GNE
Business Sectors
Power Generation-Thermal
Steam Boiler
CFB/PC/Bagasse/Biomass
Steam Turbine
Condensing/Extraction/Back Pressure
Turbo Generator
Direct Coupling/Gearbox, Air/Hytrogen Cooling
Total Controls
DCS/PLC, Instrumentations
GNE
Power Generation-Hydro
Hydro Turbine
Axial Inflow/Intrusion/Pressure Inflow
Hydro Generator
Single Shaft/Gearbox
Total Controls
DCS/PLC, Instrumentations
GNE
Power Generation-Thermal
Sound Track
Thermal Power Plants: CFB/PC boiler 120-300t/h, Steam Turbine 15-50mw major boiler, turbine, generator plus auxiliaries, 3 sets Heat and Power Plants for Sugar Millsbagasse boiler 35-85t/h, turbo generator 3-12mwmajor boiler, turbine, generator plus auxiliaries, 5 sets Heat and Power Plants for Textile, Chemical MillsCFB/PC boiler 35-120t/h turbo generator 3-15mw major boiler, turbine, generator plus auxiliaries, 2 sets
Thermal Power Plants of Burning Urban GarbageCFB boiler 35-65t/h, turbo generator 6-15mw major boiler, turbine, generator plus auxiliaries, 2 sets
Thermal Boiler Burning Vinasse from Alcohol Plant: 15T/H, vinasse treatment 600t/d
GNE
Huaxing Power Plant, Baise, China Boiler1*220t/h CFB, 9.81MPa, 540 Turbo Generator: 1*50MW, 9.0MPa, 500 Completion: Dec., 2004 Notes: Second hand turbo generator, made in 1959
Total Plant
Turbo Generator
Control Room
Feed Pumps
GNE
Deyongjia Garment Plant, Dongguan, China Boiler475t/h, CFB, 3.98MPa, 450 Turbine15MW 3.5MPa 435 DCSBTG synchronized auto controls Date of Completion: May, 2001
Total Plant
TG Set
GNE
Control Room
Power Panels
Coal Conveying
GNE
Dongguan Garbage Power Plant, 215 112mw, 1200t/d garbage handling, Guangdong, China Ningbo Garbage Power Plant, 215mw, 800t/d garbage handling, Zhejiang, China Boiler65t/h CFB, 3.98MPa 450 Turbo Generator15mw, 3.5MPa, 435 Date of Completion Dongguan-March, 2005, Ningbo-Dec., 2005
Dongguan Plant
Ningbo Plant
Control Room
CFB Boiler
Turbo Generator
GNE
International Projects
AA Group, 300t/h, CFBBiomass, Thailand Boiler300t/h, CFB, 9.8MPa, 540 Date of Completionunder construction, to commissioning in Oct. 2008
Signing Ceremony
Site Survey
Site Survey
China Representatives
GNE
International Projects
GNE
Signing Ceremony
International Projects
Lhoknga 216MW Power Plant EP Project, Indonesia Boiler75t/h,CFBC Boiler, 3.9MPa, 450 Steam turbine and generator15MW, 3.5MPa, 435 Associated with CHEC, 2006 Used plant package supplied to Indonesia, 2008. Boiler: 275t/h,CFBC Boiler, 3.9MPa, 450 Steam turbine and generator215MW, 3.5MPa, 435 HFO DG Sets, 410MW, 2008, package supplied to Indonesia 410MW, HFO DG Sets Associated with GD Imp/Exp Corp.
GNE
International Projects
India KPPL 225MW thermal power plant EP Project Boiler2130t/h, PC Boiler, 3.9MPa, 450 Steam turbine and generator225MW, 3.5MPa, 435
GNE
Contract Signing
GNE
DCS Applications
Typical DCS installed
XDPS-400, Shanghai Xinhua MACS, Beijing Hollysys WebField ECS-100, Supcon PCS7, Siemens Florence 2000, ABB UMC-800/HC900, Honeywell
GNE
PLC Applications
Typical PLC installed
S7-200/S7-300, Siemens Schneider Allen Bradley FX2N, Mitsubishi
GNE
Installed Instrumentations
Pressure Transmitters
Temprature Probe
Speed Sensors
GNE
Industrial Monitors
Typical Projects
1234 Boiler auto controls, Baiganhua, Baise, China
Honeywell HC-900 DCS system All boilers communicate to each other plus remote controls EJA series pressure transmitters, ZKZ series control valves , Wayleber flow meters
GNE
GNE