Sie sind auf Seite 1von 9

Prepared by Desinagation Reviewd By Desinagation

Draw Time

K.Natarajan Updated Date = 1-Jan-11 Default = Center =c or leave blank) Manager Completed Task Line color Top = + Left= -- (l = exact left) K.Natarajan Balance Task Line Color Bot=_ Right =+ (r= exact right) Manager Scale 2000 Days in d/w/m Default = bottom Title: PLANNED TIME SCHEDULE FOR TANJUNG TABALONG 2 X = 4686 Sug Scale 30MW POWER PLANT

Day(s)Completion Date Grouping Start Task Finshed Status at Move Data left(-) or Right(+) L Place Top or Bottom between Main Height (Default at Bot 4 28-Jun-11 0 Boiler Structure Work Start 2 1-Jul-11 0 Full Resumption F 30-Jul-11 0 Refractory & Insulation Installation 15-Aug-11 0 Remaining Refractory 21-Aug-11 0 Boiler Hydrotest 1-Sep-11 0 Piling Work Start f 23-Oct-11 0 Boiler Drum Lifting f 2-Nov-11 0 Boiler Civil Work Start 19-Nov-11 0 Boiler Light Up (First) 26-Nov-11 0 Steam Blowing Start -2 29-Nov-11 0 -Restoration 12 13-Dec-11 0 Synchronization -28 16-Dec-11 0 Reliability Run Test -10 16-Dec-11 0 Performance Gurenntee Test 20 23-Dec-11 0 Provisional Acceptance 14 15-Feb-12 0 COD 29-Mar-11 1 Interconnecting pipe to Boiler 29-Mar-11 1 Interconnecting pipe to Boiler f 25-Apr-11 1 Boiler Pressure Parts f 1-Jul-11 1 DM Water f 15-Aug-11 2 STG Erection -130 150 15-Aug-11 2 STG Erection f 16-Aug-11 2 Main Transformer 15-Sep-11 2 MV Station Board f 15-Sep-11 2 MV Unit Swotchboard 1 f 15-Sep-11 2 MV Unit Swotchboard 2 f 16-Sep-11 2 Fire Fighting System f 30-Sep-11 2 Diesel Generator System f 30-Sep-11 2 MV Cabling System f 15-Sep-11 3 Distribution Transformer 90 22-Sep-11 3 LV Bus duct 30-Sep-11 3 LV PMCC 1 30-Sep-11 3 LV PMCC 2 30-Sep-11 3 LV PMCC Common 30-Oct-11 3 LV Cabling system 30-Jun-11 4 Compress Air System 50 29-Jul-11 4 LDO System (incl. Pump Shed) 30-Jul-11 4 MFT 31-Jul-11 4 RW, FW and Treated Water Pump House 15-Aug-11 4 Chimney 15-Aug-11 4 Boiler Feed Pump System 30-Aug-11 4 Soot Blower & Piping for APH 9-Sep-11 4 PA Fan System

14-Sep-11 14-Sep-11 14-Sep-11 25-Sep-11 30-Sep-11 15-Oct-11 30-Oct-11 30-Oct-11 30-Oct-11 30-Oct-11 30-Oct-11 30-Oct-11
10-Nov-11

15-Nov-11 15-Nov-11 15-Nov-11 16-Nov-11 17-Nov-11 17-Nov-11 27-Nov-11 20-Nov-11 29-Nov-11 30-Nov-11 30-Nov-11 3-Dec-11 3-Dec-11 4-Dec-11 5-Dec-11 5-Dec-11 5-Dec-11 5-Dec-11 10-Dec-11 12-Dec-11 12-Dec-11 12-Dec-11 12-Dec-11 12-Dec-11 12-Dec-11 12-Dec-11 12-Dec-11 12-Dec-11 12-Dec-11 12-Dec-11 25-Jul-11 30-Jul-11 30-Aug-11 31-Aug-11

4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 5 5 5 5 5 5 5 5 5 5 5 6 6 6 6 6 6 6 6 6 6 6 6 7 7 7 7

Condenser System Deaerator System Condensate System IDF System Ducting System Interconnecting Piping System Bed Material Handling System Cooling Water System Fire Protection & Alarm System Chemical Dosing Sampling System Boiler Electrical System Completion of Refractory work Completion of Insulation work DCS & Instrument Control system

