A Brief Introduction of Chinas ATM System Development Vision and Current Improvement Programmes GANIS ICAO HQ 2011

Li Xin Science & Technology Committee Office, ATMB,CAAC

Air Traffic Management Bureau


1

Summary
A brief introduction of China ATM system The vision of future: China New Generation ATM System Near-term improvements and programmes

General Information of China ATM System

Air Traffic Management Bureau


3

Overview of China ATM System


Chinas ATM system is running by Air Traffic Management Bureau of Civil Aviation Administration of China Nearly 20000 employee including 5000 controllers
CAAC
ATMB

7 REGIONAL ATMBs
23 ATM Sub-Bureaus 14 ATM Stations
4

Airspace
Total Area: 10,810,000 km2 11 FIRs including HK& TAIPEI 18 upper control areas 28 medium/low level control areas 31 APPs

Traffic Volume and Flows


Traffic volume in 20105.5 million and over 90% is demotic traffic The proportion of international traffic will increase Very congested in eastern China Nearly 40% of traffic distribute in Bohai Bay, PRD and YRD. Traffic in Southwest China is expected to grow rapidly in future China is involved in most of the major traffic flows of APAC region
6

ATM Infrastructure
The eastern area and developed western area of China has covered by modernized CNS infrastructure.
VOR/DME

Matured AIS system provides aviation users with timely, accurate and complete aeronautical information and service products.

VHF

MET network all over the country provides timely weather report and meteorological information.
RADAR7

Vision of Future China New Generation ATM System

Air Traffic Management Bureau


8

Rapid Growing Demand


In the past decade, the air transportation volume in China maintained a growth of 15%. Today, China aviation transportation volume ranks No. 2 and kept a excellent record of safety. By 2030,the volume of passengers is expected to exceed 1billion

Year
2000

Airports
121

Fleet
527

Passenger
67M

2005 2010 2015

142 175 >230

863 1597 >2750

138M 268M >450M


9

Challenges
As the traffic growth rapidly, delay in congested areas is getting serious. Insufficient ground infrastructure in highland and mountain areas of western China. Insufficient airspace and inflexible utilization. CDM mechanism need to be strengthened. Nation-wide ATFM system is to be setup.

10

CAAC Long-Term Strategy


In 2010, CAAC had proposed a long term strategy to guide the development of aviation industry from now to 2030. A SAFE, EFFICIENT and ENVIRONMENT-FRIENDLY air transportation system has been set as the goal of strategy. The China New Generation ATM System is part of the strategy.

11

ATM Long Term Objectives


SAFETY: Accident rate less than 0.1 per million flight hours.

CAPACITY: Accommodate 4 times of current demands and punctuality up to 85%.


EFFICIENCY: Route non-linear coefficient down to 1.05.

SATISFACTION: Improve service to increase the satisfaction of airspace user as the demands growth rapidly.

12

Vision of ATM Development


China New Generation ATM System (CNAS)
Follow CAAC Long-Term Strategy Based on operation and development situation and environment of China Air Transportation Compliance with the concept of ICAO Doc.9854. Under the guidance of ICAO Doc.9750 and 9883.

Take NextGen and SESAR as reference.

13

Planning Framework
ConOps
Performance Framework

Roadmap

Implementation Plan

Five-Years Plan
14

Assumptions of Significant Changes


Flexible Resource/Capacity Allocation Performance-based Operation and service Collaborative decision-making From Tactical to Strategic Development of automation tools Transformation of roles and responsibilities
Inc omp let e i sha nforma rin tio g n

Incomplete information sharing

Aerodromes operational sections

Aerodromes operational sections

ATM service providers Airspace users Airspace users

ATM service providers

Inco

mple

mat nfor te i g in shar

information-rich environment

ion

15

Components
Flexible Airspace Organization and Management Performance Based Operations Collaborative Operations Collaborative Demand Capacity Balance Trajectory Based Operation
KPAs Sa fety Ca p a c ity Effic ienc y Flexib ility Pred ic ta b ility

