BLOCK B O MON GAS PIPELINE PROJECT EPC PHASE-NUMBERING PROCEDURE

APPENDIX 3 DOCUMENT FORM


(7 Pages)

BLOCK B - O MON PIPELINE OPERATING COMPANY


PROJECT PHASE BLOCK B O MON GAS PIPELINE EPC

DOCUMENT TITLE
{as per EMDR}

A1 Rev.

DD/MM/YY Date

Issued for IDC Description PVE VSP Approval BPOC Approval CA Approval

EPC CONTRACTOR
(VSP-PVC-PTSC)

Document number: BB.G-VSP-PVE-ED-....................................


Number of pages: ..... (including this page)

PROJECT PHASE

BLOCK B O MON GAS PIPELINE EPC

DOCUMENT TITLE

A1

DD/MM/YY

Issued for IDC

JB

IAJ PM

Rev.

Date

Description

Prepared Checked EM by by Sub-Contractor

Discipline

Team SPMB Leader EPC Contractor

EPC CONTRACTOR (VSP-PVC-PTSC CONSORTIUM)


Document number:

PV ENGINEERING J.S.C

BB.G-VSP-PVE-ED-..........................

BLOCK B O MON GAS PIPELINE PROJECT EPC PHASE-DOCUMENT TITLE

TABLE OF CONTENTS
2. PROJECT OVERVIEW..................................................................................................3 3. GENERAL INFORMATION AND REQUIREMENTS....................................................4 3.1 Language and Units of Measurement.........................................................................4 3.2 Purpose of Document..................................................................................................4 3.3 Definitions and Abbreviations......................................................................................5 3.3.1 Definitions ........................................................................................................5 3.3.2 Abbreviations...................................................................................................5 3.4 Codes and Standards..................................................................................................5 3.5 Reference Documents.................................................................................................5 4. Next Section...................................................................................................................5 2. PROJECT OVERVIEW PetroVietnam Gas Corporation Block B - O Mon Pipeline Operating Company (BPOC) is responsible for the development of the Block B - O Mon Gas Pipeline. This project will be implemented to transport natural gas from a proposed Central Processing Platform (CPP) located in Block B fields to Ca Mau, O Mon and Neighboring Industrial Zones in provinces along the pipeline route. The Block B-O Mon Gas Pipeline Project includes the following facilities: Approximately 246.4km subsea pipeline with DN 700 (28) Mui Tram, Ca Mau Landfall station (LFS) Approximately 152.4km onshore pipeline with DN 750 (30) from Mui Tram LFS to O Mon GDC Nine Line Block Valve Stations (LBV) A pipeline lateral section from LBV#2 to Ca Mau GDS: approximately 400m DN 250 (10)
Rev. .... Page 3/6

BB.G-VSP-PVE-ED-.............

BLOCK B O MON GAS PIPELINE PROJECT EPC PHASE-DOCUMENT TITLE

Ca Mau Gas Distribution Station (GDS) A pipeline section from O Mon Gas Distribution Centre (GDC) to each O Mon Power Plant

The project investment objective is to contribute to the economic development in Southwest provinces and to secure gas/power supply in Vietnam. 3. GENERAL INFORMATION AND REQUIREMENTS The role of the EPC Contractor for the Block B Omon Gas Pipeline Project shall be undertaken by VSP-PVC-PTSC Consortium and VSP shall be the Leader of Consortium. PV Engineering J.S.C (SUB-CONTRACTOR) is the nominated Contractor to carry out the Detailed Design of Offshore and Onshore Pipelines and Stations. 3.1 Language and Units of Measurement The content, references, attachments and any supplementary information for all engineering documents shall be in English unless specified otherwise. After the engineering package has been approved, Vietnamese translations of the approved engineering documents will be provided. Units of measurement for all engineering documents shall be in the System International (SI). 3.2 Purpose of Document {by document author} Notes: if the document is a report it should be intended to answer one or two key questions and those questions should be stated in this section, if the document is a specification it is intended to set out the minimum technical requirements that the materials or equipment to be supplied to that specification must meet, if the document is for some other purpose then a two or three sentence paragraph should be inserted here that states, with due clarity, the intended purpose.

BB.G-VSP-PVE-ED-.............

Rev. ....

Page 4/6

BLOCK B O MON GAS PIPELINE PROJECT EPC PHASE-DOCUMENT TITLE

3.3

Definitions and Abbreviations

3.3.1 Definitions BPOC COMPANY CONTRACTOR CONTRACT DNV 3.3.2 Abbreviations If not applicable please put NOT APPLICABLE 3.4 Codes and Standards If not applicable please put NOT APPLICABLE Block B - O Mon Pipeline Operating Company (Client) Block B - O Mon Pipeline Operating Company (BPOC) The EPC Contractor who will carry out the EPC work for the project. The EPC contract between COMPANY and CONTRACTOR for execution of EPC project works. Det Norske Veritas (Certifying Body)

3.5

Reference Documents If not applicable please put NOT APPLICABLE

4. NEXT SECTION

BB.G-VSP-PVE-ED-.............

Rev. ....

Page 5/6