Ash Handling system Weigh Bridge


Refractory Dry Out ESP System Alkali Boil Out Safety Valve Test Turbine Lube Oil Flushing Termination motor, MCC & Gen. Cont Panel Turbine Generator P.T Test Sequence Test T. Gland Steam System Civil start 30 Sep 11 Lime Stone Handling System Electrical & Instrument Control Test Turbine Turning Test Final Control adjustment Vacuum Test BTG Interlock Test LO System check ST Drain & Gland Sys. Check ST Vibration check Turning Gear check LO Pump Auto Cut in check Hydraulic Fluid check Overspeed test Gen. Short Circuit test Gen. Heat Run test Gen. Open Circuit test Syncronizing check Pipe rack Fdn (CT to Boiler) Pipe rack Fdn (Boiler 2 Laydown) Pipe rack Fdn (Btw Boiler & STG) Pipe rack to Ash Silo

120

= Center =c or leave blank) 4686 Gap Taken for Calcuation(min gap 9 between non mile stone shapes) 450 U may change above gap to wrt to orginal12 scale or change the scale to sug scale value for above cell gap value MileStonega gap 27.75

End Date 157 157 157 157 157 157 157 157 157 157 157 157 157 157 157 157

1. After First running cha 2. Copy Column L value

-0.75

-0.75

239.4 -2887.5 -2887.5 -3267.75 265.8 -2764.5 -2764.5

-2523 440.4001 -2517 -1744.5 1233.6 -1737 -1737

-1423.5 1471.8 -1413.75 -1413.75

-984 1891.2 -971.25 -971.25

486 3337.2 500.25 500.25

1. After First running change scale to Sug Scale value 2. Copy Column L values to Column G

PLANNED TIME SCHEDULE FOR TANJUNG TABALONG 2 X 30MW POWER PLANT


Refractory & Insulation Installation

Boiler Structure Work Start

Remaining Refractory

29-Mar-11

30-Jul-11

Full Resumption

Piling Work Start


12 d
147 d 21 w 23-Aug

Boiler Hydrotest

15-Aug-11

1d
1m 0d 0w 29-Mar 29-Mar 2m 7d 1w 05-Apr 14 d 2w 12-Apr 21 d 3w 19-Apr 28 d 4w 26-Apr 35 d 5w 03-May 42 d 6w 10-May 49 d 7w 17-May 56 d 8w 24-May 3m 63 d 9w 31-May 70 d 10 w 07-Jun 77 d 11 w 14-Jun 84 d 12 w 21-Jun

4d
4m 91 d 13 w 28-Jun 30-Jun 01-Jul 98 d 14 w 05-Jul

01-Jul-11

30 d
105 d 15 w 12-Jul 112 d 16 w 19-Jul 25-Jul

17 d
5m 126 d 18 w 02-Aug 133 d 19 w 09-Aug 15-Aug

7d
140 d 20 w 16-Aug

21-Aug-11

01-Sep-11

53 d
6m 154 d 22 w 30-Aug 161 d 23 w 06-Sep 168 d 24 w 13-Sep 15-Sep 175 d 25 w 20-Sep 182 d 26 w 27-Sep 30-Sep

119 d 17 w 26-Jul

95d

38d

31-Aug

47d

151d

Interconnecting pipe to Boiler


29-Mar-11 Interconnecting pipe to Boiler 25-Apr-11 Boiler Pressure Parts 01-Jul-11 DM Water
25-Jul-11 Pipe rack Fdn (CT to Boiler) 30-Jul-11 Pipe rack Fdn (Boiler 2 Laydown) 30-Aug-11 Pipe rack Fdn (Btw Boiler & STG) 31-Aug-11 Pipe rack to Ash Silo

STG Erection
15-Aug-11 STG Erection 16-Aug-11 Main Transformer 15-Sep-11 MV Station Board 15-Sep-11 MV Unit Swotchboard 1 15-Sep-11 MV Unit Swotchboard 2 16-Sep-11 Fire Fighting System 30-Sep-11 Diesel Generator System 30-Sep-11 MV Cabling System