Colla b ora tive DCB

TBO

Flex AOM

Colla b ora ti ve Op s

PBO

16

Performance Based Operation


Performance Based Navigation and Separation ATM service provider will provide different service to different level of aircraft performance. PBO provides measures to improve ATM by taking advantages of operation capability of aircrafts. ATM service provider can use Required Performance as a measure to maximums the utilization of ATM assets and increase capacity to accommodate demands. Users can make the tradeoffs between investments and level of service desired to best meet their needs.

17

Flexible AOM
Flexible Use of Airspace under Civil-Military Coordination
Enhance Civil-Military cooperation Increase temporary route Reduce permanently segregated airspace

Dynamic airspace capacity management


Change airspace structures with pre-defined modes according to flow requirements and changes of traffic situation. Flexible sectorization, optional route, performance base airspace access rules

Flex AOM will enhance the capability of managing the airspace to gain more capacity

18

Collaborative Operation
SWIMBuild a dynamic information sharing environment provide tailored service and facilitate unified situation awareness CDMBrings benefit in demands capacity balance and improve capacity and equity of the system. Supervision and evaluation is needed to maximize the benefits of all stakeholders without impacting overall operations of ATM system.
Wea ther Constra int FM stra teg y Ca p a c ity Pla n

Unified SA of Air Tra ffic

Deta iled Pla n Op era tiona l Stra teg y Prorit

Weather

Info-Sharing
AOC ATCO

Piolet Flow Mng

Pre-ta c tic a l DCB Ta c tic a l DCB

19

Collaborative DCB
Combine the concepts of ATFM and Capacity Management
Strategic planning Pre-tactic optimization Tactic Execution
Stra teg ic Pla nning Pre ta c tic a l Op tim iza tion Exc ec ution

1 Yea r

Da y b efore op t Pre ta c tic a l Op tim iza tion Short term unb a la nc e forec a st Tra jec tory Ad justm ent Ca p a c ity Config ura tion Op tim iza tion Ground Dela y

Op t d a y Rea l tim e DCB Rea l tim e c a p a c ity Assessm ent Tra jec tory Ad justm ent Reg ula tion Flow Ca p a c ity inform a tion b roa d c a st

Stra teg ic D a nd C p la nning Flig ht &Tra jec tory Pla nning Ca p a c ity Pla nning Initia l DCB eva lua tion

20

Trajectory Based Operation


TBO is a brand new concept TBO will change the way of ATM service delivery. Planning and execution of flight, flow and capacity management, even separation and conflict management will shift to Trajectory Based At late stage of the New Generation ATM System , China will gradually shift to TBO from current operation.

21

CNAS Operation Improvements


Focus Area PBO ID OI21 Short Term-OIs RNP/RNAV Procedures in TMA ID OI24 Mid Term-OIs RNP/RNAV Implementation in En-route ID OI25 Long Term-OIs Full Implementation of PBN

OI22

Parallel Route

OI28

Reduction of Horizontal Separation in En-route


Reduction of Horizontal Separation in TMA Enhancement on CM of Surface Movement Improvement on Conflict Management by Using User Intent Information Optimization of TMA by Using RNP/RNAV Increase of Flexibility of Route Network Dynamic Airspace Management AIS to AIM

OI32

Airborne Situational awareness


Reduction of Horizontal Separation in Oceanic Area Delegated Separation Self-separation

OI23

Improvement on Arr/Dep of Airport with Critical Terrain Reduction of Vertical Separation Reduction of Horizontal Separation in Remote Area Airspace Classification

OI29

OI33

OI26 OI27

OI30 OI31

OI34 OI35

F-AOM

OI01

OI04

OI07

FUA Based on Coordination between MA and CA

OI02 OI03 C-Operation OI08

Optimization of Control Area Optimization of Current Air Route Using PBN Improvement on Dynamic Flight Data Management Enhanced CDM inside ATM

