Sie sind auf Seite 1von 155

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS

ITEM DESCRIPTION QTY UNIT RATE

BILL NO. 2 SPECIFIC REQUIREMENTS (All Provisional)

The following Provisional Sums included herein are to be used only as directed bv the Engineer and/ or deducted in full or in part if not required. A Make, cure and convey concrete test cubes to Laboratory and test. Make insitu density tests on backfill and road base material when and as directed by the Engineer. C Reinstate Lot boundaries disturbed during construction. 1 Sum 224,000.00

Sum

67,500.00

Sum

90,000.00

SPECIFIC REQUIREMENTS Carried to Summary Infrastructure Works page I.W.

2/1

67,500.00

224,000.00

90,000.00

381,500.00

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS


ITEM DESCRIPTION QTY UNIT RATE

BILL NO. 3 DAYWORKS

The Contractor will be reimbursed as defined below for the cost of works carried out as dayworks in accordance with clause 52 (4) of the Condition of Contract. The Contractor is to insert below the percentage additions he requires to each section of the Prime Cost for overheads and profit, and also insert the appropriate amount in the cash column

LABOUR A Provide in respect of the Prime Cost of Labour the Provisional Sum of $100.000.00 Percentage addition for overheads and profit. MATERIALS C Provide in respect of the Prime Cost of Material, the Provisional Sum of $75.000.00 Percentage addition for overheads and profit. PLANT E Provide in respect of the Prime Cost of Plant, the Provisional Sum of $75.000.00 Percentage addition for overheads and profit. 15 15 10

Sum %

Sum %

Sum %

DAYWORKS Carried to Summary Infrastructure Works page I.W.

3/1

100,000.00 10,000.00

75,000.00 11,250.00

75,000.00 11,250.00

282,500.00

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS


ITEM DESCRIPTION QTY UNIT RATE

Bill NO. 4 SITE CLEARANCE A Remove shrubs, undergrowth and the like, together
with their roots and remove debris from site.

15,814 Sq.M

200.00

Remove trees together with their roots and remove from site. (girth exceeding 0.9m and not exceeding 1.2m) Ditto (girth exceeding 1.2m and not exceeding 1.5m).

10

No.

12,000.00

10 Ditto (girth exceeding 2.1 m and not exceeding 2.4m).

No.

15,000.00

10

No.

30,000.00

SITE CLEARANCE Carried to Summary Infrastructure Works page I.W.

4/1

3,162,800.00

120,000.00

150,000.00

300,000.00

3,732,800.00

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS


ITEM DESCRIPTION QTY UNIT RATE $

Bill NO. 5 ROADWAY. Preambles The works in this section comprises the construction of Roadway, sidewalk and footpath include excavating or all works to sub-base, base and surface of roads etc and kerb wall, including all normal difficulties caused by obstructions and costs in connection herewith. The supply of approved marl backfill and compact in max 150mm layers to 95% modified proctor density. Surplus excavated material is to be stockpiled on site to be used as directed by the "Engineer".

R.7

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS

R.8

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS ROADWAY. Road No.1a Excavation and Earthworks

Excavate average 150mm deep to remove vegetable soil and set aside for reuse as directed. Excavate roadway and sidewalk to subgrade commencing at strip site level not exceeding 2.50m maximum depth and deposit excavated material on site (Provisional). Extra over excavation and disposal for breaking up rock. (Provisional) Selected excavated material well consolidated in making up levels to sub-base. (Provisional) Approved granular fill material well consolidated in making up levels to sub-base. 125mm Thick approved river shingle or well graded crushed aggregate as sub-base; spread, levelled, watered and well rammed and consolidated in 100mm layers including levelling and compacting ground under and preparing surface to receive base course. (measured separately) 125mm Thick approved marl spread, levelled, watered and well rammed and consolidated in 100mm layers including levelling and compacting ground under and preparing surface to receive concrete bed and asphaltic concrete. (measured separately)

7,454

m2

120.00

894,480.00

7,339

m3

727.00

5,335,453.00

4,403

m3

2,350.00

10,347,050.00

6,605

m3

682.00

4,504,610.00

5,654

m3

1,936.00

10,946,144.00

3,970

m2

498.00

1,977,060.00

3,970

m2

515.00

2,044,550.00

Grade surface of excavation to falls and cross falls. Prepare and apply prime tack coat MCO as specified at a rate of spread of between 0.8 and 1.0 litre per M2 and including cleaning and watering the layer to be primed and maintaining the primed surface as specified. Prepare and apply 40mm thick type 4(b) asphaltic concrete laid and rolled to fall and camber approved by the engineer (all in accordance with Specification).

3,970

m2

82.00

325,540.00

3970

m2

155.00

615,350.00

3970

m2

2,100.00

8,337,000.00

R.9

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS Concrete Kerb

125mm x 250mm precast concrete half battered kerb, bed, joint, and point in cement mortar (1:3), on and including 300 x 150mm concrete 17 N/mm2 foundation, with similar concrete haunching, including all necessary excavation, backfilling and subsequent disposal of surplus excavated material. Ditto, but to varying radii 150mm average thickness of concrete 21 N/mm2 in paver gutter finished with a steel float Road #1a Carried to collection.

932 290

m m

1,438.00 2,081.00

1,340,216.00 603,490.00

K L

550

m2

1,739.00

956,450.00 48,227,393.00

R.10

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS ROADWAY (Cont.) Road No.1a Sidewalk

150mm Thick reinforced concrete 21 MPa bed laid to falls in alternate bays, complete with brush broom finish and iron marking including JRC 125 reinforced fabric, formwork and filling to make up levels Street Signs Include the Provisional Sum of $50,000 for supplying and erecting "Street Name" signs and stop signs to ministry of Construction specification.

733

m2

3,976.00

2,914,408.00

1 B Include the Provisional sum of $12,000.00 for Road marking as per Engineer requirements.

Sum

50,000.00

50,000.00

Sum

12,000.00

12,000.00

Road #1 Carried to collection.

2,976,408.00

COLLECTION Carried from page R.2 Carried from page R.3 48,227,393.00 2,976,408.00

Road #1 Carried to Roadway collection.

51,203,801.00

R.11

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS

R.12

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS ROADWAY. Road No.1b Excavation and Earthworks A Excavate average 150mm deep to remove vegetable soil and set aside for reuse as directed. Excavate roadway and sidewalk to subgrade commencing at strip site level not exceeding 2.50m maximum depth and deposit excavated material on site (Provisional). Extra over excavation and disposal for breaking up rock. (Provisional) Approved granular fill material well consolidated in making up levels to sub-base. 125mm Thick approved river shingle or well graded crushed aggregate as sub-base; spread, levelled, E watered and well rammed and consolidated in 100mm layers including levelling and compacting ground under and preparing surface to receive base course. (measured separately) 125mm Thick approved marl spread, levelled, watered and well rammed and consolidated in 100mm layers including levelling and compacting ground under and preparing surface to receive concrete bed and asphaltic concrete. (measured separately) 663 m2 498.00 330,174.00

1,244

m2

120.00

149,280.00

m3

727.00

5,089.00

m3

2,350.00

2,350.00

7,450

m3

1,936.00

14,423,200.00

663

m2

515.00

341,445.00

Grade surface of excavation to falls and cross falls. Prepare and apply prime tack coat MCO as specified at a rate of spread of between 0.8 and 1.0 litre per M2 and including cleaning and watering the layer to be primed and maintaining the primed surface as specified. Prepare and apply 40mm thick type 4(b) asphaltic concrete laid and rolled to fall and camber approved by the engineer (all in accordance with Specification).

663

m2

82.00

54,366.00

663

m2

155.00

102,765.00

663

m2

2,100.00

1,392,300.00

Concrete Kerb

R.13

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS 125mm x 250mm precast concrete half battered kerb, bed, joint, and point in cement mortar (1:3), on and including 300 x 150mm concrete 17 N/mm2 foundation, with similar concrete haunching, including all necessary excavation, backfilling and subsequent disposal of surplus excavated material. Ditto, but to varying radii 150mm average thickness of concrete 21 N/mm2 in paver gutter finished with a steel float

194 10

m m

1,438.00 2,081.00

278,972.00 20,810.00

92

m2

1,739.00

159,988.00

Road #1b Carried to collection.

17,260,739.00

R.14

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS ROADWAY (Cont.) Road No.1b Street Signs Include the Provisional Sum of $50,000 for supplying and erecting "Street Name" signs and stop signs to ministry of Construction specification. 1 B Include the Provisional sum of $5,000.00 for Road marking as per Engineer requirements. Sum 50,000.00 50,000.00

Sum

5,000.00

5,000.00

Road #1b Carried to collection.

55,000.00

COLLECTION Carried from page R.4 Carried from page R.5 17,260,739.00 55,000.00

Road #1b Carried to Roadway collection.

17,315,739.00

R.15

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS

R.16

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS ROADWAY (Cont.) Road No.2 Excavation and Earthworks A Excavate average 150mm deep to remove vegetable soil and set aside for reuse as directed. Excavate roadway and sidewalk to subgrade commencing at strip site level not exceeding 2.50m maximum depth and deposit excavated material on site (Provisional). Extra over excavation and disposal for breaking up rock. (Provisional) Selected excavated material well consolidated in making up levels to sub-base. (Provisional) 125mm Thick approved river shingle or well graded crushed aggregate as sub-base; spread, levelled, E watered and well rammed and consolidated in 100mm layers including levelling and compacting ground under and preparing surface to receive base course. (measured separately) 125mm Thick approved marl spread, levelled, watered and well rammed and consolidated in 100mm layers including levelling and compacting ground under and preparing surface to receive concrete bed and asphaltic concrete. (measured separately) Grade surface of excavation to falls and crossfalls. Prepare and apply prime tack coat MCO as specified at a rate of spread of between 0.8 and 1.0 litre per M2 and including cleaning and watering the layer to be primed and maintaining the primed surface as specified. Prepare and apply 40mm thick type 4(b) asphaltic concrete laid and rolled to fall and camber approved by the engineer (all in accordance with Specification). 582 m2 498.00 289,836.00

887

m2

120.00

106,440.00

1,743

m3

727.00

1,267,161.00

1,569

m3

2,350.00

3,687,150.00

m3

682.00

682.00

582 582

m2 m2

515.00 82.00

299,730.00 47,724.00

582

m2

155.00

90,210.00

582

m2

2,100.00

1,222,200.00

Concrete Kerb

R.17

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS 125mm x 250mm precast concrete half battered kerb, bed, joint, and point in cement mortar (1:3), on and including 300 x 150mm concrete 17 N/mm2 foundation, with similar concrete haunching, including all necessary excavation, backfilling and subsequent disposal of surplus excavated material. Ditto, but to varying radii 150mm average thickness of concrete 21 N/mm2 in paver gutter finished with a steel float

124 70

m m

1,438.00 2,081.00

178,312.00 145,670.00

87

m2

1,739.00

151,293.00

Road #2 Carried to collection.

7,486,408.00

R.18

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS ROADWAY (Cont.) Road No.2 Street Signs Include the Provisional Sum of $50,000 for supplying and erecting "Street Name" signs and stop signs to ministry of Construction specification. 1 B Include the Provisional sum of $9,000.00 for Road marking as per Engineer requirements. Sum 50,000.00 50,000.00

Sum

9,000.00

9,000.00

Road #2 Carried to collection.

59,000.00

COLLECTION Carried from page R.6 Carried from page R.7 7,486,408.00 59,000.00

Road #2 Carried to Roadway collection.

7,545,408.00

R.19

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS

R.20

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS ROADWAY (Cont.) Road No.3 Excavation and Earthworks A Excavate average 150mm deep to remove vegetable soil and set aside for reuse as directed. Excavate roadway and sidewalk to subgrade commencing at graded ground level not exceeding 2.50m maximum depth and deposit excavated material on site (Provisional). Extra over excavation and disposal for breaking up rock. (Provisional) Selected excavated material well consolidated in making up levels to sub-base. (Provisional) 125mm Thick approved river shingle or well graded crushed aggregate as sub-base; spread, levelled, watered and well rammed and consolidated in 100mm layers including levelling and compacting ground under and preparing surface to receive base course. (measured separately) 125mm Thick approved marl spread, levelled, watered and well rammed and consolidated in 100mm layers including levelling and compacting ground under and preparing surface to receive concrete bed and asphaltic concrete. (measured separately) Grade surface of excavation to falls and crossfalls. Prepare and apply prime tack coat MCO as specified at a rate of spread of between 0.8 and 1.0 litre per M2 and including cleaning and watering the layer to be primed and maintaining the primed surface as specified. Prepare and apply 40mm thick type 4(b) asphaltic concrete laid and rolled to fall and camber approved by the engineer (all in accordance with Specification).

4,758

m2

120.00

570,960.00

11,929

m3

727.00

8,672,383.00

8,947

m3

2,350.00

21,025,450.00

7,891

m3

682.00

5,381,662.00

2,535

m2

498.00

1,262,430.00

2,535 2,535

m2 m2

515.00 82.00

1,305,525.00 207,870.00

2,535

m2

155.00

392,925.00

2,535

m2

2,100.00

5,323,500.00

Concrete Kerb

R.21

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS 125mm x 250mm precast concrete half battered kerb, bed, joint, and point in cement mortar (1:3), on and including 300 x 150mm concrete 17 N/mm2 foundation, with similar concrete haunching, including all necessary excavation, backfilling and subsequent disposal of surplus excavated material. Ditto, but to varying radii 150mm average thickness of concrete 21 N/mm2 in paver gutter finished with a steel float

740 40

m m

1,438.00 2,081.00

1,064,120.00 83,240.00

351

m2

1,739.00

610,389.00

Road #3 Carried to collection.

45,900,454.00

R.22

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS ROADWAY (Cont.) Road No.3 Street Signs Include the Provisional Sum of $50,000 for supplying and erecting "Street Name" signs and stop signs to ministry of Construction specification. 1 B Include the Provisional sum of $12,000.00 for Road marking as per Engineer requirements. Sum 50,000.00 50,000.00

Sum

12,000.00

12,000.00

Road #3 Carried to collection.

62,000.00

COLLECTION Carried from page R.8 Carried from page R.9 62,000.00 45,900,454.00

Road #3 Carried to Roadway collection.

45,962,454.00

R.23

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS

R.24

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS ROADWAY (Cont.) Road No.4 Excavation and Earthworks A Excavate average 150mm deep to remove vegetable soil and set aside for reuse as directed. Excavate roadway and sidewalk to subgrade commencing at graded ground level not exceeding 1.50m maximum depth and deposit excavated material on site (Provisional). Extra over excavation and disposal for breaking up rock. (Provisional) Selected excavated material well consolidated in making up levels to sub-base. (Provisional) 125mm Thick approved river shingle or well graded crushed aggregate as sub-base; spread, levelled, E watered and well rammed and consolidated in 100mm layers including levelling and compacting ground under and preparing surface to receive base course. (measured separately) 125mm Thick approved marl spread, levelled, watered and well rammed and consolidated in 100mm layers including levelling and compacting ground under and preparing surface to receive concrete bed and asphaltic concrete. (measured separately) Grade surface of excavation to falls and crossfalls. Prepare and apply prime tack coat MCO as specified at a rate of spread of between 0.8 and 1.0 litre per M2 and including cleaning and watering the layer to be primed and maintaining the primed surface as specified. Prepare and apply 40mm thick type 4(b) asphaltic concrete laid and rolled to fall and camber approved by the engineer (all in accordance with Specification). 330 m2 498.00 164,340.00

503

m2

120.00

60,360.00

m3

727.00

5,816.00

m3

2,350.00

2,350.00

187

m3

682.00

127,534.00

330 330

m2 m2

515.00 82.00

169,950.00 27,060.00

330

m2

155.00

51,150.00

330

m2

2,100.00

693,000.00

Concrete Kerb

R.25

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS 125mm x 250mm precast concrete half battered kerb, bed, joint, and point in cement mortar (1:3), on and including 300 x 150mm concrete 17 N/mm2 foundation, with similar concrete haunching, including all necessary excavation, backfilling and subsequent disposal of surplus excavated material. Ditto, but to varying radii 150mm average thickness of concrete 21 N/mm2 in paver gutter finished with a steel float

50 60

m m

1,438.00 2,081.00

71,900.00 124,860.00

I J

50

m2

1,739.00

86,950.00

Road #4 Carried to collection.

1,585,270.00

R.26

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS ROADWAY (Cont.) Road No.4 Street Signs Include the Provisional Sum of $50,000 for supplying and erecting "Street Name" signs and stop signs to ministry of Construction specification. 1 B Include the Provisional sum of $3,850.00 for Road marking as per Engineer requirements. Sum 50,000.00 50,000.00

Sum

3,850.00

3,850.00

Road #4 Carried to collection.

53,850.00

COLLECTION Carried from page R.10 Carried from page R.11 1,585,270.00 53,850.00

Road #4 Carried to Roadway collection.

1,639,120.00

R.27

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS

R.28

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS ROADWAY (Cont.) Road No.5 Excavation and Earthworks Excavate average 150mm deep to remove vegetable soil and set aside for reuse as directed. Excavate roadway and sidewalk to subgrade commencing at strip site level not exceeding 2.50m maximum depth and deposit excavated material on site (Provisional). Extra over excavation and disposal for breaking up rock. (Provisional) Selected excavated material well consolidated in making up levels to sub-base. (Provisional) 125mm Thick approved river shingle or well graded crushed aggregate as sub-base; spread, levelled, watered and well rammed and consolidated in 100mm layers including levelling and compacting ground under and preparing surface to receive base course. (measured separately) 125mm Thick approved marl spread, levelled, watered and well rammed and consolidated in 100mm layers including levelling and compacting ground under and preparing surface to receive concrete bed and asphaltic concrete. (measured separately) Grade surface of excavation to falls and crossfalls. Prepare and apply prime tack coat MCO as specified at a rate of spread of between 0.8 and 1.0 litre per M2 and including cleaning and watering the layer to be primed and maintaining the primed surface as specified. Prepare and apply 40mm thick type 4(b) asphaltic concrete laid and rolled to fall and camber approved by the engineer (all in accordance with Specification).

2,459

m2

120.00

295,080.00

3,838

m3

727.00

2,790,226.00

384

m3

2,350.00

902,400.00

707

m3

682.00

482,174.00

1,614

m2

498.00

803,772.00

1,614 1,614

m2 m2

515.00 82.00

831,210.00 132,348.00

1,614

m2

155.00

250,170.00

1,614

m2

2,100.00

3,389,400.00

Concrete Kerb 125mm x 250mm precast concrete half battered kerb, bed, joint, and point in cement mortar (1:3), on and including 300 x 150mm concrete 17 N/mm2 foundation, with similar concrete haunching, including all necessary excavation, backfilling and subsequent disposal of surplus excavated material, but to varying radii R.29

50

1,438.00

71,900.00

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS I J Ditto, but to varying radii 150mm average thickness of concrete 21 N/mm2 in paver gutter finished with a steel float 60 m 2,081.00 124,860.00

50

m2

1,739.00

86,950.00

Road #5 Carried to collection.

10,160,490.00

R.30

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS ROADWAY (Cont.) Road No.5 (Cont.)

Street Signs Include the Provisional Sum of $50,000 for supplying and erecting "Street Name" signs and stop signs to ministry of Construction specification. 1 Sum 50,000.00 50,000.00

Include the Provisional sum of $10,000.00 for Road marking as per Engineer requirements.

Sum

10,000.00

10,000.00

Road #5 Carried to collection.

60,000.00

COLLECTION Carried from page R.12 Carried from page R.13 10,160,490.00 60,000.00

Road #5 Carried to Roadway collection.

10,220,490.00

R.31

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS

R.32

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS ROADWAY (Cont.) Road No.6 Excavation and Earthworks Excavate average 150mm deep to remove vegetable soil and set aside for reuse as directed. Excavate roadway and sidewalk to subgrade commencing at strip site level not exceeding 2.50m maximum depth and deposit excavated material on site (Provisional). Extra over excavation and disposal for breaking up rock. (Provisional) Selected excavated material well consolidated in making up levels to sub-base. (Provisional) 125mm Thick approved river shingle or well graded crushed aggregate as sub-base; spread, levelled, watered and well rammed and consolidated in 100mm layers including levelling and compacting ground under and preparing surface to receive base course. (measured separately) 125mm Thick approved marl spread, levelled, watered and well rammed and consolidated in 100mm layers including levelling and compacting ground under and preparing surface to receive concrete bed and asphaltic concrete. (measured separately) Grade surface of excavation to falls and crossfalls. Prepare and apply prime tack coat MCO as specified at a rate of spread of between 0.8 and 1.0 litre per M2 and including cleaning and watering the layer to be primed and maintaining the primed surface as specified. Prepare and apply 40mm thick type 4(b) asphaltic concrete laid and rolled to fall and camber approved by the engineer (all in accordance with Specification).

1,197

m2

120.00

143,640.00

396

m3

727.00

287,892.00

40

m3

2,350.00

94,000.00

25

m3

682.00

17,050.00

786

m2

498.00

391,428.00

786 786

m2 m2

515.00 82.00

404,790.00 64,452.00

786

m2

155.00

121,830.00

786

m2

2,100.00

1,650,600.00

Concrete Kerb

125mm x 250mm precast concrete half battered kerb, bed, joint, and point in cement mortar (1:3), on and including 300 x 150mm concrete 17 N/mm2 foundation, with similar concrete haunching, including all necessary excavation, backfilling and subsequent disposal of surplus excavated material. R.33

182

1,438.00

261,716.00

Ditto, but to varying radii

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS 80 m

2,081.00

166,480.00

150mm average thickness of concrete 21 N/mm2 in paver gutter finished with a steel float

118

m2

1,739.00

205,202.00

Road #6 Carried to collection.

3,809,080.00

R.34

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS ROADWAY (Cont.) Road No.6 (Cont.)

Street Signs Include the Provisional Sum of $50,000 for supplying and erecting "Street Name" signs and stop signs to ministry of Construction specification. 1 Include the Provisional sum of $3,850.00 for Road marking as per Engineer requirements. Sum 50,000.00 50,000.00

Sum

3,850.00

3,850.00

Road #6 Carried to collection.

53,850.00

COLLECTION Carried from page R.14 Carried from page R.15 3,809,080.00 53,850.00

Road #6 Carried to Roadway collection.

