PRESENTATION ON PRACTICAL TRAINING AT KOTA SUPER THERMAL POWER STATION

SUBMITTED TO:DEPT. OF ELECTRICALENGINEERING SUBMITTED BY:Raj Kumar Kumawat 2009uee253

INTRODUCTION
Total Generation Capacity of KSTPS = 1240 MW Stage 1 - 2 Unit (110 MW each )

Stage 2 - 2 Unit (210 MW each)


Stage 3 - 1 Unit (210 MW) Stage 4 - 1 Unit (195 MW) Stage 5 - 1 Unit (195 MW)

LAYOUT

Various Sections of The Plant


Boiler
Turbine & Generator Set Condenser & Cooling System Electrostatic precipitator Ash Handling Plant

Switchyard & Control Panel


Transformers & Backup Supply System Auxiliaries

BOILER

Turbine & Generator Set


Governor

Turbine
TECHNICAL SPECIFICATION
Rated output -- 110 MW Rated speed 3000 rpm Direction of rotation clockwise Type -3 cylinder, impulse

Stages In Turbine

Generator

TECHNICAL SPECIFICATIONApparent output 137.5 MVA Active output - 110 MW Power factor 0.85 lag Excitation voltage 230Volt Rated voltage 11 KV Rated speed 3000 rpm Phase connection star-star

Condenser & Cooling System


Condenser

Cooling System
1. Open Cycle Cooling

2. Closed Cycle cooling

Electrostatic Precipitator
Collecting electrodes

Emitting electrodes

Rapping Mechanism

Ash Handling Plant

H1

H2

H3

Water
Wetting Head

Air Air intake Valve

200 NB

Air+Ash

Vacuum System

Air

Collector Tank

Water

Wet Slurry to Disposal

Switchyard & Control Panel


7 Generator Bays 11 Outgoing Feeder Bays 2 1 1 4 1 2 For For For For For For Jaipur Beawar Gulabpura Kota Modak PGCIL Kota (400kv Sub Station)

Switchyard Single line Diagram

220kv Bus System Main Bus II Main Bus I

Bus Isolator

CB CB CB Transfer Bus Bay

GT 11/220KV
PMI Revision 00

Gen Bay

Feeder Bay

Control Panel

Transformers & Backup supply System


1. Generator Transformer 2. Station Transformer 3. Unit Auxiliary Transformer 4. Station Service Transformer 5. Unit Service Transformer

Common Auxiliaries
a.) Coal Handling Plant

COAL HANDLING PLANT


RAW MATERIAL unload HOPPER

Conveyer belt
CRUSHER HOUSE WAGON TRIPPER Coal size reduced By 20mm

Conveyer belt FURNACE BUNKER

Parts of The Coal Handling Plant


a.) Wagon Tripper

b.) Crusher

c.) Conveyor Belts

Specification:Belt width : 1400mm Speed : 2.2m/sec Capacity : 750 ton/hr No. of conveyor: 38

b.) Water Treatment Plant

CIRCULAR TANK

Row Water

Chemical Addition Alum+Cl2

Chemical Mixing

Clarification Tank
For civil Purpose

Clarified Water Tank

Sump To DM Plant

Filter Bed

To CW (6&7)

Unit Auxiliaries
a.) Pulverizing Mill

b.) Air Pre Heater

WT Plant

Coal Handling Coal Plant

Boiler

TG Set

Control room

Switchyard

Flue Gases to Stack

ESP

Cooling System Transmission

Ash handling Plant