Beruflich Dokumente
Kultur Dokumente
Consulting
SUSTAiN
Consulting
Starting Position
SUSTAiN
Consulting
Factors
&
SUSTAiN
Consulting
Factors
SUSTAiN
Consulting
Factors
SUSTAiN
Consulting
Solutions
SUSTAiN
Consulting
SUSTAiN
Consulting
SUSTAiN
Consulting
Basis of Variations
SUSTAiN
Consulting
Individualisations Facades
SUSTAiN
Consulting
SUSTAiN
Consulting
SUSTAiN
Consulting
SUSTAiN
Consulting
Portacabin
Scenarios
SUSTAiN
Consulting
SUSTAiN
Consulting
European Dimensions
Annual turnover: 910 Mrd. Construction sector = biggest european industry cluster, ~ 10% of european gross national product 25% of european industry outputs 28,5% of european employees connected to this sector European profit margins : 2% (Japan : 7%)
SUSTAiN
Consulting
S ki i H Sekisui Housing: i
Japanese production: 56.000 Units/a (Single- & multi-family houses) Largest home builder in Japan, 7,78 billion net sales, gross profit ratio: 20,3% (2003) Lego-system
SUSTAiN
Consulting
Average prices on local japanese markets Various quality levels: enable customizing to customers needs and financing possibilities Longevity guaranteed (10-80 years) Retail-market becomes possible in p Japan because of high quality housing products.
SUSTAiN
Consulting
SUSTAiN
Consulting
Property ?
no
no
Production, transport, assembly continuous improvement process, market-analysis and customer-surveys lead to new designs and products
housing
SUSTAiN
Consulting
Production
SUSTAiN
Consulting
Production
SUSTAiN
Consulting
Production
SUSTAiN
Consulting
Production
Wiring harness
SUSTAiN
Consulting
SUSTAiN
Consulting
SUSTAiN
Consulting
SUSTAiN
Consulting
Production
SUSTAiN
Consulting
Customizing at Toyota
SUSTAiN
Consulting
Customizing at Toyota
SUSTAiN
Consulting
Customizing at Toyota
SUSTAiN
Consulting
Customizing at Toyota
SUSTAiN
Consulting
Customizing at Toyota
SUSTAiN
Consulting
SUSTAiN
Consulting
SUSTAiN
Consulting
Nara - Plant
SUSTAiN
Consulting
SUSTAiN
Consulting
SUSTAiN
Consulting
SUSTAiN
Consulting
Facades
SUSTAiN
Consulting
Sandwich Panels
SUSTAiN
Consulting
Sandwich Panels
SUSTAiN
Consulting
Sandwich Panels
SUSTAiN
Consulting
Sekisui Systems y
SUSTAiN
Consulting
SUSTAiN
Consulting
SUSTAiN
Consulting
SUSTAiN
Consulting
SUSTAiN
Consulting
SUSTAiN
Consulting
SUSTAiN
Consulting
SUSTAiN
Consulting
SUSTAiN
Consulting
SUSTAiN
Consulting
SUSTAiN
Consulting
SUSTAiN
Consulting
SUSTAiN
Consulting
SUSTAiN
Consulting
Sekisui House
1. Planning The R&D division collects the latest information on dwellings and lifestyles, cooperating with specialists both inside and outside of the company. company The division s network includes among division's includes, others, universities, planners from the outside, and homemakers. 2. Development and Designing The R&D division uses the information it collects & to research just what can be considered a "truly comfortable house". The results of the research are then applied to housing specifications. specifications
SUSTAiN
Consulting
Sekisui House
3. 3 HAPPS: Heim Automated Part Pick-up System About 300,000 components are required to manufacture a freely planned house. Systems using AI conduct integrated information control from the ordering of parts through production, inventory, and shipping. HAPPS is the automated part pickup system, which steadily provides components t t hi h t dil id t to the production lines. It leads to high productivity, high quality, and considerable precision. 4. Delivery of Components Components are allocated for each house and supplied to the production line line.
SUSTAiN
Consulting
Sekisui House
5. Ceiling and Floor Panels Automated nailing machines fix plasterboards to ceiling joists. joists 6. Assembly Frames are assembled into a box-shaped structure by fully automatic spot-welding machines and rust-proofing is done at the welded p g points. The precision of assembled units is 2mm.
SUSTAiN
Consulting
Sekisui House
7. Attaching Exterior Wall Panels Exterior wall panels are attached to a boxshaped structure with special riveting machine and gaps between panels are filled with gaskets. 8. Attaching Partition Walls and Fittings Partition walls and fittings are attached according to each customer's plan. p
SUSTAiN
Consulting
Sekisui House
9. Installation of Facilities Most facilities, such as kitchens, baths, and stairs are installed at the factory. We can reduce waste factory and dust at the site by installing these in advance. 10. Inspection At the end of each process step, a specialist p p p conducts strict quality control inspections of over 250 items such as gaps between walls and squeaking of floors or stairs.
SUSTAiN
Consulting
Sekisui House
11. Protection Units that pass quality control checks are packed in unit-covers protective sheets and waterproof unit covers, sheets, caps. 12. Shipment Units are loaded onto special trucks by large forklifts and shipped out in accordance with the pp customer's delivery date.
SUSTAiN
Consulting
Sekisui House
13. Installation of Units Cranes are used to install units onto solid reinforced concrete bases. reinforced-concrete bases 14. Roofing Roofs are also manufactured at the factory and delivered to the site to be installed simultaneously with the units. Completed in a y p day, interiors are prevented from being exposed to rain or wind.
SUSTAiN
Consulting
Sekisui House
15. Interior Finish-Work Interior components are also shipped from the factory and interior finish-work is totally carried finish work out under a roof, thereby preventing exposure to rain. 16. Measurement of Performance (Formaldehyde) We sample the air of the completed house to p p measure the density of formaldehyde (Kitagawamethod Detector). You can see by the low values just how thoroughly we have eliminated formaldehyde.
SUSTAiN
Consulting
Sekisui House
17. Hand-over The average period of work at a site is 40 days from installation to hand-over - one-third the time hand over one third of conventional construction methods.
SUSTAiN
Consulting