Sie sind auf Seite 1von 70

Code:

Supports for

Sorfert

Natural Gas Pipeline

UAN (for QMHA)

Page:

11-3100

1 of 8

Contents:

Page

1.

GENERAL.....................................................................................................4

1.1.

Scope ......................................................................................................................4

1.2.

Design basis ............................................................................................................4

1.3.

Software used..........................................................................................................4

2.

INPUT DATA.................................................................................................5

2.1.

General input data ...................................................................................................5

2.2.

Input data on pipes ..................................................................................................5

2.3.

Input data for steel structures design........................................................................6

2.4.

Input data for concrete structures design..................................................................6

3.

DETAIL DESIGN DESCRIPTION..................................................................7

3.1.

Structural analysis description..................................................................................7

3.2.

Steel structures description ......................................................................................8

3.3.

Concrete structures description................................................................................8

3.4.

Material specifications and surface treatment ...........................................................8

Tebodin Proj. No.

Doc-Nr.

Description

03194

1334001

Supports for Natural Gas Pipeline

DEPARTMENT
Datum

Civil - steel

Civil - concrete

12.3.2009

12.3.2009

Ing. D. Gawlik

Ing. V. Abrahm

Signature

00
Rev

First Issue
Status Description

Status Code:
A-E According to Uhdes
Standard
Engineering
Procedure
F For inquiry
G For order placement
H For Prefabrication
J
For Construction /
Fabrication
K General issue
L Cancelled document

12.3.09

Date

D.Gawlik

Prepared

13.3.09

Date

D.Andl

Checked

M. Knol

Date

Approved

AC

Category Code (CC)


1 For Approval
2 For Information
3 Not transmitted (internal)
Acceptance Code (AC)
1 Approved / reviewed
2 Appr./rev. as noted
3 Not accepted, to be revised and resubmitted

Copyright 2008 Uhde GmbH

Doc. ID-Code

Category

SO-UD-E700.00113

Code:

Supports for

Sorfert

Natural Gas Pipeline

UAN (for QMHA)

Page:

11-3100

2 of 8

Project No.:
-Nr:

Project title:

SORFERT NG Pipeline

Document title:

Documentation

03194

2641001

Issue:

Date:

10.11.2008

Page:

2 von 14

Author:

M.Knol

Telephon:

+420 731 126 082

E-Mail:

m.knol@tebodin.cz

Dickampstrae 5, 45879 Gelsenkirchen


Telefon +49 (0) 209 17090-0 Fax +49 (0) 209 17090-970

Copyright 2008 Uhde GmbH

Doc. ID-Code

Rev.

SO-UD-E700.00113

00

Code:

Supports for
Natural Gas Pipeline

Sorfert
UAN (for QMHA)

Page:

11-3100

3 of 8

Directory:

1.

GENERAL.....................................................................................................4

1.1.

Scope ......................................................................................................................4

1.2.

Design basis ............................................................................................................4

1.3.

Software used..........................................................................................................4

2.

INPUT DATA.................................................................................................5

2.1.

General input data ...................................................................................................5

2.2.

Input data on pipes ..................................................................................................5


2.2.1.

Maps and Layouts..........................................................................................5

2.2.2.

Pipeline design drawings................................................................................6

2.3.

Input data for steel structures design........................................................................6

2.4.

Input data for concrete structures design..................................................................6

3.

DETAIL DESIGN DESCRIPTION..................................................................7

3.1.

Structural analysis description..................................................................................7

3.2.

Steel structures description ......................................................................................8

3.3.

Concrete structures description................................................................................8

3.4.

Material specifications and surface treatment ...........................................................8

List of documents:

Uhde drawing no.


SO-UD-D700.02765
SO-UD-D700.02766
SO-UD-D700.02767
SO-UD-D700.02768
SO-UD-D700.02769
SO-UD-D700.02770
SO-UD-E700.00113

Long name of document


Natural Gas - Steel Structure - CS 000101U-001
Natural Gas - Steel Structure - CS 000101U-002
Natural Gas - Steel Structure - CS 000101U-003
Natural Gas - Steel Structure - CS 000101U-004
Natural Gas - Concrete Foundations - Start
Natural Gas - Concrete Foundations - End
Natural Gas - Structural analysis
+ Attachment 1 - Start of gas pipeline - steel supports
+ Attachment 2 - End of gas pipeline - steel supports
+ Attachment 3 - Start/end of gas pipeline - foundations

Copyright 2008 Uhde GmbH

Tebodin drawing no.


1349008
1349009
1349010
1349011
1172001
1172002
1334001

Doc. ID-Code

Rev.

SO-UD-E700.00113

00

Code:

Supports for
Natural Gas Pipeline

Sorfert
UAN (for QMHA)

Page:

11-3100

4 of 8

1. General
1.1. Scope
The purpose of this project is to provide Detail Design of steel supports and concrete foundations for start and
end of 20 Natural Gas Pipeline in the scope of SORFERT project. NG pipeline is an underground pipe
providing gas supply to main plant. Both ends of pipes are placed above ground and must be supported by
means of steel supports. Position of start and end of NG pipe is shown in general layout of pipeline routing.

1.2. Design basis


Basic information and input data for design are specified in document SO-UD-5800.00001 - DESIGN BASIS,
not a part of this documentation.
Load combinations are based on Eurocode EN 1990 rules.
Output from stress analysis of the pipe serves as load input into steel structures analysis.
Steel structures
Supporting structures are designed according to Eurocode (EC3) for design of steel structures.
Concrete structures
Foundations are designed according to Eurocode for design of concrete structures.

1.3. Software used


viewer of 3D model:

NavisWorks Freedom

drawings:

AutoCAD

structural analysis:

SCIA / ESA / Nexis (SCIA CZ, s.r.o.)

steel structures dimensioning:

Ocel EC3 (FINE spol. s r.o.)

foundation structures dimensioning: Geo 4 (FINE spol. s r.o.)

Copyright 2008 Uhde GmbH

Doc. ID-Code

Rev.

SO-UD-E700.00113

00

Code:

Supports for

Sorfert

Natural Gas Pipeline

UAN (for QMHA)

Page:

11-3100

5 of 8

2. Input data
Project is based on these groups of related documents on piping, typical drawings of steel supports and list of
typical details:

2.1. General input data


For general and coordination purposes there was PDMS piping design available:

includes terrain, pipe, fixations, steel supports and concrete foundation blocks

used for space coordination and obtaining of main dimensions for support structures

2.2. Input data on pipes


2.2.1.Maps and Layouts
Related documents:
SO-UD-D605.00076

NG pipeline - General layout - drawing

SO-UD-D605.00065

NG pipeline - Longitudinal section - drawing

Pipeline routing was prepared on the basis of general layout rev. 04 from 4.10.2008.
Pipeline is routed in Corridor IV and Corridor I. For position of start and end see the pipeline routing and
longitudinal section.
Topological height

ca. 63 to 95 m (AMSL)

Start
End

Pipeline routing

Copyright 2008 Uhde GmbH

Doc. ID-Code

Rev.

SO-UD-E700.00113

00

Code:

Supports for
Natural Gas Pipeline

Sorfert
UAN (for QMHA)

Page:

11-3100

6 of 8

2.2.2.Pipeline design drawings


This part of documentation is based on piping design and layouts at the start and the end point of pipeline.
Related documents - loading schemes:
SO-UD-D605.00077

NG pipeline - Start of pipeline - Maintenance area - layout

SO-UD-D605.00078

NG pipeline - End of pipeline - Maintenance area - layout

Mentioned drawings show piping arrangement at the start / end of pipeline including required place reserves
for maintenance area and requested position of supports.

2.3. Input data for steel structures design


Related documents - support sketches:
SO-UD-D605.00342

NG pipeline - Start of pipeline - Maintenance area - supports sketch

SO-UD-D605.00343

NG pipeline - End of pipeline - Maintenance area - supports sketch

2.4. Input data for concrete structures design


Related documents:
SO-UD-R700.00001, Rev.00

Geotechnical Report Pipeline Corridor

for project:

Pipeline - Ammonia plant

for client:

Orascom

location:

Arzew

by:

INGEO International, Feb 2008

Copyright 2008 Uhde GmbH

Doc. ID-Code

Rev.

SO-UD-E700.00113

00

Code:

Supports for
Natural Gas Pipeline

Sorfert
UAN (for QMHA)

Page:

11-3100

7 of 8

3. Detail design description


3.1. Structural analysis description
Related documents:
SO-UD-E605.00016

Stress analysis - NG pipeline - report

Output from complete stress analysis of the pipeline includes nodal forces per all different load cases (selfweight of pipe, operation, wind, earthquake, pressure test). There are two sets of nodal forces - one for common
situation, (endpoint of pipeline is blinded and clamped to support) and one for situation when launcher/receiver
station is attached (endpoint of pipeline is un-clamped and attached to the station).
These values are taken into structural analysis of supports as a sole input. Only a self weight of steel structures
is automatically generated and added.
Two generalizations are presumed:
1)

All separated load cases are acting in the same direction (adding up together - increased safety factor)

2)

When the load can act in not only indicated direction, action in opposite direction is taken into account too.
The biggest value is selected and considered in both +/- directions. Wind load and earthquake load can be
applied in all possible directions.

Partial coefficients according to EC 1990:


for permanent load

Gj,sup = 1,35

for variable loads

Q,k = 1,50

Combinations are generated and the group of most severe combinations is selected automatically. Rules for
combination are user defined and EC 1990 rules are applied.
There are two main groups of dangerous combinations:
1)

Common operation
= persistent and transient design situations (with partial coefficients mentioned above)

2)

Exceptional situation
= accidental design situation (earthquake, pressure test)

Copyright 2008 Uhde GmbH

Doc. ID-Code

Rev.

SO-UD-E700.00113

00

Code:

Supports for
Natural Gas Pipeline

Sorfert
UAN (for QMHA)

Page:

11-3100

8 of 8

3.2. Steel structures description


Supports are modeled with respect to:

required degree of pipe movement freedom in every supported point (enabled/disabled movements in
separate directions)

level of fixation and allowance for rectification

Supports S1 and E1 are designed as a 3D frame (stool).


Supports S3 and E3 are designed as a column fixed in every direction.
Supports S2 and E2 are typical and not part of this documentation.
They are part of piping delivery (standardized detail).

3.3. Concrete structures description


Concrete foundations are designed of concrete C 25/30 with reinforcement bars of steel 10 505 (R).

3.4. Material specifications and surface treatment


Steel structures:
Steel:

S 235

Anchors:

HILTI HST-R (of stainless steel)

Bolts:

stainless steel

Coating:

According to UHDE specifications for structures exposed to weather.

Foundations:
Concrete:

C 25/30

Reinforcement:

steel class B500B (EN)

Copyright 2008 Uhde GmbH

Doc. ID-Code

Rev.

SO-UD-E700.00113

00

Project:
Tebodin Germany Project No.:

SORFERT Natural gas pipeline Algeria


03194
SO-UD-E700.00113 - Attachment 1

Document No.:

Steel structures

Discipline

Start of gas pipeline - steel supports

Description:

Attachment 1

Start of gas pipeline - steel supports

Calculated

Analysis checked

Ing. Daniel Gawlik

Ing. Milo Hejtmnek

12.3.2009

12.3.2009

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

1 / 22

SORFERT Natural gas pipeline Algeria


03194

Project:
Tebodin Germany Project No.:

SO-UD-E700.00113 - Attachment 1

Document No.:

Steel structures

Discipline

Start of gas pipeline - steel supports

Description:

Start of gas pipeline - 3D visualization

support S2
- part of piping
delivery

support S3

support S1

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

2 / 22

Project:
Tebodin Germany Project No.:

SORFERT Natural gas pipeline Algeria


03194

Document No.:

SO-UD-E700.00113 - Attachment 1
Steel structures

Discipline

Start of gas pipeline - steel supports

Description:

Index of Attachment 1:

1.

Support CS 000101U-001 (start S1)................................................................................................................. 4


1.1.

Schemes of structure ................................................................................................................................. 4

1.2.
Load cases and combinations.................................................................................................................... 5
1.2.1. Load cases............................................................................................................................................ 5
1.2.2. Combinating rules ................................................................................................................................ 5
1.2.3. List of ultimate combinations................................................................................................................ 6
1.3.
Columns - structural analysis.................................................................................................................... 7
1.3.1. Envelope of maximal internal forces ..................................................................................................... 7
1.3.2. Designed profile check ......................................................................................................................... 8
1.4.
Tie beams -structural analysis................................................................................................................... 9
1.4.1. Envelope of maximal internal forces ..................................................................................................... 9
1.4.2. Designed profile check ........................................................................................................................10
1.5.
Cross beams -structural analysis..............................................................................................................11
1.5.1. Envelope of maximal internal forces ....................................................................................................11
1.5.2. Designed profile check ........................................................................................................................12

2.

1.6.

Anchors - structural analysis....................................................................................................................14

1.7.

Reactions - resultant forces on foundations...............................................................................................15

Support CS 000101U-002 (start S3)................................................................................................................18


2.1.

Scheme of structure..................................................................................................................................18

2.2.
Load cases and combinations...................................................................................................................19
2.2.1. Load cases...........................................................................................................................................19
2.2.2. Combinating rules ...............................................................................................................................19
2.2.3. List of ultimate combinations...............................................................................................................20
2.3.
Column - structural analysis ....................................................................................................................20
2.3.1. Envelope of maximal internal forces ....................................................................................................20
2.3.2. Designed profile check ........................................................................................................................21
2.4.

Anchors - structural analysis....................................................................................................................22

2.5.

Reactions - resultant forces on foundations...............................................................................................22

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

3 / 22

SORFERT Natural gas pipeline Algeria


03194

Project:
Tebodin Germany Project No.:

SO-UD-E700.00113 - Attachment 1

Document No.:

Steel structures

Discipline

Start of gas pipeline - steel supports

Description:

1. Support CS 000101U-001 (start S1)


1.1. Schemes of structure
HEB

10

1 60

H EB

HE

HEB100

HE

B1
00

B1
00

HEB100

60
EB 1

160

HEB
3

16 0

12

1
HEB
1

HEB

1 60

60

HEB100

HEB100

11

550mm

1200mm
500mm

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

4 / 22

SORFERT Natural gas pipeline Algeria


03194

Project:
Tebodin Germany Project No.:

SO-UD-E700.00113 - Attachment 1

Document No.:

Steel structures

Discipline

Start of gas pipeline - steel supports

Description:

1.2. Load cases and combinations


Loading forces are taken from design calculations of gas pipe, nodes No. 6090 and 6080. There are two
sets of values representing two basic situations (without and with attached launcher/receiver station).
See document No.:
SO-UD-E605.00016 Stress analysis - NG pipeline - report, Attachment 7, rev.No.1

1.2.1.

