Sie sind auf Seite 1von 10

Activity ID

Activity Description

Orig Dur

Early Start

Early Finish

-1 1

Months 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 3

PLTU RIAU 2X110 MW


PROJECT MILESTONE
M02 M20 M09 M07 M12 M11 M08 M13 M22 M21 M24 M14 M23 M16 M18 M19 Overall Sign Hand Over (Effective Date) Completion of Soil Investigation Work Earth Work Complete (only Power Station) 1st Piling #1 Boiler Foundation Completion 1st Steel Structure erection (Boiler) Final Detail Drawing AFC #1 Turbine Foundation Completion (Table top) Transformers and Power Energise Main Power House and CCR Unit - 1 STG Installation for Unit - 1 Completion of Testing DCS #1 Boiler Installation Completion Unit 1 Start Up #1 Unit Taking Over Certificate #2 Unit Taking Over Certificate 0 01APR11 0 0 0 01FEB12 0 0 01JUL12 0 0 0 0 0 0 0 0 02JUL13 0 0 30SEP13 01JAN14 02NOV12 31DEC12 23FEB13 30MAR13 30APR13 30MAY13 27JUN13 30JUN12 15APR11 31JAN12 Overall Sign Hand Over (Effective Date) Completion of Soil Investigation Work Earth Work Complete (only Power Station) 1st Piling #1 Boiler Foundation Completion 1st Steel Structure erection (Boiler) Final Detail Drawing AFC #1 Turbine Foundation Completion (Table top) Transformers and Power Energise Main Power House and CCR Unit - 1 STG Installation for Unit - 1 Completion of Testing DCS #1 Boiler Installation Completion Unit 1 Start Up #1 Unit Taking Over Certificate #2 Unit Taking Over Certificate

CONSTRUCTION
GENERAL
PREPARATORY SITE PREPARATION CN0015 CN0025 CN0000 CN0090 CN0080 CN0085 CN0030 CN0200 CN1400 CN0100 CN0035 CN0040 CN0045 CN0050 CN0055 CN0060 CN0065 Temporary Acces Road Temporary Drainage Soil Investigation Other Facility (Fence,gate,Sewer,Parking, etc) Temporary Office Storage / Lay down Facility / Jetty Piling Test Flood Discharge Trench & Drainage Blind Ditch Temporary Access Road Slope Protection Clearing & Grubbing Geotextile Install Soil Filling (for equipment platform) Vertical Drain Horizontal Drain Surcharge Fill Pre Loading Time 0 30 01APR11 0 120 30APR11 98 22MAY11 90 30MAY11 62 01DEC11 112 01APR11 60 01APR11 140 31MAY11 60 01APR11 30 29APR11 91 29MAY11 91 26JUN11 91 24JUL11 140 21AUG11 210 18SEP11 31MAR11 30APR11 15APR11 27AUG11 27AUG11 27AUG11 31JAN12 21JUL11 30MAY11 17OCT11 30MAY11 28MAY11 27AUG11 24SEP11 22OCT11 07JAN12 14APR12 Temporary Acces Road Temporary Drainage Soil Investigation Other Facility (Fence,gate,Sewer,Parking, etc) Temporary Office Storage / Lay down Facility / Jetty Piling Test Flood Discharge Trench & Drainage Blind Ditch Temporary Access Road Slope Protection Clearing & Grubbing Geotextile Install Soil Filling (for equipment platform) Vertical Drain Horizontal Drain Surcharge Fill Pre Loading Time

SITE DEVELOPMENT

SOIL IMPROVEMENT

Sheet 1 of 10

Activity ID CN0070 CN3306 CN3307 CN3308 CN3309 CN3310 Remove Surcharge Piling Work ADMINISTRATION BUILDING

Activity Description

Orig Dur

Early Start

Early Finish 14MAY12 14JUL12 11DEC12 19FEB13 20APR13 19JUN13

-1 1

120 16JAN12 30 15JUN12 60 13OCT12 70 12DEC12 60 20FEB13 60 21APR13

Months 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 3 Remove Surcharge Piling Work Foundation & Concrete Works Main Structure Architectural Work Road Work (Parking Area)

