Sie sind auf Seite 1von 8

The Treatment Proposal of Anomalous Movement of CDM

1. The Anomalous Situation on Site


1.1 The Analysis of the Relative Data from the inclinometer
The finished piling work is about 90m shoreline-length presently, please refer to the
drawing as follow, and the inclinometers which have the anomalous movement are on the
point I06, I07, I08, I19 and I20, please refer to the appendix 1.

Steel sheet pile

I19

I06

I08 I20

I07

Crack position
Anchor

I09

1.2 The Situation of the Earth-surfaces Crack on the CDM Area


The crack on the CDMs surface is between the first row and the second row at first,
and then it is becoming bigger as the dredging work goes on. The crack appears on the
place where the distance is about 10m from the steel sheet pile, and the width is more
than 20cm. There are water flood from the crack when the flood tide is coming. The
positions of the crack please refer to the drawing as follow. The CDM movement has been
observed for a long time, the detail information is shown in appendix 2.
Steel sheet pile
Crack position
Anchor

2. The Analysis on the Reason of the Anomalous Movement


2.1 The Effect of Spring Tide
On the site recently from Jan 09 to Jan 15, there is the worst tide of the whole year, the
lowest water level is +0.1m CD; the speed of the tides fluctuation is fast, while the speed
of drain among CDM columns and between CDM columns and steel sheet pile is slow, so
that there is a high hydraulic pressure in columns. This is the efficient amse of anomalous
movement.
2.2 The Integrity of CDM Columns is different from assumptive model
CDM columns are supposed to be a close integer when the effect against the earths
lateral displacement is considered, but there is neither coincidence nor cross connection
among designed column, only tangency is existed. Meanwhile, there is some construction

error during the working, so there is the integrity of CDM Columns is different from
assumptive CDM columns model. The actual measurement of the displacement on the
top of CDM column also proved this situation, that is, the front CDM have a bigger
displacement, and the displacement of the behind CDM is becoming small as the distance
to the steel sheet pile is becoming bigger.
3. Suggestion
Cancel 1.5m height of the CDM columns top which behind the steel sheet pile, and make
a trench which is about 7 CDM rows width behind the steel sheet pile, at the same time,
the steel sheet pile shall be removed.
When the piling works are finished, A concrete retaining wall shall be erected in the trench,
in order to resist the earth pressure caused by the backfilling, in order to increase the
Integrity of CDM column, a reinforcement concrete slab shall be cast in place on the top of
CDM column, the detail structure is shown as follows:

50mmGAP

Capping
beam

Backfill
IN-SITU COPE BEAM
In-situ Cast slab

PHC pile

:3H
e 1V
Slop

CDM area

Rebar

Note:1.All dimension is in metre.

Appendix 1

PORTCOAST CONSULTANT CORPORATION


PROJECT NO:SITV

LATERAL DISPLACEMENT DIAGRAM


IN A0 - DIRECTION
INCLINOMETER ID:I06
Base Reading :29-Sep-2008

River

Lateral Displacement (mm)


-20.0

0.0

20.0

40.0

60.0

0.0

Elevation (m)

100.0

120.0

140.0

29-Nov-08 (15:30)
01-Dec-08 (14:35)
12-Dec-08 (15:50)
14-Dec-08 (9:20)
15-Dec-08 (9:54)
16-Dec-08 (16:00)
17-Dec-08 (9:18)
19-Dec-08 (9:38)
22-Dec-08 (10:20)
24-Dec-08 (9:56)
26-Dec-08 (10:40)
29-Dec-08 (10:11)
30-Dec-08 (10:37)
31-Dec-08 (10:05)
02-Jan-09 (9:22)
04-Jan-08 (10:00)
05-Jan-08 (9:20)
07-Jan-09 (9:46)
09-Jan-09 (10:00)
12-Jan-09 (10:35)
14-Jan-08 (9:35)
16-Jan-09 (8:55)

5.0

-5.0

-10.0

-15.0

-20.0

-25.0

Inclinometer
Lateral Movement Graph

80.0

-1-

PORTCOAST CONSULTANT CORPORATION


PROJECT NO:SITV

LATERAL DISPLACEMENT DIAGRAM


IN A0 - DIRECTION
INCLINOMETER ID:I07
Base Reading :13-Nov-2008

River

Lateral Displacement (mm)