3,862,930.00

R.35

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS

R.36

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS ROADWAY (Cont.) Road No.7 Excavation and Earthworks Excavate average 150mm deep to remove vegetable soil and set aside for reuse as directed. Excavate roadway and sidewalk to subgrade commencing at strip site level not exceeding 2.50m maximum depth and deposit excavated material on site (Provisional). Extra over excavation and disposal for breaking up rock. (Provisional) Selected excavated material well consolidated in making up levels to sub-base. (Provisional) 125mm Thick approved river shingle or well graded crushed aggregate as sub-base; spread, levelled, E watered and well rammed and consolidated in 100mm layers including levelling and compacting ground under and preparing surface to receive base course. (measured separately) 125mm Thick approved marl spread, levelled, watered and well rammed and consolidated in 100mm layers including levelling and compacting ground under and preparing surface to receive concrete bed and asphaltic concrete. (measured separately) Grade surface of excavation to falls and crossfalls. Prepare and apply prime tack coat MCO as specified at a rate of spread of between 0.8 and 1.0 litre per M2 and including cleaning and watering the layer to be primed and maintaining the primed surface as specified. Prepare and apply 40mm thick type 4(b) asphaltic concrete laid and rolled to fall and camber approved by the engineer (all in accordance with Specification). 2,034 m2 498.00 1,012,932.00

3,098

m2

120.00

371,760.00

2,910

m3

727.00

2,115,570.00

2,474

m3

2,350.00

5,813,900.00

3,857

m3

682.00

2,630,474.00

2,034 2,034

m2 m2

515.00 82.00

1,047,510.00 166,788.00

2,034

m2

155.00

315,270.00

2,034

m2

2,100.00

4,271,400.00

Concrete Kerb

R.37

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS 125mm x 250mm precast concrete half battered kerb, bed, joint, and point in cement mortar (1:3), on and including 300 x 150mm concrete 17 N/mm2 foundation, with similar concrete haunching, including all necessary excavation, backfilling and subsequent disposal of surplus excavated material. Ditto, but to varying radii 150mm average thickness of concrete 21 N/mm2 in paver gutter finished with a steel float

598 80

m m

1,438.00 2,081.00

859,924.00 166,480.00

I J

305

m2

1,739.00

530,395.00

Road #7 Carried to collection.

19,302,403.00

R.38

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS ROADWAY (Cont.) Road No.7 (Cont.)

Street Signs Include the Provisional Sum of $18,000 for supplying and erecting "Street Name" signs and stop signs to ministry of Construction specification. 1 Sum 18,000.00 18,000.00

Include the Provisional sum of $3,850.00 for Road marking as per Engineer requirements.

Sum

3,850.00

3,850.00

Road #7 Carried to collection.

21,850.00

COLLECTION Carried from page R.16 Carried from page R.17 19,302,403.00 21,850.00

Road #7 Carried to Roadway collection.

19,324,253.00

R.39

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS

R.40

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS ROADWAY (Cont.) Road No.8 Excavation and Earthworks Excavate average 150mm deep to remove vegetable soil and set aside for reuse as directed. Excavate roadway and sidewalk to subgrade commencing at strip site level not exceeding 2.50m maximum depth and deposit excavated material on site (Provisional). Extra over excavation and disposal for breaking up rock. (Provisional) Approved granular fill material well consolidated in making up levels to sub-base. 125mm Thick approved river shingle or well graded crushed aggregate as sub-base; spread, levelled, watered and well rammed and consolidated in 100mm layers including levelling and compacting ground under and preparing surface to receive base course. (measured separately) 125mm Thick approved marl spread, levelled, watered and well rammed and consolidated in 100mm layers including levelling and compacting ground under and preparing surface to receive concrete bed and asphaltic concrete. (measured separately) Grade surface of excavation to falls and crossfalls. Prepare and apply prime tack coat MCO as specified at a rate of spread of between 0.8 and 1.0 litre per M2 and including cleaning and watering the layer to be primed and maintaining the primed surface as specified. Prepare and apply 40mm thick type 4(b) asphaltic concrete laid and rolled to fall and camber approved by the engineer (all in accordance with Specification).

2,047

m2

120.00

245,640.00

644

m3

727.00

468,188.00

64

m3

2,350.00

150,400.00

2,873

m3

1,936.00

5,562,128.00

1,344

m2

498.00

669,312.00

1,344 1,344

m2 m2

515.00 82.00

692,160.00 110,208.00

1,344

m2

155.00

208,320.00

1,344

m2

2,100.00

2,822,400.00

Concrete Kerb

125mm x 250mm precast concrete half battered kerb, bed, joint, and point in cement mortar (1:3), on and including 300 x 150mm concrete 17 N/mm2 foundation, with similar concrete haunching, including all necessary excavation, backfilling and subsequent disposal of surplus excavated material. R.41

418

1,438.00

601,084.00

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS I J Ditto, but to varying radii 150mm average thickness of concrete 21 N/mm2 in paver gutter finished with a steel float 30 m 2,081.00 62,430.00

202

m2

1,739.00

351,278.00

Road #8 Carried to collection.

11,943,548.00

R.42

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS ROADWAY (Cont.) Road 8 (Cont.)

Street Signs Include the Provisional Sum of $50,000 for supplying and erecting "Street Name" signs and stop signs to ministry of Construction specification. 1 Include the Provisional sum of $10,000.00 for Road marking as per Engineer requirements. Sum 50,000.00 50,000.00

Sum

10,000.00

10,000.00

Road # 8 Carried to collection.

60,000.00

COLLECTION Carried from page R.18 Carried from page R.19 11,943,548.00 60,000.00

Road # 8 Carried to Roadway collection.

12,003,548.00

R.43

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS

R.44

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS ROADWAY (Cont.) Road No.9a Excavation and Earthworks A Excavate average 150mm deep to remove vegetable soil and set aside for reuse as directed. Excavate roadway and sidewalk to subgrade commencing at strip site level not exceeding 2.50m maximum depth and deposit excavated material on site (Provisional). Extra over excavation and disposal for breaking up rock. (Provisional) Selected excavated material well consolidated in making up levels to sub-base. (Provisional) Approved granular fill material well consolidated in making up levels to sub-base. 125mm Thick approved river shingle or well graded crushed aggregate as sub-base; spread, levelled, watered and well rammed and consolidated in 100mm layers including levelling and compacting ground under and preparing surface to receive base course. (measured separately) 125mm Thick approved marl spread, levelled, watered and well rammed and consolidated in 100mm layers including levelling and compacting ground under and preparing surface to receive concrete bed and asphaltic concrete. (measured separately) Grade surface of excavation to falls and crossfalls. Prepare and apply prime tack coat MCO as specified at a rate of spread of between 0.8 and 1.0 litre per M2 and including cleaning and watering the layer to be primed and maintaining the primed surface as Prepare and apply 40mm thick type 4(b) asphaltic concrete laid and rolled to fall and camber approved by the engineer (all in accordance with Specification).

2,559

m2

120.00

307,080.00

1,818

m3

727.00

1,321,686.00

182

m3

2,350.00

427,700.00

1,818

m3

682.00

1,239,876.00

3,018

m3

1,936.00

5,842,848.00

1,680

m2

498.00

836,640.00

1,680 1,680

m2 m2

515.00 82.00

865,200.00 137,760.00

1,680

m2

155.00

260,400.00

1,680

m2

2,100.00

3,528,000.00

Concrete Kerb

R.45

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS 125mm x 250mm precast concrete half battered kerb, bed, joint, and point in cement mortar (1:3), on and including 300 x 150mm concrete 17 N/mm2 foundation, with similar concrete haunching, including all necessary excavation, backfilling and subsequent disposal of surplus excavated material. Ditto, but to varying radii 150mm average thickness of concrete 21 N/mm2 in paver gutter finished with a steel float

490 70

m m

1,438.00 2,081.00

704,620.00 145,670.00

J K

252

m2

1,739.00

438,228.00

Road #9a Carried to collection.

16,055,708.00

ROADWAY (Cont.) Road 9a (Cont.)

Street Signs Include the Provisional Sum of $18,000 for supplying and erecting "Street Name" signs and stop signs to ministry of Construction specification. 1 Sum 18,000.00 18,000.00

Include the Provisional sum of $3,850.00 for Road marking as per Engineer requirements.

Sum

3,850.00

3,850.00

Road # 9a Carried to collection.

21,850.00

COLLECTION Carried from page R.20 Carried from page R.21 16,055,708.00 21,850.00

Road # 9a Carried to Roadway collection. R.46

16,077,558.00

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS

R.47

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS ROADWAY (Cont.) Road No.9b Excavation and Earthworks A Excavate average 150mm deep to remove vegetable soil and set aside for reuse as directed. Excavate roadway and sidewalk to subgrade commencing at strip site level not exceeding 2.50m maximum depth and deposit excavated material on site (Provisional). Extra over excavation and disposal for breaking up rock. (Provisional) Selected excavated material well consolidated in making up levels to sub-base. (Provisional) 125mm Thick approved river shingle or well graded crushed aggregate as sub-base; spread, levelled, watered and well rammed and consolidated in 100mm layers including levelling and compacting ground under and preparing surface to receive base course. (measured separately) 125mm Thick approved marl spread, levelled, watered and well rammed and consolidated in 100mm layers including levelling and compacting ground under and preparing surface to receive concrete bed and asphaltic concrete. (measured separately) Grade surface of excavation to falls and crossfalls. Prepare and apply prime tack coat MCO as specified at a rate of spread of between 0.8 and 1.0 litre per M2 and including cleaning and watering the layer to be primed and maintaining the primed surface as Prepare and apply 40mm thick type 4(b) asphaltic concrete laid and rolled to fall and camber approved by the engineer (all in accordance with Specification).

877

m2

120.00

105,240.00

m3

727.00

3,635.00

0.5

m3

2,350.00

1,175.00

1,623

m3

682.00

1,106,886.00

576

m2

498.00

286,848.00

576 576

m2 m2

515.00 82.00

296,640.00 47,232.00

576

m2

155.00

89,280.00

576

m2

2,100.00

1,209,600.00

Concrete Kerb

125mm x 250mm precast concrete half battered kerb, bed, joint, and point in cement mortar (1:3), on and including 300 x 150mm concrete 17 N/mm2 foundation, with similar concrete haunching, including all necessary excavation, backfilling and subsequent disposal of surplus excavated material. R.48

112

1,438.00

161,056.00

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS I J Ditto, but to varying radii 150mm average thickness of concrete 21 N/mm2 in paver gutter finished with a steel float 80 m 2,081.00 166,480.00

86

m2

1,739.00

149,554.00

Road #9b Carried to collection.

3,623,626.00

R.49

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS ROADWAY (Cont.) Road 9b (Cont.)

Street Signs Include the Provisional Sum of $36,000 for supplying and erecting "Street Name" signs and stop signs to ministry of Construction specification. 1 Sum 36,000.00 36,000.00

Include the Provisional sum of $15,400.00 for Road marking as per Engineer requirements.

Sum

15,400.00

15,400.00

Road # 9b Carried to collection.

51,400.00

COLLECTION Carried from page R.22 Carried from page R.23 3,623,626.00 51,400.00

Road # 9b Carried to Roadway collection.

3,675,026.00

R.50

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS

R.51

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS ROADWAY (Cont.) Road No.10 Excavation and Earthworks A Excavate average 150mm deep to remove vegetable soil and set aside for reuse as directed. Excavate roadway and sidewalk to subgrade commencing at strip site level not exceeding 2.50m maximum depth and deposit excavated material on site (Provisional). Extra over excavation and disposal for breaking up rock. (Provisional) Selected excavated material well consolidated in making up levels to sub-base. (Provisional) 125mm Thick approved river shingle or well graded crushed aggregate as sub-base; spread, levelled, watered and well rammed and consolidated in 100mm layers including levelling and compacting ground under and preparing surface to receive base course. (measured separately) 125mm Thick approved marl spread, levelled, watered and well rammed and consolidated in 100mm layers including levelling and compacting ground under and preparing surface to receive concrete bed and asphaltic concrete. (measured separately) Grade surface of excavation to falls and crossfalls. Prepare and apply prime tack coat MCO as specified at a rate of spread of between 0.8 and 1.0 litre per M2 and including cleaning and watering the layer to be primed and maintaining the primed surface as specified. Prepare and apply 40mm thick type 4(b) asphaltic concrete laid and rolled to fall and camber approved by the engineer (all in accordance with Specification).

1,060

m2

120.00

127,200.00

1.0

m3

727.00

727.00

0.1

m3

2,350.00

235.00

2,227

m3

682.00

1,518,814.00

696

m2

498.00

346,608.00

696 696

m2 m2

515.00 82.00

358,440.00 57,072.00

696

m2

155.00

107,880.00

696

m2

2,100.00

1,461,600.00

Concrete Kerb

R.52

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS 125mm x 250mm precast concrete half battered kerb, bed, joint, and point in cement mortar (1:3), on and including 300 x 150mm concrete 17 N/mm2 foundation, with similar concrete haunching, including all necessary excavation, backfilling and subsequent disposal of surplus excavated material. Ditto, but to varying radii 150mm average thickness of concrete 21 N/mm2 in paver gutter finished with a steel float

222 10

m m

1,438.00 2,081.00

319,236.00 20,810.00

I J

104

m2

1,739.00

180,856.00

Road #10 Carried to collection.

4,499,478.00

R.53

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS ROADWAY (Cont.) Road 10 (Cont.)

Street Signs Include the Provisional Sum of $18,000 for supplying and erecting "Street Name" signs and stop signs to ministry of Construction specification. 1 Sum 18,000.00 18,000.00

Include the Provisional sum of $3,850.00 for Road marking as per Engineer requirements.

Sum

3,850.00

3,850.00

Road # 10 Carried to collection.

21,850.00

COLLECTION Carried from page R.24 Carried from page R.25 4,499,478.00 21,850.00

Road # 10 Carried to Roadway collection.

4,521,328.00

R.54

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS

R.55

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS ROADWAY (Cont.) Road No.11 Excavation and Earthworks A Excavate average 150mm deep to remove vegetable soil and set aside for reuse as directed. Excavate roadway and sidewalk to subgrade commencing at strip site level not exceeding 2.50m maximum depth and deposit excavated material on site (Provisional). Extra over excavation and disposal for breaking up rock. (Provisional) Selected excavated material well consolidated in making up levels to sub-base. (Provisional) 125mm Thick approved river shingle or well graded crushed aggregate as sub-base; spread, levelled, watered and well rammed and consolidated in 100mm layers including levelling and compacting ground under and preparing surface to receive base course. (measured separately) 125mm Thick approved marl spread, levelled, watered and well rammed and consolidated in 100mm layers including levelling and compacting ground under and preparing surface to receive concrete bed and asphaltic concrete. (measured separately) Grade surface of excavation to falls and crossfalls. Prepare and apply prime tack coat MCO as specified at a rate of spread of between 0.8 and 1.0 litre per M2 and including cleaning and watering the layer to be primed and maintaining the primed surface as specified. Prepare and apply 40mm thick type 4(b) asphaltic concrete laid and rolled to fall and camber approved by the engineer (all in accordance with Specification).

3,866

m2

120.00

463,920.00

2,479

m3

727.00

1,802,233.00

1,859

m3

2,350.00

4,368,650.00

5,344

m3

682.00

3,644,608.00

2,538

m2

498.00

1,263,924.00

2,538 2,538

m2 m2

515.00 82.00

1,307,070.00 208,116.00

2,538

m2

155.00

393,390.00

2,538

m2

2,100.00

5,329,800.00

Concrete Kerb

R.56

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS 125mm x 250mm precast concrete half battered kerb, bed, joint, and point in cement mortar (1:3), on and including 300 x 150mm concrete 17 N/mm2 foundation, with similar concrete haunching, including all necessary excavation, backfilling and subsequent disposal of surplus excavated material. Ditto, but to varying radii 150mm average thickness of concrete 21 N/mm2 in paver gutter finished with a steel float

756 90

m m

1,438.00 2,081.00

1,087,128.00 187,290.00

I J

381

m2

1,739.00

662,559.00

Road #11 Carried to collection.

20,718,688.00

R.57

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS ROADWAY (Cont.) Road 11 (Cont.)

Street Signs Include the Provisional Sum of $36,000 for supplying and erecting "Street Name" signs and stop signs to ministry of Construction specification. 1 Sum 36,000.00 36,000.00

Include the Provisional sum of $19,250.00 for Road marking as per Engineer requirements.

Sum

19,250.00

19,250.00

Road # 11 Carried to collection.

55,250.00

COLLECTION Carried from page R.24 Carried from page R.25 20,718,688.00 55,250.00

Road # 11 Carried to Roadway collection. R.58

20,773,938.00

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS

ROADWAY (Cont.) Provisional sum

Allow the Provisional sum of $500,000.00 for additional work to Roadway as per Engineer request.

Sum

500,000.00

500,000.00

Provisional Sum Carried to Roadway collection.

500,000.00

Collection Road #1a Carried from page R.3 Road #1b Carried from page R.5 Road #2 Carried from page R.7 Road #3 Carried from page R.9 Road #4 Carried from page R.11 Road #5 Carried from page R.13 Road #6 Carried from page R.15 R.59 51,203,801.00 17,315,739.00 7,545,408.00 45,962,454.00 1,639,120.00 10,220,490.00 3,862,930.00

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS Road #7 Carried from page R.17 Road #8 Carried from page R.19 Road #9a Carried from page R.21 Road #9b Carried from page R.23 Road #10 Carried from page R. 25 Road #11 Carried from page R. 27 Provisional Sum Carried from page R.28 19,324,253.00 12,003,548.00 16,077,558.00 3,675,026.00 4,521,328.00 20,773,938.00 500,000.00

ROADWAY Carried to Summary Infrastructure Works page I.W.

214,625,593.00

R.60

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS


ITEM DESCRIPTION QTY UNIT RATE $

Bill NO. 6 WATER SUPPLY Water Supply (Provisional sum) Preambles All excavation will commence at existing ground levels and all quantities are provisional and will be subject to remeasurement as the work progresses.

Water mains to average depth includes excavating, providing, laying, jointing, and testing pipes of the diameter, material and class specified. Backfilling material in 150mm layers and disposal of surplus, difficulties caused by obstructions and all other costs in connection herewith.

W.61

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS


ITEM DESCRIPTION QTY UNIT RATE $

WATER SUPPLY (Cont.) Water Supply along Road No.1a Excavation and Earthworks Excavate in trench average 600mm average depth for 200mm diameter pipe, part backfill with sand and remainder with selected excavated material and including the disposal of surplus excavated material. Excavate in trench average 600mm average depth for 150mm diameter pipe, part backfill with sand and remainder with selected excavated material and including the disposal of surplus excavated material. Excavate in trench average 600mm average depth for 100mm diameter pipe, part backfill with sand and remainder with selected excavated material and including the disposal of surplus excavated material. Excavate trench average 450mm deep for 20mm diameter pipes part backfilled with sand and remainder backfilled with selected excavated material and including disposal of surplus excavated material. Extra over excavation and disposal for excavating in rock. (Provisional) Pipework

219

800.00

175,200.00

80

750.00

60,000.00

516

700.00

361,200.00

26

500.00

13,000.00

96

m3

2,350.00

225,600.00

The following in PVC Schedule 40 pressure pipes with couplings and jointing as described:F G H I 20mm Diameter pipes laid in trench. 100mm Diameter pipes laid in trench. 150mm Diameter pipes laid in trench. 200mm Diameter pipes laid in trench. 26 516 80 219 m m m m 800.00 1,400.00 2,230.00 3,500.00 20,800.00 722,400.00 178,400.00 766,500.00

Extra over P.V.C. Pipe for the following : J K L M N O P Q R S 200 x 200 x 200mm Diameter tee 150 x 150 x 150mm Diameter tee 100 x 100 x 100mm Diameter tee 20 x 20 x 20mm Diameter tee 200mm Diameter 90 degree bend 100mm Diameter 90 degree bend 20mm Diameter 90 degree bend 100mm Diameter 11.25 degree bend 200 x 100mm Diameter reducer 150 x 100mm Diameter reducer 3 2 1 3 1 1 18 3 1 2 No. No. No. No. No. No. No. No. No. No. 8,000.00 6,900.00 6,400.00 2,000.00 7,000.00 5,000.00 3,000.00 5,000.00 4,500.00 3,080.00 24,000.00 13,800.00 6,400.00 6,000.00 7,000.00 5,000.00 54,000.00 15,000.00 4,500.00 6,160.00

Carried to Collection

2,664,960.00

W.62

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS


ITEM DESCRIPTION QTY UNIT RATE $

WATER SUPPLY (Cont.) Water Supply along Road No.1a (Cont.) Pipework (Cont.) A B C D 200 x 20mm Diameter saddle 100 x 20mm Diameter saddle 150mm Diameter end cap 20mm Diameter end cap 400mm Thick concrete Thrust block as per Engineer specification around the following fittings:E F G H I J K 200 x 200 x 200mm Diameter tee 150 x 150 x 150mm Diameter tee 100 x 100 x 100mm Diameter tee 200mm Diameter 90 degree bend 100mm Diameter 90 degree bend 100mm Diameter 11.25 degree bend 150mm Diameter end cap 3 2 1 1 1 3 1 No. No. No. No. No. No. No. 7,900.00 6,900.00 5,000.00 8,000.00 6,000.00 5,000.00 1,000.00 23,700.00 13,800.00 5,000.00 8,000.00 6,000.00 15,000.00 1,000.00 1 2 1 5 No. No. No. No. 7,000.00 5,040.00 1,000.00 700.00 7,000.00 10,080.00 1,000.00 3,500.00

100mm Diameter cast iron gate valve to MS SP-70 or AWWA C500 including all cutting and jointing.

No.

36,000.00

108,000.00

Excavate as necessary, supply, fix, joint, flanged cast iron fire hydrant complete with 2 No. 62mm diameter hose outlets, cast iron caps and steel chain, 100mm diameter duckfoot bend, 100mm hydrant column valve, and pre-cast concrete valve box, with cast iron frame and cover, concrete 2500 PSI thrust block and base, interconnecting piping and fittings, including 100mm diameter flanged mild steel socket and adaptor and Johnson coupling all assembled complete, primed and painted in three coats gloss oil paint and make good all works disturbed. Precast Concrete valve box 300 x 300 x 1000mm deep (approximately) with 100mm thick concrete 3000 PSI (20 N/mm2) base, 50mm sides and including cast iron cover and frame and concrete surround to top. 12 mm Diameter steel pegs 900mm long painted blue used to mark point for water supply connection. Carried to Collection COLLECTION Carried from page W.2 Carried from page W.3

No.

105,000.00

315,000.00

No.

5,000.00

15,000.00

26

No.