Foundation & Concrete Works Main Structure Architectural Work Road Work (Parking Area)

MISCELLANEOUS BUILDINGS STRUCTURALS GATE HOUSE MAIN ENTRANCE CN1539 CN1541 CN1542 CN1526 CN1527 CN1528 CN1529 CN1531 CN1532 CN1533 CN1543 CN1544 CN1546 CN2626 CN2627 CN2628 CN2629 CN1548 CN1549 CN1553 MOSQUE CN1501 CN1502 CN1503 CN1504 CN1550 CN1551 Piling Work Foundation Works Main Structure Architectural Work Piling Work Foundation Works 30 15JUN12 50 06JAN13 60 25FEB13 40 26APR13 40 15JUN12 50 07NOV12 14JUL12 24FEB13 25APR13 04JUN13 24JUL12 26DEC12 Piling Work Foundation Works Piling Work Foundation Works Main Structure Architectural Work Foundation & Concrete Works Main Structure Architectural Work Piling Work Foundation Works Main Structure Architectural Work Piling Work Foundation Works Main Structure Piling Work Foundation Works Main Structure Piling Work Foundation & Concrete Works Steel Structure Architectural Work Foundation Works Main Structure Architectural Work 60 12DEC12 60 10FEB13 60 11APR13 25 15JUN12 30 12DEC12 35 11JAN13 30 15FEB13 20 15JUN12 40 11JAN13 40 20FEB13 30 15JUN12 40 28SEP12 50 07NOV12 30 15JUN12 60 07NOV12 55 06JAN13 50 02MAR13 30 06JAN13 60 05FEB13 30 06APR13 09FEB13 10APR13 09JUN13 09JUL12 10JAN13 14FEB13 16MAR13 04JUL12 19FEB13 31MAR13 14JUL12 06NOV12 26DEC12 14JUL12 05JAN13 01MAR13 20APR13 04FEB13 05APR13 05MAY13 Piling Work Foundation & Concrete Works Steel Structure Architectural Work Foundation Works Main Structure Architectural Work Piling Work Foundation Works Main Structure Piling Work Foundation Works Main Structure Piling Work Foundation Works Main Structure Architectural Work Foundation & Concrete Works Main Structure Architectural Work

FIRE STATION BUILDING

INDUSTRIAL SERVICE & FIRE FIGHTING WATER SHELTER

AUXILIARY BOILER STRUCTURES

AIR COMPRESSOR BUILDING

ELEVATED SECURITY HOUSE

AUXILIARY ISLAND ELECTRICAL BUILDING

Sheet 2 of 10

Activity ID CN1552 CN1511 CN1512 CN1513 CN1514 CN1516 CN1517 CN1518 Main Structure Piling Work MATERIAL STORAGE BUILDING

Activity Description

Orig Dur

Early Start

Early Finish 25JAN13 24JUL12 24FEB13 15APR13 14JUN13 24JUL12 25MAY13 13AUG13

-1 1

30 27DEC12 40 15JUN12 60 27DEC12 50 25FEB13 60 16APR13 40 15JUN12 90 25FEB13 80 26MAY13

Months 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 3 Main Structure Piling Work Foundation & Concrete Works Steel Structure Architectural Work Piling Work Foundation Works Main Structure

Foundation & Concrete Works Steel Structure Architectural Work Piling Work Foundation Works Main Structure

