th. Sept. 2011 at around 3.30 pm. Incident Investigation Team ACPCPL site - Gopal Nagar Mr. GV Suresh Babu Mr. Rambabu Mr. DV. Ramakrishna Mr.Srihari Repali Mr. Pragati Acharya Plant Manager-ACPCPL Plant Head-OEGI Manager /Mech-Maint./ACPCPL Asst.Manager /Electrical-ACPCPL Sr.Engineer / Safety

Sl. No 01

Classification of Incident FATAL


th

Date & Time

Agency

Exact Location 132 kV line to LIPLACP (North side of RO plant )

28 September 11 at approx 03.30 PM

M/s OEGI

Point of Contact:-Ladder got touched with 132 kV line. Current earthed path of Deceased workmen

Incident in brief Root causes of incident On 28th Aug 11, at around 03.30pm The cause of incident was The deceased (Mr.Binu kumar investigated & found as Kashyap / Helper, aged about 22 years of M/s Sunil Singh ) who was 1) Violation of Work engaged for assisting electrical instructions given by Technician (Mr.Amarjeet Prasad & Electrical in charge. Mr.Ramkishore Kashyap of M/s Instruction was clearly OEGI) for maintenance of given to the technician by perimeter lights. The accident the line manager not to occurred while shifting an take this ladder below aluminum ladder to the perimeter 132kv line.(attached the pole light-2, Incidentally the written statements of ladder got touched with the 132 survived victims & KV over head line & three persons concerned HOD) in touch with the ladder got 2) Not maintained the electrocuted. minimum safe distance between live conductor & After this incident, the three ladder while shifting of persons were immediately shifted ladder. to CIMS after giving the CPR to 3) Lack of proper the victim at site. Mr.Binu supervision. Ku.Kashyap was declared dead at around 5.30 pm by the doctors Team & other two were survived with minor burn on the left foot thumb.

Remedial measures In order to prevent the recurrence of such incidents in future, the following measures are recommended, 1) Looking towards the said incident, Strict supervision is required based on criticality location of job. 2) SOPs (both Hindi & English for all routine & Non routine activity shall be prepared & all the concerned shall be educated 3) Risk assessment to be done on site for every job, explained to all the persons involved in the job (on daily basis till the job is completed) & also displayed at site. 4) While performing such type of jobs minimum safe distance to be maintained from the bare live line ( 132 kv line, A minimum 1.4 mtrs. distance to be maintained for shifting the ladder etc.)

5) Ladder handles to be insulated or FRP ladder (Fiberglass Reinforced Plastic) material as it has got advantage over aluminum ladder may be explored. 6) Specific Refreshment training to all the electricians to be rendered immediately. 7) The available aluminum ladder to be locked & kept in safe custody. After Risk assessment at the Work area, Ladder can be given to the concern team.

After touching the ladder to 132 KV line immediately Breaker got Tripped on protection relay and plant got tripped,which was reduced the severity of the incident.