Northampton Dallington FieldsBusiness Park Kingsfield Way,OffGladstone oad, R Dallington, Northampton. NN57aN. Tei:01604580444. Fax: 1604580487. 0 email:northampton@generationuk.co.uk Southampton Claylands oad,Bishops R Waltham, Hants.S0321BH. Tel:01489894411. Fax: 1489894455. 0 email:southampton@generationuk.co.uk Stockport Unit4 Vauxhall Industrial Estate, GregStreet, eddish, R Stockport. K57BR. S Tel:01614770131. Fax:01614777618. email:stockport@generationuk.co.uk Taplow(Thames Valley) Pioneer orks,MarshLane, W Tapiow, aidenhead, M Berks. L6ODF. S Tel:01628673835.Fax01628634788. email:taplow@generationuk.co.uk
......
Birmingham Glasgow TrinityStreet, ffTatBankRoad, O 35 Duchess Road,Ruthergien, Old bury,WestMidlands. 694LA. B Glasgow. G731AU. Tel:01215443355. Fax: 1215443131. Tel:01416476969. Fax: 1416475851. 0 0 email:birmingham@generationuk.co.ukemail:glasgow@generationuk.co.uk Bristol MeritonStreet, t.PhillipsMarsh, S Bristol,Avon.BS2OSlo Tei:01179724550. Fax:0117972 4502. email:bristoi@generationuk.co.uk Cardiff MartinRoad, remorfa T Industrial Estate, Cardiff. F245SD. C Tel:029 20463835. Fax:029 20463246. email:cardiff@generationuk.co.uk Leeds Unit2 Ledger ark HaighParkRoad, P Stourlon,Leeds. S101RT. L Tel:0113277 8822.Fax:01132779977. email:leeds@generationuk.co.uk London Kierbeck Business Complex, NorthWoolwich Road, Silvertown, ondon.E162BG. L Tel:0207473 6056. Fax: 207473 2077. 0 email:london@generationuk.co.uk
neration
HAKIStairtower
User's Guide
Chelmsford Bannisters ard,Mayes Y Lane, Newcastle Sandon, helmsford, C Essex. M27RP. C Forward HousePortobello Road Tel:01245227771. Fax:01245226111. Portobello Industrial Estate,' email:chelmsford@generationuk.co.uk Birtiey, yne& Wear. H32SL. T D Tel:01914921190. Fax:01914111148. Edinburgh email:newcastle@generationuk.co.uk 4 Westerton Road,EastMainsInd.Est. Broxburn, WestLothian. H55AU E Tel:01506863864. Fax:01506863916. email:edinburgh@generationuk.co.uk
SafetyCheckList
1. Is thescaffold/supporting structure completed andready theStairtower? for 2. Is thegroundcondition adequate takethe loadimposed? to 3. Isthe correctequipment site? on 4. Is theequipment goodworkingorder? in 5. Isthe correctPersonal Protection Equipment available andin goodworkingorder? 6. Areallthe components intheircorrectposition andall lockingcatchesengaged? 7. Isthe Stairtower dequately raced a b andanchored? 8. Haveanyitemsbeenremoved?
HealthandSafelyat WorkAct,1974 HAKIequipment designed meettherequirements theaboveAct,Section is to of 6. It is alsothe customer's responsibility compiywiththe requirements thisAct, particularly usetheequipment to of to in accordance ithcurrentcodesof practice w andin ensuring thatcomponents rein goodworkingcondilionpriorto eachuse. a Weareabieto provide assistance andadviceon matters relating safeandproperuseof HAKI quipment. to e
..
GAneration
Generation
.
[rnJ]
HAKr
INTRODUCTION
HAKr
General
from prefabricated components. The stair tower is built using standards, and ledger beams. Other stair tower components include stair flights, landings, handrail and guardrails. The stair tower can be built as a separate construction or integrated into other scaffolding or staging. All components are of galvanised steel.