WORKSHOP & WAREHOUSE AND SHELTER BAYS

OTHERS FACILITIES ROAD WORK & PARKING AREA CN1506 CN1507 CN1508 CN1554 CN1555 CN1557 CN1567 CN1558 CN1559 CN1560 CN1561 CN1562 CN1563 CN1564 CN1565 CN1566 CN1556 Earth Work Concrete Work (Main Road Only) Concrete Work (Finishing) Earth Work Concrete Work (Finishing) Perimeter Wall Iron Fencing Piling Work Foundation Works Main Structure Piling Work Foundation & Concrete Works Steel Structure Foundation & Concrete Works Steel Structure Architectural Work Landscaping 50 25FEB13 50 16APR13 50 05JUN13 75 27MAR13 75 10JUN13 30 24APR13 30 24MAY13 20 25FEB13 60 17MAR13 40 16MAY13 30 25FEB13 60 01APR13 40 31MAY13 25 31MAY13 30 25JUN13 20 25JUL13 45 24AUG13 15APR13 04JUN13 24JUL13 09JUN13 23AUG13 23MAY13 22JUN13 16MAR13 15MAY13 24JUN13 26MAR13 30MAY13 09JUL13 24JUN13 24JUL13 13AUG13 07OCT13 Foundation & Concrete Works Steel Structure Architectural Work Landscaping Earth Work Concrete Work (Main Road Only) Concrete Work (Finishing) Earth Work Concrete Work (Finishing) Perimeter Wall Iron Fencing Piling Work Foundation Works Main Structure Piling Work Foundation & Concrete Works Steel Structure

PAVING WORK & SITE DRAINAGE

SECURITY AND PERIMETERS FENCING

PIPE WORK SUPPORT STRUCTURE

OIL SEPARATOR

FIRE SAFE MEANS OF ESCAPE

LANDSCAPING

POWER STATION AREA


STEAM TURBINE BUILDING & AUXILARIES STEAM TURBINE BUILDING PILING WORK CN2100 CN2105 CN2106 Piling Work Turbin Hall Foundation T/G #1 Foundation 65 01FEB12 117 06APR12 102 21APR12 05APR12 31JUL12 31JUL12 Piling Work Turbin Hall Foundation T/G #1 Foundation FOUNDATION

Sheet 3 of 10

Activity ID CN2110 CN2107 CN2115 CN2121 CN2116 CN2122 CN2125 CN2305 CN2130 CN2200 T/G #2 Foundation SS For Turbine Hall T/G #1 Pedestal

Activity Description Equipment Foundation

Orig Dur

Early Start

Early Finish 01NOV12 28SEP12 31DEC12 31DEC12 31DEC12 28FEB13 28FEB13 30MAR13 30APR13 31DEC12

-1 1

170 16MAY12 90 01JUL12 184 01JUL12 184 01JUL12 153 01AUG12 153 29SEP12 123 29OCT12 120 01DEC12 120 01JAN13 154 31JUL12

Months 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 3 Equipment Foundation T/G #2 Foundation SS For Turbine Hall T/G #1 Pedestal Steel Deck Floor & Floor for CCB T/G #2 Pedestal Roofing Structure Architectural Work for CCB Architecture Work for Roofing Siding Upper Structure

STRUCTURES

Steel Deck Floor & Floor for CCB T/G #2 Pedestal Roofing Structure Architectural Work for CCB Architecture Work for Roofing Siding Upper Structure

ARCHITECTURE WORK

DEAERATOR BAY & BUNKER BAY BOILER HOUSE & AUXILARIES BOILER HOUSE BOILER HOUSE UNIT #1 CN2400 CN2405 CN2410 CN2415 CN2500 CN2505 CN2510 CN2515 AUXILARIES CN2530 CN2520 CN2535 CN2525 CN2615 CN2620 CHIMNEY PILING WORK CN2601 CN2602 CN2603 CN2606 CN2607 CN2608 Piling Work Steel Flueliners Pedestal U/G RC Wind Shield (Slip Forming System) Platform SS 30 01APR12 30 01MAY12 30 31MAY12 30 31MAY12 182 30JUN12 45 29DEC12 30APR12 30MAY12 29JUN12 29JUN12 28DEC12 11FEB13 Piling Work Steel Flueliners Pedestal U/G RC Wind Shield (Slip Forming System) Platform SS FOUNDATION Bottom Ash Silo Primary Air Fan & Secondary Air Fan #1 Sand Bunker Unit Drainage Pit Induced Draft Fan Flue Duct 120 13MAY12 90 10SEP12 120 10OCT12 60 09DEC12 120 29DEC12 120 12JAN13 09SEP12 08DEC12 06FEB13 06FEB13 27APR13 11MAY13 Bottom Ash Silo Primary Air Fan & Secondary Air Fan #1 Sand Bunker Unit Drainage Pit Induced Draft Fan Flue Duct Piling Work Foundation works Upper Structure Architecture Work Piling Work Foundation works Upper Structure Architecture Work 60 01FEB12 91 01APR12 89 01JUL12 90 28SEP12 60 06APR12 90 05JUL12 117 01SEP12 90 27DEC12 31MAR12 30JUN12 27SEP12 26DEC12 04JUN12 02OCT12 26DEC12 26MAR13 Piling Work Foundation works Upper Structure Architecture Work Piling Work Foundation works Upper Structure Architecture Work