1,000.00 $

26,000.00 558,080.00

2,664,960.00 558,080.00

Water Supply to Road No.1A carried to Collection

3,223,040.00

W.63

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS


ITEM DESCRIPTION QTY UNIT RATE $

WATER SUPPLY (Cont.) Water Supply along Road No.1b Excavation and Earthworks

Excavate in trench average 600mm average depth for 100mm diameter pipe, part backfill with sand and remainder with selected excavated material and including the disposal of surplus excavated material.

98

700.00

68,600.00

Excavate trench average 450mm deep for 20mm diameter pipes part backfilled with sand and remainder backfilled with selected excavated material and including disposal of surplus excavated material. Extra over excavation and disposal for excavating in rock. (Provisional) Pipework The following in PVC Schedule 40 pressure pipes with couplings and jointing as described:-

31

500.00

15,500.00

m3

2,350.00

4,700.00

D E

20mm Diameter pipes laid in trench. 100mm Diameter pipes laid in trench.

31 98

m m

800.00 1,400.00

24,800.00 137,200.00

Extra over P.V.C. Pipe for the following : F G H I J K L 100 x 100 x 100mm Diameter tee 20 x 20 x 20mm Diameter tee 20mm Diameter 90 degree bend 100mm Diameter 11.25 degree bend 200 x 100mm Diameter reducer 100 x 20mm Diameter saddle 20mm Diameter end cap 400mm Thick concrete Thrust block as per Engineer specification around the following fittings:M N 100 x 100 x 100mm Diameter tee 100mm Diameter 11.25 degree bend 1 6 No. No. 6,400.00 5,000.00 6,400.00 30,000.00 1 3 21 6 1 2 6 No. No. No. No. No. No. No. 6,400.00 2,000.00 3,000.00 5,000.00 4,500.00 5,000.00 700.00 6,400.00 6,000.00 63,000.00 30,000.00 4,500.00 10,000.00 4,200.00

Carried to Collection

411,300.00

W.64

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS


ITEM DESCRIPTION QTY UNIT RATE $

WATER SUPPLY (Cont.)

Water Supply along Road No.1b (Cont.) Pipework (Cont.) Pipework A 100mm Diameter cast iron gate valve to MS SP-70 or AWWA C500 including all cutting and jointing.

No.

36,000.00

72,000.00

Excavate as necessary, supply, fix, joint, flanged cast iron fire hydrant complete with 2 No. 62mm diameter hose outlets, cast iron caps and steel chain, 100mm diameter duckfoot bend, 100mm hydrant column valve, and pre-cast concrete valve box, with cast iron frame and cover, concrete 2500 PSI thrust block and base, interconnecting piping and fittings, including 100mm diameter flanged mild steel socket and adaptor and Johnson coupling all assembled complete, primed and painted in three coats gloss oil paint and make good all works disturbed. Precast Concrete valve box 300 x 300 x 1000mm deep (approximately) with 100mm thick concrete 3000 PSI (20 N/mm2) base, 50mm sides and including cast iron cover and frame and concrete surround to top. 12 mm Diameter steel pegs 900mm long painted blue used to mark point for water supply connection.

No.

100,000.00

100,000.00

No.

10,000.00

20,000.00

No.

10,000.00

60,000.00

Carried to Collection

252,000.00

COLLECTION Carried from page W.4 Carried from page W.5 411,300.00 252,000.00

Water Supply to Road No.1B carried to Collection

663,300.00

W.65

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS


ITEM DESCRIPTION QTY UNIT RATE $

WATER SUPPLY (Cont.) Water Supply along Road No.2 Excavation and Earthworks Excavate trench average 600mm average depth for 50mm diameter pipe, part backfill with sand and remainder with selected excavated material and including the disposal of surplus excavated material.

106

6,000.00

636,000.00

Excavate trench average 450mm deep for 20mm diameter pipes part backfilled with sand and remainder backfilled with selected excavated material and including disposal of surplus excavated material. Extra over excavation and disposal for excavating in rock. (Provisional) Pipework The following in PVC Schedule 40 pressure pipes with couplings and jointing as described:-

52

500.00

26,000.00

21

m3

2,350.00

49,350.00

D E

20mm Diameter pipes laid in trench. 50mm Diameter pipes laid in trench.

52 106

m m

800.00 1,050.00

41,600.00 111,300.00

Extra over P.V.C. Pipe for the following : F G H I J K 200 x 50mm Reducer 20mm Diameter 90 degree bend 50 x 50 x 20mm Diameter tee 20 x 20 x 20mm Diameter tee 50mm Diameter end cap 20mm Diameter end cap 400mm Thick concrete Thrust block as per Engineer specification around the following fittings:L 50mm Diameter end cap 1 No. 1,000.00 1,000.00 1 35 5 5 1 10 No. No. No. No. No. No. 2,500.00 3,000.00 3,000.00 2,000.00 1,000.00 700.00 2,500.00 105,000.00 15,000.00 10,000.00 1,000.00 7,000.00

Water Supply to Road No.2 carried to Collection

1,005,750.00

W.66

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS


ITEM DESCRIPTION QTY UNIT RATE $

WATER SUPPLY (Cont.) Water Supply along Road No.3 Excavation and Earthworks

Excavate in trench average 600mm average depth for 200mm diameter pipe, part backfill with sand and remainder with selected excavated material and including the disposal of surplus excavated material.

373

800.00

298,400.00

Excavate in trench average 600mm average depth for 100mm diameter pipe, part backfill with sand and remainder with selected excavated material and including the disposal of surplus excavated material.

390

700.00

273,000.00

Excavate trench average 450mm deep for 20mm diameter pipes part backfilled with sand and remainder backfilled with selected excavated material and including disposal of surplus excavated material. Extra over excavation and disposal for excavating in rock. (Provisional) Pipework The following in PVC Schedule 40 pressure pipes with couplings and jointing as described:-

108

500.00

54,000.00

123

m3

2,350.00

289,050.00

E F G

20mm Diameter pipes laid in trench. 100mm Diameter pipes laid in trench. 200mm Diameter pipes laid in trench.

108 390 373

m m m

800.00 1,400.00 3,500.00

86,400.00 546,000.00 1,305,500.00

Extra over P.V.C. Pipe for the following : H I J K L M N O 200 x 200 x 200mm Diameter tee 20 x 20 x 20mm Diameter tee 200mm Diameter 90 degree bend 20mm Diameter 90 degree bend 100mm Diameter 11.25 degree bend 200 x 100mm Diameter reducer 200 x 20mm Diameter saddle 20mm Diameter end cap 6 10 1 74 1 4 11 21 No. No. No. No. No. No. No. No. 8,000.00 2,000.00 7,000.00 3,000.00 5,000.00 4,500.00 5,000.00 700.00 48,000.00 20,000.00 7,000.00 222,000.00 5,000.00 18,000.00 55,000.00 14,700.00

Carried to Collection

3,242,050.00

W.67

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS


ITEM DESCRIPTION QTY UNIT RATE $

WATER SUPPLY (Cont.) Water Supply along Road No.3 (Cont.) Pipework (Cont.) 400mm Thick concrete Thrust block as per Engineer specification around the following fittings:A B C 200 x 200 x 200mm Diameter tee 200mm Diameter 90 degree bend 100mm Diameter 11.25 degree bend Pipework 6 1 1 No. No. No. 8,000.00 7,000.00 5,000.00 48,000.00 7,000.00 5,000.00

200mm Diameter cast iron gate valve to MS SP-70 or AWWA C500 including all cutting and jointing.

No.

46,000.00

46,000.00

100mm Diameter cast iron gate valve to MS SP-70 or AWWA C500 including all cutting and jointing.

No.

36,000.00

108,000.00

Excavate as necessary, supply, fix, joint, flanged cast iron fire hydrant complete with 2 No. 62mm diameter hose outlets, cast iron caps and steel chain, 100mm diameter duckfoot bend, 100mm hydrant column valve, and pre-cast concrete valve box, with cast iron frame and cover, concrete 2500 PSI thrust block and base, interconnecting piping and fittings, including 100mm diameter flanged mild steel socket and adaptor and Johnson coupling all assembled complete, primed and painted in three coats gloss oil paint and make good all works disturbed.

No.

100,000.00

300,000.00

Precast Concrete valve box 300 x 300 x 1000mm deep (approximately) with 100mm thick concrete 3000 PSI (20 N/mm2) base, 50mm sides and including cast iron cover and frame and concrete surround to top.

No.

10,000.00

30,000.00

12 mm Diameter steel pegs 900mm long painted blue used to mark point for water supply connection.

21

No.

1,000.00

21,000.00

Carried to Collection

565,000.00

COLLECTION Carried from page W.7 Carried from page W.8 3,242,050.00 565,000.00

Water Supply to Road No.3 carried to Collection

3,807,050.00

W.68

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS


ITEM DESCRIPTION QTY UNIT RATE $

WATER SUPPLY (Cont.) Water Supply along Road No.4 Excavation and Earthworks

Excavate in trench average 600mm average depth for 50mm diameter pipe, part backfill with sand and remainder with selected excavated material and including the disposal of surplus excavated material.

59

600.00

35,400.00

Excavate trench average 450mm deep for 20mm diameter pipes part backfilled with sand and remainder backfilled with selected excavated material and including disposal of surplus excavated material. Extra over excavation and disposal for excavating in rock. (Provisional) Pipework The following in PVC Schedule 40 pressure pipes with couplings and jointing as described:-

36

500.00

18,000.00

m3

2,350.00

4,700.00

D E

20mm Diameter pipes laid in trench. 50mm Diameter pipes laid in trench.

36 59

m m

800.00 1,050.00

28,800.00 61,950.00

Extra over P.V.C. Pipe for the following : F G H I J 20 x 20 x 20mm Diameter tee 50 x 50 x 20mm Diameter tee 100 x 50mm Diameter reducer 20mm Diameter end cap 50mm Diameter end cap 400mm Thick concrete Thrust block as per Engineer specification around the following fittings:K L M 20 x 20 x 20mm Diameter tee 50 x 50 x 20mm Diameter tee 50mm Diameter end cap 3 4 1 No. No. No. 2,000.00 3,000.00 6,000.00 6,000.00 12,000.00 6,000.00 3 4 1 7 1 No. No. No. No. No. 2,000.00 3,000.00 3,000.00 700.00 1,000.00 6,000.00 12,000.00 3,000.00 4,900.00 1,000.00

12 mm Diameter steel pegs 900mm long painted blue used to mark point for water supply connection.

No.

7,000.00

49,000.00

Water Supply to Road No.4 carried to Collection

248,750.00

W.69

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS


ITEM DESCRIPTION QTY UNIT RATE $

WATER SUPPLY (Cont.) Water Supply along Road No.5 Excavation and Earthworks

Excavate in trench average 600mm average depth for 150mm diameter pipe, part backfill with sand and remainder with selected excavated material and including the disposal of surplus excavated material.

182

750.00

136,500.00

Excavate in trench average 600mm average depth for 100mm diameter pipe, part backfill with sand and remainder with selected excavated material and including the disposal of surplus excavated material.

120

700.00

84,000.00

Excavate trench average 450mm deep for 20mm diameter pipes part backfilled with sand and remainder backfilled with selected excavated material and including disposal of surplus excavated material. Extra over excavation and disposal for excavating in rock. (Provisional) Pipework The following in PVC Schedule 40 pressure pipes with couplings and jointing as described:-

113

500.00

56,500.00

m3

2,350.00

16,450.00

E F G

20mm Diameter pipes laid in trench. 100mm Diameter pipes laid in trench. 150mm Diameter pipes laid in trench.

113 120 182

m m m

800.00 1,400.00 2,250.00

90,400.00 168,000.00 409,500.00

Extra over P.V.C. Pipe for the following : H I J K L M N O P 100 x 100 x 100mm Diameter tee 20 x 20 x 20mm Diameter tee 150mm Diameter 90 degree bend 20mm Diameter 90 degree bend 100mm Diameter 45 degree bend 150 x 100mm Diameter reducer 100 x 20mm Diameter saddle 100mm Diameter end cap 20mm Diameter end cap 1 11 1 77 1 1 11 1 22 No. No. No. No. No. No. No. No. No. 7,000.00 2,000.00 7,000.00 3,000.00 5,000.00 5,000.00 5,000.00 2,000.00 1,000.00 7,000.00 22,000.00 7,000.00 231,000.00 5,000.00 5,000.00 55,000.00 2,000.00 22,000.00

Carried to Collection

1,317,350.00

W.70

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS


ITEM DESCRIPTION QTY UNIT RATE $

WATER SUPPLY (Cont.) Water Supply along Road No.5 (Cont.) Pipework (Cont.) 400mm Thick concrete Thrust block as per Engineer specification around the following fittings:A B C D 100 x 100 x 100mm Diameter tee 150mm Diameter 90 degree bend 100mm Diameter 45 degree bend 100mm Diameter end cap Combination air release vacuum breaker valve (valmatic 101S or equivalent) including all cutting and jointing. Pressure reducing valve with integral check valve complete as detailed including all cutting and jointing. Pipework 1 1 1 1 No. No. No. No. 5,000.00 6,000.00 5,000.00 2,000.00 5,000.00 6,000.00 5,000.00 2,000.00

No.

20,000.00

20,000.00

No.

30,000.00

30,000.00

150mm Diameter cast iron gate valve to MS SP-70 or AWWA C500 including all cutting and jointing.

No.

40,000.00

40,000.00

100mm Diameter cast iron gate valve to MS SP-70 or AWWA C500 including all cutting and jointing.

No.

36,000.00

36,000.00

Excavate as necessary, supply, fix, joint, flanged cast iron fire hydrant complete with 2 No. 62mm diameter hose outlets, cast iron caps and steel chain, 100mm diameter duckfoot bend, 100mm hydrant column valve, and pre-cast concrete valve box, with cast iron frame and cover, concrete 2500 PSI thrust block and base, interconnecting piping and fittings, including 100mm diameter flanged mild steel socket and adaptor and Johnson coupling all assembled complete, primed and painted in three coats gloss oil paint and make good all works disturbed.

No.

100,000.00

100,000.00

Precast Concrete valve box 300 x 300 x 1000mm deep (approximately) with 100mm thick concrete 3000 PSI (20 N/mm2) base, 50mm sides and including cast iron cover and frame and concrete surround to top.

No.

10,000.00

10,000.00

12 mm Diameter steel pegs 900mm long painted blue used to mark point for water supply connection.

22

No.

1,000.00

22,000.00

Carried to Collection

276,000.00

COLLECTION Carried from page W.10 Carried from page W.11 Water Supply to Road No.5 carried to Collection $ 1,317,350.00 276,000.00 1,593,350.00

W.71

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS


ITEM DESCRIPTION QTY UNIT RATE $

WATER SUPPLY (Cont.) Water Supply along Road No.6 Excavation and Earthworks

Excavate in trench average 600mm average depth for 200mm diameter pipe, part backfill with sand and remainder with selected excavated material and including the disposal of surplus excavated material.

12

800.00

9,600.00

Excavate in trench average 500mm average depth for 50mm diameter pipe, part backfill with sand and remainder with selected excavated material and including the disposal of surplus excavated material.

138

750.00

103,500.00

Excavate trench average 450mm deep for 20mm diameter pipes part backfilled with sand and remainder backfilled with selected excavated material and including disposal of surplus excavated material. Extra over excavation and disposal for excavating in rock. (Provisional) Pipework The following in PVC Schedule 40 pressure pipes with couplings and jointing as described:-

57

500.00

28,500.00

m3

2,350.00

7,050.00

E F G

20mm Diameter pipes laid in trench. 100mm Diameter pipes laid in trench. 200mm Diameter pipes laid in trench.

57 138 12

m m m

800.00 1,400.00 3,500.00

45,600.00 193,200.00 42,000.00

Extra over P.V.C. Pipe for the following : H I J K L M N O P 50 x 50 x 50mm Diameter tee 50 x 50 x 20mm Diameter tee 20 x 20 x 20mm Diameter tee 20mm Diameter 90 degree bend 200mm Diameter 45 degree bend 200 x 50mm Diameter reducer 200 x 20mm Diameter saddle 50mm Diameter end cap 20mm Diameter end cap Combination air release vacuum breaker valve (valmatic 101S or equivalent) including all cutting and jointing. 1 5 5 39 1 1 1 1 11 No. No. No. No. No. No. No. No. No. 6,000.00 5,000.00 5,000.00 3,000.00 8,000.00 5,000.00 6,000.00 2,000.00 1,000.00 6,000.00 25,000.00 25,000.00 117,000.00 8,000.00 5,000.00 6,000.00 2,000.00 11,000.00

No.

30,000.00

30,000.00

Carried to Collection

664,450.00

W.72

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS


ITEM DESCRIPTION QTY UNIT RATE $

WATER SUPPLY (Cont.) Water Supply along Road No.6 (Cont.) Pipework (Cont.) 400mm Thick concrete Thrust block as per Engineer specification around the following fittings:A B C D 200mm Diameter 45 degree bend 50 x 50 x 50mm Diameter tee 50 x 50 x 20mm Diameter tee 50mm Diameter end cap 1 1 5 1 No. No. No. No. 10,000.00 6,000.00 5,000.00 2,000.00 10,000.00 6,000.00 25,000.00 2,000.00

12 mm Diameter steel pegs 900mm long painted blue used to mark point for water supply connection. Carried to Collection

11

No.

1,000.00 $

11,000.00 54,000.00

COLLECTION Carried from page W.12 Carried from page W.13 664,450.00 54,000.00

Water Supply to Road No.6 carried to Collection

718,450.00

W.73

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS


ITEM DESCRIPTION QTY UNIT RATE $

WATER SUPPLY (Cont.) Water Supply along Road No.7 Excavation and Earthworks

Excavate in trench average 600mm average depth for 100mm diameter pipe, part backfill with sand and remainder with selected excavated material and including the disposal of surplus excavated material.

400

700.00

280,000.00

Excavate trench average 450mm deep for 20mm diameter pipes part backfilled with sand and remainder backfilled with selected excavated material and including disposal of surplus excavated material. Extra over excavation and disposal for excavating in rock. (Provisional) Pipework The following in PVC Schedule 40 pressure pipes with couplings and jointing as described:-

124

500.00

62,000.00

71

m3

2,350.00

166,850.00

D E

20mm Diameter pipes laid in trench. 100mm Diameter pipes laid in trench.

124 400

m m

800.00 1,400.00

99,200.00 560,000.00

Extra over P.V.C. Pipe for the following : F G H I J K L M 100 x 100 x 100mm Diameter tee 20 x 20 x 20mm Diameter tee 20mm Diameter 90 degree bend 100mm Diameter 45 degree bend 200 x 100mm Diameter reducer 100 x 20mm Diameter saddle 100mm Diameter end cap 20mm Diameter end cap 400mm Thick concrete Thrust block as per Engineer specification around the following fittings:N O P 100 x 100 x 100mm Diameter tee 100mm Diameter 45 degree bend 100mm Diameter end cap 3 1 1 No. No. No. 7,000.00 5,000.00 1,000.00 21,000.00 5,000.00 1,000.00 3 12 84 1 1 12 1 24 No. No. No. No. No. No. No. No. 7,000.00 2,000.00 3,000.00 8,000.00 8,000.00 5,000.00 2,000.00 1,000.00 21,000.00 24,000.00 252,000.00 8,000.00 8,000.00 60,000.00 2,000.00 24,000.00

Combination air release vacuum breaker valve (valmatic 101S or equivalent) including all cutting and jointing.

No.

30,000.00

30,000.00

Carried to Collection

1,624,050.00

W.74

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS


ITEM DESCRIPTION QTY UNIT RATE $

WATER SUPPLY (Cont.)

Water Supply along Road No.7 (Cont.) Pipework

100mm Diameter cast iron gate valve to MS SP-70 or AWWA C500 including all cutting and jointing.

No.

36,000.00

72,000.00

Excavate as necessary, supply, fix, joint, flanged cast iron fire hydrant complete with 2 No. 62mm diameter hose outlets, cast iron caps and steel chain, 100mm diameter duckfoot bend, 100mm hydrant column valve, and pre-cast concrete valve box, with cast iron frame and cover, concrete 2500 PSI thrust block and base, interconnecting piping and fittings, including 100mm diameter flanged mild steel socket and adaptor and Johnson coupling all assembled complete, primed and painted in three coats gloss oil paint and make good all works disturbed. Precast Concrete valve box 300 x 300 x 1000mm deep (approximately) with 100mm thick concrete 3000 PSI (20 N/mm2) base, 50mm sides and including cast iron cover and frame and concrete surround to top.

No.

100,000.00

100,000.00

No.

10,000.00

20,000.00

12 mm Diameter steel pegs 900mm long painted blue used to mark point for water supply connection. Carried to Collection

24

No.

1,000.00 $

24,000.00 216,000.00

COLLECTION Carried from page W.14 Carried from page W.15 1,624,050.00 216,000.00

Water Supply to Road No.7 carried to Collection

1,840,050.00

W.75

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS


ITEM DESCRIPTION QTY UNIT RATE $

WATER SUPPLY (Cont.) Water Supply along Road No.8 Excavation and Earthworks

Excavate in trench average 600mm average depth for 150mm diameter pipe, part backfill with sand and remainder with selected excavated material and including the disposal of surplus excavated material.

222

750.00

166,500.00

Excavate trench average 450mm deep for 20mm diameter pipes part backfilled with sand and remainder backfilled with selected excavated material and including disposal of surplus excavated material. Extra over excavation and disposal for excavating in rock. (Provisional) Pipework The following in PVC Schedule 40 pressure pipes with couplings and jointing as described:-

26

500.00

13,000.00

m3

2,350.00

11,750.00

D E

20mm Diameter pipes laid in trench. 150mm Diameter pipes laid in trench.

26 222

m m

800.00 2,250.00

20,800.00 499,500.00

Extra over P.V.C. Pipe for the following: F G H I J K L 150 x 150 x 150mm Diameter tee 20 x 20 x 20mm Diameter tee 150 x 150 x 150mm Diameter wye 150mm Diameter 11.25 degree bend 20mm Diameter 90 degree bend 150 x 100mm Diameter reducer 20mm Diameter end cap 400mm Thick concrete Thrust block as per Engineer specification around the following fittings:M N O 150 x 150 x 150mm Diameter tee 150 x 150 x 150mm Diameter wye 150mm Diameter 11.25 degree bend 2 1 3 No. No. No. 10,000.00 16,000.00 10,000.00 20,000.00 16,000.00 30,000.00 2 2 1 3 18 1 5 No. No. No. No. No. No. No. 10,000.00 7,000.00 12,000.00 9,000.00 5,000.00 10,000.00 1,000.00 20,000.00 14,000.00 12,000.00 27,000.00 90,000.00 10,000.00 5,000.00

Carried to Collection

955,550.00

W.76

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS


ITEM DESCRIPTION QTY UNIT RATE $

WATER SUPPLY (Cont.) Water Supply along Road No.8 (Cont.) Pipework

100mm Diameter cast iron gate valve to MS SP-70 or AWWA C500 including all cutting and jointing.

