Sie sind auf Seite 1von 8

Curriculum Vitae of

Alan Petherbridge IEng MInstMC

Discipline Date of Birth Nationality Domestic Status Home Address

Instrumentation 8th September 1956 British Married. Two Children. 58 Westkirke Avenue Scartho Grimsby Lincolnshire DN33 2HT United Kingdom 01472-874627 07768-814638 / 07918176745 APethers@aol.com Full British ( Expires 2014 ) Full British

Home Telephone Mobile Home E-mail Address Passport Driving License

Curriculum Vitae of

Alan Petherbridge Education and Qualifications


Attended Open University Qualifications Achieved Diploma of Higher Education Open (Open DipHE)
(Higher National Diploma / Foundation Degree equivalent) Technology Science Instrumentation Modelling with mathematics Analogue and digital electronics

North Lindsey College of Technology Grimsby College of Technology

Full Industrial Measurement & Control Technicians Certificate Parts I, II, III. East Midlands Educational Union Basic Electrical Engineering - Distinction Basic Mechanical Engineering - Distinction Mechanical Engineering Technicians Course 1st year IEE Wiring Regulations 15th Edition On-going BSc (Honours) Technology Incorporated Engineer (IEng) Engineering Council Member of the Institute of Measurement & Control (MInstMC) Fellow of Institute of Diagnostic Engineers (FIDiagE) AutoCad Version 12 Basic First Aid Daniel 2500 Flow Microcomputer Fisher Microvox Fisher Provox DCS Lifting and Handling Full Offshore Danish Sector BOSIET Training Saunders Control Valves Woodward Netcon / Micronet

Grimsby College of Technology Open University Professional Institutions

Manufacturers Courses etc.

Curriculum Vitae of

Alan Petherbridge
Company / Location
Chevron Nigeria Limited Baklang Allianz
41 Sinari Darainjo Street Victoria Island Lagos Nigeria

Dates
Sept 2006 to Present

Experience
Instrument & Electrical Project Construction Rep
Presently employed by Chevron Major Capital Projects in Lekki, Nigeria on the Olero Creek Restoration Project as the Project Instrument and Electrical Construction Rep and now moving into a Commissioning Engineers role. Previously involved with writing commissioning procedures and construction work packs, commissioning execution plan and completions handover documentation. Involved with the detailed design engineering at contractors project design office, engaging and mentoring graduate engineers. Involved with Project Execution Planning, Value Improving Practices (VIPs) and associated workshops. Assist with FEED, Hazops and constructability workshops. Successfully completed major construction work in preparation for Escravos Gas Plant Phase 3 expansion Previously engaged by Chevron Major Capital Projects on South Delta Water Injection Platform Upgrade reporting to Commissioning / Construction Manager. Responsible for Instrument and Electrical installation and commissioning of new topsides for water injection platform consisting of Yokogowa DCS, ESD, Fire & Gas System, Emergency Generator, 2 x Solar Centaur Gas Turbine Generator Sets, 3 x Solar Centaur Gas Turbine Driven Water Injection Pumps. Day to day management of two Expatriate Supervisors, three Indigenous Supervisors, twenty four Indigenous Instrument / Electrical Technicians as well as assorted supporting trades. Liaison with contractors, manufacturers representatives, engineering queries, etc. Responsible for final acceptance of Instrument and Electrical Control Systems on behalf of Chevron Nigeria Limited.

Mobil Equatorial Guinea Inc (ExxonMobil Corporation) Wood Group Equatorial Guinea
Zafiro Producer Malabo Equatorial Guinea

Sept 2005 to Sept 2006

Instrument Technician
Working on an FPSO for Mobil Equatorial Guinea Inc, maintenance and troubleshooting of Solar Taurus 60 and Mars gas turbine generator sets, gas injection and water injection systems, Turbotronic control systems, Allen Bradley PLC V and SLC 500 series plcs, Fisher Rosemount Delta V DCS systems, Data Acquisition and Control System (DACS), Fire & Gas Systems (ship and process). Implementation and optimization of preventive maintenance Schedules, setting priorities, allocating manpower, equipment and tools to ensure timely completion of jobs in accordance with schedules, work permits and Production Operations Best Practices Policies (POBP). Feasibility Studies of proposed facility modifications or projects and provide recommendations on standardization of materials and compatible equipment, including spare parts lists. Evaluate performance of electrical equipment and machinery to improve safety, efficiency, and minimize costs, and record modifications that are carried out. Provide a current record of main events and follow-up actions. Repair, replace and/or install pneumatic and electrical instrumentation. Prepare reports covering time spent, work carried out, materials used and any further action required for each job undertaken. Mentoring and Tutoring of Apprentice I&E Technicians and 3

