Sie sind auf Seite 1von 8

FORBES KAMBA

16 Essenhigh Street. Adcockvale Ext, Port Elizabeth 6045 Ph. +2741 373 0180 (W), +2741 3655473 (H), Cell +27 82 726 6815 Email engfkamba@gmail.com PERSONAL PARTICULARS Date of Birth: Place of Birth: Marital Status: Nationality: Identity Number: Number of Years Experience: 30 January 1968 Zimbabwe Married with Two Children born 03/1998 and 01/2002

Zimbabwean (Permanent Resident in SA, Ref PE109/2011) Zimbabwe National ID No. 63-705480L 47, Passport No BN705730 19 Years + Year Industrial Attachment.

ACADEMIC QUALIFICATIONS 2003 1993 1987 1985 MEMBERSHIP 2009 2008 2004 1997 Graduate Member Member Corporate Member Associate Member Institution of Civil Engineers (UK) Concrete Society of Southern Africa Zimbabwe Institute of Engineers Southern Africa Institute of Steel Construction MBA at the National University of Science and Technology (Zimbabwe) Bachelor of Engineering (Civil/ Structures) at University of Allahabad, India Cambridge GCE Advanced Level, Zimbabwe Cambridge GCE Ordinary Level, Zimbabwe

ECSA REGISTRATION: Application submitted and being considered for registration as Pr Eng. EMPLOYMENT RECORD 2006 to Date 2008 - 2012 2006 2008 2005 2006 2003 2005 2000 2003 1994 2000 1993 2004

Uhambiso Consult Uhambiso Consult Uhambiso Consult ASCH Engineers ACTS Consultants NUST CNM and Partners Kuchi Builders (Pty) Ltd

Head Structures Division Associate Director Senior Structural Engineers Senior Structural Engineer Senior Projects Engineer Assistant Director of Works engineer-in training to Projects Engineer Assistant Site Engineer

FIELDS OF SPECIALISATION Steel Structures Design & Construction Management Reinforced Concrete Structures Design & Construction Management Bridge Assessment Inspections and structural Survey Project & Construction Management Water Retaining Structures Design (Sewerage Treatment Plants & Potable Water Reservoirs)

2 KEY QUALIFICATIONS: 1. Project Engineer 2. Design Engineer 3. Site Engineer 4. Resident Engineer (12 Years) (14 Years) Prison, Hospitals, Office Blocks, Industrial Buildings, Bridges Reinforced Concrete & Structural Steelwork Structures

(1 Year) Bridge (2.8 km Long) & Approach Roadworks (2 years) Warehouse/Factory, Hospital, HV & MV Sub Stations Multi-Discipline Engineering Works for university Campus.

5. Project Management (5 yrs) TECHNICAL SKILLS

Structural Design & Draughting:

Structural Modelling Using Autodesk Revit Structures Analysis & Designing structural elements using PROKON modules Analysis & Designing structural elements using ATIR STRAP modules Detailing Reinforcement using PADDS Draughting using CAD Systems : AutoCAD

Construction Management:
Project Management Project Scheduling With MS-Project Construction Management

Engineering Surveys:

Engineering Surveys

Computer Programmes/Software:
Autocad Structures 2012 Autodesk Revit Structures PROKON Frame, Padds, Finite Elements Etc. ATIR STRAP MS Office Suite MS Project

3 MOST PROMINENT PROJECTS UNDERTAKEN: Tsolo Waste Water Treatment Works, Humansdorp Client Body: O.R Tambo District Municipality Reinforced Concrete Tanks (Capacity 15.5 Ml) 150 Million on going as of 03/2012 Design Engineer And Construction Supervision Detailed Project Scope: Estimated Project Value: Year Completed: Role in Project:

Kuehne & Nagel Logistics Warehouse, Port Elizabeth Client Body: Coega Development Corporation Factory precinct (9 200 m) R45 million on going as of 03/2012 Design Engineer and construction supervision Detailed Project Scope: Estimated Project Value: Year Completed: Role in Project:

2,5 Ml Portable Water Reservoir, Humansdorp Client Body: Kouga District Municipality Circular reinforced concrete portable water reservoir (capacity 2.5 Ml) R5.0 million 2011 Design Engineer and construction supervision Detailed Project Scope: Estimated Project Value: Year Completed: Role in Project:

Limba Community Hall, Zwide Township, Port Elizabeth Client Body: Nelson Mandela Bay Municipality Renovation of community hall (floor area 1 000 m) R5.0 million July 2011 Design Engineer (design and supervision) Detailed Project Scope: Estimated Project Value: Year Completed: Role in Project:

Van Stadens 250kl Water Reservoir, Port Elizabeth Client Body: Nelson Mandela Bay Municipality Circular concrete tank of capacity 250 Kl on mountain side R3.50 Million Work in progress to complete in February 2012 Structural Design Engineer Detailed Project Scope: Estimated Project Value: Year Completed: Role in Project:

Grupo Antolin Factory Extension, Port Elizabeth Client Body: Coega Development Corporation Factory precinct extension (4 000 m) R15 million 2011 Design Engineer and construction supervision Detailed Project Scope: Estimated Project Value: Year Completed: Role in Project:

Business Process Outsourcing Centre (Call Centre) Building, Port Elizabeth Client Body: Coega Development Corporation New multipurpose building with mezzanine level; 16 000m floor area; R200 million May 2010 Design, detailing & construction supervision of concrete & steel structure building Detailed Project Scope: Estimated Project Value: Year Completed: Role in Project:

Cerebos factory (Warehouse and Office Block), Port Elizabeth Client Body: Coega Development Corporation Warehouse of 4 000m, workshop, and office block and ablution facilities; R45 million April 2008 Design & detailing building structure & construction supervision. Detailed Project Scope: Estimated Project Value: Year Completed: Role in Project:

Schools Projects, Eastern Cape Client Body: IDT/CDC and Department of Public Works 13 Schools in Transkei R 35 million 2011 Design & detailing building structure & construction supervision. Detailed Project Scope: Estimated Project Value: Year Completed: Role in Project:

Engcobo Examination & Assessment Centre, Engcobo (Eastern Cape) Client Body: Project Scope: Estimated Project Value: Year Completed: Role in Project: Department of Public Works & Department of Education New Office & Storage Block R 8,5 million Works in Progress Design & detailing Building structure Concrete and Masonry

Motherwell Community (NU13) Hall Building, Port Elizabeth Client Body: Detailed Project Scope: Estimated Project Value: Year Completed: Role in Project: Nelson Mandela Metro Municipality (Dept. of Building Services) Alterations and Additions to the Existing building R1.5 Million 2008 Structural design & construction supervision.

Buffalo City Fire Dept Recreation Hall, East London Client Body: Detailed Project Scope: Year Completed: Role in Project: Estimated Project Value: Buffalo City Fire Department Refurbishment of existing building to recreation hall R 4 million 2007 Supervising renovations and design & detailing of Building structure

Grand West Casino, Cape Town Client Body: Sun International Resorts Additions and alterations to existing Casino R7 million 2008 Design & detailing of Car Parking Building including steel roof. Detailed Project Scope: Estimated Project Value: Year Completed: Role in Project:

Johannesburg Hospital Goods Hoist Lift Well, Johannesburg Client Body: City of Johannesburg Addition of goods hoist to existing 6-storey structure R6 million Design detailing and construction supervision of all works. Detailed Project Scope Estimated Project Value: Role in Project:

Year Construction Completed: August 2006

Scottish Livingstone Hospital, Molepolole Botswana Client Body: Government of Botswana Development of 450 bed district hospital US $ 100 million Project Civil/Structural Engineer Detailed Project Scope: Estimated Project Value: Role in Project:

Year Construction Completed: Structure and civil works completed in 2005

Orapa Conference Centre, Orapa - Botswana Client Body: Detailed Project Scope: Estimated Project Value: Role in Project Debswana Development of conference centre (600 seater) Pula 1.2 million Project Structural Engineer

Year Construction Completed: 2004

NUST Ceremonial Hall, Bulawayo - Zimbabwe Client Body: Detailed Project Scope: Estimated Project Value: Role in Project NUST Campus Development 4 500 seated multi-purpose hall US $ 110 million Design Engineer and detailer (Both RC and Steel)

Year Construction Completed: 2003

Megawatt Court, Harare - Zimbabwe Client Body: Detailed Project Scope: Estimated Project Value: Role in Project: Zimbabwe Electricity Supply Authority Development of residential complex US $ 150 million Design Engineer and Construction Supervisor

Year Construction Completed: 1996

6 NUST Campus Development, Bulawayo - Zimbabwe Client Body: NUST (through Zimbabwe Government funding) Development of University Precinct (Halls, workshops, etc) US $ 6 Billion but worked on the US$2.00 of it. Project management and Facility Management Detailed Project Scope: Estimated Project Value: Role in Project: WORK EXPERIENCE (01/11/2006-to Date Uhambiso Consult (Pty) Ltd: -Associate Director &

Year Construction Completed: On going on leaving in 2002

Senior Structural Engineer Details of Tasks Assigned and responsibilities: Head of Structures Division Initial & Final Designs Reinforced Concrete & Structural Steelwork Projects Management & Coordination of all structures project. Client and contractor liaison.