No.

36,000.00

36,000.00

Excavate as necessary, supply, fix, joint, flanged cast iron fire hydrant complete with 2 No. 62mm diameter hose outlets, cast iron caps and steel chain, 100mm diameter duckfoot bend, 100mm hydrant column valve, and pre-cast concrete valve box, with cast iron frame and cover, concrete 2500 PSI thrust block and base, interconnecting piping and fittings, including 100mm diameter flanged mild steel socket and adaptor and Johnson coupling all assembled complete, primed and painted in three coats gloss oil paint and make good all works disturbed.

No.

100,000.00

100,000.00

Precast Concrete valve box 300 x 300 x 1000mm deep (approximately) with 100mm thick concrete 3000 PSI (20 N/mm2) base, 50mm sides and including cast iron cover and frame and concrete surround to top.

No.

10,000.00

10,000.00

12 mm Diameter steel pegs 900mm long painted blue used to mark point for water supply connection.

No.

1,000.00

5,000.00

Carried to Collection

151,000.00

COLLECTION Carried from page W.16 Carried from page W.17 955,550.00 151,000.00

Water Supply to Road No.8 carried to Collection

1,106,550.00

W.77

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS


ITEM DESCRIPTION QTY UNIT RATE $

WATER SUPPLY (Cont.) Water Supply along Road No.9a Excavation and Earthworks

Excavate in trench average 600mm average depth for 100mm diameter pipe, part backfill with sand and remainder with selected excavated material and including the disposal of surplus excavated material.

286

700.00

200,200.00

Excavate trench average 450mm deep for 20mm diameter pipes part backfilled with sand and remainder backfilled with selected excavated material and including disposal of surplus excavated material. Extra over excavation and disposal for excavating in rock. (Provisional) The following in PVC Schedule 40 pressure pipes with couplings and jointing as described:-

57

500.00

28,500.00

m3

2,350.00

14,100.00

F G

20mm Diameter pipes laid in trench. 100mm Diameter pipes laid in trench.

57 286

m m

800.00 1,400.00

45,600.00 400,400.00

Extra over P.V.C. Pipe for the following: L M P C G 100 x 100 x 100mm Diameter tee 20 x 20 x 20mm Diameter tee 20mm Diameter 90 degree bend 150 x 100mm Diameter reducer 20mm Diameter end cap 400mm Thick concrete Thrust block as per Engineer specification around the following fittings:J 100 x 100 x 100mm Diameter tee 1 No. 15,000.00 15,000.00 1 5 39 2 11 No. No. No. No. No. 7,000.00 5,000.00 3,000.00 8,000.00 1,000.00 7,000.00 25,000.00 117,000.00 16,000.00 11,000.00

Carried to Collection

879,800.00

W.78

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS


ITEM DESCRIPTION QTY UNIT RATE $

WATER SUPPLY (Cont.) Water Supply along Road No.9a(Cont.) Pipework

100mm Diameter cast iron gate valve to MS SP-70 or AWWA C500 including all cutting and jointing.

No.

36,000.00

36,000.00

Excavate as necessary, supply, fix, joint, flanged cast iron fire hydrant complete with 2 No. 62mm diameter hose outlets, cast iron caps and steel chain, 100mm diameter duckfoot bend, 100mm hydrant column valve, and pre-cast concrete valve box, with cast iron frame and cover, concrete 2500 PSI thrust block and base, interconnecting piping and fittings, including 100mm diameter flanged mild steel socket and adaptor and Johnson coupling all assembled complete, primed and painted in three coats gloss oil paint and make good all works disturbed.

No.

100,000.00

100,000.00

Precast Concrete valve box 300 x 300 x 1000mm deep (approximately) with 100mm thick concrete 3000 PSI (20 N/mm2) base, 50mm sides and including cast iron cover and frame and concrete surround to top.

No.

10,000.00

10,000.00

12 mm Diameter steel pegs 900mm long painted blue used to mark point for water supply connection. Carried to Collection

11

No.

1,000.00 $

11,000.00 157,000.00

COLLECTION Carried from page W.18 Carried from page W.19 879,800.00 157,000.00

Water Supply to Road No.9A carried to Collection

1,036,800.00

W.79

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS


ITEM DESCRIPTION QTY UNIT RATE $

WATER SUPPLY (Cont.) Water Supply along Road No.9b Excavation and Earthworks

Excavate in trench average 600mm average depth for 100mm diameter pipe, part backfill with sand and remainder with selected excavated material and including the disposal of surplus excavated material.

102

700.00

71,400.00

Excavate trench average 450mm deep for 20mm diameter pipes part backfilled with sand and remainder backfilled with selected excavated material and including disposal of surplus excavated material. Extra over excavation and disposal for excavating in rock. (Provisional) Pipework The following in PVC Schedule 40 pressure pipes with couplings and jointing as described:-

36

500.00

18,000.00

m3

2,350.00

4,700.00

D E

20mm Diameter pipes laid in trench. 100mm Diameter pipes laid in trench.

36 102

m m

800.00 1,400.00

28,800.00 142,800.00

Extra over P.V.C. Pipe for the following : F G H I J K L M 150 x 150 x 150mm Diameter tee 100 x 100 x 100mm Diameter tee 20 x 20 x 20mm Diameter tee 20mm Diameter 90 degree bend 150 x 100mm Diameter reducer 100 x 20mm Diameter saddle 150mm Diameter end cap 20mm Diameter end cap 400mm Thick concrete Thrust block as per Engineer specification around the following fittings:N O P 150 x 150 x 150mm Diameter tee 100 x 100 x 100mm Diameter tee 150mm Diameter end cap 1 3 1 No. No. No. 20,000.00 10,000.00 3,000.00 20,000.00 30,000.00 3,000.00 1 3 3 25 2 4 1 7 No. No. No. No. No. No. No. No. 9,000.00 7,000.00 2,000.00 3,000.00 6,000.00 8,000.00 3,000.00 1,000.00 9,000.00 21,000.00 6,000.00 75,000.00 12,000.00 32,000.00 3,000.00 7,000.00

Combination air release vacuum breaker valve (valmatic 101S or equivalent) including all cutting and jointing.

No.

35,000.00

35,000.00

Carried to Collection

518,700.00

W.80

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS


ITEM DESCRIPTION QTY UNIT RATE $

WATER SUPPLY (Cont.) Water Supply along Road No.9b (Cont.) Pipework

100mm Diameter cast iron gate valve to MS SP-70 or AWWA C500 including all cutting and jointing.

No.

36,000.00

36,000.00

Excavate as necessary, supply, fix, joint, flanged cast iron fire hydrant complete with 2 No. 62mm diameter hose outlets, cast iron caps and steel chain, 100mm diameter duckfoot bend, 100mm hydrant column valve, and pre-cast concrete valve box, with cast iron frame and cover, concrete 2500 PSI thrust block and base, interconnecting piping and fittings, including 100mm diameter flanged mild steel socket and adaptor and Johnson coupling all assembled complete, primed and painted in three coats gloss oil paint and make good all works disturbed.

No.

100,000.00

100,000.00

Precast Concrete valve box 300 x 300 x 1000mm deep (approximately) with 100mm thick concrete 3000 PSI (20 N/mm2) base, 50mm sides and including cast iron cover and frame and concrete surround to top.

No.

10,000.00

10,000.00

12 mm Diameter steel pegs 900mm long painted blue used to mark point for water supply connection.

No.

1,000.00

7,000.00

Carried to Collection

153,000.00

COLLECTION Carried from page W.21 Carried from page W.22 518,700.00 153,000.00

Water Supply to Road No.9b carried to Collection

671,700.00

W.81

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS


ITEM DESCRIPTION QTY UNIT RATE $

WATER SUPPLY (Cont.) Water Supply along Road No.10 Excavation and Earthworks

Excavate in trench average 600mm average depth for 100mm diameter pipe, part backfill with sand and remainder with selected excavated material and including the disposal of surplus excavated material.

12

700.00

8,400.00

Excavate trench average 450mm deep for 20mm diameter pipes part backfilled with sand and remainder backfilled with selected excavated material and including disposal of surplus excavated material. Extra over excavation and disposal for excavating in rock. (Provisional) Pipework The following in PVC Schedule 40 pressure pipes with couplings and jointing as described:-

21

500.00

10,500.00

m3

2,350.00

0.00

D E

20mm Diameter pipes laid in trench. 100mm Diameter pipes laid in trench.

21 12

m m

800.00 1,400.00

16,800.00 16,800.00

Extra over P.V.C. Pipe for the following : F G H I J K 20 x 20 x 20mm Diameter tee 20mm Diameter 90 degree bend 100mm Diameter 11.25 degree bend 100 x 50mm Diameter reducer 100mm Diameter end cap 20mm Diameter end cap 400mm Thick concrete Thrust block as per Engineer specification around the following fittings:L M 100mm Diameter 11.25 degree bend 150mm Diameter end cap 1 1 No. No. 15,000.00 15,000.00 15,000.00 15,000.00 1 7 1 1 1 2 No. No. No. No. No. No. 2,000.00 3,000.00 6,000.00 8,000.00 2,000.00 1,000.00 2,000.00 21,000.00 6,000.00 8,000.00 2,000.00 2,000.00

12 mm Diameter steel pegs 900mm long painted blue used to mark point for water supply connection.

No.

1,000.00

1,000.00

Water Supply to Road No.10 carried to Collection

124,500.00

W.82

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS


ITEM DESCRIPTION QTY UNIT RATE $

WATER SUPPLY (Cont.) Water Supply along Road No.11 Excavation and Earthworks

Excavate in trench average 600mm average depth for 200mm diameter pipe, part backfill with sand and remainder with selected excavated material and including the disposal of surplus excavated material.

254

800.00

203,200.00

Excavate in trench average 600mm average depth for 150mm diameter pipe, part backfill with sand and remainder with selected excavated material and including the disposal of surplus excavated material.

110

750.00

82,500.00

Excavate trench average 450mm deep for 20mm diameter pipes part backfilled with sand and remainder backfilled with selected excavated material and including disposal of surplus excavated material. Extra over excavation and disposal for excavating in rock. (Provisional) Pipework

160

500.00

80,000.00

70

m3

2,350.00

164,500.00

The following in PVC Schedule 40 pressure pipes with couplings and jointing as described:F H I 20mm Diameter pipes laid in trench. 150mm Diameter pipes laid in trench. 200mm Diameter pipes laid in trench. 160 110 254 m m m 800.00 2,800.00 3,500.00 128,000.00 308,000.00 889,000.00

Extra over P.V.C. Pipe for the following : J K M P A B B C D E F 200 x 200 x 200mm Diameter tee 150 x 150 x 150mm Diameter tee 20 x 20 x 20mm Diameter tee 20mm Diameter 90 degree bend 100mm Diameter 22.5 degree bend 200 x 150mm Diameter reducer 200 x 100mm Diameter reducer 150 x 100mm Diameter reducer 200 x 20mm Diameter saddle 150 x 20mm Diameter saddle 20mm Diameter end cap 4 2 15 109 1 1 2 2 1 2 31 No. No. No. No. No. No. No. No. No. No. No. 8,000.00 7,000.00 5,000.00 3,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 1,000.00 32,000.00 14,000.00 75,000.00 327,000.00 8,000.00 8,000.00 16,000.00 16,000.00 8,000.00 16,000.00 31,000.00

Carried to Collection

2,406,200.00

W.83

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS


ITEM DESCRIPTION QTY UNIT RATE $

WATER SUPPLY (Cont.) Water Supply along Road No.11 (Cont.) 400mm Thick concrete Thrust block as per Engineer specification around the following fittings:H I M 200 x 200 x 200mm Diameter tee 150 x 150 x 150mm Diameter tee 100mm Diameter 22.5 degree bend Pipework 4 2 1 No. No. No. 20,000.00 15,000.00 15,000.00 80,000.00 30,000.00 15,000.00

150mm Diameter cast iron gate valve to MS SP-70 or AWWA C500 including all cutting and jointing.

No.

42,000.00

84,000.00

100mm Diameter cast iron gate valve to MS SP-70 or AWWA C500 including all cutting and jointing.

No.

36,000.00

144,000.00

Excavate as necessary, supply, fix, joint, flanged cast iron fire hydrant complete with 2 No. 62mm diameter hose outlets, cast iron caps and steel chain, 100mm diameter duckfoot bend, 100mm hydrant column valve, and pre-cast concrete valve box, with cast iron frame and cover, concrete 2500 PSI thrust block and base, interconnecting piping and fittings, including 100mm diameter flanged mild steel socket and adaptor and Johnson coupling all assembled complete, primed and painted in three coats gloss oil paint and make good all works disturbed.

No.

100,000.00

400,000.00

Precast Concrete valve box 300 x 300 x 1000mm deep (approximately) with 100mm thick concrete 3000 PSI (20 N/mm2) base, 50mm sides and including cast iron cover and frame and concrete surround to top.

No.

10,000.00

60,000.00

12 mm Diameter steel pegs 900mm long painted blue used to mark point for water supply connection.

31

No.

1,000.00

31,000.00

Carried to Collection

844,000.00

COLLECTION Carried from page W.23 Carried from page W.24 2,406,200.00 844,000.00

Water Supply to Road No.11 carried to Collection

3,250,200.00

W.84

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS


ITEM DESCRIPTION QTY UNIT RATE $

WATER SUPPLY (Cont.) Water Supply to Water Tank Excavation and Earthworks

Excavate in trench average 600mm average depth for 100mm diameter pipe, part backfill with sand and remainder with selected excavated material and including the disposal of surplus excavated material. Extra over excavation and disposal for excavating in rock. (Provisional) Pipework

516

700.00

361,200.00

m3

2,350.00

21,150.00

The following in Ductile Iron Schedule 40 pressure pipes with couplings and jointing as described:G 100mm Diameter pipes laid in trench. 516 m 1,400.00 722,400.00

Extra over D.I. Pipe for the following: L O P 100 x 100 x 100mm Diameter tee 100mm Diameter 90 degree bend 100mm Diameter 22.5 degree bend 400mm Thick concrete Thrust block as per Engineer specification around the following fittings:J L M 100 x 100 x 100mm Diameter tee 100mm Diameter 90 degree bend 100mm Diameter 22.5 degree bend NOTE: Thrust blocks may be replaced with joint stabilisers Pipework 1 1 1 No. No. No. 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 1 1 1 No. No. No. 6,000.00 8,000.00 8,000.00 6,000.00 8,000.00 8,000.00

100mm Diameter cast iron gate valve to MS SP-70 or AWWA C500 including all cutting and jointing.

No.

36,000.00

72,000.00

Precast Concrete valve box 300 x 300 x 1000mm deep (approximately) with 100mm thick concrete 3000 PSI (20 N/mm2) base, 50mm sides and including cast iron cover and frame and concrete surround to top.

No.

10,000.00

20,000.00

Prime cost sum for Supply and Install Bolted Steel Water Tank 66,000 US Gallons, with adequate corrosion protection suitable to the NWC and all appertenances described on the drawings including ladder, lock off float valve on prepared site Percentage addition for profit and attendence

1 40

SUM %

9,000,000.00 9,000,000.00

9,000,000.00 3,600,000.00

Water Supply to Water Tank

13,863,750.00

W.85

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS


ITEM DESCRIPTION QTY UNIT RATE $

WATER SUPPLY (Cont.) Water Tank Site Road Way Excavation and Earthworks

Excavate average 150mm deep to remove vegetable soil and set aside for reuse as directed. Excavate roadway to subgrade commencing at strip site level not exceeding 1.50m maximum depth and deposit excavated material on site (Provisional). Extra over excavation and disposal for breaking up rock. (Provisional) Selected excavated material well consolidated in making up levels to sub-base. (Provisional) 125mm Thick approved river shingle or well graded crushed aggregate as sub-base; spread, levelled, watered and well

92

m2

200.00

18,400.00

28

m3

659.00

18,452.00

18

m3

2,350.00

42,300.00

14

m3

531.00

7,434.00

rammed and consolidated in 100mm layers including levelling and compacting ground under and preparing surface to receive base course. (measured separately) 125mm Thick approved marl spread, levelled, watered and well rammed and consolidated in 100mm layers including levelling and compacting ground under and preparing surface to receive concrete bed and asphaltic concrete. (measured separately) Grade surface of excavation to falls and cross falls. Prepare surfaces, prime and apply 40mm thick asphaltic concrete driveway surfacing on marl base (measured separately) 92 m2 401.00 36,892.00

92 92

m2 m2

437.00 82.00

40,204.00 7,544.00

92

m2

2,100.00

193,200.00

Concrete Kerb

125mm x 250mm precast concrete half battered kerb, bed, joint, and point in cement mortar (1:3), on and including 300 x 150mm concrete 17 N/mm2 foundation, with similar concrete haunching, including all necessary excavation, backfilling and subsequent disposal of surplus excavated material. Ditto, but to varying radii

32 8

m m

1,438.00 2,081.00

46,016.00 16,648.00

Carried to Collection

427,090.00

W.86

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS


ITEM DESCRIPTION QTY UNIT RATE $

WATER SUPPLY (Cont.) Water Tank Site (contd)

Fencing Toe wall 350mm high (200mm of toe wall beneath ground level) constructed of 150mm thick mass concrete 1:3:6 mix I with displacers, including formwork, all necessary excavation, disposal, rendering to sides of wall above ground. Extra over fencing for single chain link gate size 3000mm wide x 3000mm high complete, including all necessary hinges, bolts, locking devices, etc. Chain link fencing 2400mm high comprising 9 guage 56mm x 56mm wire weaved chain links in diagonal pattern secured to 50mm diameter galvanized tubular terminal and intermediate posts withgalvanized metal straps and ends including all necessary brace, bolts and sundry items with 3 # strands barb wire in barb arms placed at 3.0m on centers on top . Galvanized tubular terminal and intermediate posts cast in 1:2:4 concrete mix (minimum 300mm diameter x 600mm deep) 163 To supply and errect concrete coping to secure bottom of chainlink fencing to wall and resurface chopped portions where posts had been planted m 5,000.00 815,000.00 163 m 2,500.00 407,500.00

No

100,000.00

100,000.00

163

1,200.00

195,600.00

Tank Base Excavation and Earthworks

Excavate average 150mm deep to remove vegetable soil and set aside for reuse as directed. Excavate for tank base commencing at strip site level not exceeding 1.50m maximum depth and deposit excavated material on site (Provisional). Extra over excavation and disposal for breaking up rock. (Provisional) 300mm Thick approved river shingle or well graded crushed aggregate as sub-base; spread, levelled, watered and well rammed and consolidated in 100mm layers including levelling and compacting ground under and preparing surface to receive marl fill. (measured separately)

254

m2

200.00

50,800.00

102

m3

800.00

81,600.00

20

m3

1,943.00

38,860.00

64 200mm Thick approved marl fill spread, levelled, watered and well rammed and consolidated in 100mm layers including levelling and compacting ground under and preparing surface to receive concrete bed. (measured separately)

m2

401.00

25,664.00

43

m2

1,936.00

83,248.00

Reinforced Concrete (1:2:4) 21 N/mm2 as described :F G 200mm Thick base slab Belt Beam 51 51 m3 m3 20,000.00 20,000.00 1,020,000.00 1,020,000.00

Carried to Collection

3,838,272.00

W.87

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS


ITEM DESCRIPTION QTY UNIT RATE $

WATER SUPPLY (Cont.) Water Tank Site (contd) Mild Steel Rod Reinforcement : H I J 25mm Diameter in ring beam 12mm Diameter as stirrups 12mm Diameter in base slab Formwork Sawn formwork as described to :K Side of Belt Beam Finishes L M 12mm thick cement and sand (1:3) rendering, finished with a steel float to top of slab. Ditto, to outer face of beam 72,900.00 182,250.00 125 m2 3,000.00 375,000.00 2,636 628 444 Kg Kg Kg 200.00 200.00 200.00 527,200.00 125,600.00 88,800.00

50 125

m2 m2

1,458.00 1,458.00

Carried to Collection Carried from page W.26 Carried from page W.27 Carried from page W.28

1,371,750.00 427,090.00 3,838,272.00 1,371,750.00

Water Tank Site carried to Collection

5,637,112.00

General Works to Water Supply Allow the Provisional Sum for additional work to Water Supply Installation Allow for testing the Water Supply to the Satisfaction of the Engineer Allow for chlorination of the water installation and leaving perfect to the satisfaction of the Engineer Allow the Provisional Sum for Off Site Water Supply System 1 SUM

SUM

300,000.00

300,000.00

Item

250,000.00

250,000.00

Item

130,000.00

130,000.00

400,000.00

400,000.00

Carried to Collection

1,080,000.00

W.88

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS


ITEM DESCRIPTION QTY UNIT RATE $

Water Supply to Road No.1A carried to Collection Water Supply to Road No.1B carried to Collection Water Supply to Road No.2 carried to Collection Water Supply to Road No.3 carried to Collection Water Supply to Road No.4 carried to Collection Water Supply to Road No.5 carried to Collection Water Supply to Road No.6 carried to Collection Water Supply to Road No.7 carried to Collection Water Supply to Road No.8 carried to Collection Water Supply to Road No.9A carried to Collection Water Supply to Road No.9B carried to Collection Water Supply to Road No.10 carried to Collection Water Supply to Road No.11 carried to Collection Water Supply to and Including Water Tank Water Tank Site carried to Collection General Works Carried to Collection

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

3,223,040.00 663,300.00 1,005,750.00 3,807,050.00 248,750.00 1,593,350.00 718,450.00 1,840,050.00 1,106,550.00 1,036,800.00 671,700.00 124,500.00 3,250,200.00 13,863,750.00 5,637,112.00 1,080,000.00

Water Supply Carried to Summary Infrastructure Works page I.W.

39,870,352.00

W.89

LATIUM HOUSING DEVELOPMENT


ITEM DESCRIPTION QTY UNIT RATE $

Bill NO. 7 STORMWATER SYSTEM Preambles The Contractor shall include for the provision of all labour and materials for the construction of all drainage structures. Construction of drains shall include the excavation, backfilling, consolidating, grading of bottom including difficulties caused by obstructions and all other costs in connection with the construction. Approved backfilling, compacted in maximum 150mm layers to specifications.