provide feed back to their OJT Supervisor on their development. Stand in for Lead E / I Technician when called upon to do so. Part of facility Emergency Response Team and maintenance representative for the Management Safety Steering Committee

TC Power Ltd Hessle, Hull, UK

June 2004 to Sept 2005

FIELD SERVICE ENGINEER


Field Service Engineer working on control systems and package items primarily on the GE LM 1600, 2500, 5000, 6000 range of engines but also Rolls Royce, Ruston / Alstom and Solar turbine generator and gas compressor packages within Europe and Asia. Experience with Woodward, Netcon, Micronet and GE Speedtronic control systems. Involved with Gas turbine exhaust monitoring, Engine health check testing, Fault diagnosis and troubleshooting, Emissions data for Combustor mapping exercises and Combustor mapping and Dry Low Emission (DLE) control systems Involved with small projects, writing procedural documentation and commissioning. Worked on Mechanical Project sourcing and procurement of parts and labour for LM6000 Hot Section refurbishment worth around 1,345,337.

Mobil Producing Nigeria (ExxonMobil Corporation) Overseas Technical Services (Baker MO)
Lagos Nigeria

May 1997 to June 2004

SENIOR INSTRUMENT ADVISOR


Following the ExxonMobil merger and subsequent personnel reorganisation, promoted to OSO Senior Instrument Advisors position taking responsibility for all Instrumentation within the OSO offshore multi-platform complex. Additional responsibilities include the NGL and Condensate production platforms, Gas Conditioning and Gas Compression Platforms plus wellhead and accommodation platforms.

SPECIALIST ENGINEER
Seconded to support the Mobil PTF as a Specialist Engineer for I & E during the construction, commissioning and acceptance of the Oso RK Gas Conditioning Project. Duties included liaison with contractors, manufacturers representatives, engineering queries, etc. Responsible for bringing production plant on line and providing training and support for operations.

LEAD INSTRUMENT ADVISOR


Engaged by Mobil Producing Nigeria as part of the core start up team, initially based in Morgan City, USA as Mobil Producing Nigerias company representative for Instrumentation during Worlds first offshore NGL platform construction. Based offshore in Nigeria as Lead Instrument Advisor leading a team of indigenous and expatriate technicians forming the start up team. Involved in the hook-up, design queries and commissioning of the platform, liaison with manufacturers and project contractors representatives. Also involved with faultfinding, systems compatibility design with existing platform equipment, HAZOP and management of change (MOC) justifications. Training of Operators, Supervisors and Technicians on plant instrumentation, OJ Training and Competency Assessment, Safety Shutdown Systems and equipment, Fisher Rosemount DCS, GE FANUC & Triplex PLCs, Dresser Rand Di-Tronics & Allen Bradley PLC V turbine control systems, GE LM 2500 and Solar Taurus turbines and maintenance.

Courtaulds Engineering Ltd


Gilbey Road Grimsby Lincolnshire

July 1996 to May 1997

LEAD INSTRUMENT / ELECTRICAL ENGINEER


Responsible for Instrument and Electrical Engineering from the proposal stage, design studies, specification, calculation, purchase bid analysis through to site installation and commissioning. 4

Familiar with Hazardous Area design requirements, DCS / PLC systems and field instrumentation. Involved with major plant modifications to manufacture new product in the Pharmaceutical Industry.

