1. 400 kV interconnection line Albania (Tirana)-Kosovo (Prishtina) 2. 400 kV Interconnection Line FYR of Macedonia Albania Italy
IS UNDER IMPLEMENTATION THE PROJECT: 400 KV INTERCONNECTION LINE ELBASAN TIRANA 2 (ALBANIA)-PODGORICE (MONTENEGRO)
ELBASAN TIRANA 2 (ALBANIA) Financed by Italian Government; Duration of the project: 24 months The total length is approximately 47 km. Overall project value (Euro): 29 million Euro TIRANA 2 (ALBANIA)-PODGORICE (MONTENEGRO) Financed by KfW; Duration of the project: 24 months Overall project value (Euro): 42 million Euro The total length is approximately 156 km. For the first part of the line Tirana 2 to Vau Dejes, the towers will be for double circuit (78 km), to be used also for the 400 kV interconnection line Albania-Kosovo. Moreever, Albania would need to further increase its capacities of interconnection lines
MINISTRY OF ECONOMY, TRADE AND ENERGY SEPTEMBER, 2007
Development of Electrical Demand Albania 2000 2020 Development f Peak System Load Albania 2000 2020 Development of Electricity generation Albania 2000 2020
New Projects:
KfW has expressed interest for financing the project KESH/OST None
Infrastructure
Proposed Bilateral
24 months
Environmental Assessment:
DONE
New Project
Overall project value (Euro): First phase: 450 Million EURO (Estimated) Type of the Project: Infrastructure
400 KV OHTL AND SUBMARINE CABLE INTERCONNECTION AMONG FYR OF MACEDONIAALBANIA-ITALY Technical characteristic :
OVERHEAD TRANSMISSION LINE (MACEDONIA AND ALBANIA)
VOLTAGE 400 KV RATED CAPACITY 1,200 MVA (NTC LIMIT SET TO UP TO 1,200 MW) FORMATION WITH TWO SHIELD WIRES (OF WHICH AT LEAST ONE INCLUDES\FIBER-OPTIC)
Trans-regional
400 kV overhead transmission line from 400/220/110 kV Bitola substation up to Elbasan substation, around 128 km. 400 kV transmission line Elbasan - Durres around 70 km. Construction of the new AC/DC substations in Durres and Foggia. Construction of new submarine cable from Durres substation to Foggia substation, approximately 330km.
The new 400 KV OHTL and Submarine cable interconnection among FYR OF MACEDONIA-ALBANIA-ITALY will have positive effect on the regional network performance. From an economic point of view, the benefits due to transmission interconnection Macedonia-Albania-Italy would exceed the total investment cost with a benefit-cost ratio of 3.0 over the study period. Also, some other benefits of this project are the increase of the revenue from the electricity transit, the increase of the system reliability, sharing reserve capacities, etc.