S.W.90

LATIUM HOUSING DEVELOPMENT


ITEM DESCRIPTION QTY UNIT RATE $

Stormwater drain Road No. 1a Concrete Pipe Culvert ( 914mm & 610mm Diameter) Excavation and Earthworks Excavate trench for 914mm diameter pre-cast concrete pipe in any material excluding rock, commencing at formation level, exceeding 1.5m but not exceeding 3.0m deep, average depth 1.7m, part backfill with approved granular fill and selected excavated material and remove surplus excavated material from site. Excavate trench for 610mm diameter pre-cast concrete pipe in any material excluding rock,commencing at formation level, exceeding 1.5m but not exceeding 3.0m deep, average depth 1.7m, part backfill with approved granular fill and selected excavated material and remove surplus excavated material from site. Extra over excavation for excavation in rock (Provisional). Selected sand fill around 914mm pipe with 150mm cover at both top and bottom as per Engineer drawing. Pipework F 914mm diameter pre-cast concrete pipe, laid and joint in trench 610mm diameter pre-cast concrete pipe, laid and joint in trench

225

4,500.00

1,012,500.00

45

4,000.00

180,000.00

158

m3

2,350.00

371,300.00

211.74

m3

1,000.00

211,740.00

225

29,853.00

6,716,925.00

45

22,522.00

1,013,490.00

Curb Inlet Box with Double Grating (11 no.) 0.85m wide x 1.91m long (internally measured) Excavation and Earthworks Excavate for curb inlet box in any material excluding rock, commencing at formation level and not exceeding 1.5m deep and get out. Ditto exceeding 1500mm but not exceeding 3000mm deep Extra over excavation for excavation in rock (Provisional). 1:3:6 Concrete mix, 50mm thick as blinding.

48

m3

800.00

38,400.00

13

m3

900.00

11,700.00

C D

12 32

m3 m2

2,350.00 1,000.00

28,200.00 32,000.00

Carried to Collection.

9,616,255.00

S.W.91

LATIUM HOUSING DEVELOPMENT


ITEM DESCRIPTION QTY UNIT RATE $

Stormwater drain (contd) Road No. 1a (contd) Curb Inlet Box with Double Grating (11 no.) (contd) 0.85m wide x 1.91m long (internally measured) Reinforced Concrete (1:2:4) 21 N/mm2 as described :F G 180mm Thick base slab Belt Beam Mild Steel Rod Reinforcement : I J K 12mm Diameter in base slab 12mm Diameter vertically in block wall. 12mm Diameter horizontally in block wall. Blockwall 200mm Hollow pre-cast (class "A") concrete blocks bedded and jointed in cement and sand mortar (1:3) including filling all cavities with concrete (17 N/mm2 ) Formwork Sawn formwork as described to :O O Side of Belt Beam Soffit of Belt Beam Finishes A B C 12mm thick cement and sand (1:3) rendering, finished with a steel float to blockwalls. Ditto, base slab. Ditto, to belt beam 600mm x 900mm heavy duty D-400 C.I. combination drain grate and curb inlet hood - rated axle load 400kN. (2 No. each) 60 2 m2 m2 3,000.00 3,000.00 180,000.00 6,000.00 463 352 139 Kg Kg Kg 200.00 200.00 200.00 92,600.00 70,400.00 27,800.00 6 30 m3 m3 20,000.00 20,000.00 120,000.00 600,000.00

70

m2

4,000.00

280,000.00

70 18 32

m2 m2 m2

1,458.00 1,458.00 1,458.00

102,060.00 26,244.00 46,656.00

11

No.

50,000.00

550,000.00

Carried to Collection.

2,101,760.00

S.W.92

LATIUM HOUSING DEVELOPMENT


ITEM DESCRIPTION QTY UNIT RATE $

Stormwater drain (contd) Road No. 1a (contd) Curb Inlet Box with Single Grating (2 no.) (contd) 0.85m wide x 1.91m long (internally measured) Excavation and Earthworks Excavate for curb inlet box in any material excluding rock, commencing at formation level and not exceeding 1.5m deep and get out. Ditto exceeding 1500mm but not exceeding 3000mm deep Extra over excavation for excavation in rock (Provisional). 1:3:6 Concrete mix, 50mm thick as blinding. Reinforced Concrete (1:2:4) 21 N/mm2 as described :F G H 180mm Thick base slab Belt Beam 150mm Suspended slab Mild Steel Rod Reinforcement : I J K L 12mm Diameter in base slab 12mm Diameter vertically in block wall. 12mm Diameter horizontally in block wall. 12mm Diameter in suspended slab. Blockwall 200mm Hollow pre-cast (class "A") concrete blocks bedded and jointed in cement and sand mortar (1:3) including filling all cavities with concrete (17 N/mm2 ) Formwork Sawn formwork as described to :N O O Soffit of Suspended slab. Side of Belt Beam Soffit of Belt Beam 1.1 11 0.3 m2 m2 m2 3,000.00 3,000.00 3,000.00 3,300.00 33,000.00 900.00 84 64 25 45 Kg Kg Kg Kg 200.00 200.00 200.00 200.00 16,800.00 12,800.00 5,000.00 9,000.00 1 5 0.2 m3 m3 m3 20,000.00 20,000.00 20,000.00 20,000.00 100,000.00 4,000.00

m3

800.00

7,200.00

m3

900.00

1,800.00

C D

3 6

m3 m2

2,350.00 1,000.00

7,050.00 6,000.00

13

m2

4,000.00

52,000.00

Carried to Collection.

278,850.00

S.W.93

LATIUM HOUSING DEVELOPMENT


ITEM DESCRIPTION QTY UNIT RATE $

Stormwater drain (contd) Road No. 1a (contd) Curb Inlet Box with Single Grating (2 no.) (contd) 0.85m wide x 1.91m long (internally measured) Finishes A B C 12mm thick cement and sand (1:3) rendering, finished with a steel float to blockwalls. Ditto, base slab. Ditto, to belt beam 600mm x 900mm heavy duty D-400 C.I. combination drain grate and curb inlet hood - rated axle load 400kN. (2 No. each)

13 18 6

m2 m2 m2

1,458.00 1,458.00 1,458.00

18,954.00 26,244.00 8,748.00

11

No.

50,000.00

550,000.00

900mm x 900mm Wide Reinforced Concrete Open U-Drain (contd) Excavation and Earthworks Excavate for RC open drain 1300mm wide x 1150mm deep in any material excluding rock, commencing at ground level and not exceeding 1.5m deep and get out. Extra over excavation for excavation in rock (Provisional). 1:3:6 Concrete mix, 50mm thick as blinding. Reinforced Concrete (1:2:4) 21 N/mm2 as described :F G 200mm Thick base slab 200mm Thick in-situ reinforced concrete wall Mild Steel Rod Reinforcement : I J 12mm Diameter in base slab 12mm Diameter in concrete wall Formwork Sawn formwork as described to :O O Edge of base slab Sides of concrete wall 10 47 m2 m2 3,000.00 3,000.00 30,000.00 141,000.00 426 780 Kg Kg 200.00 200.00 85,200.00 156,000.00 7 9 m3 m3 20,000.00 20,000.00 140,000.00 180,000.00

25

2,250.00

56,250.00

C D

22.4 33

m3 m2

2,350.00 1,000.00

52,640.00 33,000.00

Carried to Collection.

1,478,036.00

S.W.94

LATIUM HOUSING DEVELOPMENT


ITEM DESCRIPTION QTY UNIT RATE $

Stormwater drain (contd) Road No. 1a (contd) Stone Pitched Chute (2 no.) Excavation and Earthworks Excavate for stone pitch chute in any material excluding rock, commencing at ground level and not exceeding 1.5m deep and get out. Excavate trench for 610mm diameter pre-cast concrete pipe in any material excluding rock,commencing form reduced level, exceeding 1.5m but not exceeding 3.0m deep, average depth 1.7m, part backfill with approved granular fill and selected excavated material and remove surplus excavated material from site. Extra over excavation for excavation in rock (Provisional). Selected sand fill around 610mm pipe with 150mm cover at both top and bottom as per Engineer drawing. Pipework F 610mm diameter pre-cast concrete pipe, laid and joint in trench Concrete Bedding D 1:3:6 Concrete mix, 50mm thick as bedding base for stone packing. Stone Packing Random rubble stones 150 to 200mm diameter laid with 1:3 cement sand mortar mix in joints on concrete bedding to obtain overall thickness of 300mm.

33

m3

800.00

26,400.00

10

4,000.00

40,000.00

16

m3

2,350.00

37,600.00

25.88

m3

1,000.00

25,880.00

10

22,522.00

225,220.00

73

m2

1,000.00

73,000.00

73

m2

6,878.00

502,094.00

Carried to Collection. COLLECTION. Carried from page S.W 2 Carried from page S.W 3 Carried from page S.W 4 Carried from page S.W 5 Carried from page S.W 6

930,194.00

9,616,255.00 2,101,760.00 278,850.00 1,478,036.00 930,194.00

Storm Water Drain to Road 1A Carried to collection.

14,405,095.00

S.W.95

LATIUM HOUSING DEVELOPMENT


ITEM DESCRIPTION QTY UNIT RATE $

Stormwater drain Road No. 2 Concrete Pipe Culvert ( 610mm Diameter) Excavation and Earthworks Excavate trench for 610mm diameter pre-cast concrete pipe in any material excluding rock, commencing at formation level, exceeding 1.5m but not exceeding 3.0m deep, average depth 1.7m, part backfill with approved granular fill and selected excavated material and remove surplus excavated material from site. Extra over excavation for excavation in rock (Provisional). Selected sand fill around 610mm pipe with 150mm cover at both top and bottom as per Engineer drawing. Pipework F 610mm diameter pre-cast concrete pipe, laid and joint in trench Curb Inlet Box with Double Grating (2 no.) 0.85m wide x 1.91m long (internally measured) Excavation and Earthworks Excavate for curb inlet box in any material excluding rock, commencing at formation level and not exceeding 1.5m deep and get out. Ditto exceeding 1500mm but not exceeding 3000mm deep Extra over excavation for excavation in rock (Provisional). 1:3:6 Concrete mix, 50mm thick as blinding. Reinforced Concrete (1:2:4) 21 N/mm2 as described :F G 180mm Thick base slab Belt Beam Mild Steel Rod Reinforcement : I J K 12mm Diameter in base slab 12mm Diameter vertically in block wall. 12mm Diameter horizontally in block wall. 84 64 25 Kg Kg Kg 200.00 200.00 200.00 16,800.00 12,800.00 5,000.00 1 5 m3 m3 20,000.00 20,000.00 20,000.00 100,000.00

46

4,000.00

184,000.00

0.6

m3

2,350.00

1,410.00

36.07

m3

1,000.00

36,070.00

46

22,522.00

1,036,012.00

m3

800.00

7,200.00

m3

900.00

1,800.00

C D

10 6

m3 m2

2,350.00 1,000.00

23,500.00 6,000.00

Carried to Collection.

1,450,592.00

S.W.96

LATIUM HOUSING DEVELOPMENT


ITEM DESCRIPTION QTY UNIT RATE $

Stormwater drain (contd) Road No. 2 (contd) Curb Inlet Box with Double Grating (11 no.) (contd) Blockwall 200mm Hollow pre-cast (class "A") concrete blocks bedded and jointed in cement and sand mortar (1:3) including filling all cavities with concrete (17 N/mm2 ) Formwork Sawn formwork as described to :O O Side of Belt Beam Soffit of Belt Beam Finishes A B C 12mm thick cement and sand (1:3) rendering, finished with a steel float to blockwalls. Ditto, base slab. Ditto, to belt beam 600mm x 900mm heavy duty D-400 C.I. combination drain grate and curb inlet hood - rated axle load 400kN. (2 No. each) 11 0.3 m2 m2 3,000.00 3,000.00 33,000.00 900.00

13

m2

4,000.00

52,000.00

13 3 6

m2 m2 m2

1,458.00 1,458.00 1,458.00

18,954.00 4,374.00 8,748.00

No.

50,000.00

100,000.00

Carried to Collection.

217,976.00

COLLECTION. Carried from page S.W 7 Carried from page S.W 8 1,450,592.00 217,976.00

Storm Water Drain to Road 2 Carried to collection.

1,668,568.00

S.W.97

LATIUM HOUSING DEVELOPMENT


ITEM DESCRIPTION QTY UNIT RATE $

Stormwater drain Road No. 3 Concrete Pipe Culvert ( 914, 750 & 610mm Diameter) Excavation and Earthworks Excavate trench for 914mm diameter pre-cast concrete pipe in any material excluding rock, commencing at formation level, exceeding 1.5m but not exceeding 3.0m deep, average depth 1.7m, part backfill with approved granular fill and selected excavated material and remove surplus excavated material from site. Excavate trench for 750mm diameter pre-cast concrete pipe in any material excluding rock, commencing at formation level, exceeding 1.5m but not exceeding 3.0m deep, average depth 1.7m, part backfill with approved granular fill and selected excavated material and remove surplus excavated material from site. Excavate trench for 610mm diameter pre-cast concrete pipe in any material excluding rock, commencing at formation level, exceeding 1.5m but not exceeding 3.0m deep, average depth 1.7m, part backfill with approved granular fill and selected excavated material and remove surplus excavated material from site. Extra over excavation for excavation in rock (Provisional). Selected sand fill around 610mm pipe with 150mm cover at both top and bottom as per Engineer drawing. Pipework F 914mm diameter pre-cast concrete pipe, laid and joint in trench 750mm diameter pre-cast concrete pipe, laid and joint in trench 610mm diameter pre-cast concrete pipe, laid and joint in trench

95

4,500.00

427,500.00

62

4,200.00

260,400.00

50

4,000.00

200,000.00

264

m3

2,350.00

620,400.00

162.33

m3

1,000.00

162,330.00

95

29,853.00

2,836,035.00

62

24,300.00

1,506,600.00

50

22,522.00

1,126,100.00

Carried to Collection.

7,139,365.00

S.W.98

LATIUM HOUSING DEVELOPMENT


ITEM DESCRIPTION QTY UNIT RATE $

Stormwater drain Road No. 3 (contd) Curb Inlet Box with Double Grating (11 no.) 0.85m wide x 1.91m long (internally measured) Excavation and Earthworks Excavate for curb inlet box in any material excluding rock, commencing at formation level and not exceeding 1.5m deep and get out. Ditto exceeding 1500mm but not exceeding 3000mm deep Extra over excavation for excavation in rock (Provisional). 1:3:6 Concrete mix, 50mm thick as blinding. Reinforced Concrete (1:2:4) 21 N/mm2 as described :F G 180mm Thick base slab Belt Beam Mild Steel Rod Reinforcement : I J K 12mm Diameter in base slab 12mm Diameter vertically in block wall. 12mm Diameter horizontally in block wall. Blockwall 200mm Hollow pre-cast (class "A") concrete blocks bedded and jointed in cement and sand mortar (1:3) including filling all cavities with concrete (17 N/mm2 ) Formwork Sawn formwork as described to :O O Side of Belt Beam Soffit of Belt Beam Finishes A B C 12mm thick cement and sand (1:3) rendering, finished with a steel float to blockwalls. Ditto, base slab. Ditto, to belt beam 600mm x 900mm heavy duty D-400 C.I. combination drain grate and curb inlet hood - rated axle load 400kN. (2 No. each) 60 1.9 m2 m2 3,000.00 3,000.00 180,000.00 5,700.00 463 352 139 Kg Kg Kg 200.00 200.00 200.00 92,600.00 70,400.00 27,800.00 6 30 m3 m3 20,000.00 20,000.00 120,000.00 600,000.00

48

m3

800.00

38,400.00

13

m3

900.00

11,700.00

C D

46 32

m3 m2

2,350.00 1,000.00

108,100.00 32,000.00

70

m2

4,000.00

280,000.00

70 18 32

m2 m2 m2

1,458.00 1,458.00 1,458.00

102,060.00 26,244.00 46,656.00

11

No.

50,000.00

550,000.00

Carried to Collection.

2,291,660.00

S.W.99

LATIUM HOUSING DEVELOPMENT


ITEM DESCRIPTION QTY UNIT RATE $

Stormwater drain Road No. 3 (contd)

COLLECTION. Carried from page S.W 9 Carried from page S.W 10 7,139,365.00 2,291,660.00

Storm Water Drain to Road 3 Carried to collection.

9,431,025.00

S.W.100

LATIUM HOUSING DEVELOPMENT


ITEM DESCRIPTION QTY UNIT RATE $

Stormwater drain Road No. 4

Concrete Pipe Culvert (750 & 610mm Diameter) Excavation and Earthworks Excavate trench for 750mm diameter pre-cast concrete pipe in any material excluding rock, commencing at formation level, exceeding 1.5m but not exceeding 3.0m deep, average depth 1.7m, part backfill with approved granular fill and selected excavated material and remove surplus excavated material from site. Excavate trench for 610mm diameter pre-cast concrete pipe in any material excluding rock, commencing at formation level, exceeding 1.5m but not exceeding 3.0m deep, average depth 1.7m, part backfill with approved granular fill and selected excavated material and remove surplus excavated material from site. Extra over excavation for excavation in rock (Provisional). Selected sand fill around 610mm pipe with 150mm cover at both top and bottom as per Engineer drawing. Pipework F 750mm diameter pre-cast concrete pipe, laid and joint in trench 610mm diameter pre-cast concrete pipe, laid and joint in trench Curb Inlet Box with Double Grating (3 no.) 0.85m wide x 1.91m long (internally measured) Excavation and Earthworks Excavate for curb inlet box in any material excluding rock, commencing at formation level and not exceeding 1.5m deep and get out. Ditto exceeding 1500mm but not exceeding 3000mm deep Extra over excavation for excavation in rock (Provisional). 1:3:6 Concrete mix, 50mm thick as blinding.

31

4,200.00

130,200.00

12

4,000.00

48,000.00

m3

2,350.00

16,450.00

33.72

m3

1,000.00

33,720.00

31

24,300.00

753,300.00

12

22,522.00

270,264.00

13

m3

8,000.00

104,000.00

m3

1,000.00

3,000.00

C D

3 9

m3 m2

2,350.00 1,000.00

7,050.00 9,000.00

Carried to Collection.

1,374,984.00

S.W.101

LATIUM HOUSING DEVELOPMENT


ITEM DESCRIPTION QTY UNIT RATE $

Stormwater drain Road No. 4 (contd) Reinforced Concrete (1:2:4) 21 N/mm2 as described :F G 180mm Thick base slab Belt Beam Mild Steel Rod Reinforcement : I J K 12mm Diameter in base slab 12mm Diameter vertically in block wall. 12mm Diameter horizontally in block wall. Blockwall 200mm Hollow pre-cast (class "A") concrete blocks bedded and jointed in cement and sand mortar (1:3) including filling all cavities with concrete (17 N/mm2 ) Formwork Sawn formwork as described to :O O Side of Belt Beam Soffit of Belt Beam Finishes A B C 12mm thick cement and sand (1:3) rendering, finished with a steel float to blockwalls. Ditto, base slab. Ditto, to belt beam 600mm x 900mm heavy duty D-400 C.I. combination drain grate and curb inlet hood - rated axle load 400kN. (2 No. each) 16 0.5 m2 m2 3,000.00 3,000.00 48,000.00 1,500.00 126 96 38 Kg Kg Kg 200.00 200.00 200.00 25,200.00 19,200.00 7,600.00 2 8 m3 m3 20,000.00 20,000.00 40,000.00 160,000.00

19

m2

4,000.00

76,000.00

19 5 9

m2 m2 m2

1,458.00 1,458.00 1,458.00

27,702.00 7,290.00 13,122.00

No.

50,000.00

150,000.00

Carried to Collection.

575,614.00

COLLECTION. Carried from page S.W 12 Carried from page S.W 13 1,374,984.00 575,614.00

Storm Water Drain to Road 4 Carried to collection.

1,950,598.00

S.W.102

LATIUM HOUSING DEVELOPMENT


ITEM DESCRIPTION QTY UNIT RATE $

Stormwater drain Road No. 5 cul-de-sac Curb Inlet Box with Single Grating (2 no.) (contd) 0.85m wide x 1.91m long (internally measured) Excavation and Earthworks Excavate for curb inlet box in any material excluding rock, commencing at formation level and not exceeding 1.5m deep and get out. Ditto exceeding 1500mm but not exceeding 3000mm deep Extra over excavation for excavation in rock (Provisional). 1:3:6 Concrete mix, 50mm thick as blinding. Reinforced Concrete (1:2:4) 21 N/mm2 as described :F G H 180mm Thick base slab Belt Beam 150mm Suspended slab Mild Steel Rod Reinforcement : I J K L 12mm Diameter in base slab 12mm Diameter vertically in block wall. 12mm Diameter horizontally in block wall. 12mm Diameter in suspended slab. Blockwall 200mm Hollow pre-cast (class "A") concrete blocks bedded and jointed in cement and sand mortar (1:3) including filling all cavities with concrete (17 N/mm2 ) Formwork Sawn formwork as described to :N O O Soffit of Suspended slab. Side of Belt Beam Soffit of Belt Beam 0.5 5 0.2 m2 m2 m2 3,000.00 3,000.00 3,000.00 1,500.00 15,000.00 600.00 42 32 13 23 Kg Kg Kg Kg 200.00 200.00 200.00 200.00 8,400.00 6,400.00 2,600.00 4,600.00 1 3 0.1 m3 m3 m3 20,000.00 20,000.00 20,000.00 20,000.00 60,000.00 2,000.00

m3

1,000.00

4,000.00

m3

1,500.00

1,500.00

C D

0.50 3

m3 m2

2,350.00 1,000.00

1,175.00 3,000.00

m2

4,000.00

24,000.00

Carried to Collection.

154,775.00

S.W.103

LATIUM HOUSING DEVELOPMENT


ITEM DESCRIPTION QTY UNIT RATE $

Stormwater drain (contd) Road No. 5 cul-de-sac (contd) Curb Inlet Box with Single Grating (2 no.) (contd) 0.85m wide x 1.91m long (internally measured) Finishes A B C 12mm thick cement and sand (1:3) rendering, finished with a steel float to blockwalls. Ditto, base slab. Ditto, to belt beam 600mm x 900mm heavy duty D-400 C.I. combination drain grate and curb inlet hood - rated axle load 400kN. Stone Pitched Chute (2 no.) Excavation and Earthworks Excavate for stone pitch chute in any material excluding rock, commencing at ground level and not exceeding 1.5m deep and get out. Excavate trench for 610mm diameter pre-cast concrete pipe in any material excluding rock,commencing form reduced level, exceeding 1.5m but not exceeding 3.0m deep, average depth 1.7m, part backfill with approved granular fill and selected excavated material and remove surplus excavated material from site. Extra over excavation for excavation in rock (Provisional). Selected sand fill around 610mm pipe with 150mm cover at both top and bottom as per Engineer drawing. Pipework F 610mm diameter pre-cast concrete pipe, laid and joint in trench Concrete Bedding D 1:3:6 Concrete mix, 50mm thick as bedding base for stone packing. Stone Packing Random rubble stones 150 to 200mm diameter laid with 1:3 cement sand mortar mix in joints on concrete bedding to obtain overall thickness of 300mm.