BOILER HOUSE UNIT #2

UPPER STRUCTURES STEEL STRUCTURES ERECTION

Sheet 4 of 10

Activity ID STEEL FLUE LINER CN2609 CN2611 CN2612 CN2613 CN2616 CN2614 CN2610 CN2617 CN2619 Fabrication Fit-Up Installation Lifting Painting Lighting & Lightening Piling Work

Activity Description

Orig Dur

Early Start

Early Finish 18MAR13 30APR13 30APR13 30APR13 13MAR13 30APR13 30APR12 01DEC12 30APR13

-1 1

Months 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 3 Fabrication Fit-Up Installation Lifting Painting Lighting & Lightening Piling Work Foundation & Concrete Works Architectural Work

80 29DEC12 78 12FEB13 63 27FEB13 63 27FEB13 30 12FEB13 30 01APR13 30 01APR12 60 03OCT12 150 02DEC12

ARCHITECTURE WORKS

ELECTROSTATIC PRECIPITATOR (ESP) Foundation & Concrete Works Architectural Work

UTILITY & OFFSITES AREA


COAL HANDLING FACILITIES COAL YARD CN1201 CN1240 CN1235 CN1216 CN1217 CN1218 CN1245 CN1246 CN1247 CN1248 COAL SHED CN1205 CN1206 CN1207 CN1208 CN1210 CN1211 CN1212 CN1213 CN1230 CN1231 CN1232 CN1233 Foundation & Concrete Work Steel Structure Equipment Foundation Architectural Work (Roofing) Piling Work Foundation & Concrete Work Main Structure Architectural Work Piling Work Foundation Works Steel Structure Architectural Work 60 10JUL12 60 08SEP12 30 07NOV12 30 27MAR13 30 01MAY12 60 14AUG12 60 13OCT12 30 12DEC12 30 01MAY12 50 13OCT12 30 02DEC12 40 01JAN13 07SEP12 06NOV12 06DEC12 25APR13 30MAY12 12OCT12 11DEC12 10JAN13 30MAY12 01DEC12 31DEC12 09FEB13 Piling Work Foundation Works Steel Structure Architectural Work Piling Work Foundation & Concrete Work Main Structure Architectural Work Foundation & Concrete Work Steel Structure Equipment Foundation Architectural Work (Roofing) Lining Work Drainage for Coal Yard Coal Slime Pond Piling Work Foundation Works Steel Structure Piling Work Foundation & Concrete Works Steel Structure Architectural Work 100 17MAY12 120 17JUL12 90 14NOV12 30 01MAY12 75 31MAY12 100 14AUG12 30 01MAY12 60 14AUG12 30 13OCT12 30 12NOV12 24AUG12 13NOV12 11FEB13 30MAY12 13AUG12 21NOV12 30MAY12 12OCT12 11NOV12 11DEC12 Piling Work Foundation & Concrete Works Steel Structure Architectural Work Piling Work Foundation Works Steel Structure Lining Work Drainage for Coal Yard Coal Slime Pond