OI05 OI06 OI09

OI11

SWIM

OI12

OI10 OI13

Integration of Weather Information into ATM IM System Initial MA/CA Coordination Mechanism

OI14 OI15

Extended CDM to Airspace User and Airport Improved MA/CA Coordination Mechanism

22

CNAS Operation Improvements


Focus Area ID Short-OIs ID Mid-OIs Improvement on Flow Forecast by Using User Intent Information Integrated Management of Arrival/Departure Stream Dynamic Flow-capacity Balancing Trajectory Sharing and Negotiation Dynamic Trajectory Data Management Trajectory Evaluation during Execution Enhancement of DCB by Using Trajectory Data OI40 TBO Procedures in TMA ID Long-OIs

OI16
DCB OI17

Flow Management
Capacity Resource Evaluation and Planning

OI18

OI19 OI20 OI36

OI37
TBO OI38 OI39

OI41
OI42 OI43 OI44

TBO Procedures in All Phases


Flight Planning based on Trajectory User Preferred Optimized Trajectory

Trajectory-based Flow Management

23

Current Improvement Programmes and Near-term Plan

Air Traffic Management Bureau


24

Current Activities
To bring the vision to reality:
China New Generation ATM System Planning Framework is under development. R&D, validation and trail has been carried out for CNS/ATM technologies. Near-term improvement programme, such as implementation of PBN and ADS-B, had already started.

25

PBN
PBN Roadmap
Short-term2009-2012: Local Implementation Mid-term2013-2016: Fully implemented Long-term2017-2025: Fully integrated

Currently
23 Airports 10400km PBN route

Relevant initiatives
Training and Guidance material WGS-84
26

ADS-B
Policy
Application policy of civil surveillance technology of China,CAAC,2011

Initial Operation
Chengdu-Lhasa Air Route: May 18th, 2011 Sanya ATC Area: Jun 16th, 2011

Relevant Initiatives
Implementation Roadmap Operational Procedure Ground Station Construction\Maintenance\Flight Inspection Requirement CHENGDU
LASHA

SANYA

27

Operational
Navigation: Follow the PBN roadmap Separation: Reduce Separation Minimum in NonRADAR area by using ADS-B

Airspace Management:
Establish capacity evaluation facility & air route structure optimization Control Area Combination: Reduce Upper Control Area from18 to 8 Civ-Mil Joint FUA: Joint operation in busy area

28

CNS infrastructure update


AIDC: Nation-wide implementation AMAN/DMAN: Deploy in most congested terminals ACARS: Upgrade to VDL M2 ATN/AMHS :Trunk network construction, transit from
AFTN to AMHS

Digital-ATIS & DCL: Deploy in 50 busiest airports MLAT: Deploy for surface surveillance and wide-area
surveillance test

29

R&D initiative
SWIM :Research and Development GBAS : Demonstration and operational approval Wx System: Concept of new generation weather system AFTM: System Designing FUA: Mechanism Research

30

Compass(BEIDOU) system
Vision
Asia-Pacific region coverage with 12 SVs at 2012 Global Coverage with 35 SVs at 2020

Standardization
Development of GNSS SARPs to include COMPASS through approval process of ICAO

Service for Civil Aviation


Enhance the Availability, Integrality, Continuity and Accuracy of GNSS PNT Services

Evaluation and Development


Evaluate Compass PNT performance for civil aviation Develop ground and airborne equipment
31

Conclusion
CNAS is the vision of China ATM System development. The planning framework is under development and will follow the guidance of ICAO. CNAS is expected to be fully operational in 2030 and contains five components Planning and deployment of some CNS/ATM technologies such as PBN, ADS-B are in progress and will be integrated into CNAS in future.

32

Thank you!

Air Traffic Management Bureau


33