Major Projects worked on


Van Staden 250kl Reservoir

, Port Elizabeth

Kruisfontein 2.5ML Water Reservoir, Port Elizabeth Tsolo Sewage Treatment Tanks & Ponds, O.R. Tambo District Municipality Glen Hurd Bridge Initial Design, Port Elizabeth Coega Call Centre, Port Elizabeth Cerebos Factory Precinct, Port Elizabeth Motherwell Community Centre Hall, Port Elizabeth Fleet Fire Station Assembly Hall, East London Chatty Reservoir, Port Elizabeth CDC School Block Designs (double storey),Port Elizabeth Various Multi Storey residence/Office Blocks, Port Elizabeth ASCH Consulting Engineers: -Senior Engineer

(01/11/2005-to 15/08/2006

General Initial & Final Designs on various Reinforced Concrete & Structural Steelwork Projects Initial Civil Designs for station parking areas for the Gautrain Project as well as preparation of tender documents for the works. Way leave application to the access road to the Ekurhuleni Mechanical Workshops in Thembisa from the R350 Highway.

(01/10/2003-to 31/10/2005

ACTS CONSULTANTS: - Projects Engineer

7 Details of Tasks Assigned and responsibilities: Projects Coordinator & Design Office Manager. Principal Structural Engineer responsible for all designs and construction supervision Projects Management Draughting of proposals (Technical & Financial) for bidding for projects. Client and contractor liaison. Training cadets in standard methods of Draughting and detailing Concrete and Steel structures

Projects worked on

Scottish Livingstone Hospital (US$70mil) BDF Mechanical Workshops (US$5mil) Accountancy & Legal Studies 3-Storey Building (US$8mil) G / West Medical Centre (US$10 mil)

Molepolole Maun Gaborone Gaborone

01/10/00-30/09/04

NAT UNIV. OF SCIENCE & TECHnology (Assistant Works Director)

Details of Tasks Assigned and responsibilities: Engineering Project management for the development of the main campus. Management of maintenance works on campus completed works Auditing all design by consultants for suitability and functional compliance. Facility Management on building handed over and occupied by the client.

Projects or Main Areas of Work Main Administration Building blocks Lecture & Ceremonial Halls (4Nos) Main sub station builders works & coordination of the installation of items of plant Laboratories & Workshops (i.e. warehouse and factory type buildings) Development of the area irrigation reticulation. Maintaining the as-built information for all services within the area of the campus. Coordinating of Hazardous waste disposal works from laboratories and workshops. CNM & PARTNERS Civil/Structural Engineer

02/01/94 - 03/09/2000

Details of Tasks Assigned and responsibilities: Initial & Final Design - Reinforced Concrete & Structural Steel (All structures) Projects Management & Coordination projects to completion. Client and contractor liaison. Draughting tender documents and carrying out the tender adjudication. Preparing project progress reports and defects assessment reports (e.g. faults) Inspection of buildings and highway structures for integrity certification.

Projects worked on Prison complex (Khami Remand Prison facility) (6.000 capacity) Church & other congregation halls (Up to 10 000 seats with upper gallery seating) Industrial factory shells and warehouse structures for manufacturing setups. Residential buildings bocks ( Up to 5 floors) Hotel and conference facility structures and infrastructure Liquid retaining (water and sewer treatment plants) structures and grain silos Aerodrome runway pavements and hangers for plantation estates. Routine inspection of highway bridges on the A2 highway(Beit bridge -Victoria Falls) KUCHI BUILDERS & CONTRACTORS Asst. Site Engineer Office blocks &shopping malls in CBD (up to 5 storeys) over an areas of 100 000m 2

01/09/93 - 31/12/93

Details of Tasks Assigned and responsibilities: Site engineering duties (i.e. setting out, checking reinforcement steel) and Coordination of works Procuring of construction materials and ordering construction machinery

Projects worked on Hospital construction concreting works (Parirenyatwa Health Sciences Building works) Civil works for telecommunication & sewerage infrastructure works N.B.: During the same period I was a lecture at the Bulawayo Polytechnic on part-time basis 2. LANGUAGE PROFICIENCIES LANGUAGE English Chishona Hindi SiNdebele/Zulu Afrikaans 3. REFERENCES Royal Chikwava Excellent Excellent Functional Fair Functional SPEAKING Excellent Excellent NO Fair NO WRITING

Associate:

Mr. A. Mangezi (Pr Eng)

SSI International PORT ELIZABETH, S. Africa Ph. +(041) 391-0400 Cell +27 76 212 6199 E-MAIL: - royalc@ssi.co.za

Technical Director:
Bergstan (Pty) LTD

Eng. Masimba D Nyabvure

Senior Partner:

PROMECS Engineers HARARE, ZIMBABWE Ph. +263 4 253499 Cell +26391 226 036 E-mail:- promecs@comone.co.zw

GABORONE, Botswana, Ph. +267 72 666 111 CELL +267 72666 111 e-mail - amangezi@bergstan.co.bw

Das könnte Ihnen auch gefallen