COAL HANDLING TRESTLE

FLY ASH SILE & SWITCH GEAR ROOM

COAL JUNCTION HOUSE

BULLDOZER GARAGE ROOM

Sheet 5 of 10

Activity ID CN1225 CN1226 CN1227 CN1228 CN1229 CN1220 CN1221 CN1222 CN1223 ASH YARD CN1305 CN1306 CN1300 CN1301 CN1302 CN1303 CN1304 CN1101 CN1100 CN1102 CN1103 CN3100 CN3105 CN3110 CN3120 CN3115 CN3125 Earth Work Lining Work Piling Work Piling Work Foundation Works Main Structure

Activity Description

Orig Dur

Early Start

Early Finish 30MAY12 31DEC12 30JAN13 19FEB13 11MAR13 31DEC12 30JAN13 19FEB13 21MAR13

-1 1

Months 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 3 Piling Work Foundation Works Main Structure Equipment Foundation Architectural Work Foundation Works Main Structure Equipment Foundation Architectural Work

COAL HANDLING ELECTRICAL ROOM 30 01MAY12 30 02DEC12 30 01JAN13 20 31JAN13 20 20FEB13 30 02DEC12 30 01JAN13 20 31JAN13 30 20FEB13

Equipment Foundation Architectural Work Foundation Works Main Structure Equipment Foundation Architectural Work

SAMPLING HOUSE

ASH HANDLING FACILITIES 180 15MAY12 90 11NOV12 30 01MAY12 70 31MAY12 20 09AUG12 30 29AUG12 20 28SEP12 30 01MAY12 60 31MAY12 80 30JUL12 75 18OCT12 290 13APR12 120 21APR12 180 05MAY12 150 19AUG12 100 08NOV12 120 27JAN13 10NOV12 08FEB13 30MAY12 08AUG12 28AUG12 27SEP12 17OCT12 30MAY12 29JUL12 17OCT12 31DEC12 27JAN13 18AUG12 31OCT12 15JAN13 15FEB13 26MAY13 Piling Work Causeway Foundation & Concrete Work Jetty Facility River Water Pump House River Water Settling Pond Circulating Water Discharge Line / Culver Intake Pipe Siphon Well Cooling Tower Piling Work Foundation & Concrete Works Steel Structure Architectural Work Road Work (Gravel) Earth Work Lining Work

LIMESTONE MAIN SILO Foundation & Concrete Works Steel Structure Architectural Work Road Work (Gravel) Piling Work Causeway Foundation & Concrete Work Jetty Facility River Water Pump House River Water Settling Pond Circulating Water Discharge Line / Culver Intake Pipe Siphon Well Cooling Tower

COAL UNLOADING JETTY / WHARF & ASSOCIATED

COOLING WATERWAY FACILITIES

BOP FACILITIES WATER TREATMENT PLANT CN3200 CN3201 CN3202 CN3203 CN3204 CN3205 Piling Work Main Strucure Foundation Main Structure Equipment Foundation Architecural Work Piling Work 30 01MAY12 60 31MAY12 30 30JUL12 45 29AUG12 45 13OCT12 20 01MAY12 30MAY12 29JUL12 28AUG12 12OCT12 26NOV12 20MAY12 Piling Work Piling Work Main Strucure Foundation Main Structure Equipment Foundation Architecural Work

PLANT WATER SYSTEM & COMPREHENSIVE PUMP ROOM

Sheet 6 of 10

Activity ID CN3206 CN3207 CN3208 CN3209 CN3211 CN3210 CN3215 CN3216 CN3217 CN3225 CN3226 CN3227 CN3228 CN3229 CN3230 CN3231 CN3232 CN3233 CN3234 Main Structure

Activity Description Main Strucure Foundation Equipment Foundation Architecural Work (Roofing) Architectural Work (Wall, etc) Foundation & Concrete Works Piling Work Foundation & Concrete Works Road Work Piling Work Main Strucure Foundation Main Structure Equipment Foundation Architectural Work Piling Work Main Strucure Foundation Main Structure Equipment Foundation Architectural Work