Marking
All components with the exception of locks,
bolt pins etc. come permanently marked with the HAKllogo and the year of manufacture
(2 figures).(Forexample: lID. 8) 9
A
All INFORMATION ONLY TO COMPONENTS
WARNING
&
Standard
Handrail post
Handrail
ANY COMPONENTS ORIGINATING FROM OTHER SOURCES WHICH ARE INCORPORATED INTO A STRUCTUREWill INFORMATION. IN SUCH CASE, HAKI HAS NO PRODUCT LIABILITY.
Basejack
ledger beam
INVALIDATE THIS
Stairflight
BY MIXING
COMPONENTS
THIS
landing
~OSI1] Published May 2003 subject to change Customers' responsibility to check for changes
m HAKr
Name
Base Jack
LISTOF COMPONENTS
Name
Folding
LISTOF COMPONENTS
Art. No.
Guard Frame
m HAKr
Size
Weight
(kg) 9.2
Article numbers and weights are for galvanized options unless otherwise stated. please refer to HAKIprice listfor the corresponding details for painted options.
Size
1122191
Stair Flight
Standard
7017051
7017101
0.5m
3.3
Locking
Pin
Q
--oD
5141256
0.3
Handrail Post
I
7015100
4.9
Ledger Beam
7021160 7021300
1.605m 3.0m
rI r
7022161
10.2 18.8
1.6m Ledger Beam has beenreplaced witha 1.6m Single Tube Beam. This
1.605m 6.3kg
Stair Handrail
It
j
.........
1211136 1222231
1222222
1.0m 1.5m
2.0m
10.5 12.5
13.8
Landing
,.
7095000
29.1
7103160
15.1
Guardrail
Entron<e s~ -
~
4 5
[I] HAKrl
Name GuardrailFrame
LIST OF COMPONENTS
Art. No. Size
GENERALNOTES
Weight (kg) 10.9 15.4
[I]
HAKr
MaxPersons* 74 91 108 125 127 125 122 119 116 114 III 108 106 103 100 97 95 92 89 87 84 81
HAKIStairTower
All HAKISystems have been designed to conform to current Britishand European Standards. The loading criteria contained in this manual have been calculated according to current BritishStandards.
7052160 7052300
1.605m 3.0m
J:fO
8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50
Base Jacks
The stair tower is mounted on Base Jacks which are adjustable in height. This means the standards can always be adjusted to ensure that the beams are horizontal.
Diagonal Brace
7122160 7121300
9.8 15.6
Standards
Standards of 3m and 2m in length are used wherever possible. Shorter standards may be used as top standards.
Beams
Top End Guard Frame 7053000 7.3
The stair tower is built using 1.605m and 3.0m ledger beams, with 2.0m, 1.5m or 1.Ombetween the platforms depending on which stair flight is used.
~
Clip On Post
7015000 6.6 Erection Platform 2091316 1.605xO.6m
Anchorage
The stair tower must be anchored to the structures at each platform levelon both sides (inner and outer standards) using scaffold tube and couplers - see Page 15.
15.0
SpecialSolutions
For scaffolding constructions not covered by this User's Manual, please contact the HAKI Technical Department.
[I] HAKrl
~ Ll.1
Note: Prior to starting erection, determine
. ALWAYS ENSURE THAT SIDE ACCESS POINTS
ERECTION
position of tower. Always start with stair flight
ARE REQUIRED.
ERECTION
1[1]HAKr
Check distance from structure.
for clockwise direction of ascent. BEFORE STARTING ERECTION, ALWAYS CHECK WHERE ACCESS POINTS
ONLY OCCUR IN 2m
UFTS !
For base jacks as shown. Set out sole plates and base plates at position of standards, ledger beams and transom beams. Place base jacks onto sole plates, adjust to estimated final height.
1 ~
5.
1.
place standard on base jacks, ensure that pockets are running in direction as shown (Iowpocket, 1.605m direction, high pocket 3.0m position).
6.
2.
Connect 3.0m ledger beam to higher level pockets. Connect 1.605m ledger beams to
lower level pockets.
7.
)l
Engage all locking catches as you proceed.