Dopet - Insertech Services (Dotech)


PO Box 1744 Doha Qatar

June 1995 to July 1996

PROJECT ENGINEER
Project Engineer supervising the total Instrumentation, cabling, piping, hook ups, panel installation and control room wiring for two LNG trains, Sulphur Handling and Acid Gas Removal units for QATARGAS at Ras Laffan, Qatar. Responsible for site co-ordination of workforce, planning and scheduling budget control, engineering queries, quantity surveying, and liaison with client. Responsible for developing and managing other project work and manpower supply in Qatar involving Qatargas, QGPC, Qatar Fertiliser Company, Qatar Petroleum Company, GEC-Alsthom, Occidental Oil Company and Maersk Oil Company. Deputise for the Middle East Director in the running of the joint venture when Director on vacation or absent.

Insertech (Middle East ) Limited


PO Box 4488 Abu Dhabi UAE

April 1995 to July 1996

MIDDLE EAST AREA MANAGER


Temporary assignment managing the Abu Dhabi office. Liaison with clients, quotations, managing and coordinating local contracts, cost control and corporate sales.

Insertech Limited
80 High Street Barton on Humber Lincolnshire

August 1994 to April 1995

INSTRUMENT ENGINEER

&

ELECTRICAL

PROJECT

Responsible for Project Engineering duties involving commercial and technical activities associated with an engineering management position. Sole responsibility for projects from tender preparation to final accounts and acceptance. Responsible for total Instrument and Electrical projects including equipment specification, installation, liaison with clients Engineers, liaison with QA Engineers and day to day running of major projects. Project Management of projects involving forward planning, budget control and implementing QA systems with the aim of ensuring success of all project programs. Full responsibility for all subsequent claims arising on any project. Familiar with Permit to Work Systems and Safety.

Grimsby College of Technology


Nuns Corner Grimsby Lincolnshire

Sept. 1994 to April 1995

ENGINEERING LECTURER
Part time Lecturer teaching day release students plc based control systems and mathematics.

Special Technical Services


Petroleum Development Oman North Oman Sultanate of Oman

Oct. 1993 to July 1994

INSTRUMENT & ELECTRICAL ENGINEER


Supervision of a multinational, multidiscipline Maintenance Optimisation Program involving the overhaul and servicing of major rotating equipment, eg, Ruston TA 1750, TB 3000, TB 4000, TB 5000 and Solar Saturn and Taurus Gas Turbines, centrifugal and reciprocating compressors, LNG trains, gas engines and associated pumps and services. Providing verbal and written reports on services and overhauls, recommending and highlighting future maintenance requirements, writing maintenance craft procedures and troubleshooting. 5

Overseas Technical Services (Baker MO) Texaco Overseas (Nigeria) Petroleum Company, ( TOPCON )
Lagos Nigeria

August 1991 to August 1993

INSTRUMENT ENGINEER
On secondment to Texaco Overseas (Nigeria) Petroleum Company, (TOPCON), responsible for sampling systems on ocean going storage tanker and custody transfer metering on offloading facility. Supervision and training of Instrument Supervisors and Technicians on oil / gas producing platforms with Solar Saturn Gas Turbine generation sets and conventional plant instrumentation.

Mobil Producing Nigeria

INSTRUMENT ADVISOR
Seconded to Mobil Producing Nigeria on new Oil / Gas producing platform. Involved in the hook-up, design queries and commissioning of the platform, liaison with manufacturers and project contractors representatives. Set up procurement of two years spare parts and preventative maintenance schemes. Training of national Operators, Supervisors and Technicians on plant instrumentation and equipment, DCS, turbines and maintenance. Equipment included Solar Saturn Gas Turbines, Bentley Nevada 7000 & 9000 vibration monitoring systems, Allen Bradley plc 5 and mlc 500 programmable logic computers, Fisher Provox and Microvox DCS, Triconnex Electronic shutdown system and all associated electronic and pneumatic plant equipment and instrumentation. Commissioned and worked in an onshore tank farm and tanker loading facility for both oil and condensate.

AFI Corporation Ltd


Doncaster South Yorkshire

July 1990 to August 1991

COMPANY DIRECTOR
Managing Director and Group Director reporting to the MoranCopley Group Board. Responsible for establishing and running an aircraft finance and leasing company. Specified and procured DEC mainframe computer system for installation into Group Headquarters. Evaluate general word-processing, accounting and financial control software packages to be networked on the mainframe computer system. Direct liaison with manufacturers, installation contract companies, customers and creditors

Bladehaven Limited
Grimsby Lincolnshire

May 1985 to July 1990

PROJECT MANAGER ENGINEER

PROJECT

CONTROL

Epcot Projects Limited, Birmingham Project Manager responsible for estimating, cost control, customer liaison, overseeing multidiscipline project engineering teams on major projects, production of maintenance manuals and customers personnel training. Project Control Engineer reporting to the Project Manager on various projects in petrochemical and food related industries. Responsible for procurement, installation and commissioning of Instrument and Electrical equipment, supervision of contractors, draughtsmen and tracers, design checking, on-the-job training of clients personnel on new equipment.