Load cases

Load
case
Load case name:
No.
1 Self weight of structure

coeff

Load case description

1.35

Self weight. Direction -Z

Dead load

1.35

Permanent - Loads

Operation +

1.50

Variable - Excl. Medium term

Operation -

1.50

Variable - Excl. Medium term

Wind +

1.50

Variable - Excl.

Wind -

1.50

Variable - Excl.

Earthquake 1

1.00

Variable - Excl. Instantaneous

Earthquake 2

1.00

Variable - Excl. Instantaneous

Earthquake 3

1.00

Variable - Excl. Instantaneous

10

Earthquake 4

1.00

Variable - Excl. Instantaneous

11

Pressure test

1.00

Variable - Excl. Instantaneous

1.2.2.

Combinating rules

Basic rules for generating of ultimate common load combinations according to EC.
1 : 1.35*ZS1 / 1.35*ZS2
2 : 1.35*ZS1 / 1.35*ZS2 / 1.50*ZS3 / 1.50*ZS4
3 : 1.35*ZS1 / 1.35*ZS2 / 1.50*ZS5 / 1.50*ZS6
4 : 1.35*ZS1 / 1.35*ZS2 / 1.35*ZS3 / 1.35*ZS4 / 1.35*ZS5 / 1.35*ZS6
Basic rules for generating of ultimate accidental load combinations according to EC.
1 : 1.00*ZS1 / 1.00*ZS2 / 1.00*ZS3 / 1.00*ZS4 / 1.00*ZS5 / 1.00*ZS6 / 1.00*ZS7
/ 1.00*ZS8 / 1.00*ZS9 / 1.00*ZS10 / 1.00*ZS11

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

5 / 22

Project:
Tebodin Germany Project No.:

SORFERT Natural gas pipeline Algeria


03194
SO-UD-E700.00113 - Attachment 1

Document No.:

Steel structures

Discipline

Start of gas pipeline - steel supports

Description:

1.2.3.

List of ultimate combinations

List of ultimate common load combinations.


1/ 1 : +1.35*ZS1+1.35*ZS2
2/ 2 : +1.35*ZS1+1.35*ZS2+1.50*ZS3
3/ 2 : +1.35*ZS1+1.35*ZS2+1.50*ZS4
4/ 3 : +1.35*ZS1+1.35*ZS2+1.50*ZS5
5/ 3 : +1.35*ZS1+1.35*ZS2+1.50*ZS6
6/ 4 : +1.35*ZS1+1.35*ZS2+1.35*ZS3+1.35*ZS5
7/ 4 : +1.35*ZS1+1.35*ZS2+1.35*ZS4+1.35*ZS5
8/ 4 : +1.35*ZS1+1.35*ZS2+1.35*ZS3+1.35*ZS6
9/ 4 : +1.35*ZS1+1.35*ZS2+1.35*ZS4+1.35*ZS6
List of ultimate accidental load combinations.
1/ 1 : +1.00*ZS1+1.00*ZS2
2/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS3
3/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS4
4/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS8
5/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS11
6/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS4+1.00*ZS7
7/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS3+1.00*ZS9
8/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS4+1.00*ZS8
9/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS5+1.00*ZS7
10/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS6+1.00*ZS7
11/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS5+1.00*ZS8
12/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS3+1.00*ZS10
13/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS4+1.00*ZS9
14/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS4+1.00*ZS10
15/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS6+1.00*ZS8
16/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS6+1.00*ZS9
17/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS6+1.00*ZS11
18/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS3+1.00*ZS6+1.00*ZS7
19/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS3+1.00*ZS5+1.00*ZS8
20/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS4+1.00*ZS6+1.00*ZS7
21/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS4+1.00*ZS5+1.00*ZS8
22/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS3+1.00*ZS5+1.00*ZS9
23/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS3+1.00*ZS6+1.00*ZS8
24/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS3+1.00*ZS5+1.00*ZS10
25/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS3+1.00*ZS6+1.00*ZS9
26/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS4+1.00*ZS6+1.00*ZS8
27/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS4+1.00*ZS5+1.00*ZS9
28/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS4+1.00*ZS5+1.00*ZS10
29/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS4+1.00*ZS6+1.00*ZS9

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

6 / 22

SORFERT Natural gas pipeline Algeria


03194

Project:
Tebodin Germany Project No.:

SO-UD-E700.00113 - Attachment 1

Document No.:

Steel structures

Discipline

Start of gas pipeline - steel supports

Description:

1.3. Columns - structural analysis


1.3.1.

Envelope of maximal internal forces

Columns - common combinations


Group of member(s) :1/4,13/16
Group of ultimate combi :1/9
memb

cr.nr

2
1
2
4
4
4
4
2
1

combi
2
2
2
2
2
2
2
2
2

4
7
8
3
2
3
2
8
7

dx
[m]
0.550
0.000
0.000
0.000
0.000
0.550
0.550
0.550
0.550

N
[kN]
2.08
-30.42
-20.93
-13.10
-24.23
-12.95
-24.08
-20.78
-30.27

Vy
[kN]
-1.05
-2.29
2.25
0.24
0.43
0.24
0.43
2.25
-2.29

Vz
Mx
My
Mz
[kN]
[kNm] [kNm] [kNm]
0.27
0.00
0.15
-0.58
-0.05
0.00
0.00
0.00
-0.66
-0.00
-0.00
-0.00
5.84
0.00
0.00
0.00
-5.93
-0.00
-0.00
-0.00
3.21
5.84
0.00
0.13
-3.26
-5.93
-0.00
0.24
1.24
-0.66
-0.00
-0.36
-1.26
-0.05
0.00
-0.03

Columns - accidental combinations


Group of member(s) :1/4,13/16
Group of ultimate accidental combi :1/29
memb

cr.nr

2
1
2
4
4
4
4
2
1

combi
2
2
2
2
2
2
2
2
2

11
28
25
21
18
28
25
25
28

dx
[m]
0.550
0.000
0.000
0.000
0.000
0.550
0.550
0.550
0.550

N
[kN]
11.68
-33.02
-25.98
-5.88
-14.56
-13.06
-21.75
-25.87
-32.90

Vy
[kN]
-3.09
-4.08
4.06
-0.14
0.50
-0.01
0.64
4.06
-4.08

Vz
Mx
My
Mz
[kN]
[kNm] [kNm] [kNm]
0.68
0.00
0.37
-1.70
-0.53
0.00
0.00
0.00
-0.98
-0.00
-0.00
-0.00
4.53
0.00
0.00
0.00
-4.60
-0.00
-0.00
-0.00
2.49
4.53
0.00
-0.00
-2.53
-4.60
-0.00
0.35
2.23
-0.98
-0.00
-0.54
-2.25
-0.53
0.00
-0.29

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

7 / 22

SORFERT Natural gas pipeline Algeria


03194

Project:
Tebodin Germany Project No.:

SO-UD-E700.00113 - Attachment 1

Document No.:

Steel structures

Discipline

Start of gas pipeline - steel supports

Description:

1.3.2.
Designed profile check
Fin10 - Ocel EC3 [CS000101U_001 -- S1-column]
Input values
Material: EN 10025 : Fe 360
Cross-section: HE 100 B
Internal forces:
Loading case
Load case 1 - acci
Load case 2 - acci
Load case 3 - acci
Load case 4 - comm
Load case 5 - comm
Load case 6 - comm
Load case 7 - comm
Load case 8 - acci
Load case 9 - acci

N [kN]
11.680
-33.020
-25.980
-13.100
-24.230
-12.950
-24.080
-25.870
-32.900

Q3 [kN]
0.680
-0.530
-0.980
5.840
-5.930
5.840
-5.930
-0.980
-0.530

Buckling resistance:
Computation including buckling
Section length for buckling Lz
Coefficient of buckling length
Section length for buckling Ly
Coefficient of buckling length
Section length for buckling Lw
Coefficient of buckling length

resistance.
= 1.500 m
kz = 1.000
= 1.500 m
ky = 1.000
= 1.500 m
kw = 1.000

M2 [kNm]
0.370
0.000
0.000
0.000
0.000
3.210
-3.260
-0.540
-0.290

Q2 [kN]
-3.090
-4.080
4.060
0.240
0.430
0.240
0.430
4.060
-4.080

M3 [kNm]
-1.700
0.000
0.000
0.000
0.000
0.130
0.240
2.230
-2.250

Buckling length Lcrz = 1.500 m


Buckling length Lcry = 1.500 m

Lateral-torsional buckling:
Computation including lateral-torsional buckling.
lz1 = 6.800 m
Mom. area My: Shape No.4
zP = 1.000
Mom. area Mz: Shape No.4
yP = 0.500

Verification results
Results for load case: Load case 9 - accidental
Cross-section class: 1
Verification of the shear due to the shear force Qz:
0.530 kN < 106.182 kN Is satisfied
Verification of the shear due to the shear force Qy:
4.080 kN < 200.566 kN Is satisfied
Internal forces: N = -32.900 kN; My = -0.290 kNm; Mz = 2.250 kNm
Verification of the most unfavorable combination of buckling and bending:
Resistances: N_R = -407.685 kN; My_R = -20.841 kNm; Mz_R = 10.261 kNm
| 0.081 + 0.014 + 0.219 | < 1
Is satisfied
Verification of the most unfavorable combination of buckling and bending with lateral
buckling:
Resistances: N_R = -407.685 kN; My_R = -15.386 kNm; Mz_R = 10.261 kNm
| 0.081 + 0.019 + 0.219 | < 1
Is satisfied
Verification of the member slenderness:
member slenderness: 59.186
reliable limit of slenderness: 180.000
Slenderness is reliable
The cross-section is satisfied
Cross-section utilization: 31.9 %

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

8 / 22

SORFERT Natural gas pipeline Algeria


03194

Project:
Tebodin Germany Project No.:

SO-UD-E700.00113 - Attachment 1

Document No.:

Steel structures

Discipline

Start of gas pipeline - steel supports

Description:

1.4. Tie beams -structural analysis


1.4.1.

Envelope of maximal internal forces

Tie beam - common combinations


Group of member(s) :11/12,23/24
Group of ultimate combi :1/9
memb

cr.nr

11
11
12
12
12
12
11
12

combi
2
2
2
2
2
2
2
2

3
2
8
7
3
2
4
2

dx
[m]
0.000
0.000
0.000
0.000
0.000
1.200
0.000
0.000

N
[kN]
5.61
-5.71
-5.14
5.05
5.61
-5.71
-0.05
-5.71

Vy
[kN]
0.02
-0.02
0.27
-0.28
-0.21
0.21
-0.07
0.21

Vz
Mx
My
Mz
[kN]
[kNm] [kNm] [kNm]
5.16
0.00
-3.76
-0.04
-4.83
-0.00
3.72
0.04
-0.00
-0.19
-4.87
3.67
0.19
5.21
0.00
-3.72
5.57
-4.01
0.00
0.15
-5.57
-0.00
-2.52
0.10
0.00
-0.03
0.10
0.04
3.96
-5.24
-0.00
-0.15

Tie beam - accidental combinations


Group of member(s) :11/12,23/24
Group of ultimate accidental combi :1/29
memb

cr.nr

11
11
12
12
12
12
11
12

combi
2
2
2
2
2
2
2
2

3
18
18
28
21
18
28
16

dx
[m]
0.000
0.000
0.000
0.000
0.000
1.200
0.000
0.000

N
[kN]
3.74
-3.81
-3.81
3.74
3.74
-3.81
3.74
-0.04

Vy
[kN]
0.01
0.25
0.41
-0.41
-0.40
0.41
-0.25
0.24

Vz
Mx
My
Mz
[kN]
[kNm] [kNm] [kNm]
3.45
0.00
-2.51
-0.03
-2.64
-0.00
2.14
-0.13
2.98
-0.26
-4.05
-0.00
0.27
4.30
0.00
-3.02
4.30
-3.02
0.00
0.26
-4.29
-0.00
-2.02
0.23
0.00
2.88
-2.16
0.13
-0.00
-0.45
0.33
-0.15

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

9 / 22

SORFERT Natural gas pipeline Algeria


03194

Project:
Tebodin Germany Project No.:

SO-UD-E700.00113 - Attachment 1

Document No.:

Steel structures

Discipline

Start of gas pipeline - steel supports

Description:

1.4.2.
Designed profile check
Fin10 - Ocel EC3 [CS000101U_001 -- S1-tie beam]
Input values
Material: EN 10025 : Fe 360
Cross-section: HE 100 B
Internal forces:
Loading case
Load case 1 - comm
Load case 2 - comm
Load case 3 - comm
Load case 4 - comm
Load case 5 - comm
Load case 6 - comm
Load case 7 - comm
Load case 8 - acci
Load case 9 - acci
Load case 10 - acc

N [kN]
5.610
-5.710
-5.140
5.050
5.610
-5.710
-5.710
-3.810
3.740
3.740

Buckling resistance:
Computation including buckling
Section length for buckling Lz
Coefficient of buckling length
Section length for buckling Ly
Coefficient of buckling length
Section length for buckling Lw
Coefficient of buckling length

Q3 [kN]
5.160
-4.830
-4.870
5.210
5.570
-5.570
-5.240
-4.050
4.300
2.880

resistance.
= 1.200 m
kz = 0.500
= 1.200 m
ky = 0.500
= 1.200 m
kw = 0.500

M2 [kNm]
-3.760
3.720
3.670
-3.720
-4.010
-2.520
3.960
2.980
-3.020
-2.160

Q2 [kN]
0.020
-0.020
0.270
-0.280
-0.210
0.210
0.210
0.410
-0.410
-0.250

M3 [kNm]
-0.040
0.040
-0.190
0.190
0.150
0.100
-0.150
-0.260
0.270
0.130

Buckling length Lcrz = 0.600 m


Buckling length Lcry = 0.600 m

Lateral-torsional buckling:
Computation including lateral-torsional buckling.
lz1 = 1.200 m
Mom. area My: Shape No.4
zP = 1.000
Mom. area Mz: Shape No.4
yP = 0.500

Verification results
Crucial load case: Load case 5 - common combi
Cross-section class: 1
Verification of the shear due to the shear force Qz:
5.570 kN < 106.182 kN Is satisfied
Verification of the shear due to the shear force Qy:
0.210 kN < 200.566 kN Is satisfied
Internal forces: N = 5.610 kN; My = -4.010 kNm; Mz = -0.150 kNm
Verification of the most unfavorable combination of simple tension and bending:
Resistances: N_R = 531.304 kN; My_R = -21.296 kNm; Mz_R = -10.508 kNm
| 0.011 + 0.188 + 0.014 | < 1
Is satisfied
Verification of the most unfavorable combination of buckling and bending with lateral
buckling:
Resistances: N_R = 531.304 kN; My_R = -21.325 kNm; Mz_R = -10.456 kNm
| 0.011 + 0.188 + 0.014 | < 1
Is satisfied
Verification of the member slenderness:
member slenderness: 47.349
reliable limit of slenderness: 150.000
Slenderness is reliable
The cross-section is satisfied
Cross-section utilization: 21.3 %

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

10 / 22

SORFERT Natural gas pipeline Algeria


03194

Project:
Tebodin Germany Project No.:

SO-UD-E700.00113 - Attachment 1

Document No.:

Steel structures

Discipline

Start of gas pipeline - steel supports

Description:

1.5. Cross beams -structural analysis


1.5.1.

