I19
I06
I08 I20
I07
Crack position
Anchor
I09
error during the working, so there is the integrity of CDM Columns is different from
assumptive CDM columns model. The actual measurement of the displacement on the
top of CDM column also proved this situation, that is, the front CDM have a bigger
displacement, and the displacement of the behind CDM is becoming small as the distance
to the steel sheet pile is becoming bigger.
3. Suggestion
Cancel 1.5m height of the CDM columns top which behind the steel sheet pile, and make
a trench which is about 7 CDM rows width behind the steel sheet pile, at the same time,
the steel sheet pile shall be removed.
When the piling works are finished, A concrete retaining wall shall be erected in the trench,
in order to resist the earth pressure caused by the backfilling, in order to increase the
Integrity of CDM column, a reinforcement concrete slab shall be cast in place on the top of
CDM column, the detail structure is shown as follows:
50mmGAP
Capping
beam
Backfill
IN-SITU COPE BEAM
In-situ Cast slab
PHC pile
:3H
e 1V
Slop
CDM area
Rebar
Appendix 1
River
0.0
20.0
40.0
60.0
0.0
Elevation (m)
100.0
120.0
140.0
29-Nov-08 (15:30)
01-Dec-08 (14:35)
12-Dec-08 (15:50)
14-Dec-08 (9:20)
15-Dec-08 (9:54)
16-Dec-08 (16:00)
17-Dec-08 (9:18)
19-Dec-08 (9:38)
22-Dec-08 (10:20)
24-Dec-08 (9:56)
26-Dec-08 (10:40)
29-Dec-08 (10:11)
30-Dec-08 (10:37)
31-Dec-08 (10:05)
02-Jan-09 (9:22)
04-Jan-08 (10:00)
05-Jan-08 (9:20)
07-Jan-09 (9:46)
09-Jan-09 (10:00)
12-Jan-09 (10:35)
14-Jan-08 (9:35)
16-Jan-09 (8:55)
5.0
-5.0
-10.0
-15.0
-20.0
-25.0
Inclinometer
Lateral Movement Graph
80.0
-1-
River
-20.0
0.0
20.0
40.0
60.0
80.0
100.0
120.0
140.0
160.0
180.0
200.0
13-Nov-08
22-Nov-08
25-Nov-08
29-Nov-08 (15:15)
01-Dec-08 (15:43)
08-Dec-08 (9:00)
11-Dec-08 (15:55)
12-Dec-08 (15:45)
14-Dec-08 (8:40)
15-Dec-08 (9:32)
16-Dec-08 (14:45)
17-Dec-08 (9:05)
19-Dec-08 (9:28)
22-Dec-08 (10:05)
24-Dec-08 (10:06)
26-Dec-08 (10:55)
29-Dec-08 (9:40)
30-Dec-08 (11:18)
31-Dec-08 (9:45)
02-Jan-08 (9:35)
05-Jan-08 (10:15)
07-Jan-09 (10:00)
09-Jan-09 (9:25)
12-Jan-09 (10:00)
14-Jan-09 (9:35)
15-Jan-09 (9:10)
16-Jan-09 (9:10)
17-Jan-09 (9:25)
0.0
Elevation (m)
-5.0
-10.0
-15.0
-20.0
-25.0
-30.0
Inclinometer
Lateral Movement Graph
-1-
River
0.0
20.0
40.0
60.0
80.0
100.0
120.0
140.0
160.0
180.0
200.0
220.0
240.0
13-Nov-08
28-Nov-08 (18:43)
29-Non-08 (15:00)
30-Nov-08 (8:40)
01-Dec-08 (16:23)
03-Dec-08 (10:12)
05-Dec-08 (8:30)
08-Dec-08 (9:25)
11-Dec-08 (16:15)
12-Dec-08 (15:31)
14-Dec-08 (8:20)
15-Dec-08 (9:20)
16-Dec-08 (15:00)
17-Dec-08 (8:54)
19-Dec-08 (9:10)
22-Dec-08 (9:56)
24-Dec-08 (10:20)
26-Dec-08 (15:50)
29-Dec-08 (9:19)
30-Dec-08 (11:04)
31-Dec-08 (9:45)
02-Jan-08 (9:44)
05-Jan-08 (10:00)
07-Jan-09 (10:10)
09-Jan-09 (9:12)
12-Jan-09 (10:10)
14-Jan-09 (9:50)
15-Jan-09 (8:50)
16-Jan-09 (9:30)
17-Jan-09 (9:45)
5.0
Elevation (m)
0.0
-5.0
-10.0
-15.0
-20.0
-25.0
Inclinometer
Lateral Movement Graph
-1-
River
-10.0
0.0
10.0
20.0
30.0
40.0
50.0
60.0
70.0
80.0
90.0
100.0
13-Nov-08
27-Nov-08 (19:57')
28-Nov-08 (18:07)