PROJECT INSTRUMENT ENGINEER

&

ELECTRICAL

WS Atkins & Partners ( Northern ), Whitehaven, Cumbria Involved in design projects for a nuclear reprocessing plant in the North West of England. Instrument and Electrical audit carried out and reports written as part of a fully developed safety case to be presented by the Nuclear Installations Inspectorate. Produced equipment specifications and engineering orders for equipment and services on project work. Collated and coordinated project work to predetermined budgets within WS Atkins Electrical and Instrumentation Department. Ensured that 6

office practice conformed to BS 5750.

PROJECT DESIGNER

INSTRUMENT

&

ELECTRICAL

On-Line Design & Engineering Limited, Immingham On secondment to SCM Chemicals Limiteds Project Department. Designed instrument packages to be installed mainly on the site services and sulphate plants. Projects included computerised gas fiscal metering system; retrofit boiler control systems to electronic transducers and plcs, plc control system for water treatment plant, nucleonic density control, nucleonic and ultrasonic level control systems.

TURBINE SPECIALIST ENGINEER

POWER

STATION

CPS International Inc., Houston, Texas Employed within CPSI gas turbine start up, commissioning, operation and maintenance group at Petrobel Petroleum Company, Belayim Power Station, Egypt. On-the-job training of Egyptian Instrument and Electrical Engineers on Speedtronic control systems mk II, GE frame 3 gas/distillate gas turbines with Ansaldo generators, Sulzer gas turbines, Diesel Caterpillar generators, Siemens switchgear, Nuovo Pignone SCADA system, Ruston TB5 gas turbine driven compressor sets with Rustronic control systems.

PROJECT INSTRUMENT DESIGNER


On-Line Design & Engineering Limited, Immingham Project Instrument Designer at Conocos Project Department, Theddlethorpe on the Viking Gas Terminal Extension. General plant upgrade to DCS. Short time spent as a Junior Planning Engineer. Involved in the conversion of a large part of Conocos Humber Refinery to TDC 2000 at On-Line Designs Immingham office.

OFFSHORE INSTRUMENT TECHNICIAN


Shell ( UK ) Limited, Lowestoft Seconded to Shell on A Platform in the Leman Gas Field. Installation and commissioning of Bentley Nevada vibration monitoring system on Rolls Royce RB 211 and Avon gas turbines and Cooper compressors. General maintenance on Rolls Royce and Ruston TA 1750 gas turbines.

Sirte Oil Company formally Esso Standard Libya


Triploi Libya

Oct. 1981 to April 1985

SENIOR INSTRUMENT SUPERVISOR

CRAFTSMAN

First contracted to Esso Standard Libya as an Instrument Supervisor then employed direct as a Senior Instrument Craftsman. Supervision and on-the-job training of Instrument Craftsmen, trainees and multi-disciplined contract labour force at desert based oil, gas and NGL plants. Worked with GE frame 3 & 5 gas turbines, Ruston TA 1750 gas turbines, Nuovo Pignone compressors, monitoring and control systems, Bentley Nevada 3000 vibration systems, alarm and shutdown systems, analytical apparatus ( Chromatographs, pH, Calorimeters, etc. ), water injection plant. Initiated preventative maintenance program, involved with planning of major shutdowns, specification and design of Instrument Control systems, design appraisal, checking, acceptance and commissioning of contractors installations.

B.T.P. Tioxide Limited

Sept 1973 to

SHIFT INSTRUMENT ARTIFICER


7

Oct 1981
Grimsby Lincolnshire

Apprentice trained Instrument Artificer working on pneumatic and electronic process control instrumentation and logic sequence controllers at a continuous process chemicalmanufacturing factory.

Das könnte Ihnen auch gefallen