Orig Dur

Early Start

Early Finish 17SEP12 17OCT12 16NOV12 06DEC12 05JAN13 16NOV12 14JUN12 05JAN13 04FEB13 14JUN12 11DEC12 10JAN13 09FEB13 06MAR13 14JUN12 25JAN13 06MAR13 05APR13 15MAY13

-1 1

50 30JUL12 30 18SEP12 30 18OCT12 20 17NOV12 30 07DEC12 60 18SEP12 30 16MAY12 110 18SEP12 30 06JAN13 30 16MAY12 60 13OCT12 30 12DEC12 30 11JAN13 25 10FEB13 30 16MAY12 45 12DEC12 40 26JAN13 30 07MAR13 40 06APR13

Months 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 3 Main Strucure Foundation Main Structure Equipment Foundation Architecural Work (Roofing) Architectural Work (Wall, etc) Foundation & Concrete Works Piling Work Foundation & Concrete Works Road Work Piling Work Main Strucure Foundation Main Structure Equipment Foundation Architectural Work Piling Work Main Strucure Foundation Main Structure Equipment Foundation Architectural Work

PRE-TREATMENT PLANT FUEL OIL STORAGE TANK AREA

SEWAGE TREATMENT STATION

INDUSTRIAL WATER RECIRCULATING PUMP HOUSE

ELECTRICAL FACILITIES BUILDINGS OIL STORAGE TANK CN3400 CN3401 CN3430 CN3431 CN3432 CN3433 CN3434 CN3435 CN3436 CN3437 CN3438 CN3440 CN3441 CN3442 Piling Work Foundation & Concrete Works Piling Work Main Strucure Foundation Main Strucure Architecural Work Road Work Piling Work Foundation & Concrete Work Steel Strucure Architecural Work Piling Work Foundation & Concrete Work Steel Strucure 30 16MAY12 60 12DEC12 30 16MAY12 45 15JUN12 70 12DEC12 45 20FEB13 15 06APR13 30 16MAY12 45 12DEC12 40 26JAN13 45 07MAR13 30 16MAY12 60 12DEC12 60 10FEB13 14JUN12 09FEB13 14JUN12 29JUL12 19FEB13 05APR13 20APR13 14JUN12 25JAN13 06MAR13 20APR13 14JUN12 09FEB13 10APR13 Piling Work Foundation & Concrete Work Steel Strucure Piling Work Foundation & Concrete Work Steel Strucure Architecural Work Piling Work Main Strucure Foundation Main Strucure Architecural Work Road Work Piling Work Foundation & Concrete Works

150 KV SUBSTATION & SWITCHYARD

SUBSTATION BUILDING

START UP BOILER ROOM

Sheet 7 of 10

Activity ID CN3443 CN3410 CN3411 CN3412 CN3405 CN3406 CN3416 CN3415 CN3422 CN3420 CN3421 CN3426 CN3425 Architecural Work Piling Work #1 GENERATOR TRANSFORMER

Activity Description

Orig Dur

Early Start

Early Finish 25MAY13 14JUN12 07SEP12 07OCT12 04JUN12 21MAR13 04JUN12 17OCT12 14JUN12 26NOV12 26DEC12 04JUN12 05JAN13

-1 1

45 11APR13 30 16MAY12 40 30JUL12 30 08SEP12 20 16MAY12 60 21JAN13 20 16MAY12 40 08SEP12 30 16MAY12 40 18OCT12 30 27NOV12 20 16MAY12 40 27NOV12

Months 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 3 Architecural Work Piling Work Foundation & Concrete Work Architectural Work Piling Work Foundation & Concrete Works Piling Work Foundation & Concrete Works Piling Work Foundation & Concrete Work Architectural Work Piling Work Foundation & Concrete Works

Foundation & Concrete Work Architectural Work Piling Work Foundation & Concrete Works Piling Work Foundation & Concrete Works Piling Work Foundation & Concrete Work Architectural Work Piling Work Foundation & Concrete Works