30-Jun-11 Compress Air System 29-Jul-11 LDO System (incl. Pump Shed) 30-Jul-11 MFT 31-Jul-11 RW, FW and Treated Water Pump House 15-Aug-11 Chimney 15-Aug-11 Boiler Feed Pump System 30-Aug-11 Soot Blower & Piping for APH 09-Sep-11 PA Fan System 14-Sep-11 Condenser System 14-Sep-11 Deaerator System 14-Sep-11 Condensate System 25-Sep-11 IDF System 30-Sep-11 Ducting System 15-Oct-11 Interconnecting Piping System 30-Oct-11 Bed Material Handling System 30-Oct-11 Cooling Water System 30-Oct-11 Fire Protection & Alarm System 30-Oct-11 Chemical Dosing 30-Oct-11 Sampling System 30-Oct-11 Boiler Electrical System 10-Nov-11 Completion of Refractory work 15-Nov-11 Completion of Insulation work 15-Nov-11 DCS & Instrument Control system 15-Nov-11 Ash Handling system 16-Nov-11 Weigh Bridge 17-Nov-11 Refractory Dry Out 17-Nov-11 ESP System 27-Nov-11 Alkali Boil Out

Prepared by : K.Natarajan Desinagation : Manager

Updated Date = : 01-Jan-11

K.Natarajan

102133886.xls.ms_office 6/30/2012

Page 6 of 9

30MW POWER PLANT

Performance Gurenntee Test

Provisional Acceptance

Boiler Civil Work Start

Boiler Light Up (First)

Steam Blowing Start

Reliability Run Test

Boiler Drum Lifting

Synchronization

16-Dec-11

02-Nov-11

19-Nov-11

26-Nov-11

-Restoration

23-Oct-11

29-Nov-11

13-Dec-11

16-Dec-11

23-Dec-11

11 d
7m 182 d 26 w 27-Sep 30-Sep 189 d 27 w 04-Oct 196 d 28 w 11-Oct 203 d 29 w 18-Oct 210 d 30 w 25-Oct 30-Oct 8m 217 d 31 w 01-Nov

18 d
224 d 32 w 08-Nov 231 d 33 w 15-Nov

8d
238 d 34 w 22-Nov

4d
9m 245 d 35 w 29-Nov

15 d
252 d 36 w 06-Dec

4d d 1
259 d 37 w 13-Dec 12-Dec

8d
10 m 266 d 38 w 20-Dec 273 d 39 w 27-Dec 280 d 40 w 03-Jan 287 d 41 w 10-Jan

55 d
294 d 42 w 17-Jan 301 d 43 w 24-Jan 11 m 308 d 44 w 31-Jan

05-Feb-12

315 d 45 w 07-Feb

322 d 46 w 14-Feb

20-Nov

46d

16d

27-Nov

05-Dec

Pump Shed)

ed Water Pump House

15-Sep-11 Distribution Transformer 22-Sep-11 LV Bus duct 30-Sep-11 LV PMCC 1 30-Sep-11 LV PMCC 2 30-Sep-11 LV PMCC Common 30-Oct-11 LV Cabling system

ng for APH

20-Nov-11 Safety Valve Test 29-Nov-11 Turbine Lube Oil Flushing 30-Nov-11 Termination motor, MCC & Gen. Cont Panel 30-Nov-11 Turbine Generator P.T Test 03-Dec-11 Sequence Test T. Gland Steam System 03-Dec-11 Civil start 30 Sep 11 04-Dec-11 Lime Stone Handling System 05-Dec-11 Electrical & Instrument Control Test 05-Dec-11 Turbine Turning Test 05-Dec-11 Final Control adjustment 05-Dec-11 Vacuum Test

10-Dec

3d

10-Dec-11 BTG Interlock Test 12-Dec-11 LO System check 12-Dec-11 ST Drain & Gland Sys. Check 12-Dec-11 ST Vibration check 12-Dec-11 Turning Gear check 12-Dec-11 LO Pump Auto Cut in check 12-Dec-11 Hydraulic Fluid check 12-Dec-11 Overspeed test 12-Dec-11 Gen. Short Circuit test 12-Dec-11 Gen. Heat Run test 12-Dec-11 Gen. Open Circuit test 12-Dec-11 Syncronizing check

ing System ng System

arm System

actory work ation work Control system

Reviewd By : K.Natarajan Desinagation : Manager

15-Feb-12

COD

K.Natarajan

102133886.xls.ms_office 6/30/2012

Page 7 of 9

K.Natarajan

102133886.xls.ms_office 6/30/2012

Page 8 of 9

K.Natarajan

102133886.xls.ms_office 6/30/2012

Page 9 of 9

Das könnte Ihnen auch gefallen