6 2 3

m2 m2 m2

1,458.00 1,458.00 1,458.00

8,748.00 2,916.00 4,374.00

No.

50,000.00

50,000.00

48

m3

1,000.00

48,000.00

4,000.00

20,000.00

10

m3

2,350.00

23,500.00

37.64

m3

1,000.00

37,640.00

22,522.00

112,610.00

106

m2

1,000.00

106,000.00

106

m2

6,878.00

729,068.00

Carried to Collection.

1,142,856.00

S.W.104

LATIUM HOUSING DEVELOPMENT


ITEM DESCRIPTION QTY UNIT RATE $

Stormwater drain (contd) Road No. 5 cul-de-sac (contd)

COLLECTION. Carried from page S.W 14 Carried from page S.W 15 154,775.00 1,142,856.00

Storm Water Drain to Road 5 cul-de-sac Carried to collection.

1,297,631.00

S.W.105

LATIUM HOUSING DEVELOPMENT


ITEM DESCRIPTION QTY UNIT RATE $

Stormwater drain Road No. 6

Concrete Pipe Culvert (750 & 610mm Diameter) Excavation and Earthworks Excavate trench for 750mm diameter pre-cast concrete pipe in any material excluding rock, commencing at formation level, exceeding 1.5m but not exceeding 3.0m deep, average depth 1.7m, part backfill with approved granular fill and selected excavated material and remove surplus excavated material from site. Excavate trench for 610mm diameter pre-cast concrete pipe in any material excluding rock, commencing at formation level, exceeding 1.5m but not exceeding 3.0m deep, average depth 1.7m, part backfill with approved granular fill and selected excavated material and remove surplus excavated material from site. Extra over excavation for excavation in rock (Provisional). Selected sand fill around 610mm pipe with 150mm cover at both top and bottom as per Engineer drawing. Pipework F 750mm diameter pre-cast concrete pipe, laid and joint in trench 610mm diameter pre-cast concrete pipe, laid and joint in trench Curb Inlet Box with Double Grating (3 no.) 0.85m wide x 1.91m long (internally measured) Excavation and Earthworks Excavate for curb inlet box in any material excluding rock, commencing at formation level and not exceeding 1.5m deep and get out. Ditto exceeding 1500mm but not exceeding 3000mm deep Extra over excavation for excavation in rock (Provisional). 1:3:6 Concrete mix, 50mm thick as blinding.

27

4,200.00

113,400.00

4,000.00

28,000.00

5.8

m3

2,350.00

13,630.00

26.66

m3

1,000.00

26,660.00

27

24,300.00

656,100.00

22,522.00

157,654.00

m3

1,000.00

9,000.00

m3

1,500.00

3,000.00

C D

2 6

m3 m2

2,350.00 1,000.00

4,700.00 6,000.00

Carried to Collection.

1,018,144.00

S.W.106

LATIUM HOUSING DEVELOPMENT


ITEM DESCRIPTION QTY UNIT RATE $

Stormwater drain Road No. 6 (contd) Reinforced Concrete (1:2:4) 21 N/mm2 as described :F G 180mm Thick base slab Belt Beam Mild Steel Rod Reinforcement : I J K 12mm Diameter in base slab 12mm Diameter vertically in block wall. 12mm Diameter horizontally in block wall. Blockwall 200mm Hollow pre-cast (class "A") concrete blocks bedded and jointed in cement and sand mortar (1:3) including filling all cavities with concrete (17 N/mm2 ) Formwork Sawn formwork as described to :O O Side of Belt Beam Soffit of Belt Beam Finishes A B C 12mm thick cement and sand (1:3) rendering, finished with a steel float to blockwalls. Ditto, base slab. Ditto, to belt beam 600mm x 900mm heavy duty D-400 C.I. combination drain grate and curb inlet hood - rated axle load 400kN. (2 No. each) 11 0.3 m2 m2 3,000.00 3,000.00 33,000.00 900.00 84 64 25 Kg Kg Kg 200.00 200.00 200.00 16,800.00 12,800.00 5,000.00 1 5 m3 m3 20,000.00 20,000.00 20,000.00 100,000.00

13

m2

4,000.00

52,000.00

13 3 6

m2 m2 m2

1,458.00 1,458.00 1,458.00

18,954.00 4,374.00 8,748.00

No.

50,000.00

100,000.00

Carried to Collection.

372,576.00

COLLECTION. Carried from page S.W 17 Carried from page S.W 18 1,018,144.00 372,576.00

Storm Water Drain to Road 6 Carried to collection.

1,390,720.00

S.W.107

LATIUM HOUSING DEVELOPMENT


ITEM DESCRIPTION QTY UNIT RATE $

Stormwater drain Road No. 7 Concrete Pipe Culvert (914, 750 & 610mm Diameter) Excavation and Earthworks Excavate trench for 914mm diameter pre-cast concrete pipe in any material excluding rock, commencing at formation level, exceeding 1.5m but not exceeding 3.0m deep, average depth 1.7m, part backfill with approved granular fill and selected excavated material and remove surplus excavated material from site. Excavate trench for 750mm diameter pre-cast concrete pipe in any material excluding rock, commencing at formation level, exceeding 1.5m but not exceeding 3.0m deep, average depth 1.7m, part backfill with approved granular fill and selected excavated material and remove surplus excavated material from site. Excavate trench for 610mm diameter pre-cast concrete pipe in any material excluding rock, commencing at formation level, exceeding 1.5m but not exceeding 3.0m deep, average depth 1.7m, part backfill with approved granular fill and selected excavated material and remove surplus excavated material from site. Extra over excavation for excavation in rock (Provisional). Selected sand fill around 610mm pipe with 150mm cover at both top and bottom as per Engineer drawing. Pipework F 914mm diameter pre-cast concrete pipe, laid and joint in trench 750mm diameter pre-cast concrete pipe, laid and joint in trench 610mm diameter pre-cast concrete pipe, laid and joint in trench

114

4,500.00

513,000.00

27

4,200.00

113,400.00

77

4,000.00

308,000.00

315

m3

2,350.00

740,250.00

171

m3

1,000.00

171,000.00

114

29,853.00

3,403,242.00

27

24,300.00

656,100.00

77

22,522.00

1,734,194.00

Carried to Collection.

7,639,186.00

S.W.108

LATIUM HOUSING DEVELOPMENT


ITEM DESCRIPTION QTY UNIT RATE $

Stormwater drain Road No. 7 (contd) Curb Inlet Box with Double Grating (3 no.) 0.85m wide x 1.91m long (internally measured) Excavation and Earthworks Excavate for curb inlet box in any material excluding rock, commencing at formation level and not exceeding 1.5m deep and get out. Ditto exceeding 1500mm but not exceeding 3000mm deep Extra over excavation for excavation in rock (Provisional). 1:3:6 Concrete mix, 50mm thick as blinding. Reinforced Concrete (1:2:4) 21 N/mm2 as described :F G 180mm Thick base slab Belt Beam Mild Steel Rod Reinforcement : I J K 12mm Diameter in base slab 12mm Diameter vertically in block wall. 12mm Diameter horizontally in block wall. Blockwall 200mm Hollow pre-cast (class "A") concrete blocks bedded and jointed in cement and sand mortar (1:3) including filling all cavities with concrete (17 N/mm2 ) Formwork Sawn formwork as described to :O O Side of Belt Beam Soffit of Belt Beam Finishes A B C 12mm thick cement and sand (1:3) rendering, finished with a steel float to blockwalls. Ditto, base slab. Ditto, to belt beam 600mm x 900mm heavy duty D-400 C.I. combination drain grate and curb inlet hood - rated axle load 400kN. (2 No. each) 66 2.0 m2 m2 3,000.00 3,000.00 198,000.00 6,000.00 505 384 152 Kg Kg Kg 200.00 200.00 200.00 101,000.00 76,800.00 30,400.00 6 33 m3 m3 20,000.00 20,000.00 120,000.00 660,000.00

52

m3

1,000.00

52,000.00

14

m3

1,500.00

21,000.00

C D

56 35

m3 m2

2,350.00 1,000.00

131,600.00 35,000.00

76

m2

4,000.00

304,000.00

76 19 35

m2 m2 m2

1,458.00 1,458.00 1,458.00

110,808.00 27,702.00 51,030.00

12

No.

50,000.00

600,000.00

Carried to Collection.

2,525,340.00

S.W.109

LATIUM HOUSING DEVELOPMENT


ITEM DESCRIPTION QTY UNIT RATE $

Stormwater drain Road No. 7 (contd) Stone Pitched Chute (2 no.) Excavation and Earthworks Excavate for stone pitch chute in any material excluding rock, commencing at ground level and not exceeding 1.5m deep and get out. Excavate trench for 610mm diameter pre-cast concrete pipe in any material excluding rock,commencing form reduced level, exceeding 1.5m but not exceeding 3.0m deep, average depth 1.7m, part backfill with approved granular fill and selected excavated material and remove surplus excavated material from site. Extra over excavation for excavation in rock (Provisional). Selected sand fill around 610mm pipe with 150mm cover at both top and bottom as per Engineer drawing. Pipework F 610mm diameter pre-cast concrete pipe, laid and joint in trench Concrete Bedding D 1:3:6 Concrete mix, 50mm thick as bedding base for stone packing. Stone Packing Random rubble stones 150 to 200mm diameter laid with 1:3 cement sand mortar mix in joints on concrete bedding to obtain overall thickness of 300mm.

65

m3

1,000.00

65,000.00

66

4,000.00

264,000.00

92

m3

2,350.00

216,200.00

50.97

m3

1,000.00

50,970.00

66

22,522.00

1,486,452.00

145

m2

1,000.00

145,000.00

145

m2

6,878.00

997,310.00

Carried to Collection.

3,224,932.00

COLLECTION. Carried from page S.W 19 Carried from page S.W 20 Carried from page S.W 21 7,639,186.00 2,525,340.00 3,224,932.00

Storm Water Drain to Road 7 Carried to collection.

13,389,458.00

S.W.110

LATIUM HOUSING DEVELOPMENT


ITEM DESCRIPTION QTY UNIT RATE $

Stormwater drain Road No. 8 Concrete Pipe Culvert (914mm Diameter) Excavation and Earthworks Excavate trench for 914mm diameter pre-cast concrete pipe in any material excluding rock, commencing at formation level, exceeding 1.5m but not exceeding 3.0m deep, average depth 1.7m, part backfill with approved granular fill and selected excavated material and remove surplus excavated material from site. Extra over excavation for excavation in rock (Provisional). Selected sand fill around 914mm pipe with 150mm cover at both top and bottom as per Engineer drawing. Pipework F 914mm diameter pre-cast concrete pipe, laid and joint in trench Curb Inlet Box with Double Grating (3 no.) 0.85m wide x 1.91m long (internally measured) Excavation and Earthworks Excavate for curb inlet box in any material excluding rock, commencing at formation level and not exceeding 1.5m deep and get out. Ditto exceeding 1500mm but not exceeding 3000mm deep Extra over excavation for excavation in rock (Provisional). 1:3:6 Concrete mix, 50mm thick as blinding. Reinforced Concrete (1:2:4) 21 N/mm2 as described :F G 180mm Thick base slab Belt Beam Mild Steel Rod Reinforcement : I J K 12mm Diameter in base slab 12mm Diameter vertically in block wall. 12mm Diameter horizontally in block wall. 84 64 25 Kg Kg Kg 200.00 200.00 200.00 16,800.00 12,800.00 5,000.00 1 5 m3 m3 20,000.00 20,000.00 20,000.00 100,000.00

4,500.00

31,500.00

1.2

m3

2,350.00

2,820.00

5.49

m3

1,000.00

5,490.00

29,853.00

208,971.00

m3

1,000.00

9,000.00

m3

1,500.00

3,000.00

C D

0.2 6

m3 m2

2,350.00 1,000.00

470.00 6,000.00

Carried to Collection.

421,851.00

S.W.111

LATIUM HOUSING DEVELOPMENT


ITEM DESCRIPTION QTY UNIT RATE $

Stormwater drain Road No. 8 (contd) Blockwall 200mm Hollow pre-cast (class "A") concrete blocks bedded and jointed in cement and sand mortar (1:3) including filling all cavities with concrete (17 N/mm2 ) Formwork Sawn formwork as described to :O O Side of Belt Beam Soffit of Belt Beam Finishes A B C 12mm thick cement and sand (1:3) rendering, finished with a steel float to blockwalls. Ditto, base slab. Ditto, to belt beam 600mm x 900mm heavy duty D-400 C.I. combination drain grate and curb inlet hood - rated axle load 400kN. (2 No. each) Curb Inlet Box with Double Grating (2 no.) 0.85m wide x 1.91m long (internally measured) Excavation and Earthworks Excavate for curb inlet box in any material excluding rock, commencing at formation level and not exceeding 1.5m deep and get out. Ditto exceeding 1500mm but not exceeding 3000mm deep Extra over excavation for excavation in rock (Provisional). 1:3:6 Concrete mix, 50mm thick as blinding. Reinforced Concrete (1:2:4) 21 N/mm2 as described :F G 180mm Thick base slab Belt Beam 1 5 m3 m3 20,000.00 20,000.00 20,000.00 100,000.00 11 0.3 m2 m2 3,000.00 3,000.00 33,000.00 900.00

13

m2

4,000.00

52,000.00

13 3 6

m2 m2 m2

1,458.00 1,458.00 1,458.00

18,954.00 4,374.00 8,748.00

No.

50,000.00

100,000.00

m3

1,000.00

9,000.00

m3

1,500.00

3,000.00

C D

0.2 6

m3 m2

2,350.00 1,000.00

470.00 6,000.00

Carried to Collection.

356,446.00

S.W.112

LATIUM HOUSING DEVELOPMENT


ITEM DESCRIPTION QTY UNIT RATE $

Stormwater drain Road No. 8 (contd) Mild Steel Rod Reinforcement : I J K 12mm Diameter in base slab 12mm Diameter vertically in block wall. 12mm Diameter horizontally in block wall. Blockwall 200mm Hollow pre-cast (class "A") concrete blocks bedded and jointed in cement and sand mortar (1:3) including filling all cavities with concrete (17 N/mm2 ) Formwork Sawn formwork as described to :O O Side of Belt Beam Soffit of Belt Beam Finishes A B C 12mm thick cement and sand (1:3) rendering, finished with a steel float to blockwalls. Ditto, base slab. Ditto, to belt beam 600mm x 900mm heavy duty D-400 C.I. combination drain grate and curb inlet hood - rated axle load 400kN. (2 No. each) 11 0.3 m2 m2 3,000.00 3,000.00 33,000.00 900.00 84 64 25 Kg Kg Kg 200.00 200.00 200.00 16,800.00 12,800.00 5,000.00

13

m2

4,000.00

52,000.00

13 3 6

m2 m2 m2

1,458.00 1,458.00 1,458.00

18,954.00 4,374.00 8,748.00

No.

50,000.00

100,000.00

Carried to Collection.

252,576.00

S.W.113

LATIUM HOUSING DEVELOPMENT


ITEM DESCRIPTION QTY UNIT RATE $

Stormwater drain Road No. 8 (contd) 600mm x 600mm Wide Reinforced Concrete Open U-Drain (from Retention Basin) Excavation and Earthworks Excavate for RC open drain 1000mm wide x 950mm deep in any material excluding rock, commencing at ground level and not exceeding 1.5m deep and get out. Extra over excavation for excavation in rock (Provisional). 1:3:6 Concrete mix, 50mm thick as blinding. Reinforced Concrete (1:2:4) 21 N/mm2 as described :F G 200mm Thick base slab 200mm Thick in-situ reinforced concrete wall Mild Steel Rod Reinforcement : I J 12mm Diameter in base slab 12mm Diameter in concrete wall Formwork Sawn formwork as described to :O O Edge of base slab Sides of concrete wall 11 35 m2 m2 3,000.00 3,000.00 33,000.00 105,000.00 320 585 Kg Kg 200.00 200.00 64,000.00 117,000.00 6 7 m3 m3 20,000.00 20,000.00 120,000.00 140,000.00

28

4,000.00

112,000.00

C D

2.7 28

m3 m2

2,350.00 1,000.00

6,345.00 28,000.00

Carried to Collection.

725,345.00

S.W.114

LATIUM HOUSING DEVELOPMENT


ITEM DESCRIPTION QTY UNIT RATE $

Stormwater drain Road No. 8 (contd) 900mm x 600mm Wide Reinforced Concrete Open U-Drain (Along Road 8) Excavation and Earthworks Excavate for RC open drain 1000mm wide x 1150mm deep in any material excluding rock, commencing at ground level and not exceeding 1.5m deep and get out. Extra over excavation for excavation in rock (Provisional). 1:3:6 Concrete mix, 50mm thick as blinding. Reinforced Concrete (1:2:4) 21 N/mm2 as described :F G 200mm Thick base slab 200mm Thick in-situ reinforced concrete wall Mild Steel Rod Reinforcement : I J 12mm Diameter in base slab 12mm Diameter in concrete wall Formwork Sawn formwork as described to :O O Edge of base slab Sides of concrete wall 10 49 m2 m2 3,000.00 3,000.00 30,000.00 147,000.00 297 811 Kg Kg 200.00 200.00 59,400.00 162,200.00 5 9 m3 m3 20,000.00 20,000.00 100,000.00 180,000.00

26

4,000.00

104,000.00

C D

3.0 26

m3 m2

2,350.00 1,000.00

7,050.00 26,000.00

Carried to Collection.

815,650.00

COLLECTION. Carried from page S.W 22 Carried from page S.W 23 Carried from page S.W 24 Carried from page S.W 25 Carried from page S.W 26 421,851.00 356,446.00 252,576.00 725,345.00 815,650.00

Storm Water Drain to Road 8 Carried to collection.

2,571,868.00

S.W.115

LATIUM HOUSING DEVELOPMENT


ITEM DESCRIPTION QTY UNIT RATE $

Stormwater drain Road No. 9a Curb Inlet Box with Double Grating (5 no.) 0.85m wide x 1.91m long (internally measured) Excavation and Earthworks Excavate for curb inlet box in any material excluding rock, commencing at formation level and not exceeding 1.5m deep and get out. Ditto exceeding 1500mm but not exceeding 3000mm deep Extra over excavation for excavation in rock (Provisional). 1:3:6 Concrete mix, 50mm thick as blinding. Reinforced Concrete (1:2:4) 21 N/mm2 as described :F G 180mm Thick base slab Belt Beam Mild Steel Rod Reinforcement : I J K 12mm Diameter in base slab 12mm Diameter vertically in block wall. 12mm Diameter horizontally in block wall. Blockwall 200mm Hollow pre-cast (class "A") concrete blocks bedded and jointed in cement and sand mortar (1:3) including filling all cavities with concrete (17 N/mm2 ) Formwork Sawn formwork as described to :O O Side of Belt Beam Soffit of Belt Beam Finishes A B C 12mm thick cement and sand (1:3) rendering, finished with a steel float to blockwalls. Ditto, base slab. Ditto, to belt beam 600mm x 900mm heavy duty D-400 C.I. combination drain grate and curb inlet hood - rated axle load 400kN. (2 No. each) 27 0.9 m2 m2 3,000.00 3,000.00 81,000.00 2,700.00 211 160 63 Kg Kg Kg 200.00 200.00 200.00 42,200.00 32,000.00 12,600.00 3 14 m3 m3 20,000.00 20,000.00 60,000.00 280,000.00

22

m3

1,000.00

22,000.00

m3

1,500.00

7,500.00

C D

0.5 14

m3 m2

2,350.00 1,000.00

1,175.00 14,000.00

32

m2

4,000.00

128,000.00

32 8 14

m2 m2 m2

1,458.00 1,458.00 1,458.00

46,656.00 11,664.00 20,412.00

No.

50,000.00

250,000.00

Carried to Collection.

1,011,907.00

S.W.116

LATIUM HOUSING DEVELOPMENT


ITEM DESCRIPTION QTY UNIT RATE $

Stormwater drain Road No. 9a (contd) Concrete Pipe Culvert (610mm Diameter) Excavation and Earthworks Excavate trench for 610mm diameter pre-cast concrete pipe in any material excluding rock, commencing at formation level, exceeding 1.5m but not exceeding 3.0m deep, average depth 1.7m, part backfill with approved granular fill and selected excavated material and remove surplus excavated material from site. Extra over excavation for excavation in rock (Provisional). Selected sand fill around 610mm pipe with 150mm cover at both top and bottom as per Engineer drawing. Pipework F 610mm diameter pre-cast concrete pipe, laid and joint in trench

48

4,000.00

192,000.00

8.2

m3

2,350.00

19,270.00

37.64

m3

1,000.00

37,640.00

48

22,522.00

1,081,056.00

Stone Pitched Sag Chute (1 no.) Excavation and Earthworks Excavate for stone pitch sag chute in any material excluding rock, commencing at ground level and not exceeding 1.5m deep and get out. Excavate trench for 750mm diameter pre-cast concrete pipe in any material excluding rock,commencing form reduced level, exceeding 1.5m but not exceeding 3.0m deep, average depth 1.7m, part backfill with approved granular fill and selected excavated material and remove surplus excavated material from site. Extra over excavation for excavation in rock (Provisional). Selected sand fill around 750mm pipe with 150mm cover at both top and bottom as per Engineer drawing. Pipework F 750mm diameter pre-cast concrete pipe, laid and joint in trench Concrete Bedding D 1:3:6 Concrete mix, 50mm thick as bedding base for stone packing.

18

m3

1,000.00

18,000.00

18

4,200.00

75,600.00

m3

2,350.00

7,050.00

14.12

m3

1,000.00

14,120.00

18

24,300.00

437,400.00

40

m2

1,000.00

40,000.00

Carried to Collection.

1,922,136.00

S.W.117

LATIUM HOUSING DEVELOPMENT


ITEM DESCRIPTION QTY UNIT RATE $

Stormwater drain Road No. 9a (contd) Stone Pitched Sag Chute (1 no.) (contd) Stone Packing Random rubble stones 150 to 200mm diameter laid with 1:3 cement sand mortar mix in joints on concrete bedding to obtain overall thickness of 300mm.

40

m2

6,878.00

275,120.00

Carried to Collection.

275,120.00

COLLECTION. Carried from page S.W 27 Carried from page S.W 28 Carried from page S.W 29 1,011,907.00 1,922,136.00 275,120.00

Storm Water Drain to Road 9a Carried to collection.