5.0

-20.0

0.0

20.0

40.0

60.0

80.0

100.0

120.0

140.0

160.0

180.0

200.0

13-Nov-08
22-Nov-08
25-Nov-08

29-Nov-08 (15:15)
01-Dec-08 (15:43)
08-Dec-08 (9:00)
11-Dec-08 (15:55)
12-Dec-08 (15:45)
14-Dec-08 (8:40)
15-Dec-08 (9:32)
16-Dec-08 (14:45)
17-Dec-08 (9:05)
19-Dec-08 (9:28)
22-Dec-08 (10:05)
24-Dec-08 (10:06)
26-Dec-08 (10:55)
29-Dec-08 (9:40)
30-Dec-08 (11:18)
31-Dec-08 (9:45)
02-Jan-08 (9:35)
05-Jan-08 (10:15)
07-Jan-09 (10:00)
09-Jan-09 (9:25)
12-Jan-09 (10:00)
14-Jan-09 (9:35)
15-Jan-09 (9:10)
16-Jan-09 (9:10)
17-Jan-09 (9:25)

0.0

Elevation (m)

-5.0

-10.0

-15.0

-20.0

-25.0

-30.0

Inclinometer
Lateral Movement Graph

-1-

PORTCOAST CONSULTANT CORPORATION


PROJECT NO:SITV

LATERAL DISPLACEMENT DIAGRAM


IN A0 - DIRECTION
INCLINOMETER ID:I08
Base Reading :13-Nov-2008

River

Lateral Displacement (mm)


-20.0

0.0

20.0

40.0

60.0

80.0

100.0

120.0

140.0

160.0

180.0

200.0

220.0

240.0

13-Nov-08

28-Nov-08 (18:43)
29-Non-08 (15:00)
30-Nov-08 (8:40)
01-Dec-08 (16:23)
03-Dec-08 (10:12)
05-Dec-08 (8:30)
08-Dec-08 (9:25)
11-Dec-08 (16:15)
12-Dec-08 (15:31)
14-Dec-08 (8:20)
15-Dec-08 (9:20)
16-Dec-08 (15:00)
17-Dec-08 (8:54)
19-Dec-08 (9:10)
22-Dec-08 (9:56)
24-Dec-08 (10:20)
26-Dec-08 (15:50)
29-Dec-08 (9:19)
30-Dec-08 (11:04)
31-Dec-08 (9:45)
02-Jan-08 (9:44)
05-Jan-08 (10:00)
07-Jan-09 (10:10)
09-Jan-09 (9:12)
12-Jan-09 (10:10)
14-Jan-09 (9:50)
15-Jan-09 (8:50)
16-Jan-09 (9:30)
17-Jan-09 (9:45)

5.0

Elevation (m)

0.0

-5.0

-10.0

-15.0

-20.0

-25.0

Inclinometer
Lateral Movement Graph

-1-

PORTCOAST CONSULTANT CORPORATION


PROJECT NO:SITV

LATERAL DISPLACEMENT DIAGRAM


IN A0 - DIRECTION
INCLINOMETER ID:I19
Base Reading :13-Nov-2008

River

Lateral Displacement (mm)


-20.0

-10.0

0.0

10.0

20.0

30.0

40.0

50.0

60.0

70.0

80.0

90.0

100.0

13-Nov-08

27-Nov-08 (19:57')
28-Nov-08 (18:07)
29-Nov-08 (15:00)
30-Nov-08 (9:20)
01-Dec-08 (15:12)
03-Dec-08 (14:20)
05-Dec-08 (9:30)
08-Dec-08 (15:00)
11-Dec-08 (15:50)
12-Dec-08 (16:13)
14-Dec-08 (7:41)
15-Dec-08 (10:08)
16-Dec-08 (15:40)
17-Dec-08 (9:30)
19-Dec-08 (9:25)
22-Dec-08 (10:15)
24-Dec-08 (9:44)
26-Dec-08 (10:27)
29-Dec-08 (10:23)
31- Dec-08 (9:40)
02-Jan-08 (9:10)
04-Jan-08 (10:15)
05-Jan-08 (8:20)
07-Jan-09 (9:34)
09-Jan-09 (9:45)
12-Jan-09 (9:40)
14-Jan-09 (9:25)
16-Jan-09 (10:55)

5.0

Elevation (m)

0.0

-5.0

-10.0

-15.0

-20.0

-25.0

Inclinometer
Lateral Movement Graph

-1-

PORTCOAST CONSULTANT CORPORATION


PROJECT NO:SITV

LATERAL DISPLACEMENT DIAGRAM


IN A0 - DIRECTION
INCLINOMETER ID:I20
Base Reading :13-Nov-2008

River

Lateral Displacement (mm)