29-Nov-08 (15:00)
30-Nov-08 (9:20)
01-Dec-08 (15:12)
03-Dec-08 (14:20)
05-Dec-08 (9:30)
08-Dec-08 (15:00)
11-Dec-08 (15:50)
12-Dec-08 (16:13)
14-Dec-08 (7:41)
15-Dec-08 (10:08)
16-Dec-08 (15:40)
17-Dec-08 (9:30)
19-Dec-08 (9:25)
22-Dec-08 (10:15)
24-Dec-08 (9:44)
26-Dec-08 (10:27)
29-Dec-08 (10:23)
31- Dec-08 (9:40)
02-Jan-08 (9:10)
04-Jan-08 (10:15)
05-Jan-08 (8:20)
07-Jan-09 (9:34)
09-Jan-09 (9:45)
12-Jan-09 (9:40)
14-Jan-09 (9:25)
16-Jan-09 (10:55)
5.0
Elevation (m)
0.0
-5.0
-10.0
-15.0
-20.0
-25.0
Inclinometer
Lateral Movement Graph
-1-
River
0.0
20.0
40.0
60.0
80.0
100.0
120.0
140.0
160.0
180.0
200.0
13-Nov-08
27-Nov-08 (18:35')
28-Nov-08 (19:27)
29-Nov-08 (14:30)
30-Nov-08 (8:00)
01-Dec-08 (16:20)
03-Dec-08 (14:40)
05-Dec-08 (8:50)
08-Dec-08 (15:28)
11-Dec-08 (16:10)
12-Dec-08 (15:07)
14-Dec-08 (7:30)
15-Dec-08 (9:01)
16-Dec-08 (14:36)
17-Dec-08 (8:32)
19-Dec-08 (9:40)
22-Dec-08 (10:30)
24-Dec-08 (11:17)
26-Dec-08 (15:20)
29-Dec-08 (10:23)
30-Dec-08 (10:10)
31-Dec-08 (9:25)
02-Jan-09 (15:30)
04-Jan-08 (14:10)
05-Jan-08 (14:35)
07-Jan-09 (15:05)
09-Jan-09 (8:55)
12-Jan-08 (10:19)
13-Jan-09 (15:30)
14-Jan-09 (10:00)
15-Jan-09 (8:20)
16-Jan-09 (8:45)
17-Jan-09 (8:29)
5.0
Elevation (m)
0.0
-5.0
-10.0
-15.0
-20.0
-25.0
Inclinometer
Lateral Movement Graph
-1-
Appendix 2
2009-1-14 8:00
Point
Initial
observation date
J1
J3
2008-10-31
2008-10-31
3.734
3.875
J4
2008-10-31
J5
2008-10-31
J6
3.762
3.898
-3
1
0
3
1
0
14
41
1
-6
28
23
3.865
3.881
51
-4
16
3.646
3.665
10
19
2008-10-31
3.593
3.598
77
25
J8
2008-11-15
4.215
4.217
56
J9
2008-11-15
4.082
4.075
57
-7
J10
J11
2008-11-17
2008-11-17
3.616
3.727
3.617
3.726
27
70
-10
-9
1
-1
J15
2008-12-19
3.583
3.580
-11
-1
-3
J16
J17
J18
J19
J17-1
J20
2008-12-19
2008-12-21
2008-12-21
2008-12-21
2008-12-24
2008-12-24
1948.998
1949.910
1951.962
1952.266
1949.113
1949.224
3.616
3.567
3.290
3.523
3.055
3.219
1948.988
1949.911
1952.012
1952.336
1949.140
1949.285
3.610
3.563
3.281
3.514
3.049
3.214
-10
1
50
70
27
61
11
16
7
4
9
6
-6
-4
-9
-9
-6
-5
-1.024
-0.955
-1.332
-1.099
-1.486
-1.422
M1
1948.988
1949.907
1952.007
1952.337
1949.134
1949.283
2660.548
2681.966
2703.975
2712.862
2692.594
2723.838
-1.051
-1.099
-1.377
-1.143
-1.309
-1.145
J9
Z
3.761
3.898
3.600
3.619
3.727
3.609
3.561
3.283
3.517
3.051
3.215
2660.547
2681.987
2703.974
2712.864
2692.593
2723.838
Total data(mm)
2660.536
2681.971
2703.967
2712.860
2692.584
2723.832
Curent data(mm)
N
P
o
i
n
t
2009-1-15 8:00
Z
O
b
s
e
r
v
a
t
i
o
n
-1.059
-1.106
-1.388
-1.155
-1.320
-1.155
-2
1
0
4
5
-1
6
2
J8
L
a
B1
y
M5
o
M6
u
t N is the lateral deviation of the river bank"+" means to the river"-" means to the bank
J4
J1
o
E is the lateral deciation on the right side"+" means to the upstreamthe side of HOLCIM"-" means to the downstream
f
J3
J15
-2
1
-3
-2
-1
-1
21
-1
2
-1
0
J16
1
2
-2
-3
-2
-1
J18
J17
J17-1
J11
J19 J20
J6
M2
J5
J10
A1
M8
M7
M9
M3
Remark
Observation ended on
Dec 28,2008
Observation ended on
Jan 11,2009
Observation ended on
Dec 24,2008
Observation ended on
Dec 31,2008
Observation ended on
Dec 26,2008