,t
&
8.
place 1 st landingA, on ledger beams as shown (fig 8).Place Erecting Platform,B,at opposite end of bay (foot lilt). Install2nd levelof ledger beams.(Check drawing for l.5m or 2.0m liftheights). Next landing,C, is located by working off Erecting Platform,B. The landing on this lift,and all further lifts,are initiallypositioned on ledger beams approximately O.5m from end of bay. 9
~ HAKrl
rr
~
ERECTION
I
I ....1
.'\ I
ERECTION
If I
I~ HAKr
rIT\.;>uararall ~ rrames and Guardrails to the ~.. ~ 1.1 outside face of the stair flight.
'i
9.
Fit entrance step to tower. The stair tower must be anchored to the struc-
12.
tures at each platform level on both ends (inner and outer standards) using scaffold tube and couplers.
Uppermost erector clips to mid point of ledger beam. Both erectors then fix Stair Handrail Postinto top and lower landings. Then, Stair Handrail is located into pockets of posts and locking catches engaged.
Stair flight is positioned vertically and located into pockets of lower landing (11 A & 11B). Flight is then lowered onto landing above (11 C) and pushed along (11 D) until top of stair flight is fully located into pockets of upper landing (11 E). Note. At this stage check top and bottom of stair is fully engaged into both landing pockets. Stairflights should be erected for a clockwise ascent.
13.
Fit Folding Guard Frame into handrail post and standard at entrance of stair.
11B.
Re-position Erecting Platform onto next lift directly above lower landing.
15.
10
11
.....
[I] HAKrl
I
ERECTION
Erector 1 proceeds up stair flightand fits temporary Clip-On Post to ledger beam close to erecting platform. Erector 1 then hooks to ledger, and, using clip-on-post for support, he climbs onto Erecting Platform. Note: Clip-On Post is only used to facilitate climbing to exposed landing
ERECTION
1[1]HAKr
NB:Ties should be fitted to structure and tower ateach level before erecting next lift.
16.
Erector 2 proceeds up stair flightonto landing, hooks onto ledger beam close to standard.
Forfurther liftsrepeat procedures 8, 11-13, 15- 20 until reaching final exit levelor mid exit points.
17.
Next standards are added to all four legs. Temporary Clip-On Post may now be removed to a safe place until it is required again - eg
21.
18.
FitGuardrail Frames to face and end of tower as shown. Fitledger beams to next liftrequired (1.5m or 2.0m). Re-hook to upper ledger near standards.
Entrance/exit at top of tower. Erector 1 is safely standing on landing and hooked on to centre of 1.605m ledger beam, fits 3.0m guardrail frame with Erector 2 safely standing on erecting platform at opposite end of tower, hooked onto 1.605m ledger beam. Erector 1 then fitsTopGuard Frame into handrail post and landing as shown.
19.
12
13
[I]
HAKrl
ERECTION
For side exit
Erector 1 is safely standing on landing and fits clip on post to inside ledger beam. Erector 2 standing on erecting platform at opposite end oftower hooked onto 1.605m ledger beam. Bothoperators then fit2.16m guardrails or 2.16m guardrail frame into Clip On Postand standard ensuring lockingcatches are engaged. Means of access/ egress at side of tower is then complete.
ERECTION
1[1]
Shows construction of the HAKI Stair Tower with the 3.0m face parallel to the structure or scaffold (side exits).
HAKr
Using tube & couplers, the tower should be tied to the structure below each lift position (except first lift) through both inside & outside
standards.
For nd e exit
Erector 1 is safely standing on landing. Erector 2 standing on erecting platform at opposite end of tower clipped onto 1.605m ledger beam. Bothoperators then fit 3.0m guardrail frame at each side of tower. Remove 1.605m Guard from landing position. Means of access/egress at end of tower is then complete.
Shows construction of the HAKI Stair Tower with the 1.605m face parallel to the structure or scaffold (end exits). Using tube & couplers, the tower should be tied to the structure below each lift position (except first lift) A. to inside standards, and B. using diagonal tubes to outside standards.
Access
Points
For dismantling the Stair Tower, the reverse of the above squence should be followed.
Itisonly possible to have a side access point (3.05m) in a 2.0m lift. Access to/from end of tower (1.655m) is not restricted, but 1.605m ledger Beam may have to be raised to create sufficientheadroom when access liftis less than 2.0m. ---
14