IGBC Green Factory

SS Credit 4 (2 points) Avoid site disturbance by retaining the natural topography of the site and / or landscape at least 20%/30% of the site area or meet the local regulation, whichever is higher WC Credit 2 (2 points) 30% / 40% of the landscaped area is planted with drought tolerant species. SS Credit 5 (2point) 75% parking in basement or covered Parking or shaded with trees. High albedo paint for roofs. (2 point) Use high albedo roofing material or heat resistant paint or china mosaic or white cement tiles or any other highly reflective materials over the roof to cover atleast 50% of the exposed roof area. OR Provide vegetation to cover at least 50% of the exposed roof area. SS Credit 6 (1 point) Alternate Fuel refueling stations for 5% of total parking capacity. Liquid or gaseous fueling facilities must be separately ventilated or located outdoors SS Credit 7 (1 point) Barrier free-1 preferred car parking spaces with easy access to the main entrance/lift. Uniformity in f.level / ramps in the factory areas. SS Credit 3 (1 point) Provide at least three in-situ amenities as listed First aid medical facility Crche Lockers and showers Canteen Guest house Cyber caf (high speed internet access to employees, at least 1 system for every 10 people WC Credit (mandatory) Rainwater Harvesting, 50 % Roof and Non-Roof Run-Off WC Credit 4 Rainwater Harvesting, 75%, 95% of roof area (6 points)

Other Green building guidelines


USGBC NC SS Credit 4.2 Alternative transportation: Bicycle storage and changing rooms. Provide bicycle racks for 5% of total building users (commercial and institutional buildings) and showers for 0.5% Full Time Equivalent occupants (FTE) SS Credit 6.1: Stormwater Design: Quantity Control Case 1 Existing Imperviousness Is Less Than or Equal To 50% Implement a stormwater management plan that prevents the post-development peak discharge rate and quantity from exceeding the pre-development peak discharge rate and quantity for the one- and two-year 24-hour design storms. OR Case 2 Existing Imperviousness Is Greater Than 50% Implement a stormwater management plan that results in a 25% decrease in the volume of stormwater runoff from the two-year 24-hour design storm.

GRIHA Criteria 3 (3 points) Plan utilities efficiently (utility trench) and optimize on-site circulation efficiency (reduce road surface) Criteria 5 (2points partly mandatory) Reduce hard paving on-site and/or provide shaded hard-paved surfaces: Total paved area of the site under parking, roads, paths or any other use should not exceed 25% of the site area or net imperviousness of the site not to exceed the imperviousness factor as prescribed by the NBC 2005(7090% for industrial) Total surface parking should not exceed the area as permissible under the local by-law and more than 50% of the paved area to have pervious paving/open-grid pavement/ grass paver or minimum 50% of the paved area (including parking) to have shading by vegetated roof/pergola with planters or minimum 50% of the paved area (including parking) to be topped with finish having solar reflectance of 0.5 or higher

SS=Site Sustainability WC=Water Conservation USGBC NC = us Green Building Council NewConstruction

Das könnte Ihnen auch gefallen