Envelope of maximal internal forces

Cross beam - common combinations


Group of macro(s) :5/6,13/14
Group of ultimate combi :1/9
macro memb combi
5
5
5
5
5
5
5
5
5
5
5

6
6
6
6
6
6
6
6
6
6
6

7
8
3
2
7
8
3
2
7
2
3

dx
[m]
0.500
0.250
0.250
0.250
0.000
0.500
0.000
0.000
0.250
0.250
0.250

N
[kN]
1.94
-2.52
0.99
-1.64
-2.35
-2.52
-1.45
0.72
-2.35
0.72
-1.45

Vy
[kN]
5.81
-5.80
6.23
-6.22
-4.99
-5.80
-5.77
5.78
-4.99
5.78
-5.77

Vz
Mx
My
Mz
[kN]
[kNm] [kNm] [kNm]
-8.37
-2.64
0.93
0.19
-25.35
2.64
5.06
1.26
-13.70
-2.94
3.87
-1.40
-23.36
2.94
5.02
1.40
25.63
2.65
-1.29
-0.01
-25.49
-1.29
2.64
-0.19
2.94
23.65
-0.83
0.04
-2.94
13.99
0.39
-0.04
5.10
25.49
2.65
-1.26
1.40
13.84
-2.94
3.86
-1.40
23.50
2.94
5.07

Cross beam - accidental combinations


Group of macro(s) :5/6,13/14
Group of ultimate accidental combi :1/29
macro memb combi
5
5
5
5
5
5
5
5
5
5
5

6
6
6
6
6
6
6
6
6
6
6

21
25
21
18
28
25
21
18
28
22
26

dx
[m]
0.500
0.250
0.250
0.250
0.000
0.500
0.000
0.000
0.250
0.250
0.250

N
[kN]
4.02
-4.46
4.02
-4.45
-4.33
-4.46
-4.32
3.84
-4.33
2.28
-2.77

Vy
[kN]
4.79
-4.79
4.79
-4.79
-3.21
-4.79
-3.21
3.21
-3.21
3.51
-3.50

Vz
Mx
My
Mz
[kN]
[kNm] [kNm] [kNm]
4.72
-1.95
2.02
0.26
-29.69
1.95
5.14
0.94
4.82
-1.95
0.83
-0.94
-28.64
1.95
4.89
0.93
29.91
1.97
-2.29
-0.13
-29.80
-2.30
1.95
-0.26
1.97
28.86
-2.28
-0.13
-1.97
-4.61
1.99
0.13
5.17
29.80
1.97
-0.93
0.94
2.57
-1.97
1.84
-0.94
22.51
1.97
4.16

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

11 / 22

SORFERT Natural gas pipeline Algeria


03194

Project:
Tebodin Germany Project No.:

SO-UD-E700.00113 - Attachment 1

Document No.:

Steel structures

Discipline

Start of gas pipeline - steel supports

Description:

1.5.2.

Designed profile check

Fin10 - Ocel EC3 [CS000101U_001 -- S1-cross beam]


Input values
Material: EN 10025 : Fe 360
Cross-section: HE 160 B
Internal forces:
Loading case
Load case 1 - comm
Load case 2 - comm
Load case 3 - comm
Load case 4 - comm
Load case 5 - comm
Load case 6 - comm
Load case 7 - comm
Load case 8 - comm
Load case 9 - comm
Load case 10 - com
Load case 11 - com
Load case 12 - acc
Load case 13 - acc
Load case 14 - acc
Load case 15 - acc
Load case 16 - acc
Load case 17 - acc
Load case 18 - acc
Load case 19 - acc
Load case 20 - acc
Load case 21 - acc
Load case 22 - acc

N [kN]
1.940
-2.520
0.990
-1.640
-2.350
-2.520
-1.450
0.720
-2.350
0.720
-1.450
4.020
-4.460
4.020
-4.450
-4.330
-4.460
-4.320
3.840
-4.330
2.280
-2.770

Buckling resistance:
Computation including buckling
Section length for buckling Lz
Coefficient of buckling length
Section length for buckling Ly
Coefficient of buckling length
Section length for buckling Lw
Coefficient of buckling length

Q3 [kN]
-8.370
-25.350
-13.700
-23.360
25.630
-25.490
23.650
13.990
25.490
13.840
23.500
4.720
-29.690
4.820
-28.640
29.910
-29.800
28.860
-4.610
29.800
2.570
22.510

resistance.
= 1.050 m
kz = 1.000
= 1.050 m
ky = 1.000
= 1.050 m
kw = 1.000

M2 [kNm]
0.930
5.060
3.870
5.020
-1.290
-1.290
-0.830
0.390
5.100
3.860
5.070
2.020
5.140
0.830
4.890
-2.290
-2.300
-2.280
1.990
5.170
1.840
4.160

Q2 [kN]
5.810
-5.800
6.230
-6.220
-4.990
-5.800
-5.770
5.780
-4.990
5.780
-5.770
4.790
-4.790
4.790
-4.790
-3.210
-4.790
-3.210
3.210
-3.210
3.510
-3.500

M3 [kNm]Tomega [kNm]
0.190
-2.640
1.260
2.640
-1.400
-2.940
1.400
2.940
-0.010
2.650
-0.190
2.640
0.040
2.940
-0.040
-2.940
-1.260
2.650
1.400
-2.940
-1.400
2.940
0.260
-1.950
0.940
1.950
-0.940
-1.950
0.930
1.950
-0.130
1.970
-0.260
1.950
-0.130
1.970
0.130
-1.970
-0.930
1.970
0.940
-1.970
-0.940
1.970

Buckling length Lcrz = 1.050 m


Buckling length Lcry = 1.050 m

Lateral-torsional buckling:
Computation including lateral-torsional buckling.
lz1 = 1.000 m
Mom. area My: Shape No.4
zP = 1.000
Mom. area Mz: Shape No.4
yP = 0.500

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

12 / 22

Project:
Tebodin Germany Project No.:

SORFERT Natural gas pipeline Algeria


03194

Document No.:
Discipline
Description:

SO-UD-E700.00113 - Attachment 1
Steel structures
Start of gas pipeline - steel supports

Verification results
Crucial load case: Load case 3 - common combi
Cross-section class: 1 due to restrained warping analyzed as from the class No. 3
Verification of the shear due to the shear force Qz:
13.700 kN < 208.117 kN Is satisfied
Verification of the shear due to the shear force Qy+dQy:
66.284 kN < 432.516 kN Is satisfied
Internal forces: N = 0.990 kN; My = 3.870 kNm; Mz = 1.400 kNm
Verification of the most unfavorable combination of simple tension and bending:
Resistances: N_R = 1109.609 kN; My_R = 63.603 kNm; Mz_R = 22.708 kNm
| 0.001 + 0.061 + 0.062 | < 1
Is satisfied
Verification of the most unfavorable combination of buckling and bending with lateral
buckling:
Resistances: N_R = 1109.609 kN; My_R = 63.611 kNm; Mz_R = 22.708 kNm
| 0.001 + 0.061 + 0.062 | < 1
Is satisfied
Verification of the member slenderness:
member slenderness: 25.950
reliable limit of slenderness: 150.000
Slenderness is reliable
The cross-section is satisfied
Cross-section utilization: 15.3 %

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

13 / 22

SORFERT Natural gas pipeline Algeria


03194

Project:
Tebodin Germany Project No.:

SO-UD-E700.00113 - Attachment 1

Document No.:

Steel structures

Discipline

Start of gas pipeline - steel supports

Description:

1.6. Anchors - structural analysis


Anchors - common max combinations
Group of node(s) :1/24
Group of ultimate common combi :2 (Rx is maximal)
support
5
4
7
2
6

node

combi

13
7
17
3
15

2
2
2
2
2

Rx
[kN]
0.05
-5.93
-0.05
-0.52
0.05

Ry
[kN]
0.10
-0.43
0.30
-1.43
-0.10

Rz
Mx
My
Mz
[kN]
[kNm] [kNm] [kNm]
6.20
0.00
0.00
0.00
24.23
0.00
0.00
0.00
16.76
0.00
0.00
0.00
18.58
0.00
0.00
0.00
6.19
0.00
0.00
0.00

Anchors - accidental max combinations


Group of node(s) :1/24
Group of ultimate accidental combi :11, 28 (Rz is maximal)
support
4
3
1
8
2

node

combi

7
5
1
19
3

28
11
28
11
11

Rx
[kN]
4.53
-0.68
-0.53
-0.04
0.68

Ry
[kN]
0.01
0.45
4.08
-0.28
3.09

Rz
Mx
My
Mz
[kN]
[kNm] [kNm] [kNm]
13.18
0.00
0.00
0.00
11.64
0.00
0.00
0.00
33.02
0.00
0.00
0.00
15.66
0.00
0.00
0.00
-11.57
0.00
0.00
0.00

Maximal load per column (per group of anchors) - selected from both merged tables:
2

Pd,max = sqrt ( | Rz* | + | Rxy* | ) = sqrt ( 11,6 + 6,0 ) = 13,1 kN (diagonal tension 30)
2

.... Rxy* = sqrt ( 5,93 + 0,43 ) = 6,0 kN

Proposed anchors - anticorrosive:

2x HILTI HST-R M12

..... bearing capacity 28,6 kN > 13,1 kN .... OKAY

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

14 / 22

SORFERT Natural gas pipeline Algeria


03194

Project:
Tebodin Germany Project No.:

SO-UD-E700.00113 - Attachment 1

Document No.:

Steel structures

Discipline

Start of gas pipeline - steel supports

Description:

1.7. Reactions - resultant forces on foundations

Reactions - common combinations - var. A


(without attached launcher/receiver station)
Group of node(s) :1,3,5,7
Group of ultimate common combi :1/9
combi
1
2
3
4
5
6
7
8
9

Rx
[kN]
0.00
-12.00
12.00
0.00
0.00
-10.80
10.80
-10.80
10.80

Ry
[kN]
0.04
-2.36
2.44
2.36
-2.29
-0.03
4.29
-4.22
0.10

Rz
Mx
My
Mz
[kN]
[kNm] [kNm] [kNm]
42.79
-0.04 -19.14
-0.02
75.79
2.46 -11.82
1.42
75.79
-2.53 13.14
-1.46
43.87
-2.45 -20.04
-1.42
41.53
2.38 -18.64
1.37
73.47
0.03 -13.36
0.02
73.47
-4.46
9.10
-2.57
71.36
4.39 -12.10
2.53
71.36
-0.11 10.36
-0.06

Central point: 0.600 0.250 0.000 m

Reactions - accidental combinations - var. A


(without attached launcher/receiver station)
Group of node(s) :1,3,5,7
Group of ultimate accidental combi :1/29
combi
1
2
3
4
5
6
7
8
9
10
11
12
13

Rx
[kN]
0.00
-8.00
8.00
0.00
0.00
8.00
-8.00
8.00
0.00
0.00
0.00
-8.00
8.00

Ry
[kN]
0.03
-1.57
1.63
5.19
0.03
-3.54
-6.74
6.79
-3.59
-6.69
6.74
3.59
-3.54

Rz
Mx
My
Mz
[kN]
[kNm] [kNm] [kNm]
31.70
-0.03 -14.18
-0.02
53.70
1.64
-9.30
0.94
53.70
-1.69
7.34
-0.98
23.35
-5.40 -10.43
-3.11
36.93
-0.03 -17.32
-0.02
45.35
3.68 11.09
2.12
62.05
7.01 -13.05
4.04
45.35
-7.06 11.09
-4.07
24.07
3.73 -11.03
2.15
22.51
6.96 -10.09
4.01
24.07
-7.01 -11.03
-4.04
62.05
-3.73 -13.05
-2.15
62.05
3.68
3.59
2.12

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

15 / 22

SORFERT Natural gas pipeline Algeria


03194

Project:
Tebodin Germany Project No.:

SO-UD-E700.00113 - Attachment 1

Document No.:

Steel structures

Discipline

Start of gas pipeline - steel supports

Description:

combi

Rx
[kN]
8.00
0.00
0.00
0.00
-8.00
-8.00
8.00
8.00
-8.00
-8.00
-8.00
-8.00
8.00
8.00
8.00
8.00

14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29

Ry
[kN]
6.79
3.64
-6.69
-1.52
-8.29
5.14
-5.09
8.34
-5.19
2.04
5.14
-8.29
5.24
-1.99
8.34
-5.09

Rz
Mx
My
Mz
[kN]
[kNm] [kNm] [kNm]
62.05
-7.06
3.59
-4.07
22.51
-3.79 -10.09
-2.18
39.21
6.96 -17.59
4.01
36.09
1.58 -16.98
0.91
44.51
8.62
-5.21
4.97
46.07
-5.35
-6.15
-3.08
44.51
5.29 11.43
3.05
46.07
-8.67 10.49
-5.00
62.77
5.40 -13.65
3.11
44.51
-2.12
-5.21
-1.22
62.77
-5.35 -13.65
-3.08
61.21
8.62 -12.71
4.97
44.51
-5.45 11.43
-3.14
62.77
2.07
2.99
1.19
62.77
-8.67
2.99
-5.00
61.21
5.29
3.93
3.05

Central point: 0.600 0.250 0.000 m

Reactions - common combinations - var. B


(with attached launcher/receiver station)
Group of node(s) :13,15,17,19
Group of ultimate common combi :1/9
combi
1
2
3
4
5
6
7
8
9

Rx
Ry
[kN] [kN]
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

Rz
Mx
My
Mz
[kN]
[kNm] [kNm] [kNm]
45.91
-0.00 -12.68
0.00
45.91
-0.00 -12.68
0.00
45.91
-0.00 -12.68
0.00
44.42
-0.00 -12.07
0.00
47.39
-0.00 -13.28
0.00
44.57
-0.00 -12.13
0.00
44.57
-0.00 -12.13
0.00
47.24
-0.00 -13.22
0.00
47.24
-0.00 -13.22
0.00

Central point: 0.600 0.250 0.000 m

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

16 / 22

SORFERT Natural gas pipeline Algeria


03194

Project:
Tebodin Germany Project No.:

SO-UD-E700.00113 - Attachment 1

Document No.:

Steel structures

Discipline

Start of gas pipeline - steel supports

Description:

Reactions - accidental combinations - var. B


(with attached launcher/receiver station)
Group of node(s) :13,15,17,19
Group of ultimate accidental combi :1/29
combi
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29

Rx
Ry
[kN] [kN]
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

Rz
Mx
My
Mz
[kN]
[kNm] [kNm] [kNm]
34.00
-0.00
-9.39
0.00
34.00
-0.00
-9.39
0.00
34.00
-0.00
-9.39
0.00
42.38
-0.00 -13.16
0.00
41.70
-0.00
-9.57
0.00
25.62
-0.00
-5.62
0.00
34.00
-0.00
-9.39
0.00
42.38
-0.00 -13.16
0.00
24.63
-0.00
-5.22
0.00
26.61
-0.00
-6.02
0.00
41.39
-0.00 -12.75
0.00
34.00
-0.00
-9.39
0.00
34.00
-0.00
-9.39
0.00
34.00
-0.00
-9.39
0.00
43.37
-0.00 -13.56
0.00
34.99
-0.00
-9.79
0.00
42.69
-0.00
-9.97
0.00
26.61
-0.00
-6.02
0.00
41.39
-0.00 -12.75
0.00
26.61
-0.00
-6.02
0.00
41.39
-0.00 -12.75
0.00
33.01
-0.00
-8.99
0.00
43.37
-0.00 -13.56
0.00
33.01
-0.00
-8.99
0.00
34.99
-0.00
-9.79
0.00
43.37
-0.00 -13.56
0.00
33.01
-0.00
-8.99
0.00
33.01
-0.00
-8.99
0.00
34.99
-0.00
-9.79
0.00

Central point: 0.600 0.250 0.000 m

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

17 / 22

SORFERT Natural gas pipeline Algeria


03194

Project:
Tebodin Germany Project No.:

SO-UD-E700.00113 - Attachment 1

Document No.:

Steel structures

Discipline

Start of gas pipeline - steel supports

Description:

2. Support CS 000101U-002 (start S3)


2.1. Scheme of structure
2

HEB160

height of column 3,38m

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

18 / 22

SORFERT Natural gas pipeline Algeria


03194

Project:
Tebodin Germany Project No.:

SO-UD-E700.00113 - Attachment 1

Document No.:

Steel structures

Discipline

Start of gas pipeline - steel supports

Description:

2.2. Load cases and combinations

Loading forces are taken from design calculations of gas pipe, nodes No. 6098. There are two sets of
values representing two basic situations (without and with attached launcher/receiver station). However,
their differences are not significant so these sets of values were merged into one enveloping set of forces.
See document No.:
SO-UD-E605.00016 Stress analysis - NG pipeline - report, Attachment 7, rev.No.1

2.2.1.

Load cases

Load
case
Load case name:
No.
1 Self weight of structure

coeff

Load case description

1.35

Self weight. Direction -Z

Dead load

1.35

Permanent - Loads

Operation +

1.50

Variable - Excl. Medium term

Operation -

1.50

Variable - Excl. Medium term

Wind +

1.50

Variable - Excl.

Wind -

1.50

Variable - Excl.

Earthquake 1

1.00

Variable - Excl. Instantaneous

Earthquake 2

1.00

Variable - Excl. Instantaneous

2.2.2.

Combinating rules

Basic rules for generating of ultimate common load combinations according to EC.
1 : 1.35*LC1 / 1.35*LC2
2 : 1.35*LC1 / 1.35*LC2 / 1.50*LC3 / 1.50*LC4
3 : 1.35*LC1 / 1.35*LC2 / 1.50*LC5 / 1.50*LC6
4 : 1.35*LC1 / 1.35*LC2 / 1.35*LC3 / 1.35*LC4 / 1.35*LC5 / 1.35*LC6
Basic rules for generating of ultimate accidental load combinations according to EC.
1 : 1.00*LC1 / 1.00*LC2 / 1.00*LC3 / 1.00*LC4 / 1.00*LC5 / 1.00*LC6 / 1.00*LC7
/ 1.00*LC8

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

19 / 22

SORFERT Natural gas pipeline Algeria


03194

Project:
Tebodin Germany Project No.:

SO-UD-E700.00113 - Attachment 1

Document No.:

Steel structures

Discipline

Start of gas pipeline - steel supports

Description:

2.2.3.

List of ultimate combinations

List of ultimate common load combinations.


1/ 1 : +1.35*LC1+1.35*LC2
2/ 2 : +1.35*LC1+1.35*LC2+1.50*LC3
3/ 2 : +1.35*LC1+1.35*LC2+1.50*LC4
4/ 3 : +1.35*LC1+1.35*LC2+1.50*LC5
List of ultimate accidental load combinations.
1/ 1 : +1.00*LC1+1.00*LC2
2/ 1 : +1.00*LC1+1.00*LC2+1.00*LC3
3/ 1 : +1.00*LC1+1.00*LC2+1.00*LC4
4/ 1 : +1.00*LC1+1.00*LC2+1.00*LC5+1.00*LC7
5/ 1 : +1.00*LC1+1.00*LC2+1.00*LC3+1.00*LC6+1.00*LC8

2.3. Column - structural analysis


2.3.1.

Envelope of maximal internal forces

Column - common combinations


Group of member(s) :1
Group of ultimate combi :1/4
memb

cr.nr

1
1
1

combi
1
1
1

4
3
2

dx
[m]
0.000
0.000
0.000

N
[kN]
-15.87
-14.95
-14.95

Vy
[kN]
0.00
1.65
-1.65

Vz
Mx
[kN]
[kNm]
0.00
0.00
-4.05
0.00
4.05
0.00

My
Mz
[kNm]
[kNm]
0.00
0.00
13.69
-5.58
-13.69
5.58

Columns - accidental combinations


Group of member(s) :1
Group of ultimate accidental combi :1/5
memb

cr.nr

1
1
1

combi
1
1
1

4
3
2

dx
[m]
0.000
0.000
0.000

N
[kN]
-11.80
-11.14
-11.14

Vy
[kN]
0.00
1.10
-1.10

Vz
Mx
My
Mz
[kN]
[kNm] [kNm] [kNm]
0.00
0.00
0.00
0.00
-2.70
9.13
-3.72
0.00
2.70
-9.13
3.72
0.00

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

20 / 22

SORFERT Natural gas pipeline Algeria


03194

Project:
Tebodin Germany Project No.:

SO-UD-E700.00113 - Attachment 1

Document No.:

Steel structures

Discipline

Start of gas pipeline - steel supports

Description:

2.3.2.

Designed profile check

Fin10 - Ocel EC3 [CS000101U_002 -- S3]


Input values
Material: EN 10025 : Fe 360
Cross-section: HE 160 B
Internal forces:
Loading case
Load case 1
Load case 2

N [kN]
-14.950
-15.870

Q3 [kN]
4.000
0.000

Buckling resistance:
Computation including buckling
Section length for buckling Lz
Coefficient of buckling length
Section length for buckling Ly
Coefficient of buckling length
Section length for buckling Lw
Coefficient of buckling length

resistance.
= 6.800 m
kz = 1.000
= 6.800 m
ky = 1.000
= 6.800 m
kw = 1.000

M2 [kNm]
13.700
0.000

Q2 [kN]
1.000
0.000

M3 [kNm]
5.580
0.000

Buckling length Lcrz = 6.800 m


Buckling length Lcry = 6.800 m

Lateral-torsional buckling:
Computation including lateral-torsional buckling.
lz1 = 6.800 m
Mom. area My: Shape No.4
zP = 1.000
Mom. area Mz: Shape No.4
yP = 0.500

Verification results
Results for load case: Load case 1
Cross-section class: 1
Verification of the shear due to the shear force Qz:
4.000 kN < 208.117 kN Is satisfied
Verification of the shear due to the shear force Qy:
1.000 kN < 432.516 kN Is satisfied
Internal forces: N = -14.950 kN; My = 13.700 kNm; Mz = -5.580 kNm
Verification of the most unfavorable combination of buckling and bending:
Resistances: N_R = -262.763 kN; My_R = 70.310 kNm; Mz_R = -31.639 kNm
| 0.057 + 0.195 + 0.176 | < 1
Is satisfied
Verification of the most unfavorable combination of buckling and bending with lateral
buckling:
Resistances: N_R = -262.763 kN; My_R = 53.625 kNm; Mz_R = -31.639 kNm
| 0.057 + 0.255 + 0.176 | < 1
Is satisfied
Verification of the member slenderness:
member slenderness: 168.058
reliable limit of slenderness: 180.000
Slenderness is reliable
The cross-section is satisfied
Cross-section utilization: 48.9 %

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

21 / 22

SORFERT Natural gas pipeline Algeria


03194

Project:
Tebodin Germany Project No.:

SO-UD-E700.00113 - Attachment 1

Document No.:

Steel structures

Discipline

Start of gas pipeline - steel supports

Description:

2.4. Anchors - structural analysis


Anchors - common max combinations
Group of node(s) :1/2
Group of ultimate common combi :1/4
support
1
1
1

node

combi

1
1
1

2
3
4

Rx
[kN]
1.65
-1.65
0.00

Ry
[kN]
-4.05
4.05
0.00

Rz
[kN]
14.95
14.95
15.87

Mx
My
Mz
[kNm]
[kNm] [kNm]
13.69
5.58
0.00
-13.69
-5.58
0.00
0.00
0.00
0.00

Anchors - accidental max combinations


Group of node(s) :1/2
Group of ultimate accidental combi :1/5
support
1
1
1
1

node

combi

1
1
1
1

2
3
4
5

Rx
[kN]
1.10
-1.10
0.00
1.10

Ry
[kN]
-2.70
2.70
0.00
-2.70

Rz
[kN]
11.14
11.14
11.80
11.08

Mx
My
Mz
[kNm]
[kNm] [kNm]
9.13
3.72
0.00
-9.13
-3.72
0.00
0.00
0.00
0.00
9.13
3.72
0.00

Maximal load per foot of column:


Rx = 1.7 kN
Ry = -4.1 kN Rz* = Rz x 60% = 9.0 kN
Mx = 13.7 kN My = 5.6 kN
Mz = 0.0 kN
Note:
Vertical load was additionally decreased by cca 40% - increased
safety reserve on design of anchors.

Proposed anchors - anticorrosive:

4x HILTI HST-R M20


..... maximal utilization 78% .... OKAY

2.5. Reactions - resultant forces on foundations


For resultant reactions on foundations see article above. They are the same.
Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

22 / 22

Project:
Tebodin Germany Project No.:

SORFERT Natural gas pipeline Algeria


03194
SO-UD-E700.00113 - Attachment 2

Document No.:

Steel structures

Discipline

End of gas pipeline - steel supports

Description:

Attachment 2

End of gas pipeline - steel supports

Calculated

Analysis checked

Ing. Daniel Gawlik

Ing. Milo Hejtmnek

12.3.2009

12.3.2009

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

1 / 23

SORFERT Natural gas pipeline Algeria


03194

Project:
Tebodin Germany Project No.:

SO-UD-E700.00113 - Attachment 2

Document No.:

Steel structures

Discipline

End of gas pipeline - steel supports

Description:

End of gas pipeline - 3D visualization

support E2
- part of piping
delivery

support E3

support E1

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

2 / 23

Project:
Tebodin Germany Project No.:

SORFERT Natural gas pipeline Algeria


03194

Document No.:

SO-UD-E700.00113 - Attachment 2
Steel structures

Discipline

End of gas pipeline - steel supports

Description:

Index of Attachment 2:

1.

Support CS 000101U-003 (end E1) .................................................................................................................. 4


1.1.

Schemes of structure ................................................................................................................................. 4

1.2.
Load cases and combinations.................................................................................................................... 5
1.2.1. Load cases............................................................................................................................................ 5
1.2.2. Combinating rules ................................................................................................................................ 5
1.2.3. List of ultimate combinations................................................................................................................ 6
1.3.
Columns - structural analysis.................................................................................................................... 7
1.3.1. Envelope of maximal internal forces ..................................................................................................... 7
1.3.2. Designed profile check ......................................................................................................................... 8
1.4.
Tie beams -structural analysis................................................................................................................... 9
1.4.1. Envelope of maximal internal forces ..................................................................................................... 9
1.4.2. Designed profile check ........................................................................................................................10
1.5.
Cross beams -structural analysis..............................................................................................................12
1.5.1. Envelope of maximal internal forces ....................................................................................................12
1.5.2. Designed profile check ........................................................................................................................13

2.

1.6.

Anchors - structural analysis....................................................................................................................15

1.7.

Reactions - resultant forces on foundations...............................................................................................16

Support CS 000101U-004 (end E3) .................................................................................................................19


2.1.

Scheme of structure..................................................................................................................................19

2.2.
Load cases and combinations...................................................................................................................20
2.2.1. Load cases...........................................................................................................................................20
2.2.2. Combinating rules ...............................................................................................................................20
2.2.3. List of ultimate combinations...............................................................................................................21
2.3.
Column - structural analysis ....................................................................................................................21
2.3.1. Envelope of maximal internal forces ....................................................................................................21
2.3.2. Designed profile check ........................................................................................................................22
2.4.

Anchors - structural analysis....................................................................................................................23

2.5.

Reactions - resultant forces on foundations...............................................................................................23

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

3 / 23

SORFERT Natural gas pipeline Algeria


03194

Project:
Tebodin Germany Project No.:

SO-UD-E700.00113 - Attachment 2

Document No.:

Steel structures

Discipline

End of gas pipeline - steel supports

Description:

1. Support CS 000101U-003 (end E1)


1.1. Schemes of structure
HEB

10

1 60

H EB

HE

HEB100

HE

B1
00

B1
00

HEB100

60
EB 1

160

HEB
3

16 0

12

1
HEB
1

HEB

1 60

60

HEB100

HEB100

11

500mm

1200mm
500mm

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

4 / 23

SORFERT Natural gas pipeline Algeria


03194

Project:
Tebodin Germany Project No.:

SO-UD-E700.00113 - Attachment 2

Document No.:

Steel structures

Discipline

End of gas pipeline - steel supports

Description:

1.2. Load cases and combinations


Loading forces are taken from design calculations of gas pipe, nodes No. 5060 and 5070. There are two
sets of values representing two basic situations (without and with attached launcher/receiver station).
See document No.:
SO-UD-E605.00016 Stress analysis - NG pipeline - report, Attachment 7, rev.No.1

1.2.1.

Load cases

Load
case
Load case name:
No.
1 Self weight of structure

coeff

1.35

Self weight. Direction -Z


Permanent - Loads

Dead load

1.35

Operation +

1.50

Operation -

1.50

Wind +

1.50

Wind -

1.50

Earthquake 1

1.00

Earthquake 2

1.00

Earthquake 3

1.00

10

Earthquake 4

1.00

11

Pressure test

1.00

1.2.2.

