Sie sind auf Seite 1von 1

We are ready

to cross that
bridge!
Councilmember Sandy Sheedy and the City of Sacramento
Get ready to see: Department of Transportation invite you to the Grand Re-opening Grand Ave.

of the Norwood Avenue Bridge.


• Expanded I-5/Richards Boulevard interchange off ramps Fairbanks Ave.
• Expansion of Richards Boulevard between Jibboom Street and Bercut Drive to improve
capacity The new, modern bridge includes nearly $8 million in improvements:
• Bike lanes on portions of Richards Boulevard, Bercut Drive and Jibboom Street bike lanes, widened sidewalks and ornamental streetlights. The bridge
• Enhanced pedestrian walkways and improved roadway crossings has also been raised to mitigate for the possibility of flooding.
• New landscaping and streetscapes Parking

Rio Linda Blvd.


Norwood Bridge

When: Sat., June 2, 10 a.m. Event site

Norwood Ave.
Where: West side of the Norwood Avenue Bridge. Park in lot at
southwest corner of Fairbanks and Norwood Avenue.

.
vd
Bl
so
El Camino Blvd.

Pa
el
D
For questions about the event, please contact Linda Tucker at
Grove Ave.
(916) 808-7523 or ltucker@cityofsacramento.org.

808-8300

For information about the event, please contact Linda Tucker at ltucker@cityofsacramento.org, 916/808-7523.

Das könnte Ihnen auch gefallen