-20.0

0.0

20.0

40.0

60.0

80.0

100.0

120.0

140.0

160.0

180.0

200.0

13-Nov-08

27-Nov-08 (18:35')
28-Nov-08 (19:27)
29-Nov-08 (14:30)
30-Nov-08 (8:00)
01-Dec-08 (16:20)
03-Dec-08 (14:40)
05-Dec-08 (8:50)
08-Dec-08 (15:28)
11-Dec-08 (16:10)
12-Dec-08 (15:07)
14-Dec-08 (7:30)
15-Dec-08 (9:01)
16-Dec-08 (14:36)
17-Dec-08 (8:32)
19-Dec-08 (9:40)
22-Dec-08 (10:30)
24-Dec-08 (11:17)
26-Dec-08 (15:20)
29-Dec-08 (10:23)
30-Dec-08 (10:10)
31-Dec-08 (9:25)
02-Jan-09 (15:30)
04-Jan-08 (14:10)
05-Jan-08 (14:35)
07-Jan-09 (15:05)
09-Jan-09 (8:55)
12-Jan-08 (10:19)
13-Jan-09 (15:30)
14-Jan-09 (10:00)
15-Jan-09 (8:20)
16-Jan-09 (8:45)
17-Jan-09 (8:29)

5.0

Elevation (m)

0.0

-5.0

-10.0

-15.0

-20.0

-25.0

Inclinometer
Lateral Movement Graph

-1-

Appendix 2

Observation record of CDM displacement in FP4 area


Initial observation data

2009-1-14 8:00

Point

Initial
observation date

J1
J3

2008-10-31
2008-10-31

1938.466 2621.612 -1.115


1938.855 2652.225 -0.974

3.734
3.875

J4

2008-10-31

1944.460 2652.320 -0.984

J5

2008-10-31

J6

1938.480 2621.613 -0.907


1938.896 2652.219 -0.771

3.762
3.898

-3
1

0
3

1
0

14
41

1
-6

28
23

3.865

1944.511 2652.316 -0.787

3.881

51

-4

16

1938.306 2726.611 -1.203

3.646

1938.306 2726.621 -0.982

3.665

10

19

2008-10-31

1944.195 2725.586 -0.556

3.593

1944.272 2725.611 -1.071

3.598

77

25

J8

2008-11-15

1951.202 2541.769 -0.445

4.215

1951.258 2541.772 -0.424

4.217

56

J9

2008-11-15

1951.969 2523.886 -0.578

4.082

1952.026 2523.888 -0.554

4.075

57

-7

J10
J11

2008-11-17
2008-11-17

1938.467 2683.014 -1.035


1945.823 2682.019 -0.924

3.616
3.727

1938.494 2683.004 -1.052


1945.893 2682.010 -0.943

3.617
3.726

27
70

-10
-9

1
-1

J15

2008-12-19

1949.796 2671.639 -0.857

3.583

1949.785 2671.638 -1.072

3.580

-11

-1

-3

J16
J17
J18
J19
J17-1
J20

2008-12-19
2008-12-21
2008-12-21
2008-12-21
2008-12-24
2008-12-24

1948.998
1949.910
1951.962
1952.266
1949.113
1949.224

3.616
3.567
3.290
3.523
3.055
3.219

1948.988
1949.911
1952.012
1952.336
1949.140
1949.285

3.610
3.563
3.281
3.514
3.049
3.214

-10
1
50
70
27
61

11
16
7
4
9
6

-6
-4
-9
-9
-6
-5

-1.024
-0.955
-1.332
-1.099
-1.486
-1.422

M1

1938.483 2621.613 -0.899


1938.895 2652.216 -0.762

1944.272 2725.609 -1.060

1938.496 2683.003 -1.041


1945.892 2682.013 -0.933

1948.988
1949.907
1952.007
1952.337
1949.134
1949.283

2660.548
2681.966
2703.975
2712.862
2692.594
2723.838

-1.051
-1.099
-1.377
-1.143
-1.309
-1.145

J9

Z
3.761
3.898

3.600

3.619
3.727

3.609
3.561
3.283
3.517
3.051
3.215

2660.547
2681.987
2703.974
2712.864
2692.593
2723.838

Total data(mm)

2660.536
2681.971
2703.967
2712.860
2692.584
2723.832

Curent data(mm)
N

P
o
i
n
t

2009-1-15 8:00
Z

O
b
s
e
r
v
a
t
i
o
n

-1.059
-1.106
-1.388
-1.155
-1.320
-1.155

-2
1

0
4
5
-1
6
2

J8

L
a
B1
y
M5
o
M6
u
t N is the lateral deviation of the river bank"+" means to the river"-" means to the bank

J4
J1

o
E is the lateral deciation on the right side"+" means to the upstreamthe side of HOLCIM"-" means to the downstream
f

J3

J15

-2

1
-3

-2
-1

-1
21
-1
2
-1
0

J16

1
2
-2
-3
-2
-1

J18
J17
J17-1
J11

J19 J20
J6

M2

J5

J10

A1

M8
M7

M9
M3

Remark

Observation ended on
Dec 28,2008
Observation ended on
Jan 11,2009
Observation ended on
Dec 24,2008
Observation ended on
Dec 31,2008

Observation ended on
Dec 26,2008