3,209,163.00

S.W.118

LATIUM HOUSING DEVELOPMENT


ITEM DESCRIPTION QTY UNIT RATE $

Stormwater drain Road No. 9b Concrete Pipe Culvert (610mm Diameter) Excavation and Earthworks Excavate trench for 610mm diameter pre-cast concrete pipe in any material excluding rock, commencing at formation level, exceeding 1.5m but not exceeding 3.0m deep, average depth 1.7m, part backfill with approved granular fill and selected excavated material and remove surplus excavated material from site. Extra over excavation for excavation in rock (Provisional). Selected sand fill around 610mm pipe with 150mm cover at both top and bottom as per Engineer drawing. Pipework F 610mm diameter pre-cast concrete pipe, laid and joint in trench

59

4,000.00

236,000.00

10

m3

2,350.00

23,500.00

46.27

m3

1,000.00

46,270.00

59

22,522.00

1,328,798.00

Curb Inlet Box with Double Grating (3 no.) 0.85m wide x 1.91m long (internally measured) Excavation and Earthworks Excavate for curb inlet box in any material excluding rock, commencing at formation level and not exceeding 1.5m deep and get out. Ditto exceeding 1500mm but not exceeding 3000mm deep Extra over excavation for excavation in rock (Provisional). 1:3:6 Concrete mix, 50mm thick as blinding. Reinforced Concrete (1:2:4) 21 N/mm2 as described :F G 180mm Thick base slab Belt Beam 2 8 m3 m3 20,000.00 20,000.00 40,000.00 160,000.00

13

m3

1,000.00

13,000.00

m3

1,500.00

4,500.00

C D

0.3 9

m3 m2

2,350.00 1,000.00

705.00 9,000.00

Carried to Collection.

1,861,773.00

S.W.119

LATIUM HOUSING DEVELOPMENT


ITEM DESCRIPTION QTY UNIT RATE $

Stormwater drain Road No. 9b (contd) Curb Inlet Box with Double Grating (3 no.) (contd) Mild Steel Rod Reinforcement : I J K 12mm Diameter in base slab 12mm Diameter vertically in block wall. 12mm Diameter horizontally in block wall. Blockwall 200mm Hollow pre-cast (class "A") concrete blocks bedded and jointed in cement and sand mortar (1:3) including filling all cavities with concrete (17 N/mm2 ) Formwork Sawn formwork as described to :O O Side of Belt Beam Soffit of Belt Beam Finishes A B C 12mm thick cement and sand (1:3) rendering, finished with a steel float to blockwalls. Ditto, base slab. Ditto, to belt beam 600mm x 900mm heavy duty D-400 C.I. combination drain grate and curb inlet hood - rated axle load 400kN. (2 No. each) 16 0.5 m2 m2 3,000.00 3,000.00 48,000.00 1,500.00 126 96 38 Kg Kg Kg 200.00 200.00 200.00 25,200.00 19,200.00 7,600.00

19

m2

4,000.00

76,000.00

19 5 9

m2 m2 m2

1,458.00 1,458.00 1,458.00

27,702.00 7,290.00 13,122.00

No.

50,000.00

150,000.00

Carried to Collection.

375,614.00

COLLECTION. Carried from page S.W 31 Carried from page S.W 32 1,861,773.00 375,614.00

Storm Water Drain to Road 9a Carried to collection.

2,237,387.00

S.W.120

LATIUM HOUSING DEVELOPMENT


ITEM DESCRIPTION QTY UNIT RATE $

Stormwater drain Road No. 10 Stone Pitched V-Drain Excavation and Earthworks Excavate for stone pitch v-drain in any material excluding rock, commencing at ground level and not exceeding 1.5m deep and get out. Extra over excavation for excavation in rock (Provisional). Concrete Bedding D 1:3:6 Concrete mix, 50mm thick as bedding base for stone packing. Stone Packing Random rubble stones 150 to 200mm diameter laid with 1:3 cement sand mortar mix in joints on concrete bedding to obtain overall thickness of 300mm.

95

m3

1,000.00

95,000.00

10

m3

2,350.00

23,500.00

212

m2

1,000.00

212,000.00

212

m2

6,878.00

1,458,136.00

Barrier Wall (along Road 10) Excavation and Earthworks

Excavate for barrier wall commencing at formation level and not exceeding 1.5m deep and get out. Extra over excavation for excavation in rock (Provisional). Reinforced Concrete 35 MPa as described :-

m3

1,000.00

7,000.00

m3

2,350.00

2,350.00

Barrier Wall Mild Steel Rod Reinforcement :

m3

20,000.00

140,000.00

G H

12mm diameter bar 10mm Diameter bar Formwork Sawn formwork as described to :-

655 123

Kg Kg

200.00 200.00

131,000.00 24,600.00

Sides of walls

59

m2

3,000.00

177,000.00

Storm Water Drain to Road 10 Carried to collection.

2,270,586.00

S.W.121

LATIUM HOUSING DEVELOPMENT


ITEM DESCRIPTION QTY UNIT RATE $

Stormwater drain Road No. 11 Concrete Pipe Culvert (914mm Diameter) Excavation and Earthworks Excavate trench for 914mm diameter pre-cast concrete pipe in any material excluding rock, commencing at formation level, exceeding 1.5m but not exceeding 3.0m deep, average depth 1.7m, part backfill with approved granular fill and selected excavated material and remove surplus excavated material from site. Extra over excavation for excavation in rock (Provisional). Selected sand fill around 914mm pipe with 150mm cover at both top and bottom as per Engineer drawing. Pipework F 914mm diameter pre-cast concrete pipe, laid and joint in trench

69

4,500.00

310,500.00

88

m3

2,350.00

206,800.00

54.11

m3

1,000.00

54,110.00

69

29,853.00

2,059,857.00

Curb Inlet Box with Double Grating (7 no.) 0.85m wide x 1.91m long (internally measured) Excavation and Earthworks Excavate for curb inlet box in any material excluding rock, commencing at formation level and not exceeding 1.5m deep and get out. Ditto exceeding 1500mm but not exceeding 3000mm deep Extra over excavation for excavation in rock (Provisional). 1:3:6 Concrete mix, 50mm thick as blinding. Reinforced Concrete (1:2:4) 21 N/mm2 as described :F G 180mm Thick base slab Belt Beam 4 19 m3 m3 20,000.00 20,000.00 80,000.00 380,000.00

30

m3

1,000.00

30,000.00

m3

1,500.00

12,000.00

C D

6 20

m3 m2

2,350.00 1,000.00

14,100.00 20,000.00

Carried to Collection.

3,167,367.00

S.W.122

LATIUM HOUSING DEVELOPMENT


ITEM DESCRIPTION QTY UNIT RATE $

Stormwater drain Road No. 11 (contd) Curb Inlet Box with Double Grating (3 no.) (contd) Mild Steel Rod Reinforcement : I J K 12mm Diameter in base slab 12mm Diameter vertically in block wall. 12mm Diameter horizontally in block wall. Blockwall 200mm Hollow pre-cast (class "A") concrete blocks bedded and jointed in cement and sand mortar (1:3) including filling all cavities with concrete (17 N/mm2 ) Formwork Sawn formwork as described to :O O Side of Belt Beam Soffit of Belt Beam Finishes A B C 12mm thick cement and sand (1:3) rendering, finished with a steel float to blockwalls. Ditto, base slab. Ditto, to belt beam 600mm x 900mm heavy duty D-400 C.I. combination drain grate and curb inlet hood - rated axle load 400kN. (2 No. each) 38 1.2 m2 m2 3,000.00 3,000.00 114,000.00 3,600.00 295 224 89 Kg Kg Kg 200.00 200.00 200.00 59,000.00 44,800.00 17,800.00

44

m2

4,000.00

176,000.00

44 11 20

m2 m2 m2

1,458.00 1,458.00 1,458.00

64,152.00 16,038.00 29,160.00

No.

50,000.00

350,000.00

Carried to Collection.

874,550.00

COLLECTION. Carried from page S.W 34 Carried from page S.W 35 3,167,367.00 874,550.00

Storm Water Drain to Road 11 Carried to collection.

4,041,917.00

S.W.123

LATIUM HOUSING DEVELOPMENT


ITEM DESCRIPTION QTY UNIT RATE $

Stormwater drain Stone Pitched Trapezoidal Drain Road 8) Excavation and Earthworks Excavate for stone pitch trapezoidal drain in any material excluding rock, commencing at ground level and not exceeding 1.5m deep and get out. Extra over excavation for excavation in rock (Provisional). Concrete Bedding D 1:3:6 Concrete mix, 50mm thick as bedding base for stone packing. Stone Packing Random rubble stones 150 to 200mm diameter laid with 1:3 cement sand mortar mix in joints on concrete bedding to obtain overall thickness of 300mm. (Aong

129

m3

1,000.00

129,000.00

13

m3

2,350.00

30,550.00

174

m2

1,000.00

174,000.00

174

m2

6,878.00

1,196,772.00

Storm Water Trapezoidal Drain Along Road 8 Carried to collection.

1,530,322.00

S.W.124

LATIUM HOUSING DEVELOPMENT


ITEM DESCRIPTION QTY UNIT RATE $

Stormwater drain Stone Pitched Boundary Drain No 3 Excavation and Earthworks Excavate for stone pitch boundary drain in any material excluding rock, commencing at ground level and not exceeding 1.5m deep and get out. Extra over excavation for excavation in rock (Provisional). Concrete Bedding D 1:3:6 Concrete mix, 50mm thick as bedding base for stone packing. Stone Packing Random rubble stones 150 to 200mm diameter laid with 1:3 cement sand mortar mix in joints on concrete bedding to obtain overall thickness of 300mm. Concrete Drain Outfall to Boundary Drain No.) Excavation and Earthworks Excavate for drain outfall in any material excluding rock, commencing at ground level and not exceeding 1.5m deep and get out. Extra over excavation for excavation in rock (Provisional). 1:3:6 Concrete mix, 50mm thick as blinding. Reinforced Concrete (1:2:4) 21 N/mm2 as described :F F G 200mm Thick downstand ground beam 200mm Thick base slab 200mm Thick in-situ reinforced concrete wall Mild Steel Rod Reinforcement : I I J I J 12mm Diameter downstand ground beam 12mm Diameter in base slab 12mm Diameter in concrete wall 10mm Diameter downstand ground beam 10mm Diameter in concrete wall 36 252 203 33 83 Kg Kg Kg Kg Kg 200.00 200.00 200.00 200.00 200.00 7,200.00 50,400.00 40,600.00 6,600.00 16,600.00 1 4 4 m3 m3 m3 25,000.00 20,000.00 20,000.00 25,000.00 80,000.00 80,000.00 (2

428

m3

1,000.00

428,000.00

300

m3

2,350.00

705,000.00

870

m2

1,000.00

870,000.00

870

m2

6,878.00

5,983,860.00

33

m3

1,000.00

33,000.00

C D

7 22

m3 m2

2,350.00 1,000.00

16,450.00 22,000.00

Carried to Collection.

8,364,710.00

S.W.125

LATIUM HOUSING DEVELOPMENT


ITEM DESCRIPTION QTY UNIT RATE $

Stormwater drain Stone Pitched Boundary Drain No 3 (contd) Concrete Drain Outfall to Boundary Drain No.) (contd) Formwork Sawn formwork as described to :O O Edge of base slab Sides of concrete wall 6 20 m2 m2 3,000.00 3,000.00 18,000.00 60,000.00 (2

Carried to Collection.

78,000.00

COLLECTION. Carried from page S.W 36 Carried from page S.W 37 8,364,710.00 78,000.00

Storm Water Drain to Stone Pitched Boundary Drain No 3 Carried to collection.

8,442,710.00

S.W.126

LATIUM HOUSING DEVELOPMENT


ITEM DESCRIPTION QTY UNIT RATE $

Stormwater drain Stone Pitched Tangent Chute - Drain No 6 Excavation and Earthworks Excavate for stone pitch chute in any material excluding rock, commencing at ground level and not exceeding 1.5m deep and get out. Excavate trench for 610mm diameter pre-cast concrete pipe in any material excluding rock,commencing form reduced level, exceeding 1.5m but not exceeding 3.0m deep, average depth 1.7m, part backfill with approved granular fill and selected excavated material and remove surplus excavated material from site. Extra over excavation for excavation in rock (Provisional). Selected sand fill around 610mm pipe with 150mm cover at both top and bottom as per Engineer drawing. Pipework F 610mm diameter pre-cast concrete pipe, laid and joint in trench Concrete Bedding D 1:3:6 Concrete mix, 50mm thick as bedding base for stone packing. Stone Packing Random rubble stones 150 to 200mm diameter laid with 1:3 cement sand mortar mix in joints on concrete bedding to obtain overall thickness of 300mm.

40

m3

1,000.00

40,000.00

10

4,000.00

40,000.00

11

m3

2,350.00

25,850.00

31.37

m3

1,000.00

31,370.00

10

22,522.00

225,220.00

88

m2

1,000.00

88,000.00

88

m2

6,878.00

605,264.00

Storm Water Drain to Stone Pitched Tangent Chute - Drain No 6 Carried to collection.

1,055,704.00

S.W.127

LATIUM HOUSING DEVELOPMENT


ITEM DESCRIPTION QTY UNIT RATE $

Stormwater drain 600mm Wide Reinforced Concrete U-Drain Drain No 7 900mm x 600mm Wide Reinforced Concrete Open U-Drain Excavation and Earthworks Excavate for RC open drain 1000mm wide x 1150mm deep in any material excluding rock, commencing at ground level and not exceeding 1.5m deep and get out. Extra over excavation for excavation in rock (Provisional). 1:3:6 Concrete mix, 50mm thick as blinding. Reinforced Concrete (1:2:4) 21 N/mm2 as described :F G 200mm Thick base slab 200mm Thick in-situ reinforced concrete wall Mild Steel Rod Reinforcement : I J 12mm Diameter in base slab 12mm Diameter in concrete wall Formwork Sawn formwork as described to :O O Edge of base slab Sides of concrete wall 17 77 m2 m2 3,000.00 3,000.00 51,000.00 231,000.00 480 878 Kg Kg 200.00 200.00 96,000.00 175,600.00 8 15 m3 m3 20,000.00 20,000.00 160,000.00 300,000.00

42

4,000.00

168,000.00

C D

10 55

m3 m2

2,350.00 1,000.00

23,500.00 55,000.00

Drain No 7 Intake Structure Excavation and Earthworks Excavate for intake structure 1000mm wide x 1150mm deep in any material excluding rock, commencing at ground level and not exceeding 1.5m deep and get out. Extra over excavation for excavation in rock (Provisional). 1:3:6 Concrete mix, 50mm thick as blinding.

2.3

4,000.00

9,200.00

C D

1 2

m3 m2

2,350.00 1,000.00

2,350.00 2,000.00

Carried to Collection.

1,273,650.00

S.W.128

LATIUM HOUSING DEVELOPMENT


ITEM DESCRIPTION QTY UNIT RATE $

Stormwater drain 600mm Wide Reinforced Concrete U-Drain Drain No 7 (contd) Reinforced Concrete (1:2:4) 21 N/mm2 as described :F G F D 200mm Thick base slab 200mm Thick in-situ reinforced concrete wall 200mm Thick cover slab Head Wall Mild Steel Rod Reinforcement : I J I G 12mm Diameter in base slab 12mm Diameter in concrete wall 12mm Diameter in cover slab 12mm diameter bar in head wall Formwork Sawn formwork as described to :O O O O Edge of base slab Sides of concrete wall Edge of cover slab Sides of head wall Metalwork Pedestrian safety railing 1.4m long x 0.9m high constructed of 50mm diameter galvanized steel pipe as both horizontal (top and bottom) and vertical members spaced at 150mm centers, all welded together with 6mm fillet weld, with 3no 200mm x 75mm x 10mm thick base plate bored twice for 150mm long anchor bolts with nut and washer. ( see dwg.) 1 6 1 2 m2 m2 m2 m2 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 18,000.00 3,000.00 6,000.00 39 72 39 26 Kg Kg Kg Kg 200.00 200.00 200.00 200.00 7,800.00 14,400.00 7,800.00 5,200.00 0.5 1 1 0.4 m3 m3 m3 m3 25,000.00 20,000.00 20,000.00 25,000.00 12,500.00 20,000.00 20,000.00 10,000.00

No

100,000.00

100,000.00

Carried to Collection.

227,700.00

COLLECTION. Carried from page S.W 39 Carried from page S.W 40 1,273,650.00 227,700.00

Storm Water Drain to 900mm Wide Reinforced Concrete U-Drain - Drain No 7 Carried to collection.

1,501,350.00

S.W.129

LATIUM HOUSING DEVELOPMENT


ITEM DESCRIPTION QTY UNIT RATE $

Stormwater drain Retention Pond Erosion Mitigation Rip-Rap Excavation and Earthworks Excavate for rip-rap structure 3.0m wide x 5.0m long x average 0.6m deep in any material excluding rock, commencing at ground level and not exceeding 1.5m deep and get out. Extra over excavation for excavation in rock (Provisional). Stone Packing Boulders average size 250mm diameter laid in excavation to form rip-rap.

m3

1,000.00

9,000.00

m3

2,350.00

2,350.00

15

m2

7,000.00

105,000.00

Stone Reventment Excavation and Earthworks Excavate for stone reventment structure 1.9m wide x 1.5m long x 0.3m deep in any material excluding rock, commencing at ground level and not exceeding 1.5m deep and get out. Extra over excavation for excavation in rock (Provisional). Stone Packing Random rubble stones 150 to 200mm diameter laid with 1:3 cement sand mortar mix in joints on concrete bedding to obtain overall thickness of 300mm.

m3

1,000.00

1,000.00

0.1

m3

2,350.00

235.00

m2

6,878.00

20,634.00

Storm Water Drain to Retention Pond Carried to collection.

138,219.00

S.W.130

LATIUM HOUSING DEVELOPMENT


ITEM DESCRIPTION QTY UNIT RATE $

Stormwater drain COLLECTION. Storm Water Drain to Road 1A Carried from Page 6 Storm Water Drain to Road 2 Carried from Page 8 Storm Water Drain to Road 3 Carried from Page 11 Storm Water Drain to Road 4 from Page 13 Carried $ 1,950,598.00

14,405,095.00

1,668,568.00

9,431,025.00

Storm Water Drain to Road 5 cul-de-sac Carried from Page 16

1,297,631.00

Storm Water Drain to Road 6 from Page 18 Storm Water Drain to Road 7 Carried from Page 21 Storm Water Drain to Road 8 from Page 26 Storm Water Drain to Road 9a Carried from Page 29 Storm Water Drain to Road 9a from Page 31 Storm Water Drain to Road 10 from Page 32 Storm Water Drain to Road 11 Carried from Page 34

Carried $ 1,390,720.00

$ Carried $

13,389,458.00

2,571,868.00

$ Carried $ Carried $

3,209,163.00

2,237,387.00

2,270,586.00

4,041,917.00

Storm Water Trapezoidal Drain Along Road 8 Carried from Page 35 Storm Water Drain to Stone Pitched Boundary Drain No 3 Carried from Page 37 Storm Water Drain to Stone Pitched Tangent Chute - Drain No 6 Carried from Page 38 Storm Water Drain to 600mm Wide Reinforced Concrete U-Drain - Drain No 7 Carried from Page 40 Storm Water Drain to Retention Pond Carried from Page 41

1,530,322.00

8,442,710.00

1,055,704.00

1,501,350.00

138,219.00

Storm Water Drain Carried to Summary Infrastructure Works page I.W.

70,532,321.00

S.W.131

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS


ITEM DESCRIPTION QTY UNIT RATE $

Bill NO. 8 LANDSCAPING

Include the Prime Cost sum of $ 2,300,000 for Landscaping to be executed by a nominated subcontractor..

Sum

2,300,000.00

2,300,000.00

B C

ADD Profit

25 25

% %

2,300,000.00 2,300,000.00

575,000.00 575,000.00

Attendance

LANDSCAPING: Carried to Summary Infrastructure Works page I.W.

3,450,000.00

L.132

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS


ITEM DESCRIPTION QTY UNIT RATE $

Bill NO. 9 Reinforced Concrete Retaining Wall to Road # 1a Chainage 0+220 to 0+360 Excavation and Earthworks Excavating trenches in all materials except rock for foundation of retaining wall. Part return and compact excavated material, depth of excavation commencing at ground level and not exceeding 1.5m deep. Extra over for rock excavation (Provisional) Concrete Reinforced Concrete (1:2:4) 21 N/mm 2 as described :C D 350mm Thick foundation base Tapered Stem 127.4 140.53 m3 m3 20,000.00 20,000.00 2,548,000.00 2,810,600.00

933.8 186.8

m3 m3

1,000.00 2,350.00

933,800.00 438,980.00

Form Work Sawn formwork as described to :E F G Edge of foundation base Front of Tapered Stem Back of Tapered Stem Steel Reinforcement High tensile steel reinforcement bars as described in: H I J 10mm dia. in wall stem and base 12mm dia. in wall stem and base 20mm dia. in wall stem Extra over masonry wall for providing weep holes as 150mm diameter PVC DWG pipe, 1.2m on centers horizontally and vertically. Backfilling L Geotextile material 400mm x 400mm placed at weep hole opening Well graded, free draining imported, granular fill material to back of retaining wall 4,116.0 4,793.6 6,300.0 kg kg kg 200.00 200.00 200.00 823,200.00 958,720.00 1,260,000.00 98.0 526.4 526.4 m2 m2 m2 3,000.00 3,000.00 3,000.00 294,000.00 1,579,200.00 1,579,200.00

350.0

No

1,274.00

445,900.00

56.0

m2

400.00

22,400.00

861.0

m3

2,000.00

1,722,000.00

Carried to Collection.