EMERGENCY OIL PIT

#1 UNIT AUXILIARY TRANSFORMER

#2 GENERATOR TRANSFORMER

#2 UNIT AUXILIARY TRANSFORMER

MECHANICAL / ELECTRICAL INSTALLATION


GENERAL AREA MISCELLANEOUS BUILDING WORKSHOP CN4100 Workshop Building Installation 50 26APR13 14JUN13* Workshop Building Installation OTHERS FACILITIES PIPE WORK SUPPORT STRUCTURE CN4105 Pipe Rack Installation 165 01NOV12 14APR13* Pipe Rack Installation POWER STATION AREA STEAM TURBINE BUILDING & AUXILARIES INSTALLATION CN4400 CN4405 CN4440 CN4410 CN4415 CN4420 CN4425 CN4430 CN4445 CN4435 CN4450 Overhead Crane Installation Condenser Installation CCR Installation Turbine Bed Plate Installation Generator Proper Installation Steam Turbine Auxiliary Installation Turbine Capping Installation Regulating System Installation CCR Debug Turbine Oil Circulation Test Run 30 28NOV12 45 28DEC12 118 01JAN13 3 11FEB13 76 14FEB13 60 28FEB13 3 21APR13 30 21APR13 32 29APR13 30 21MAY13 20 31MAY13 27DEC12 10FEB13 28APR13 13FEB13 30APR13 28APR13 23APR13 20MAY13 30MAY13 19JUN13 19JUN13 Steam Turbine Auxiliary Installation Turbine Capping Installation Regulating System Installation CCR Debug Turbine Oil Circulation Test Run Overhead Crane Installation Condenser Installation CCR Installation Turbine Bed Plate Installation Generator Proper Installation

BOILER AND AUXILARIES INSTALLATION CN4520 Bottom Ash Silo Installation 92 10SEP12 10DEC12 Bottom Ash Silo Installation

Sheet 8 of 10

Activity ID CN4500 CN4510 CN4505 CN4515 CN4525 CN4615 CN4605 CN4610 CN4501 CN4506 #1 Boiler Installation

Activity Description Primary Air Fan & Secondary Air Fan #1 Installat #2 Boiler Installation Unit Drainage Pit Installation Sand Bunker Installation Air Compressor Building Installation Induced Draft Fan Installation Flue Duct Installation #1 Boiler Stoving Dry & Chemical Cleaning #2 Boiler Stoving Dry & Chemical Cleaning

Orig Dur

Early Start

Early Finish 27JUN13 10MAR13 29OCT13 20MAR13 19MAR13 24JUN13 20AUG13 18SEP13 27JUN13 29OCT13

-1 1

273 28SEP12 92 09DEC12 277 26JAN13 42 07FEB13 41 07FEB13 115 02MAR13 115 28APR13 130 12MAY13 30 29MAY13 30 30SEP13

Months 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 3 #1 Boiler Installation #2 Boiler Installation Unit Drainage Pit Installation Sand Bunker Installation Air Compressor Building Installation Induced Draft Fan Installation Flue Duct Installation #1 Boiler Stoving Dry & Chemical Cleaning #2 Boiler Stoving Dry & Chemical Cleaning

Primary Air Fan & Secondary Air Fan #1 Installat

ELECTROSTATIC PRECIPITATOR (ESP) INSTALLATION CN4600 Electrostatic Precipitator Installation 120 02DEC12 31MAR13 Electrostatic Precipitator Installation UTILITY & OFFSITES AREA COAL & LIMESTONE HANDLING FACILITIES CN4215 CN4220 CN4210 CN4200 CN4205 Coal Handling trestle Installation Coal Yard Installation Coal Crushing Room Installation Coal Junction House Installation TransportCoal building Installation 150 14AUG12 116 25AUG12 145 07DEC12 140 12DEC12 140 12DEC12 10JAN13 18DEC12 30APR13 30APR13 30APR13 TransportCoal building Installation Coal Handling trestle Installation Coal Yard Installation Coal Crushing Room Installation Coal Junction House Installation

