Beruflich Dokumente
Kultur Dokumente
.Divisional Office,
Transportation Brauch, Bangalore - 23.
No:BIT.lSOIRTI./Sr.DPO/125107/11/1!
To: Slni. S. C. Chopra, No.5. 2nd Cross, Vasanthansgar. BANGALORE - :560 052.
Dated:19-07-2011.
Sub: Supplyofinfonun1ionldoc~l1et1t Wlder'RTI - 2005 Re.f Your application dated12.07.2011 received through ~cnior Divisional Pmonal Offic:crlBangnlorc und Cmcf.Public: infomudion Officer, letter No. BIP.180IRTJ/Sr.DPO/12S/07I11 da~d 13.07.11 ..
...
.Infommion sougbt.
. '1'
Information provided
Infamatioo denied
(with reasoo.~ including citing of ~ecit'ic clause/clauSes under
No.
1.
RTI }-~d.)
The Topography
at CSDR-
Station towards BUllgalore City have to wait .BYPL - 3.23 Kllt. CSDR-KJM for any time between 15 mitwtes to 45 - 1.6 Km". is lrinngular mId
both
sides' merge
at
one
line trom KrisIuimajapl.U'3l1l to Bangalore .}JaI1icularpoint City. shortly before . Baiyyappannhalli mmoD. 1bis is on ac:c:owrtof the crossing
Bangalore City towards Krisbnarajapunun. Prior to 1972 on, the':Suburban section of West.cm Railway atMumbai CcntIal Station there was a sinWar c:rossb1g. as shown hi the cbartt.;. '._. 'Ibis .c:rossUlg was:nc~sary liS there Were: 4ttatks' till. Mumbai CciJtti1~" which Intet were tuerg cd into 2 tracks
h . _
Proposals have been initiated to provide individual reception and dispatch line towards. 10M &. BYPL ft0D:1 CSD:R:'U1\der . -40tibJiDg'proj~ct otCSDR . ' YNK. Auto11l81icsignaling also
.-
before Grant Road station. There was crossing of tracks by local trains in both the direction every .4 minutes during -peak bouors without any delay for clearance. wOUid like to know why the SoUth Western Railways CDIlDQUnstall a similar sigimliug system at the above crossing at
BaivvaPD8nabl1li.
has,been initiated under works . programme 2012.13. Iftbis system of working are sanctioned, then the movement of trains arc possible as indicated.
To: Sr.DPO
&:.
CPIO
Scmor Divisional ~tions Maoag> South West.cm Railway, BangaJore - S60 023. ..