Load case description

Medium term, Selective - either (+) or (-)

Climatic load, Selective - either (+) or (-)

Accidental load, Instantaneous,


Selective - only one load case applies per each
accidental combination

Combinating rules

Basic rules for generating of ultimate common load combinations according to EC.
1 : 1.35*ZS1 / 1.35*ZS2
2 : 1.35*ZS1 / 1.35*ZS2 / 1.50*ZS3 / 1.50*ZS4
3 : 1.35*ZS1 / 1.35*ZS2 / 1.50*ZS5 / 1.50*ZS6
4 : 1.35*ZS1 / 1.35*ZS2 / 1.35*ZS3 / 1.35*ZS4 / 1.35*ZS5 / 1.35*ZS6
Basic rules for generating of ultimate accidental load combinations according to EC.
1 : 1.00*ZS1 / 1.00*ZS2 / 1.00*ZS3 / 1.00*ZS4 / 1.00*ZS5 / 1.00*ZS6 / 1.00*ZS7
/ 1.00*ZS8 / 1.00*ZS9 / 1.00*ZS10 / 1.00*ZS11

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

5 / 23

Project:
Tebodin Germany Project No.:

SORFERT Natural gas pipeline Algeria


03194
SO-UD-E700.00113 - Attachment 2

Document No.:

Steel structures

Discipline

End of gas pipeline - steel supports

Description:

1.2.3.

List of ultimate combinations

List of ultimate common load combinations.


1/ 1 : +1.35*ZS1+1.35*ZS2
2/ 2 : +1.35*ZS1+1.35*ZS2+1.50*ZS3
3/ 2 : +1.35*ZS1+1.35*ZS2+1.50*ZS4
4/ 3 : +1.35*ZS1+1.35*ZS2+1.50*ZS5
5/ 3 : +1.35*ZS1+1.35*ZS2+1.50*ZS6
6/ 4 : +1.35*ZS1+1.35*ZS2+1.35*ZS3+1.35*ZS5
7/ 4 : +1.35*ZS1+1.35*ZS2+1.35*ZS4+1.35*ZS5
8/ 4 : +1.35*ZS1+1.35*ZS2+1.35*ZS3+1.35*ZS6
9/ 4 : +1.35*ZS1+1.35*ZS2+1.35*ZS4+1.35*ZS6
List of ultimate accidental load combinations.
1/ 1 : +1.00*ZS1+1.00*ZS2
2/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS3
3/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS4
4/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS7
5/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS9
6/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS11
7/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS3+1.00*ZS7
8/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS3+1.00*ZS8
9/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS4+1.00*ZS7
10/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS5+1.00*ZS7
11/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS3+1.00*ZS9
12/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS4+1.00*ZS8
13/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS5+1.00*ZS8
14/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS4+1.00*ZS9
15/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS3+1.00*ZS10
16/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS4+1.00*ZS10
17/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS6+1.00*ZS8
18/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS6+1.00*ZS9
19/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS5+1.00*ZS11
20/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS6+1.00*ZS10
21/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS3+1.00*ZS5+1.00*ZS7
22/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS4+1.00*ZS5+1.00*ZS7
23/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS3+1.00*ZS5+1.00*ZS8
24/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS4+1.00*ZS5+1.00*ZS8
25/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS3+1.00*ZS5+1.00*ZS9
26/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS3+1.00*ZS6+1.00*ZS9
27/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS4+1.00*ZS5+1.00*ZS9
28/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS4+1.00*ZS6+1.00*ZS8
29/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS3+1.00*ZS6+1.00*ZS10
30/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS4+1.00*ZS6+1.00*ZS9
31/ 1 : +1.00*ZS1+1.00*ZS2+1.00*ZS4+1.00*ZS6+1.00*ZS10

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

6 / 23

SORFERT Natural gas pipeline Algeria


03194

Project:
Tebodin Germany Project No.:

SO-UD-E700.00113 - Attachment 2

Document No.:

Steel structures

Discipline

End of gas pipeline - steel supports

Description:

1.3. Columns - structural analysis


1.3.1.

Envelope of maximal internal forces

Columns - common combinations


Group of member(s) :1/4,13/16
Group of ultimate combi :1/9
memb

cr.nr

13
13
14
16
16
16
16
14
13

combi
2
2
2
2
2
2
2
2
2

5
7
8
3
2
3
2
8
7

dx
[m]
0.500
0.000
0.000
0.000
0.000
0.500
0.500
0.500
0.500

N
[kN]
2.44
-27.66
-18.71
-14.83
-24.30
-14.69
-24.17
-18.57
-27.52

Vy
[kN]
1.04
-2.13
2.07
0.35
0.49
0.35
0.49
2.07
-2.13

Vz
Mx
My
Mz
[kN]
[kNm] [kNm] [kNm]
0.25
0.00
0.13
0.52
-0.28
-0.00
0.00
-0.00
-0.27
0.00
-0.00
0.00
5.58
-0.00
0.00
0.00
-5.68
0.00
-0.00
-0.00
2.79
5.58
-0.00
0.17
-2.84
-5.68
0.00
0.24
1.04
-0.27
0.00
-0.13
-1.07
-0.28
-0.00
-0.14

Columns - accidental combinations


Group of member(s) :1/4,13/16
Group of ultimate accidental combi :1/29
memb

cr.nr

13
13
14
16
16
16
16
14
13

combi
2
2
2
2
2
2
2
2
2

20
22
26
22
26
22
26
26
22

dx
[m]
0.500
0.000
0.000
0.000
0.000
0.500
0.500
0.500
0.500

N
[kN]
12.64
-31.67
-25.04
-14.27
-22.01
-14.17
-21.91
-24.94
-31.57

Vy
[kN]
3.34
-4.24
4.19
0.08
0.70
0.08
0.70
4.19
-4.24

Vz
Mx
My
Mz
[kN]
[kNm] [kNm] [kNm]
0.67
0.00
0.34
1.67
-0.71
-0.00
0.00
-0.00
-0.70
0.00
-0.00
-0.00
4.35
-0.00
0.00
-0.00
-4.42
0.00
-0.00
0.00
2.17
4.35
-0.00
0.04
-2.21
-4.42
0.00
0.35
2.10
-0.70
0.00
-0.35
-2.12
-0.71
-0.00
-0.35

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

7 / 23

SORFERT Natural gas pipeline Algeria


03194

Project:
Tebodin Germany Project No.:

SO-UD-E700.00113 - Attachment 2

Document No.:

Steel structures

Discipline

End of gas pipeline - steel supports

Description:

1.3.2.
Designed profile check
Fin10 - Ocel EC3 [CS000101U_001 -- E1-column]
Input values
Material: EN 10025 : Fe 360
Cross-section: HE 100 B
Internal forces:
Loading case
Load case 1 - comm
Load case 2 - comm
Load case 3 - comm
Load case 4 - comm
Load case 5 - comm
Load case 6 - acci
Load case 7 - acci
Load case 8 - acci
Load case 9 - acci
Load case 10 - acc

N [kN]
2.440
-27.660
-18.710
-14.830
-24.300
12.640
-31.670
-25.040
-14.270
-22.010

Q3 [kN]
0.250
-0.280
-0.270
5.580
-5.680
0.670
-0.710
-0.700
4.350
-4.420

Buckling resistance:
Computation including buckling
Section length for buckling Lz
Coefficient of buckling length
Section length for buckling Ly
Coefficient of buckling length
Section length for buckling Lw
Coefficient of buckling length

resistance.
= 1.500 m
kz = 1.000
= 1.500 m
ky = 1.000
= 1.500 m
kw = 1.000

M2 [kNm]
0.130
-0.140
-0.130
2.790
-2.840
0.340
-0.350
-0.350
2.170
-2.210

Q2 [kN]
1.040
-2.130
2.070
0.350
0.490
3.340
-4.240
4.190
0.080
0.700

M3 [kNm]
0.520
-1.070
1.040
0.170
0.240
1.670
-2.120
2.100
0.040
0.350

Buckling length Lcrz = 1.500 m


Buckling length Lcry = 1.500 m

Lateral-torsional buckling:
Computation including lateral-torsional buckling.
lz1 = 6.800 m
Mom. area My: Shape No.4
zP = 1.000
Mom. area Mz: Shape No.4
yP = 0.500

Verification results
Crucial load case: Load case 7 - accidental
Cross-section class: 1
Verification of the shear due to the shear force Qz:
0.710 kN < 106.182 kN Is satisfied
Verification of the shear due to the shear force Qy:
4.240 kN < 200.566 kN Is satisfied
Internal forces: N = -31.670 kN; My = -0.350 kNm; Mz = 2.120 kNm
Verification of the most unfavorable combination of buckling and bending:
Resistances: N_R = -407.685 kN; My_R = -20.858 kNm; Mz_R = 10.270 kNm
| 0.078 + 0.017 + 0.206 | < 1
Is satisfied
Verification of the most unfavorable combination of buckling and bending with lateral
buckling:
Resistances: N_R = -407.685 kN; My_R = -15.386 kNm; Mz_R = 10.270 kNm
| 0.078 + 0.023 + 0.206 | < 1
Is satisfied
Verification of the member slenderness:
member slenderness: 59.186
reliable limit of slenderness: 180.000
Slenderness is reliable
The cross-section is satisfied
Cross-section utilization: 30.7 %

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

8 / 23

SORFERT Natural gas pipeline Algeria


03194

Project:
Tebodin Germany Project No.:

SO-UD-E700.00113 - Attachment 2

Document No.:

Steel structures

Discipline

End of gas pipeline - steel supports

Description:

1.4. Tie beams -structural analysis


1.4.1.

Envelope of maximal internal forces

Tie beam - common combinations


Group of member(s) :11/12,23/24
Group of ultimate combi :1/9
memb

cr.nr

23
23
24
24
24
24
23
24
24

combi
2
2
2
2
2
2
2
2
2

3
2
8
7
3
2
4
5
2

dx
[m]
0.000
0.000
0.000
0.000
0.000
1.200
0.000
0.000
0.000

N
[kN]
5.41
-5.52
-4.97
4.86
5.41
-5.52
-0.05
-0.05
-5.52

Vy
[kN]
0.04
-0.04
0.23
-0.24
-0.18
0.17
-0.06
0.06
0.17

Vz
Mx
My
Mz
[kN]
[kNm] [kNm] [kNm]
4.53
0.00
-3.32
-0.05
-4.21
-0.00
3.29
0.05
-0.16
-4.15
-0.00
3.18
0.17
4.49
0.00
-3.23
4.81
-3.49
0.00
0.13
-4.80
-0.00
-2.12
0.08
0.00
-0.00
0.08
0.04
-0.00
0.00
0.08
-0.04
3.44
-4.47
-0.00
-0.13

Tie beam - accidental combinations


Group of member(s) :11/12,23/24
Group of ultimate accidental combi :1/29
memb

cr.nr

23
23
24
24
24
23
24
24

combi
2
2
2
2
2
2
2
2

3
21
29
22
26
10
18
26

dx
[m]
0.000
0.000
0.000
0.000
1.200
0.000
0.000
0.000

N
[kN]
3.60
-3.68
-3.68
3.60
-3.68
-0.04
-0.04
-3.68

Vy
[kN]
0.03
-0.28
0.38
-0.39
0.37
-0.24
0.24
0.37

Vz
Mx
My
Mz
[kN]
[kNm] [kNm] [kNm]
3.03
0.00
-2.22
-0.03
-3.31
0.00
2.50
0.19
-0.24
-3.48
-0.00
2.60
3.73
-2.63
0.25
0.00
-3.73
-0.00
-1.72
0.21
0.00
-0.39
0.30
0.15
-0.00
-0.39
0.29
-0.14
2.60
-3.48
-0.00
-0.24

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

9 / 23

SORFERT Natural gas pipeline Algeria


03194

Project:
Tebodin Germany Project No.:

SO-UD-E700.00113 - Attachment 2

Document No.:

Steel structures

Discipline

End of gas pipeline - steel supports

Description:

1.4.2.
Designed profile check
Fin10 - Ocel EC3 [CS000101U_001 -- E1-tie beam]
Input values
Material: EN 10025 : Fe 360
Cross-section: HE 100 B
Internal forces:
Loading case
Load case 1 - comm
Load case 2 - comm
Load case 3 - comm
Load case 4 - comm
Load case 5 - comm
Load case 6 - comm
Load case 7 - comm
Load case 8 - acci
Load case 9 - acci
Load case 10 - acc
Load case 11 - acc
Load case 12 - acc
Load case 13 - acc
Load case 14 - acc

N [kN]
5.410
-5.520
-4.970
4.860
5.410
-5.520
-5.520
-3.680
-3.680
3.600
-3.680
-0.040
-0.040
-3.680

Q3 [kN]
4.530
-4.210
-4.150
4.490
4.810
-4.800
-4.470
-3.310
-3.480
3.730
-3.730
-0.390
-0.390
-3.480

Buckling resistance:
Computation including buckling
Section length for buckling Lz
Coefficient of buckling length
Section length for buckling Ly
Coefficient of buckling length
Section length for buckling Lw
Coefficient of buckling length

resistance.
= 1.200 m
kz = 0.500
= 1.200 m
ky = 0.500
= 1.200 m
kw = 0.500

M2 [kNm]
-3.320
3.290
3.180
-3.230
-3.490
-2.120
3.440
2.500
2.600
-2.630
-1.720
0.300
0.290
2.600

Q2 [kN]
0.040
-0.040
0.230
-0.240
-0.180
0.170
0.170
-0.280
0.380
-0.390
0.370
-0.240
0.240
0.370

M3 [kNm]
-0.050
0.050
-0.160
0.170
0.130
0.080
-0.130
0.190
-0.240
0.250
0.210
0.150
-0.140
-0.240

Buckling length Lcrz = 0.600 m


Buckling length Lcry = 0.600 m

Lateral-torsional buckling:
Computation including lateral-torsional buckling.
lz1 = 1.200 m
Mom. area My: Shape No.4
zP = 1.000
Mom. area Mz: Shape No.4
yP = 0.500

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

10 / 23

Project:
Tebodin Germany Project No.:

SORFERT Natural gas pipeline Algeria


03194

Document No.:
Discipline
Description:

SO-UD-E700.00113 - Attachment 2
Steel structures
End of gas pipeline - steel supports

Verification results
Crucial load case: Load case 5 - common combi
Cross-section class: 1
Verification of the shear due to the shear force Qz:
4.810 kN < 106.182 kN Is satisfied
Verification of the shear due to the shear force Qy:
0.180 kN < 200.566 kN Is satisfied
Internal forces: N = 5.410 kN; My = -3.490 kNm; Mz = -0.130 kNm
Verification of the most unfavorable combination of simple tension and bending:
Resistances: N_R = 531.304 kN; My_R = -21.296 kNm; Mz_R = -10.508 kNm
| 0.010 + 0.164 + 0.012 | < 1
Is satisfied
Verification of the most unfavorable combination of buckling and bending with lateral
buckling:
Resistances: N_R = 531.304 kN; My_R = -21.324 kNm; Mz_R = -10.458 kNm
| 0.010 + 0.164 + 0.012 | < 1
Is satisfied
Verification of the member slenderness:
member slenderness: 47.349
reliable limit of slenderness: 150.000
Slenderness is reliable
The cross-section is satisfied
Cross-section utilization: 18.6 %

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

11 / 23

SORFERT Natural gas pipeline Algeria


03194

Project:
Tebodin Germany Project No.:

SO-UD-E700.00113 - Attachment 2

Document No.:

Steel structures

Discipline

End of gas pipeline - steel supports

Description:

1.5. Cross beams -structural analysis


1.5.1.