ASH HANDLING FACILITIES INSTALLATION CN4300 Limestone Main Silo Installation 90 09AUG12 06NOV12* Limestone Main Silo Installation COOLING WATERWAY FACILITIES INSTALLATION CN4700 Circulating Water Intake Pipe Installation 90 02SEP12 30NOV12 Circulating Water Intake Pipe Installation BOP FACILITIES INSTALLATION CN4800 CN4805 CN4810 CN4815 CN4820 CN4830 Water Treatment Plant Installation Plant Water System & Comprehensive Pump Room Ins Pre Treatment Plant Installation Fuel Oil Storage Tank Area Installation Industrial Water Recirculating Pump House Insta Sewage Treatment Station Installation 120 13OCT12 105 17NOV12 135 17NOV12 150 06JAN13 200 28JAN13 50 10FEB13 09FEB13* 01MAR13 31MAR13 04JUN13 15AUG13* 31MAR13* Fuel Oil Storage Tank Area Installation Industrial Water Recirculating Pump House Insta Sewage Treatment Station Installation Plant Water System & Comprehensive Pump Room Ins Pre Treatment Plant Installation Water Treatment Plant Installation

ELECTRICAL BUILDING & AUXILARIES INSTALLATION CN4910 CN4915 CN4916 CN4917 CN4920 CN4925 CN4900 #1 Generator Transformer Installation #1 Unit Auxiliary Transformer Installation #2 Generator Transformer Installation #2 Unit Auxiliary Transformer Installation 150 KV Substation Installation Substation Control Building Installation Oil Storage Tank Installation 90 08SEP12 129 18OCT12 90 27NOV12 129 06JAN13 90 21JAN13 90 26JAN13 30 10FEB13 06DEC12 23FEB13 24FEB13 14MAY13 20APR13 25APR13 11MAR13* Substation Control Building Installation Oil Storage Tank Installation #2 Unit Auxiliary Transformer Installation 150 KV Substation Installation #1 Generator Transformer Installation #1 Unit Auxiliary Transformer Installation #2 Generator Transformer Installation

Sheet 9 of 10

Activity ID CN4930 CN4905 JETTY INSTALLATION CN4000

Activity Description Start Up Boiler Room Installation Emergency Oil Pit Installation

Orig Dur

Early Start

Early Finish 30APR13* 20APR13*

-1 1

80 10FEB13 30 22MAR13

Months 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 3 Start Up Boiler Room Installation Emergency Oil Pit Installation

Jetty for Coal Supply and Trestle Installation

163 31OCT12

11APR13

Jetty for Coal Supply and Trestle Installation

MECHANICAL / ELECTRICAL COMMISSIONING


#1 UNIT
COM05 COM10 COM15 COM20 COM25 #1 Unit Start Up #1 Unit Synchronizing #1 Unit 30 Days Reliability Test #1 Unit NCR Test #1 Unit Connection to Grid #2 Unit Start Up #2 Unit Synchronizing #2 Unit 30 Days Reliability Test #2 Unit NCR Test #2 Unit Connection to Grid 30 28JUN13 10 28JUL13 30 07AUG13 24 06SEP13 1 30SEP13 25 01OCT13 10 26OCT13 30 05NOV13 26 05DEC13 2 31DEC13 27JUL13 06AUG13 05SEP13 29SEP13 30SEP13 25OCT13 04NOV13 04DEC13 30DEC13 01JAN14 #1 Unit Start Up #1 Unit Synchronizing #1 Unit 30 Days Reliability Test #1 Unit NCR Test #1 Unit Connection to Grid #2 Unit Start Up #2 Unit Synchronizing #2 Unit 30 Days Reliability Test #2 Unit NCR Test #2 Unit Connection to Grid

#2 UNIT
COM40 COM41 COM42 COM43 COM44

Sheet 10 of 10

Das könnte Ihnen auch gefallen