Beruflich Dokumente
Kultur Dokumente
0949-168-9807
Objective:
Seeking a position as a Foreman in an electrical installation of construction plan such as cable pulling of low-voltage (LV)/medium-voltage (MV) cable, low-voltage (LV) termination, gas turbine generator (GTG) control cables and power supply, instrumentation cables, lay-out and termination, and erection of electrical panels, transformers, ladders and cable trays.
Education Undergraduate Studies: Philippine Merchant Marine School Sta. Cruz, Manila Degree: Bachelor of Science in Marine Transportation Vocational: Quezon Technical School Calbayog City, Western Samar Training: General Radio Communication Operator 1981-1982 1983-1986
Secondary: Tiburcio Tancinco Memorial Vocational School Calbayog City, Western Samar Primary: Carayman Elementary School Calbayog City, Western Samar
1976-1981 1970-1976
ELECTRICIAN (JUNE 12, 2011 DECEMBER 13, 2011) Bechtel International Inc.Angola, West Africa
Meggering and testing of low-voltage and control cables. Cable-pulling and termination of cables.
JULY15,2010)
NAJM AL-
JAZIRA, Kingdom of Saudi Arabia Directed and supervised all work to be done in installation of cable for control and power supply of gas turbine generator (GTG) Checked and directed layout, pulling and termination of cable for low/medium voltage supply of switch gear for power plant sub-station. Directed installation of switch gear panel, raceways, ladder etc. Directed the testing and commissioning of work project Checked and seen to it that all job orders are in conformity to the given plan Checked and seen to it that timetable for the job is timely acquired. Operated and checked the maintenance of power generators for the temporary supply of gas turbine generator (GTG) such as: 1000 KVA Generator (Cummins) o Installing ACDB Panel for temporary supply of each GTG. o Terminating cable from generator set to temporary panel and also the cable going to GTG. o Monitoring of required volts and amperes.
o o
Checking oil, gas, water, and batteries to maintain good condition of the machine. Changing oil and gas filters in every required time. Cleaning oil spill and dirt surrounding the machine in case of shut-down.
PROJECT NAME: Duba and Tabuok Power Plant Expansion project; 80MW
III. TECHNICIAN-Electrician-Communication (FEB.9, 2000 MAR.15, 2008) ALARAB CONTRATING CO.LTD Riyadh, Kingdom of Saudi Arabia Lead the electro-mechanical installation of pump house, chiller and switch gearing of King Faisal University Phase II Project Installation of high bay lighting Electro-mechanical Installation of sub-stations, cabling termination and testing of works on the construction of132/13.8KVSub-station, contract no. 517/19/3 under SCECO Supervised the construction and implementation of OSP and ISP for Riyadh GPT Special Project Operated and checks the maintenance of power generators for the temporary supply such as: Doosan Generator Set (45-500 KW) o Installing breakers for temporary supply purposes. o Maintaining of temporary supply in any place at site such as: o Reporting machine malfunctions or damages. Supply for lighting, power, tools, etc. Checking of gas, water, and batteries for maintenance purposes.
IV. SUPERVISOR-OUTSIDE PLANT (OSP)Construction (FEB.11, 1997 JUL.31, 1998) A&A Telecom Construction Phils. Sta.Cruz, Manila Supervised the implementation of the project regarding the installation of poles, lines, hardware and layout of copper/fiber cables Supervised and checked the OSP standard implementation procedure of all in under my command.
V. Senior InstallerSubscriber Line Installation & Repair (Dec.18, 19951997) Philippine Telegraph and Telephone (PT&T) Makati, Philippines Installed repaired and maintained subscriber line and accessories i.e. telephone and high speed data clients.
VI. Cabling Technician- Local Area Network (Feb16, 19941995) SLL/CABLE SPECIALIST, Makati City, Philippines Implemented and constructed house cable facilities including installation of conduit and cable runways Installed multiple house cable wiring facilities for computers and PABX requirements
Personal Details Citizenship: Filipino Date of Birth: March17, 1963 Place of Birth: Carayman, Calbayog City, Western Samar Civil Status: Single I hereby certify that the above information is true and correct to my knowledge.