Envelope of maximal internal forces

Cross beam - common combinations


Group of macro(s) :5/6,13/14
Group of ultimate combi :1/9
macro memb combi
13
13
13
13
13
13
13
13
13
13
13

18
18
18
18
18
18
18
18
18
18
18

7
8
3
2
7
8
3
2
7
2
3

dx
[m]
0.417
0.250
0.250
0.250
0.000
0.500
0.000
0.000
0.250
0.250
0.250

N
[kN]
1.67
-2.30
0.69
-1.39
-2.17
-2.30
-1.23
0.44
-2.17
0.44
-1.23

Vy
[kN]
5.25
-5.24
5.63
-5.62
-4.58
-5.24
-5.29
5.30
-4.58
5.30
-5.29

Vz
Mx
My
Mz
[kN]
[kNm] [kNm] [kNm]
-8.58
-2.40
1.44
-0.27
-22.43
2.40
4.54
1.15
-13.38
-2.67
3.62
-1.27
-20.60
2.67
4.51
1.28
23.42
-1.09
2.41
-0.00
-22.57
2.40
-1.09
-0.16
2.68
20.93
-0.65
0.05
-2.68
13.71
0.21
-0.05
4.74
23.27
2.41
-1.15
1.28
13.56
-2.68
3.62
-1.27
20.78
2.68
4.56

Cross beam - accidental combinations


Group of macro(s) :5/6,13/14
Group of ultimate accidental combi :1/29
macro memb combi
13
13
13
13
13
13
13
13
13

18
18
18
18
18
18
18
18
18

24
26
22
22
26
26
22
26
24

dx
[m]
0.417
0.250
0.250
0.000
0.500
0.000
0.250
0.250
0.250

N
[kN]
4.09
-4.56
4.07
-4.47
-4.56
3.91
-4.47
3.91
-4.45

Vy
[kN]
4.38
-4.38
4.38
-2.90
-4.38
2.90
-2.90
2.90
-2.90

Vz
Mx
My
Mz
[kN]
[kNm] [kNm] [kNm]
5.23
-1.78
1.45
-0.12
-28.20
1.78
4.90
0.86
4.09
-1.78
0.87
-0.85
28.93
1.79
-2.16
-0.12
-28.30
1.78
-2.16
-0.24
-1.79
-4.33
1.85
0.13
5.06
28.83
1.79
-0.85
0.86
-4.44
-1.79
0.75
-0.85
27.61
1.79
4.76

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

12 / 23

SORFERT Natural gas pipeline Algeria


03194

Project:
Tebodin Germany Project No.:

SO-UD-E700.00113 - Attachment 2

Document No.:

Steel structures

Discipline

End of gas pipeline - steel supports

Description:

1.5.2.

Designed profile check

Fin10 - Ocel EC3 [CS000101U_001 -- E1-cross beam]


Input values
Material: EN 10025 : Fe 360
Cross-section: HE 160 B
Internal forces:
Loading case
Load case 1 - comm
Load case 2 - comm
Load case 3 - comm
Load case 4 - comm
Load case 5 - comm
Load case 6 - comm
Load case 7 - comm
Load case 8 - comm
Load case 9 - comm
Load case 10 - com
Load case 11 - com
Load case 12 - acc
Load case 13 - acc
Load case 14 - acc
Load case 15 - acc
Load case 16 - acc
Load case 17 - acc
Load case 18 - acc
Load case 19 - acc
Load case 20 - acc

N [kN]
1.670
-2.300
0.690
-1.390
-2.170
-2.300
-1.230
0.440
-2.170
0.440
-1.230
4.090
-4.560
4.070
-4.470
-4.560
3.910
-4.470
3.910
-4.450

Buckling resistance:
Computation including buckling
Section length for buckling Lz
Coefficient of buckling length
Section length for buckling Ly
Coefficient of buckling length
Section length for buckling Lw
Coefficient of buckling length

Q3 [kN]
-8.580
-22.430
-13.380
-20.600
23.420
-22.570
20.930
13.710
23.270
13.560
20.780
5.230
-28.200
4.090
28.930
-28.300
-4.330
28.830
-4.440
27.610

resistance.
= 1.050 m
kz = 1.000
= 1.050 m
ky = 1.000
= 1.050 m
kw = 1.000

M2 [kNm]
1.440
4.540
3.620
4.510
-1.090
-1.090
-0.650
0.210
4.740
3.620
4.560
1.450
4.900
0.870
-2.160
-2.160
1.850
5.060
0.750
4.760

Q2 [kN]
5.250
-5.240
5.630
-5.620
-4.580
-5.240
-5.290
5.300
-4.580
5.300
-5.290
4.380
-4.380
4.380
-2.900
-4.380
2.900
-2.900
2.900
-2.900

M3 [kNm] Tomega [kNm]


-0.270
-2.400
1.150
2.400
-1.270
-2.670
1.280
2.670
0.000
2.410
-0.160
2.400
0.050
2.680
-0.050
-2.680
-1.150
2.410
1.280
-2.680
-1.270
2.680
-0.120
-1.780
0.860
1.780
-0.850
-1.780
-0.120
1.790
-0.240
1.780
0.130
-1.790
-0.850
1.790
0.860
-1.790
-0.850
1.790

Buckling length Lcrz = 1.050 m


Buckling length Lcry = 1.050 m

Lateral-torsional buckling:
Computation including lateral-torsional buckling.
lz1 = 1.000 m
Mom. area My: Shape No.4
zP = 1.000
Mom. area Mz: Shape No.4
yP = 0.500

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

13 / 23

Project:
Tebodin Germany Project No.:

SORFERT Natural gas pipeline Algeria


03194

Document No.:
Discipline
Description:

SO-UD-E700.00113 - Attachment 2
Steel structures
End of gas pipeline - steel supports

Verification results
Crucial load case: Load case 3 - common combi.
Cross-section class: 1 due to restrained warping analyzed as from the class No. 3
Verification of the shear due to the shear force Qz:
13.380 kN < 208.117 kN Is satisfied
Verification of the shear due to the shear force Qy+dQy:
60.169 kN < 432.516 kN Is satisfied
Internal forces: N = 0.690 kN; My = 3.620 kNm; Mz = 1.270 kNm
Verification of the most unfavorable combination of simple tension and bending:
Resistances: N_R = 1109.609 kN; My_R = 63.603 kNm; Mz_R = 22.708 kNm
| 0.001 + 0.057 + 0.056 | < 1
Is satisfied
Verification of the most unfavorable combination of buckling and bending with lateral
buckling:
Resistances: N_R = 1109.609 kN; My_R = 63.608 kNm; Mz_R = 22.708 kNm
| 0.001 + 0.057 + 0.056 | < 1
Is satisfied
Verification of the member slenderness:
member slenderness: 25.950
reliable limit of slenderness: 150.000
Slenderness is reliable
The cross-section is satisfied
Cross-section utilization: 13.9 %

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

14 / 23

SORFERT Natural gas pipeline Algeria


03194

Project:
Tebodin Germany Project No.:

SO-UD-E700.00113 - Attachment 2

Document No.:

Steel structures

Discipline

End of gas pipeline - steel supports

Description:

1.6. Anchors - structural analysis


Anchors - common max combinations
Group of node(s) :1/24
Group of ultimate common combi :2
support
5
8
7
6
1

node

combi

13
19
17
15
1

2
2
2
2
2

Rx
[kN]
0.22
-5.68
-5.36
-0.10
0.05

Ry
[kN]
-0.47
-0.49
0.36
-1.22
0.12

Rz
Mx
My
Mz
[kN]
[kNm] [kNm] [kNm]
9.79
0.00
0.00
0.00
24.30
0.00
0.00
0.00
23.85
0.00
0.00
0.00
16.57
0.00
0.00
0.00
6.26
0.00
0.00
0.00

Anchors - accidental max combinations


Group of node(s) :1/24
Group of ultimate accidental combi :20,22
support
8
5
6
5

node

combi

19
13
15
13

22
22
20
20

Rx
[kN]
4.35
-0.71
-0.59
0.67

Ry
[kN]
-0.08
4.24
-3.36
-3.34

Rz
Mx
My
Mz
[kN]
[kNm] [kNm] [kNm]
14.27
0.00
0.00
0.00
31.67
0.00
0.00
0.00
14.26
0.00
0.00
0.00
-12.54
0.00
0.00
0.00

Maximal load per column (per group of anchors) - selected from both merged tables:
2

Pd,max = sqrt ( | Rz* | + | Rxy* | ) = sqrt ( 12,5 + 5,7 ) = 13,7 kN (diagonal tension 30)
.... Rxy* = sqrt ( 5,68 2 + 0,49 2 ) = 5,7 kN

Proposed anchors - anticorrosive:

2x HILTI HST-R M12

..... bearing capacity 28,6 kN > 13,7 kN .... OKAY

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

15 / 23

SORFERT Natural gas pipeline Algeria


03194

Project:
Tebodin Germany Project No.:

SO-UD-E700.00113 - Attachment 2

Document No.:

Steel structures

Discipline

End of gas pipeline - steel supports

Description:

1.7. Reactions - resultant forces on foundations

Reactions - common combinations - var. A


(without attached launcher/receiver station)
Group of node(s) :1,3,5,7
Group of ultimate common combi :1/9
combi
1
2
3
4
5
6
7
8
9

Rx
[kN]
0.00
-10.92
10.92
0.00
0.00
-9.83
9.83
-9.83
9.83

Ry
[kN]
0.04
-1.83
1.92
2.38
-2.30
0.46
3.84
-3.75
-0.37

Rz
Mx
My
Mz
[kN]
[kNm] [kNm] [kNm]
43.77
-0.05 -20.71
-0.03
74.52
1.81 -13.07
1.10
74.52
-1.90
8.55
-1.15
45.11
-2.36 -20.63
-1.43
42.44
2.27 -20.79
1.38
72.65
-0.46 -13.76
-0.28
72.65
-3.80
5.70
-2.30
70.25
3.71 -13.91
2.25
70.25
0.37
5.55
0.22

Central point: 0.600 0.250 0.000 m

Reactions - accidental combinations - var. A


(without attached launcher/receiver station)
Group of node(s) :1,3,5,7
Group of ultimate accidental combi :1/31
combi
1
2
3
4
5
6
7
8
9
10
11
12
13

Rx
[kN]
0.00
-7.28
7.28
0.00
0.00
0.00
-7.28
-7.28
7.28
0.00
-7.28
7.28
0.00

Ry
[kN]
0.03
-1.22
1.28
5.73
-5.67
0.03
4.48
4.48
6.98
7.29
-6.92
6.98
7.29

Rz
Mx
My
Mz
[kN]
[kNm] [kNm] [kNm]
32.42
-0.03 -15.34
-0.02
52.92
1.20 -10.25
0.73
52.92
-1.27
4.17
-0.77
40.94
-5.68 -18.99
-3.44
40.94
5.61 -18.99
3.40
37.06
-0.03 -18.12
-0.02
61.44
-4.44 -13.90
-2.69
44.40
-4.44
-6.60
-2.69
61.44
-6.92
0.52
-4.19
41.83
-7.22 -18.93
-4.38
61.44
6.84 -13.90
4.15
44.40
-6.92
7.81
-4.19
24.79
-7.22 -11.64
-4.38

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

16 / 23

SORFERT Natural gas pipeline Algeria


03194

Project:
Tebodin Germany Project No.:

SO-UD-E700.00113 - Attachment 2

Document No.:

Steel structures

Discipline

End of gas pipeline - steel supports

Description:

combi

Rx
[kN]
7.28
-7.28
7.28
0.00
0.00
0.00
0.00
-7.28
7.28
-7.28
7.28
-7.28
-7.28
7.28
7.28
-7.28
7.28
7.28

14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

Ry
[kN]
-4.42
-6.92
-4.42
4.17
-7.23
1.59
-7.23
6.04
8.54
6.04
8.54
-5.36
-8.48
-2.86
5.42
-8.48
-5.98
-5.98

Rz
Mx
My
Mz
[kN]
[kNm] [kNm] [kNm]
61.44
4.37
0.52
2.65
44.40
6.84
-6.60
4.15
44.40
4.37
7.81
2.65
23.01
-4.14 -11.75
-2.50
40.05
7.15 -19.04
4.34
37.95
-1.58 -18.07
-0.96
23.01
7.15 -11.75
4.34
62.33
-5.99 -13.84
-3.63
62.33
-8.46
0.57
-5.13
45.29
-5.99
-6.55
-3.63
45.29
-8.46
7.87
-5.13
62.33
5.30 -13.84
3.21
60.55
8.39 -13.95
5.09
62.33
2.82
0.57
1.71
43.51
-5.37
7.76
-3.25
43.51
8.39
-6.65
5.09
60.55
5.91
0.46
3.59
43.51
5.91
7.76
3.59

Central point: 0.600 0.250 0.000 m

Reactions - common combinations - var. B


(with attached launcher/receiver station)
Group of node(s) :13,15,17,19
Group of ultimate common combi :1/9
combi
1
2
3
4
5
6
7
8
9

Rx
Ry
[kN] [kN]
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

Rz
Mx
My
Mz
[kN]
[kNm] [kNm] [kNm]
45.76
0.00 -12.43
0.00
45.76
0.00 -12.43
0.00
45.76
0.00 -12.43
0.00
46.90
0.00 -12.61
0.00
44.62
0.00 -12.25
0.00
46.78
0.00 -12.59
0.00
46.78
0.00 -12.59
0.00
44.73
0.00 -12.27
0.00
44.73
0.00 -12.27
0.00

Central point: 0.600 0.250 0.000 m

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

17 / 23

SORFERT Natural gas pipeline Algeria


03194

Project:
Tebodin Germany Project No.:

SO-UD-E700.00113 - Attachment 2

Document No.:

Steel structures

Discipline

End of gas pipeline - steel supports

Description:

Reactions - accidental combinations - var. B


(with attached launcher/receiver station)
Group of node(s) :13,15,17,19
Group of serviceability combi :1/31
combi
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

