Introduction
Production planning is done in order to solve anticipated possible difficulties and decide in advance as to how the production should be carried out in the best and economical way.

Company Overview- Arvind Mills Ltd


It is worlds third largest and Indias largest Producer of Denim Established-1931A.D Owner-Kasturbhai, Narottambhai and Chimanbhai CEO and Managing Director-Mr. Sanjay S. Lalbhai

Company Overview- Arvind Mills Ltd


Production of Denim-120 million meters of Denim Per annum Total Revenue-Rs 23.45 Billions Revenues from different segments as follows:

Source:- http://en.wikipedia.org/wiki/Arvind_Mills

Brands of Arvind

Research Background
Research Objective
To translate orders received from sales department into orders on the works department and to coordinate different departments so that a fine balance of activities may be maintained. To find ways and means through which product manufacturing requirements such as materials and their necessary constituents may be available in right quality and quantity at the right time. To determine capacity of all manufacturing departments and to plan systematically

Production Planning and Control


Concept
Production planning and Control may be defined as the technique of foreseeing every step in a long series of separate operations, each step to be taken at the right time and in the right place and each operation to be performed with maximum efficiency.

Production Planning and Control


Purpose
Effectively utilize limited resources in the production of goods so as to satisfy customer demands and create a profit for investors.

Production Planning and Control


Functions

Production Planning and Control for Denim Manufacturing


Role of PPC for Denim Manufacturing

Process of Sales Order Execution

Dispatch Date Commitment


The dispatch date commitment is based on following factors Current Load Product Characteristic Bottleneck areas

Capacity Planning

Capacity Planning (Spinning)

Capacity Planning (Dyeing)

Capacity Planning (Weaving)

Capacity Planning (Finishing)


Average Speed= 30 Metres/ min Average Time =18 hours Efficiency %= 0.80 Production capacity (Finishing) per Day= (Avg. Speed x Avg time x Efficiency) Production capacity per day=(30 x 18 x 60 x 0.80) = 25920 metres

Yarn, Weaving and Process Outsourcing


Yarn Outsourcing
-Ring Yarn- 1000 tons (Source-Nahar Industries, Vardhaman, Oswal, Abhishek, Etco, Ravali, Nitin, Nadan etc) -Filament Yarn- 450 tons (Source- Reliance, Welspun, Alok, Taiwan, China etc) -Lycra Yarn -130 tons (Source-Auro, Abhishek etc) -Open end Yarn 150 tons ( Source- Nahar, Abhishek etc) -Linen Yarn- 20 tons ( Source-Jayshree, Germany) -Dyed weft Yarn and melange- 10 tons (Source-Shirting, Winsome)

Scheduling Process

Plan Release
The plan is forwarded to production department and execution of plan takes place. The production department follows the plan to optimize the production capacity.

Co-ordination and Control

Recommendations
Total Productive Maintenance Sequence of Operations Termination of unnecessary process of Finishing

Conclusion
The production control activity is a chain of interrelated events that functions as a system. The decisions are made for different horizons in time and with different degrees of accuracy. To use limited resources effectively to produce goods that satisfy customer demands and create a profit for investors.