Table of Contents
Existing design Demerits Possible Solutions
Minor changings & additions in present design Roundabout
Conclusion
DTEM UET, Lahore
12/26/2012
NATIONAL LIBRARY
DTEM UET, Lahore
12/26/2012
Existing Design
12/26/2012
12/26/2012
284 59
Gate #3
316
316 56
335
509
30
DTEM ROAD
12/26/2012
Gate #3
DTEM ROAD
Sharp turns
Improper Marking Insufficient Sidewalk width Wrong Island location Conflict Points
(According to the PD of University this intersection is designed as per desire of V.C. without any proper study)
DTEM UET, Lahore
12/26/2012
Faults in intersection
(According to the security center of the University about 8-10 accidents have been occurred in the last 10 years)
12/26/2012
12/26/2012
12/26/2012
Structure changing's
Side walk:
At this time
12/26/2012
Pavement marking
In pavement
marking
Zebra crossing
12/26/2012
Signs
In signs, we
have recommended,
Give way sign
12/26/2012
Speed breakers
Introduction
12/26/2012
12/26/2012
12/26/2012
Proposed design
12/26/2012
316
32
316
32
12/26/2012
15ft diameter of circular island. Each lane is 15 wide. Sidewalk of 8 is provided. Shoulder width is 2. Width of vehicle circulating area is 30ft.
Splitter island has 2.5 ft width and 10 ft length Natural slope of 2% is provided.
.
12/26/2012
roundabout is 25km/h
Operating speed is
20km/h
12/26/2012
Stopping Sight
distance is 85ft
12/26/2012
Control on accidents
Reduction in conflict
12/26/2012
12/26/2012
12/26/2012
Conclusion
If
we consider the economic factor, then modifications in the existing design is the best option
12/26/2012