Rx
Ry
[kN] [kN]
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

Rz
Mx
My
Mz
[kN]
[kNm] [kNm] [kNm]
33.89
0.00
-9.21
0.00
33.89
0.00
-9.21
0.00
33.89
0.00
-9.21
0.00
40.93
0.00 -12.37
0.00
33.89
0.00
-9.21
0.00
41.39
0.00
-8.91
0.00
40.93
0.00 -12.37
0.00
26.85
0.00
-6.05
0.00
40.93
0.00 -12.37
0.00
41.69
0.00 -12.48
0.00
33.89
0.00
-9.21
0.00
26.85
0.00
-6.05
0.00
27.61
0.00
-6.17
0.00
33.89
0.00
-9.21
0.00
33.89
0.00
-9.21
0.00
33.89
0.00
-9.21
0.00
26.09
0.00
-5.93
0.00
33.13
0.00
-9.09
0.00
42.15
0.00
-9.03
0.00
33.13
0.00
-9.09
0.00
41.69
0.00 -12.48
0.00
41.69
0.00 -12.48
0.00
27.61
0.00
-6.17
0.00
27.61
0.00
-6.17
0.00
34.65
0.00
-9.33
0.00
33.13
0.00
-9.09
0.00
34.65
0.00
-9.33
0.00
26.09
0.00
-5.93
0.00
33.13
0.00
-9.09
0.00
33.13
0.00
-9.09
0.00
33.13
0.00
-9.09
0.00

Central point: 0.600 0.250 0.000 m

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

18 / 23

SORFERT Natural gas pipeline Algeria


03194

Project:
Tebodin Germany Project No.:

SO-UD-E700.00113 - Attachment 2

Document No.:

Steel structures

Discipline

End of gas pipeline - steel supports

Description:

2. Support CS 000101U-004 (end E3)


2.1. Scheme of structure
2

HEB160

height of column 3,33m

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

19 / 23

SORFERT Natural gas pipeline Algeria


03194

Project:
Tebodin Germany Project No.:

SO-UD-E700.00113 - Attachment 2

Document No.:

Steel structures

Discipline

End of gas pipeline - steel supports

Description:

2.2. Load cases and combinations

Loading forces are taken from design calculations of gas pipe, node No. 5090. There are two sets of
values representing two basic situations (without and with attached launcher/receiver station). However,
their differences are not significant so these sets of values were merged into one enveloping set of forces.
See document No.:
SO-UD-E605.00016 Stress analysis - NG pipeline - report, Attachment 7, rev.No.1

2.2.1.

Load cases

Load
case
Load case name:
No.
1 Self weight of structure

coeff

1.35

Self weight. Direction -Z


Permanent - Loads

Dead load

1.35

Operation +

1.50

Operation -

1.50

Wind +

1.50

Wind -

1.50

Earthquake 1

1.00

Earthquake 2

1.00

2.2.2.

Load case description

Medium term, Selective - either (+) or (-)

Climatic load, Selective - either (+) or (-)


Accidental load, Instantaneous,
Selective - only one load case applies per each
accidental combination

Combinating rules

Basic rules for generation of ultimate load combinations:


1 : 1.35*LC1 / 1.35*LC2
2 : 1.35*LC1 / 1.35*LC2 / 1.50*LC3 / 1.50*LC4
3 : 1.35*LC1 / 1.35*LC2 / 1.50*LC5 / 1.50*LC6
4 : 1.35*LC1 / 1.35*LC2 / 1.35*LC3 / 1.35*LC4 / 1.35*LC5 / 1.35*LC6
Basic rules for generation of serviceability load combinations:
1 : 1.00*LC1 / 1.00*LC2 / 1.00*LC3 / 1.00*LC4 / 1.00*LC5 / 1.00*LC6 / 1.00*LC7
/ 1.00*LC8

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

20 / 23

SORFERT Natural gas pipeline Algeria


03194

Project:
Tebodin Germany Project No.:

SO-UD-E700.00113 - Attachment 2

Document No.:

Steel structures

Discipline

End of gas pipeline - steel supports

Description:

2.2.3.

List of ultimate combinations

List of extreme ultimate load combinations


1/ 1 : +1.35*LC1+1.35*LC2
2/ 2 : +1.35*LC1+1.35*LC2+1.50*LC3
3/ 2 : +1.35*LC1+1.35*LC2+1.50*LC4
4/ 3 : +1.35*LC1+1.35*LC2+1.50*LC5
List of extreme serviceability load combinations
1/ 1 : +1.00*LC1+1.00*LC2
2/ 1 : +1.00*LC1+1.00*LC2+1.00*LC3
3/ 1 : +1.00*LC1+1.00*LC2+1.00*LC4
4/ 1 : +1.00*LC1+1.00*LC2+1.00*LC5+1.00*LC7
5/ 1 : +1.00*LC1+1.00*LC2+1.00*LC3+1.00*LC6+1.00*LC8

2.3. Column - structural analysis


2.3.1.

Envelope of maximal internal forces

Column - common combinations


Group of member(s) :1
Group of ultimate combi :1/4
memb

cr.nr

1
1
1

combi
1
1
1

4
2
3

dx
[m]
0.000
0.000
0.000

N
[kN]
-11.78
-10.72
-10.72

Vy
[kN]
0.00
2.70
-2.70

Vz
Mx
[kN]
[kNm]
0.00
0.00
3.06
0.00
-3.06
0.00

My
Mz
[kNm]
[kNm]
0.00
0.00
-10.19
-8.99
10.19
8.99

Columns - accidental combinations


Group of member(s) :1
Group of ultimate accidental combi :1/5
memb

cr.nr

1
1
1

combi
1
1
1

4
2
3

dx
[m]
0.000
0.000
0.000

N
[kN]
-8.74
-8.02
-8.02

Vy
[kN]
0.00
1.80
-1.80

Vz
Mx
My
Mz
[kN]
[kNm] [kNm] [kNm]
0.00
0.00
0.00
0.00
2.04
-6.79
-5.99
0.00
-2.04
6.79
5.99
0.00

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

21 / 23

SORFERT Natural gas pipeline Algeria


03194

Project:
Tebodin Germany Project No.:

SO-UD-E700.00113 - Attachment 2

Document No.:

Steel structures

Discipline

End of gas pipeline - steel supports

Description:

2.3.2.

Designed profile check

Fin10 - Ocel EC3 [CS000101U_004 -- E3]


Input values
Material: EN 10025 : Fe 360
Cross-section: HE 160 B
Internal forces:
Loading case
Load case 1 - comm
Load case 2 - comm
Load case 3 - comm

N [kN]
-11.780
-10.720
-10.720

Q3 [kN]
0.000
3.060
-3.060

Buckling resistance:
Computation including buckling
Section length for buckling Lz
Coefficient of buckling length
Section length for buckling Ly
Coefficient of buckling length
Section length for buckling Lw
Coefficient of buckling length

resistance.
= 6.700 m
kz = 1.000
= 6.700 m
ky = 1.000
= 6.700 m
kw = 1.000

M2 [kNm]
0.000
-10.190
10.190

Q2 [kN]
0.000
2.700
-2.700

M3 [kNm]
0.000
-8.990
8.990

Buckling length Lcrz = 6.700 m


Buckling length Lcry = 6.700 m

Lateral-torsional buckling:
Computation including lateral-torsional buckling.
lz1 = 6.800 m
Mom. area My: Shape No.4
zP = 1.000
Mom. area Mz: Shape No.4
yP = 0.500

Verification results
Crucial load case: Load case 3 - common combi
Cross-section class: 1
Verification of the shear due to the shear force Qz:
3.060 kN < 208.117 kN Is satisfied
Verification of the shear due to the shear force Qy:
2.700 kN < 432.516 kN Is satisfied
Internal forces: N = -10.720 kN; My = 10.190 kNm; Mz = -8.990 kNm
Verification of the most unfavorable combination of buckling and bending:
Resistances: N_R = -269.305 kN; My_R = 70.918 kNm; Mz_R = -32.547 kNm
| 0.040 + 0.144 + 0.276 | < 1
Is satisfied
Verification of the most unfavorable combination of buckling and bending with lateral
buckling:
Resistances: N_R = -269.305 kN; My_R = 53.456 kNm; Mz_R = -32.547 kNm
| 0.040 + 0.191 + 0.276 | < 1
Is satisfied
Verification of the member slenderness:
member slenderness: 165.586
reliable limit of slenderness: 180.000
Slenderness is reliable
The cross-section is satisfied
Cross-section utilization: 50.7 %

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

22 / 23

SORFERT Natural gas pipeline Algeria


03194

Project:
Tebodin Germany Project No.:

SO-UD-E700.00113 - Attachment 2

Document No.:

Steel structures

Discipline

End of gas pipeline - steel supports

Description:

2.4. Anchors - structural analysis


Anchors - common max combinations
Group of node(s) :1/2
Group of ultimate common combi :1/4
support
1
1
1

node

combi

1
1
1

3
2
4

Rx
[kN]
2.70
-2.70
0.00

Ry
[kN]
3.06
-3.06
0.00

Rz
[kN]
10.72
10.72
11.78

Mx
My
Mz
[kNm]
[kNm] [kNm]
-10.19
8.99
0.00
10.19
-8.99
0.00
0.00
0.00
0.00

Anchors - accidental max combinations


Group of node(s) :1/2
Group of ultimate accidental combi :1/5
support
1
1
1
1

node

combi

1
1
1
1

3
2
4
5

Rx
[kN]
1.80
-1.80
0.00
-1.80

Ry
[kN]
2.04
-2.04
0.00
-2.04

Rz
Mx
My
Mz
[kN]
[kNm] [kNm] [kNm]
-6.79
5.99
8.02
0.00
6.79
-5.99
8.02
0.00
8.74
0.00
0.00
0.00
8.00
6.79
-5.99
0.00

Maximal load per foot of column:


Rx = -2.7 kN Ry = -3.1 kN Rz* = Rz x 60% = 7.1 kN
Mx = 10.2 kN My = -9.0 kN Mz = 0.0 kN
Note:
Vertical load was additionally decreased by cca 40% increased safety reserve on design of anchors.

Proposed anchors - anticorrosive:

4x HILTI HST-R M20


..... maximal utilization 71% .... OKAY

2.5. Reactions - resultant forces on foundations


For resultant reactions on foundations see article above. They are the same.

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

23 / 23

Project:
Tebodin Germany Project No.:

SORFERT Natural gas pipeline Algeria


03194
SO-UD-E700.00113 - Attachment 3

Document No.:

Concrete structures

Discipline

Start / end of gas pipeline - foundations

Description:

Attachment 3

Start / end of gas pipeline - foundations

Calculated

Analysis checked

Ing. Vt Abrahm

Ing. Milo Hejtmnek

12.3.2009

12.3.2009

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

1 / 17

Project:
Tebodin Germany Project No.:

SORFERT Natural gas pipeline Algeria


03194

Document No.:
Discipline
Description:

SO-UD-E700.00113 - Attachment 3
Concrete structures
Start / end of gas pipeline - foundations

Index of Attachment 3:

1.

Foundation of start S1, end E1 (CS 000101U-001, -003) ................................................................................. 3

2.

Foundation of start S2, end E2......................................................................................................................... 8

3.

Foundation of start S3, end E3 (CS 000101U-002, -004) ................................................................................13

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

2 / 17

SORFERT Natural gas pipeline Algeria


03194

Project:
Tebodin Germany Project No.:

SO-UD-E700.00113 - Attachment 3

Document No.:

Concrete structures

Discipline

Start / end of gas pipeline - foundations

Description:

1. Foundation of start S1, end E1 (CS 000101U-001, -003)


Spread footing verification
Input data
Project
Task
: SORFERT Natural gas pipeline Algeria
Descript. : Start and end of gas pipeline - foundations S1, E1
Date
: 12.3.2009
Soil parameters
Silt, clayed with fine sand
Unit weight :
Angle of intern. friction :
Cohesion of soil :
Poisson's ratio :
Deformation modulus :
Poisson's ratio :
Coeff. of structural strength :
Saturated unit weight :

u
cu

Edef

m
sat

=
=
=
=
=
=
=
=

18.50
0.00
80.00
0.35
6.50
0.35
0.30
20.00

kN/m3

kPa
MPa

kN/m3

Foundation
Foundation type: concentric spread footing
Depth from ground surface hz = 1.10 m
Depth of footing bottom
d = 1.10 m
Foundation thickness
t = 1.40 m
Incl. of finished grade
s1 = 0.00
Incl. of footing bottom
s2 = 0.00
Unit weight of soil above foundation = 17.50 kN/m3
Geometry of structure
Foundation type: concentric spread footing
Spread footing length
x = 1.60
Spread footing width
y = 1.10
Column width in the direction of x cx = 0.10
Column width in the direction of y cy = 0.10
Spread footing volume
= 2.46

m
m
m
m
m3

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

3 / 17

SORFERT Natural gas pipeline Algeria


03194

Project:
Tebodin Germany Project No.:

SO-UD-E700.00113 - Attachment 3

Document No.:

Concrete structures

Discipline

Start / end of gas pipeline - foundations

Description:

Geological profile and assigned soils


Layer
No.
Assigned soil
[m]
1

Pattern

Silt, clayed with fine sand

Load
No.