15,416,000.00

R.W.133

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS


ITEM DESCRIPTION QTY UNIT RATE $

Reinforced Concrete Retaining Wall to Road # 1a (contd) Chainage 0+455 to 0+485 Excavation and Earthworks Excavating trenches in all materials except rock for foundation of retaining wall. Part return and compact excavated material, depth of excavation commencing at ground level and not exceeding 1.5m deep. Extra over for rock excavation (Provisional) Concrete Reinforced Concrete (1:2:4) 21 N/mm 2 as described :C D 350mm Thick foundation base Tapered Stem 27.3 30.11 m3 m3 20,000.00 20,000.00 546,000.00 602,200.00

200.1 40.0

m3 m3

1,000.00 2,350.00

200,100.00 94,000.00

Form Work Sawn formwork as described to :E F G Edge of foundation base Front of Tapered Stem Back of Tapered Stem Steel Reinforcement High tensile steel reinforcement bars as described in: H I J 10mm dia. in wall stem and base 12mm dia. in wall stem and base 20mm dia. in wall stem Extra over masonry wall for providing weep holes as 150mm diameter PVC DWG pipe, 1.2m on centers horizontally and vertically. Backfilling L Geotextile material 400mm x 400mm placed at weep hole opening Well graded, free draining imported, granular fill material to back of retaining wall 882.0 1,027.2 1,350.0 kg kg kg 200.00 200.00 200.00 176,400.00 205,440.00 270,000.00 21.0 112.8 112.8 m2 m2 m2 3,000.00 3,000.00 3,000.00 63,000.00 338,400.00 338,400.00

75.0

No

1,274.00

95,550.00

12.0

m2

400.00

4,800.00

184.5

m3

2,000.00

369,000.00

Carried to Collection.

3,303,290.00

R.W.134

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS


ITEM DESCRIPTION QTY UNIT RATE $

Reinforced Concrete Retaining Wall to Road # 1a (contd) Chainage 0+530 to 0+560 Excavation and Earthworks Excavating trenches in all materials except rock for foundation of retaining wall. Part return and compact excavated material, depth of excavation commencing at ground level and not exceeding 1.5m deep. Extra over for rock excavation (Provisional) Concrete Reinforced Concrete (1:2:4) 21 N/mm 2 as described :C D 350mm Thick foundation base Tapered Stem Form Work Sawn formwork as described to :E F G Edge of foundation base Front of Tapered Stem Back of Tapered Stem Steel Reinforcement High tensile steel reinforcement bars as described in: H I J 10mm dia. in wall stem and base 12mm dia. in wall stem and base 20mm dia. in wall stem Extra over masonry wall for providing weep holes as 150mm diameter PVC DWG pipe, 1.2m on centers horizontally and vertically. Backfilling L Geotextile material 400mm x 400mm placed at weep hole opening Well graded, free draining imported, granular fill material to back of retaining wall Carried to Collection. COLLECTION Carried from page R.W.1 Carried from page R.W.2 Carried from page R.W.3 Reinforced Concrete Retaining Wall to Road # 1a Carried to Collection. 15,416,000.00 3,303,290.00 3,303,290.00 882.0 1,027.2 1,350.0 kg kg kg 200.00 200.00 200.00 176,400.00 205,440.00 270,000.00 21.0 112.8 112.8 m2 m2 m2 3,000.00 3,000.00 3,000.00 63,000.00 338,400.00 338,400.00 27.3 30.11 m3 m3 20,000.00 20,000.00 546,000.00 602,200.00

200.1 40.0

m3 m3

1,000.00 2,350.00

200,100.00 94,000.00

75.0

No

1,274.00

95,550.00

12.0

m2

400.00

4,800.00

184.5

m3

2,000.00 $

369,000.00 3,303,290.00

22,022,580.00

R.W.135

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS


ITEM DESCRIPTION QTY UNIT RATE $

Reinforced Concrete Retaining Wall to Road # 3 Chainage 0+015 to 0+215 Excavation and Earthworks Excavating trenches in all materials except rock for foundation of retaining wall. Part return and compact excavated material, depth of excavation commencing at ground level and not exceeding 1.5m deep. Extra over for rock excavation (Provisional) Concrete Reinforced Concrete (1:2:4) 21 N/mm 2 as described :C D 350mm Thick foundation base Tapered Stem 182.0 200.75 m3 m3 20,000.00 20,000.00 3,640,000.00 4,015,000.00

1,334.0 266.8

m3 m3

1,000.00 2,350.00

1,334,000.00 626,980.00

Form Work Sawn formwork as described to :E F G Edge of foundation base Front of Tapered Stem Back of Tapered Stem Steel Reinforcement High tensile steel reinforcement bars as described in: H I J 10mm dia. in wall stem and base 12mm dia. in wall stem and base 20mm dia. in wall stem Extra over masonry wall for providing weep holes as 150mm diameter PVC DWG pipe, 1.2m on centers horizontally and vertically. Backfilling L Geotextile material 400mm x 400mm placed at weep hole opening Well graded, free draining imported, granular fill material to back of retaining wall 5,880.0 6,848.0 9,000.0 kg kg kg 200.00 200.00 200.00 1,176,000.00 1,369,600.00 1,800,000.00 140.0 752.0 752.0 m2 m2 m2 3,000.00 3,000.00 3,000.00 420,000.00 2,256,000.00 2,256,000.00

500.0

No

1,274.00

637,000.00

80.0

m2

400.00

32,000.00

1,230.0

m3

2,000.00

2,460,000.00

Reinforced Concrete Retaining Wall to Road # 3 Carried to Collection.

22,022,580.00

R.W.136

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS


ITEM DESCRIPTION QTY UNIT RATE $

Random Rubble Retaining Wall to Road # 9a Chainage 0+180 to 0+250 Excavation and Earthworks Excavating trenches in all materials except rock for foundation of retaining wall. Part return and compact excavated material, depth of excavation commencing at ground level and not exceeding 1.5m deep. Extra over for rock excavation (Provisional) Concrete Reinforced Concrete (1:2:4) 21 N/mm 2 as described :C D E 550mm Thick foundation base 150mm Thick belt beam 150mm Thick head wall capping Form Work Sawn formwork as described to :F G H Edge of foundation base Sides of belt beam Sides of head wall capping Stone Work Random rubble stones 150 to 450mm diameter laid with 1:3 cement sand mortar mix in joints as described to: Using material from site construct random rubble stone wall complete, not exceeding 1.5m high, including pointing to face of wall Head wall 77 84 14 m2 m2 m2 3,000.00 3,000.00 3,000.00 231,000.00 252,000.00 42,000.00 123 13 5 m3 m3 m3 20,000.00 20,000.00 20,000.00 2,460,000.00 260,000.00 100,000.00

76 8

m3 m3

1,000.00 2,350.00

76,000.00 18,800.00

105 19

m3 m3

20,000.00 20,000.00

2,100,000.00 380,000.00

Extra over masonry wall for providing weep holes 75mm diameter, 1.2m on centers horizontally and vertically above belt beams, staggered Backfilling

175

No

1,274.00

222,950.00

L M

Geotextile material 400mm x 400mm placed at weep hole opening Graded gravel as backfill to rubble wall

28 210

m2 m3

400.00 2,000.00

11,200.00 420,000.00

Random Rubble Retaining Wall to Road # 9a Carried to Collection.

6,573,950.00

R.W.137

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS


ITEM DESCRIPTION QTY UNIT RATE $

Reinforced Concrete Retaining Wall to Road # 1a

Collection

Reinforced Concrete Retaining Wall to Road # 1a Carried to Collection. Reinforced Concrete Retaining Wall to Road # 3 Carried to Collection. Random Rubble Retaining Wall to Road # 9a Carried to Collection.

22,022,580.00

22,022,580.00

6,573,950.00

RETAINING WALL: Carried to Summary Infrastructure Works page I.W.

50,619,110.00

R.W.138

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS


ITEM DESCRIPTION

GENERAL SUMMARY MEASURED WORKS PRELIMINARIES SPECIFIC REQUIREMENTS (All Provisional) BILL NO. 1 BILL NO. 2 BILL NO. 3 BILL NO. 4 BILL NO. 5 BILL NO. 6 BILL NO. 7 BILL NO. 8 BILL NO. 9 2/1 3/1 4/1 R28 W29 SW42 L1 RW6 PAGE 18,657,773.00 300,000.00 250,000.00 2,464,890.00 158,379,047.00 51,188,490.00 62,155,660.00 3,450,000.00 48,978,140.00

DAYWORKS SITE CLEARANCE ROADWAY. WATER SUPPLY STORMWATER SYSTEM LANDSCAPING RETAINING WALLS

CONTINGENCIES Include the Contingency Sum of $2,500.000.00 to be used as directed by the Engineer. Include the Contingency Sum of $3,500.000.00 for increase in the cost of materials to be expended in full or part as directed by the Engineer.

Sum

4,000,000.00

Sum

9,000,000.00

358,824,000.00

GENERAL SUMMARY

G.S.139

22,375,273.00 381,500.00 282,500.00 3,732,800.00 214,625,593.00 39,870,352.00 70,532,321.00 3,450,000.00 50,619,110.00

2,500,000.00

3,500,000.00

411,869,449.00

G.S.140

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS


ITEM DESCRIPTION QTY UNIT RATE

APPENDIX - 1 PRIME COST & PROVISIONAL SUMS SPECIFIC REQUIREMENTS (All Provisional) A Make, cure and convey concrete test cubes to Laboratory and test. Make insitu density tests on backfill and road base material when and as directed by the Engineer. C Reinstate Lot boundaries disturbed during construction. DAYWORKS A Provide in respect of the Prime Cost of Labour the Provisional Sum of $100.000.00 Provide in respect of the Prime Cost of Material, the Provisional Sum of $75.000.00 Provide in respect of the Prime Cost of Plant, the Provisional Sum of $75.000.00 ROADWAY. Road No.1a Include the Provisional Sum of $50,000 for supplying and erecting "Street Name" signs and stop signs to ministry of Construction specification. Include the Provisional sum of $12,000.00 for Road marking as per Engineer requirements. Road No.1b Include the Provisional Sum of $50,000 for supplying and erecting "Street Name" signs and stop signs to ministry of Construction specification. Include the Provisional sum of $5,000.00 for Road marking as per Engineer requirements. Road No.2 Include the Provisional Sum of $50,000 for supplying and erecting "Street Name" signs and stop signs to ministry of Construction specification. Include the Provisional sum of $9,000.00 for Road marking as per Engineer requirements. Sum

Sum

Sum

Sum

Sum

Sum

Sum

50,000.00

Sum

12,000.00

Sum

50,000.00

Sum

5,000.00

Sum

50,000.00

Sum

9,000.00

Carried to Collection.

A141

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS


ITEM DESCRIPTION QTY UNIT RATE

APPENDIX -1 (CONT'D) Road No.3 Include the Provisional Sum of $50,000 for supplying and erecting "Street Name" signs and stop signs to ministry of Construction specification. Include the Provisional sum of $12,000.00 for Road marking as per Engineer requirements. Road No.4 Include the Provisional Sum of $50,000 for supplying and erecting "Street Name" signs and stop signs to ministry of Construction specification. 1 B Include the Provisional sum of $3,850.00 for Road marking as per Engineer requirements. Road No.5 Include the Provisional Sum of $50,000 for supplying and erecting "Street Name" signs and stop signs to ministry of Construction specification. 1 B Include the Provisional sum of $10,000.00 for Road marking as per Engineer requirements. Road No.6 Include the Provisional Sum of $50,000 for supplying and erecting "Street Name" signs and stop signs to ministry of Construction specification. 1 B Include the Provisional sum of $3,850.00 for Road marking as per Engineer requirements. Road No.7 Include the Provisional Sum of $18,000 for supplying and erecting "Street Name" signs and stop signs to ministry of Construction specification. 1 B Include the Provisional sum of $3,850.00 for Road marking as per Engineer requirements. Road 8 Include the Provisional Sum of $50,000 for supplying and erecting "Street Name" signs and stop signs to ministry of Construction specification. 1 B Include the Provisional sum of $10,000.00 for Road marking as per Engineer requirements. Sum 50,000.00 Sum 18,000.00 Sum 50,000.00 Sum 50,000.00 Sum 50,000.00

Sum

50,000.00

Sum

12,000.00

Sum

3,850.00

Sum

10,000.00

Sum

3,850.00

Sum

3,850.00

Sum

10,000.00

Carried to Collection.

A142

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS


ITEM DESCRIPTION QTY UNIT RATE

APPENDIX -1 (CONT'D) Road 9a Include the Provisional Sum of $18,000 for supplying and erecting "Street Name" signs and stop signs to ministry of Construction specification. Include the Provisional sum of $3,850.00 for Road marking as per Engineer requirements. Road 9b Include the Provisional Sum of $36,000 for supplying and erecting "Street Name" signs and stop signs to ministry of Construction specification. Include the Provisional sum of $15,400.00 for Road marking as per Engineer requirements. Road 10 Include the Provisional Sum of $18,000 for supplying and erecting "Street Name" signs and stop signs to ministry of Construction specification. Include the Provisional sum of $3,850.00 for Road marking as per Engineer requirements. Road 11 Include the Provisional Sum of $36,000 for supplying and erecting "Street Name" signs and stop signs to ministry of Construction specification. Include the Provisional sum of $19,250.00 for Road marking as per Engineer requirements. Provisional sum A Allow the Provisional sum of $500,000.00 for additional work to Roadway as per Engineer request. Water Supply to Water Tank Prime Cost Sum to Supply and Install Bolted Steel Water Tank 66,000 US Gallons 1 General Works to Water Supply N Allow the Provisional Sum for additional work to Water Supply Installation Allow for testing the Water Supply to the Satisfaction of the Engineer Allow for chlorination of the water installation and leaving perfect to the satisfaction of the Engineer Allow the Provisional Sum for connection to NWC Water Supply main Allow the Provisional Sum for Off Site Water Supply System Carried to Collection. SUM 1 Sum 500,000.00

Sum

18,000.00

Sum

3,850.00

Sum

36,000.00

Sum

15,400.00

Sum

18,000.00

Sum

3,850.00

Sum

36,000.00

Sum

19,250.00

9,000,000.00

SUM

O P Q R

Item Item SUM SUM

A143

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS


ITEM DESCRIPTION QTY UNIT RATE

APPENDIX -1 (CONT'D) LANDSCAPING Include the Prime Cost sum of $ 2,300,000 for Landscaping to be executed by a nominated subcontractor. CONTINGENCIES

Sum

2,300,000.00

Include the Contingency Sum of $2,500.000.00 to be used as directed by the Engineer. Include the Contingency Sum of $2,500.000.00 for increase in the cost of materials to be expended in full or part as directed by the Engineer.

Sum

Sum

Carried to Collection.

COLLECTION Carried from page A1 Carried from page A2 Carried from page A3 Carried from page A4

SUMMARY OF PRIME COST & PROVISIONAL SUMS

A144

LATIUM HOUSING DEVELOPMENT INFRASTRUCTURE WORKS


ITEM DESCRIPTION QTY UNIT RATE

APPENDIX -2 LIST OF DRAWINGS

SL-01 PROPOSED SUBDIVISION LAYOUT R- 01OVERALL ROAD LAYOUT R-02 ROAD CROSS SECTIONS R-03 PROFILES ALONG CENTERLINES OF ROADS 2, 3, 4, 5, 6 & 7 R-04 PROFILES ALONG CENTERLINES OF ROADS 8, 10 & 11 R-05 PROFILES ALONG CENTERLINES OF ROADS 1a, 1b, 9a & 9b R-06 ROAD LAYOUT SHOWING CUT/FILL AND RETAINING WALLS R-07 ROAD GEOMETRY SHOWING TEE INTERSECTIONS R-08 ROAD GEOMETRY FOR TEE AND CROSS INTS R-09 ROAD GEOMETRY FOR TEE INTERSECTIONS AND CUL DE SACS R-10 ROAD GEOMETRY FOR CUL DE SACS DETAILS & TABLE WITH TEE & CUL DE SAC COORDINATES FOR SETTING OUT POINTS D-01 OVERALL DRAINAGE LAYOUT D-02 DRAINAGE LAYOUT (NORTH) (1 OF 2) D-02 DRAINAGE LAYOUT (SOUTH) (2 OF 2) D-03 STORM WATER INLET DETAILS D-04 STORM WATER INLET, R.C. U-DRAIN AND STONE PITCHED BOUNDARY DRAIN DETAILS D-05 STONE PITCHED DRAIN CHUTE AND CHUTE FLARED END DETAIL D-06 STORM WATER INLET WITH STONE PITCHED CHUTE AND CHUTE FLARED END DETAIL D-08 DRAIN #7 INTAKE AND OUTFALL STRUCTURES D-09 RETENTION POND DETAILS D-13DRAIN PROFILES ALONG DRAIN ROADS 2, 4 & PART ROAD 1A & 3 D-14 DRAIN PROFILES ALONG DRAIN ROADS 6, 7, 9b & PART ROAD 11 D-15 PROFILE ALONG DRAIN NO. 3 SD-01 STORM WATER INLET REINFORCEMENT DETAILS SD-02 STORM WATER INLET R.C. U-DRAIN AND STONE PITCHED BOUNDARY, DRAIN REINFORCEMENT DETAILS SD-03 COMBINED STORM WATER INLET AND STONE PITCHED CHUTE REINFORCEMENT DETAILS SD-04 R.C. PIPE OUTFALL ON SLOPE AND STONE PITCHED CHUTE, REINFPRCEMENT DETAILS & RETAINING WALL DETAIL SD-05 DRAIN #7 INTAKE & OUTFALL STRUCTURES REINFORCEMENT DETAILS S-01 ON-LOT SEWERAGE LAYOUT OPTIONS S-02 SEWAGE DETAILS S-03 SEWAGE DETAILS W-01WATER SUPPLY LAYOUT W-02 WATER SUPPLY DETAILS- SUB-DIVISION W-03 WATER SUPPLY DETAILS- SUB-DIVISION W-04 WATER TANK SITE LAYOUT

A145

100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 157,773.00 1,500,000.00 2,800,000.00 850,000.00 1,000,000.00 1,250,000.00 2,350,000.00 1,150,000.00 950,000.00 550,000.00 250,000.00 500,000.00 100,000.00 450,000.00 1,200,000.00 3,000,000.00 Existing Prelim.. = $18,657,773.00

Format of BQ Method of Measurement & V Method of Measurement & V Particulars of Site Particulars of Site

67,500.00

Definitions Description of Works & Form Language & Law, Engineers Information/Sign Board, Perf Temporary crossing & Roads

Extraordinary Traffic, Specia

224,000.00

Protection of The Environme Lighting & Power, Telephone

90,000.00

Labour Requirements, Fringe Overtime, Storage Shed, Me

100,000.00

Samples, Testing, Defective Programme, Extension of Tim Measurement & Evaluation o Fluctuations In The Cost of L Statutory Deductions, Tax Co Levies, Mobilization, , Delaye Insurance

75,000.00

75,000.00

150,000.00 150,000.00 150,000.00 150,000.00 150,000.00 150,000.00

Format of BQ

Method of Measurement & V Method of Measurement & V Particulars of Site Particulars of Site Definitions

50,000.00

157,773.00 1,500,000.00 3,080,000.00 977,500.00 1,000,000.00 1,500,000.00

Description of Works & Form Language & Law, Engineers

12,000.00

Information/Sign Board, Perf Temporary crossing & Roads Extraordinary Traffic, Specia

Protection of The Environme

50,000.00

3,000,000.00 1,322,500.00 2,000,000.00 632,500.00 287,500.00 500,000.00

Lighting & Power, Telephone Labour Requirements, Fringe

5,000.00

Overtime, Storage Shed, Me Samples, Testing, Defective Programme, Extension of Tim Measurement & Evaluation o

50,000.00

120,000.00 517,500.00 1,380,000.00 3,500,000.00 Revised Prelim. = $22,375,273.00

Fluctuations In The Cost of L Statutory Deductions, Tax Co

9,000.00

Levies, Mobilization, , Delaye Insurance

17% Increase on Prelim.

807,500.00

A146

100,000.00

Format of BQ

50,000.00

12,000.00

50,000.00

3,850.00

50,000.00

10,000.00

50,000.00

3,850.00

18,000.00

3,850.00

50,000.00

10,000.00

1,926,550.00

A147

100,000.00

Format of BQ

18,000.00

3,850.00

36,000.00

15,400.00

18,000.00

3,850.00

36,000.00

19,250.00

500,000.00

9,000,000.00

300,000.00 250,000.00 130,000.00 200,000.00 400,000.00 10,930,350.00

A148

100,000.00

Format of BQ

2,300,000.00

2,500,000.00

2,500,000.00

7,300,000.00

807,500.00 1,926,550.00 10,930,350.00 7,300,000.00

20,964,400.00

A149

100,000.00

Format of BQ

A150

Format of BQ Method of Measurement & Valuation Method of Measurement & Valuation Particulars of Site Particulars of Site

Description of Works & Form of Contract Language & Law, Engineers Duties & Authorities and Site Meeting nformation/Sign Board, Performance Bond and Setting Out Temporary crossing & Roads, Unforseeable Physical Conditions and Contractor's Site Office

Extraordinary Traffic, Special Loads, Contractor's Equipment

Protection of The Environment, Cover Up & Protection & Water for The Works Lighting & Power, Telephone, Employer's Provision, Hoarding, Watching & Lighting and Fossils

Labour Requirements, Fringe Benefits & Stat. Deduc., Fair Rates of Pay & Working Hours and Reports Regarding Labour Overtime, Storage Shed, Mess Room, Sanitary Accom., Safety, Health & Welfare & Manufacturers Instructions

Samples, Testing, Defective or Imperfect Work & Commencement Delays & Suspension Programme, Extension of Time & Measurement of Works Measurement & Evaluation of Work, Right to Vary & Adjustments for Changes In Cost Fluctuations In The Cost of Labour Statutory Deductions, Tax Compliance & NHT Contributions and Retentions Levies, Mobilization, , Delayed Payments and Suspended Works

Format of BQ

Method of Measurement & Valuation Method of Measurement & Valuation Particulars of Site Particulars of Site

Description of Works & Form of Contract Language & Law, Engineers Duties & Authorities and Site Meeting

nformation/Sign Board, Performance Bond and Setting Out Temporary crossing & Roads, Unforseeable Physical Conditions and Contractor's Site Office Extraordinary Traffic, Special Loads, Contractor's Equipment

Protection of The Environment, Cover Up & Protection & Water for The Works

Lighting & Power, Telephone, Employer's Provision, Hoarding, Watching & Lighting and Fossils Labour Requirements, Fringe Benefits & Stat. Deduc., Fair Rates of Pay & Working Hours and Reports Regarding Labour

Overtime, Storage Shed, Mess Room, Sanitary Accom., Safety, Health & Welfare & Manufacturers Instructions Samples, Testing, Defective or Imperfect Work & Commencement Delays & Suspension Programme, Extension of Time & Measurement of Works Measurement & Evaluation of Work, Right to Vary & Adjustments for Changes In Cost

Fluctuations In The Cost of Labour Statutory Deductions, Tax Compliance & NHT Contributions and Retentions

Levies, Mobilization, , Delayed Payments and Suspended Works

e on Prelim.

A151

Format of BQ

A152

Format of BQ

A153

Format of BQ

A154

Format of BQ

A155

Das könnte Ihnen auch gefallen