Load
new change

1
2

YES
YES

YES

YES

Name
Loading - 1
Loading - 2
Loading - 1 unfactored
Loading - 2 unfactored

Type

N
[kN]

Mx
[kNm]

My
[kNm]

Hx
[kN]

Hy
[kN]

Design
Design

75.80
74.60

4.50
3.80

20.10
20.80

-12.00
-11.00

2.50
2.40

Service

63.17

3.75

16.75

-10.00

2.08

Service

62.17

3.17

17.33

-9.17

2.00

Analysis settings
Type of analysis - Analysis for undrained conditions
Analysis of vertical bearing capacity - Standardn postup
Analysis of settlement - Analysis using oedometric modulus.
Bounding of influence zone - based on structural strength
Analysis of bearing capacity - partial results
Cd = 40.000 kPa
Nc = 5.142
Sc = 1.188
Dc = 1.106
Ic = 0.824
Bc = 1.000
Analysis carried out with automatic selection of the most unfavourable load cases.
Computed weight of spread footing G = 56.67 kN
Computed weight of overburden
Z = 0.00 kN

Vertical bearing capacity check


Type of contact stress : rectangle
Parameters of slip surface below foundation:
Depth of slip surface zsp = 0.78 m
Length of slip surface lsp = 1.65 m
Design bearing capacity of found.soil Rd = 222.49 kPa
Extreme contact pressure
= 129.72 kPa
Bearing capacity in the vertical direction is SATISFACTORY

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

4 / 17

Project:
Tebodin Germany Project No.:

SORFERT Natural gas pipeline Algeria


03194
SO-UD-E700.00113 - Attachment 3

Document No.:

Concrete structures

Discipline

Start / end of gas pipeline - foundations

Description:

Horizontal bearing capacity check


Earth resistance: at rest
Design magnitude of earth resistance
Spd = 5.10 kN
Friction angle foundation-footing bottom = 0.00
Cohesion foundation-footing bottom
a
= 80.00 kPa
Horizontal bearing capacity Rdh = 45.95 kN
Extreme horizontal force
H = 12.26 kN
Horizontal bearing capacity is SATISFACTORY
Foundation bearing capacity is SATISFACTORY
Stage : 1; Analysis : 1

Delta = 5.29

Name : 1.MS

+x

1.04

+y

0.98

1.60

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

5 / 17

1.10

Project:
Tebodin Germany Project No.:

SORFERT Natural gas pipeline Algeria


03194
SO-UD-E700.00113 - Attachment 3

Document No.:

Concrete structures

Discipline
Description:

Start / end of gas pipeline - foundations

Settlement and rotation of foundation - input data


Analysis carried out with automatic selection of the most unfavourable load cases.
Analysis carried out with accounting for coefficient 1 (influence of foundation depth).
Stress at the footing bottom considered from the original grade.
Computed weight of spread footing G = 56.67 kN
Computed weight of overburden
Z = 0.00 kN
Settlement of mid point of edge x - 1
= 1.3 mm
Settlement of mid point of edge x - 2
= 0.6 mm
Settlement of mid point of edge y - 1
= 2.4 mm
Settlement of mid point of edge y - 2
= 0.0 mm
Settlement of foundation centre point = 2.5 mm
Settlement of characteristic point
= 1.2 mm
(1-max.compressed edge; 2-min.compressed edge)
Settlement and rotation of foundation - results
Foundation stiffness:
Computed weighted average modulus of deformation Edef = 6.50 MPa
Foundation in the longitudinal direction is rigid (k=3091.95)
Foundation in the direction of width is rigid (k=9515.11)
Overall settlement and rotation of foundation:
Foundation settlement
= 1.2 mm
Depth of influence zone = 0.94 m
Rotation in direction of x = 1.475 (tan*1000)
Rotation in direction of y = 0.683 (tan*1000)

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

6 / 17

Project:
Tebodin Germany Project No.:

SORFERT Natural gas pipeline Algeria


03194
SO-UD-E700.00113 - Attachment 3

Document No.:

Concrete structures

Discipline

Start / end of gas pipeline - foundations

Description:

Name : 2.MS

Stage : 1; Analysis : 1

PT UT

1.40
1.10 1.10

0.94
Sigma,z
Sigma,or
mSigma,or

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

7 / 17

SORFERT Natural gas pipeline Algeria


03194

Project:
Tebodin Germany Project No.:

SO-UD-E700.00113 - Attachment 3

Document No.:

Concrete structures

Discipline

Start / end of gas pipeline - foundations

Description:

2. Foundation of start S2, end E2


Spread footing verification
Input data
Project
Task
: SORFERT Natural gas pipeline Algeria
Descript. : Start and end of gas pipeline - foundations S2, E2
Date
: 12.3.2009
Soil parameters
Silt, clayed with fine sand
Unit weight :
Angle of intern. friction :
Cohesion of soil :
Poisson's ratio :
Deformation modulus :
Poisson's ratio :
Coeff. of structural strength :
Saturated unit weight :

u
cu

Edef

m
sat

=
=
=
=
=
=
=
=

18.50
0.00
80.00
0.35
6.50
0.35
0.30
20.00

kN/m3

kPa
MPa

kN/m3

Foundation
Foundation type: concentric spread footing
Depth from ground surface hz = 1.10 m
Depth of footing bottom
d = 1.10 m
Foundation thickness
t = 1.40 m
Incl. of finished grade
s1 = 0.00
Incl. of footing bottom
s2 = 0.00
Unit weight of soil above foundation = 17.50 kN/m3
Geometry of structure
Foundation type: concentric spread footing
Spread footing length
x = 1.00
Spread footing width
y = 0.70
Column width in the direction of x cx = 0.10
Column width in the direction of y cy = 0.10
Spread footing volume
= 0.98

m
m
m
m
m3

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

8 / 17

SORFERT Natural gas pipeline Algeria


03194

Project:
Tebodin Germany Project No.:

SO-UD-E700.00113 - Attachment 3

Document No.:

Concrete structures

Discipline

Start / end of gas pipeline - foundations

Description:

Geological profile and assigned soils


Layer
No.
Assigned soil
[m]
1

Pattern

Silt, clayed with fine sand

Load
No.

Load
new change

YES

YES

Name
Loading - 1
Loading - 1 unfactored

Type

N
[kN]

Mx
[kNm]

My
[kNm]

Hx
[kN]

Hy
[kN]

Design

50.00

0.00

0.00

0.00

0.00

Service

41.67

0.00

0.00

0.00

0.00

Analysis settings
Type of analysis - Analysis for undrained conditions
Analysis of vertical bearing capacity - Standardn postup
Analysis of settlement - Analysis using oedometric modulus.
Bounding of influence zone - based on structural strength
Analysis of bearing capacity - partial results
Cd = 40.000 kPa
Nc = 5.142
Sc = 1.140
Dc = 1.125
Ic = 1.000
Bc = 1.000
Analysis carried out with automatic selection of the most unfavourable load cases.
Computed weight of spread footing G = 22.54 kN
Computed weight of overburden
Z = 0.00 kN
Vertical bearing capacity check
Type of contact stress : rectangle
Parameters of slip surface below foundation:
Depth of slip surface zsp = 0.50 m
Length of slip surface lsp = 1.05 m
Design bearing capacity of found.soil Rd = 263.85 kPa
Extreme contact pressure
= 103.63 kPa
Bearing capacity in the vertical direction is SATISFACTORY

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

9 / 17

SORFERT Natural gas pipeline Algeria


03194

Project:
Tebodin Germany Project No.:

SO-UD-E700.00113 - Attachment 3

Document No.:

Concrete structures

Discipline

Start / end of gas pipeline - foundations

Description:

Horizontal bearing capacity check


Earth resistance: at rest
Design magnitude of earth resistance
Spd = 3.25 kN
Friction angle foundation-footing bottom = 0.00
Cohesion foundation-footing bottom
a
= 80.00 kPa
Horizontal bearing capacity Rdh = 31.25 kN
Extreme horizontal force
H = 0.00 kN
Horizontal bearing capacity is SATISFACTORY
Foundation bearing capacity is SATISFACTORY
Stage : 1; Analysis : 1

Delta = 0.00

Name : 1.MS

1.00

0.70 0.70
+x

+y

1.00

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

10 / 17

Project:
Tebodin Germany Project No.:

SORFERT Natural gas pipeline Algeria


03194
SO-UD-E700.00113 - Attachment 3

Document No.:

Concrete structures

Discipline
Description:

Start / end of gas pipeline - foundations

Settlement and rotation of foundation - input data


Analysis carried out with automatic selection of the most unfavourable load cases.
Analysis carried out with accounting for coefficient 1 (influence of foundation depth).
Stress at the footing bottom considered from the original grade.
Computed weight of spread footing G = 22.54 kN
Computed weight of overburden
Z = 0.00 kN
Settlement of mid point of edge x - 1
= 1.3 mm
Settlement of mid point of edge x - 2
= 1.3 mm
Settlement of mid point of edge y - 1
= 1.1 mm
Settlement of mid point of edge y - 2
= 1.1 mm
Settlement of foundation centre point = 2.5 mm
Settlement of characteristic point
= 1.5 mm
(1-max.compressed edge; 2-min.compressed edge)
Settlement and rotation of foundation - results
Foundation stiffness:
Computed weighted average modulus of deformation Edef = 6.50 MPa
Foundation in the longitudinal direction is rigid (k=12664.62)
Foundation in the direction of width is rigid (k=36923.08)
Overall settlement and rotation of foundation:
Foundation settlement
= 1.5 mm
Depth of influence zone = 0.85 m
Rotation in direction of x = 0.000 (tan*1000)
Rotation in direction of y = 0.000 (tan*1000)

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

11 / 17

Project:
Tebodin Germany Project No.:

SORFERT Natural gas pipeline Algeria


03194
SO-UD-E700.00113 - Attachment 3

Document No.:

Concrete structures

Discipline

Start / end of gas pipeline - foundations

Description:

Name : 2.MS

Stage : 1; Analysis : 1

PT UT

1.40
1.10 1.10

0.85
Sigma,z
Sigma,or
mSigma,or

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

12 / 17

SORFERT Natural gas pipeline Algeria


03194

Project:
Tebodin Germany Project No.:

SO-UD-E700.00113 - Attachment 3

Document No.:

Concrete structures

Discipline

Start / end of gas pipeline - foundations

Description:

3. Foundation of start S3, end E3 (CS 000101U-002, -004)


Spread footing verification
Input data
Project
Task
: SORFERT Natural gas pipeline Algeria
Descript. : Start and end of gas pipeline - foundations S3, E3
Date
: 12.3.2009
Soil parameters
Silt, clayed with fine sand
Unit weight :
Angle of intern. friction :
Cohesion of soil :
Poisson's ratio :
Deformation modulus :
Poisson's ratio :
Coeff. of structural strength :
Saturated unit weight :

u
cu

Edef

m
sat

=
=
=
=
=
=
=
=

18.50
0.00
80.00
0.35
6.50
0.35
0.30
20.00

kN/m3

kPa
MPa

kN/m3

Foundation
Foundation type: concentric spread footing
Depth from ground surface hz = 1.10 m
Depth of footing bottom
d = 1.10 m
Foundation thickness
t = 1.40 m
Incl. of finished grade
s1 = 0.00
Incl. of footing bottom
s2 = 0.00
Unit weight of soil above foundation = 17.50 kN/m3
Geometry of structure
Foundation type: concentric spread footing
Spread footing length
x = 1.00
Spread footing width
y = 1.60
Column width in the direction of x cx = 0.10
Column width in the direction of y cy = 0.10
Spread footing volume
= 2.24

m
m
m
m
m3

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

13 / 17

SORFERT Natural gas pipeline Algeria


03194

Project:
Tebodin Germany Project No.:

SO-UD-E700.00113 - Attachment 3

Document No.:

Concrete structures

Discipline

Start / end of gas pipeline - foundations

Description:

Geological profile and assigned soils


Layer
No.
Assigned soil
[m]
1

Pattern

Silt, clayed with fine sand

Load
No.

Load
new change

1
2

YES
YES

YES

YES

Name
Loading - 1
Loading - 2
Loading - 1 unfactored
Loading - 2 unfactored

Type

N
[kN]

Mx
[kNm]

My
[kNm]

Hx
[kN]

Hy
[kN]

Design
Design

14.95
10.70

13.70
10.20

5.60
9.00

-1.70
-2.70

4.10
3.10

Service

12.46

11.42

4.67

-1.42

3.42

Service

8.92

8.50

7.50

-2.25

2.58

Analysis settings
Type of analysis - Analysis for undrained conditions
Analysis of vertical bearing capacity - Standardn postup
Analysis of settlement - Analysis using oedometric modulus.
Bounding of influence zone - based on structural strength
Analysis of bearing capacity - partial results
Cd = 40.000 kPa
Nc = 5.142
Sc = 1.104
Dc = 1.137
Ic = 0.872
Bc = 1.000
Analysis carried out with automatic selection of the most unfavourable load cases.
Computed weight of spread footing G = 51.52 kN
Computed weight of overburden
Z = 0.00 kN
Vertical bearing capacity check
Type of contact stress : rectangle
Parameters of slip surface below foundation:
Depth of slip surface zsp = 0.71 m
Length of slip surface lsp = 1.50 m
Design bearing capacity of found.soil Rd = 225.11 kPa
Extreme contact pressure
= 93.24 kPa
Bearing capacity in the vertical direction is SATISFACTORY

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

14 / 17

SORFERT Natural gas pipeline Algeria


03194

Project:
Tebodin Germany Project No.:

SO-UD-E700.00113 - Attachment 3

Document No.:

Concrete structures

Discipline

Start / end of gas pipeline - foundations

Description:

Horizontal bearing capacity check


Earth resistance: at rest
Design magnitude of earth resistance
Spd = 7.42 kN
Friction angle foundation-footing bottom = 0.00
Cohesion foundation-footing bottom
a
= 80.00 kPa
Horizontal bearing capacity Rdh = 34.11 kN
Extreme horizontal force
H = 4.11 kN
Horizontal bearing capacity is SATISFACTORY
Foundation bearing capacity is SATISFACTORY
Stage : 1; Analysis : 1

Delta = 3.78

Name : 1.MS

+x

1.60

+y

1.13

0.59
1.00

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

15 / 17

Project:
Tebodin Germany Project No.:

SORFERT Natural gas pipeline Algeria


03194
SO-UD-E700.00113 - Attachment 3

Document No.:

Concrete structures

Discipline
Description:

Start / end of gas pipeline - foundations

Settlement and rotation of foundation - input data


Analysis carried out with automatic selection of the most unfavourable load cases.
Analysis carried out with accounting for coefficient 1 (influence of foundation depth).
Stress at the footing bottom considered from the original grade.
Computed weight of spread footing G = 51.52 kN
Computed weight of overburden
Z = 0.00 kN
Settlement of mid point of edge x - 1
= 0.8 mm
Settlement of mid point of edge x - 2
= 0.0 mm
Settlement of mid point of edge y - 1
= 0.5 mm
Settlement of mid point of edge y - 2
= 0.0 mm
Settlement of foundation centre point = 0.8 mm
Settlement of characteristic point
= 0.5 mm
(1-max.compressed edge; 2-min.compressed edge)
Settlement and rotation of foundation - results
Foundation stiffness:
Computed weighted average modulus of deformation Edef = 6.50 MPa
Foundation in the longitudinal direction is rigid (k=12664.62)
Foundation in the direction of width is rigid (k=3091.95)
Overall settlement and rotation of foundation:
Foundation settlement
= 0.5 mm
Depth of influence zone = 0.59 m
Rotation in direction of x = 0.763 (tan*1000)
Rotation in direction of y = 0.478 (tan*1000)

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

16 / 17

SORFERT Natural gas pipeline Algeria


03194

Project:
Tebodin Germany Project No.:

SO-UD-E700.00113 - Attachment 3

Document No.:

Concrete structures

Discipline

Start / end of gas pipeline - foundations

Description:

Name : 2.MS

Stage : 1; Analysis : 1

PT UT

1.40
1.10 1.10

0.59
Sigma,z
Sigma,or
mSigma,or

Originated:

Page:

TEBODIN Czech Republic, Prvnho pluku 20, 186 59 Praha 8

17 / 17