Optical Fiber Laying Procedures

Laying means installation on supervision basis for successful project completion. Cable ends should be sealed. Exposed cables should be protect from public traffic. Cable should not be more pull by the manufacturer recommendation. Cable bend should not be reduced from the manufacturer recommendation. The minimum bend formula r = 20*diameter of OFC. Loading, unloading and moving of OFC shall be properly. Cable drum shall always be carry on their flanges. Use of nails shall be avoided on drums of cable because of varying flange thickness.

Preparation for Excavation of trench


Strictly follow the route plane. Local authority shall be informed. All the required materials shall be on site. Diversion of traffic shall be organized where necessary. A line shall be marked on the ground with a string or marking compound. The trench shall be in-side from the extreme edge of right of way (row).

Excavation of trench in normal soil


In normal soil, the trench shall be Excavated to a depth of 1.5 meter. The width of trench shall be 40 cm at the top and 35-40 cm at the bed. The depth reference for the trench shall be taken from the road surface, The bed of sand 10 cm deep shall be laid along the bottom of the trench and above the cable. Bricks shall be placed on the cable with no space between the bricks. Double layer of bricks shall be used in less populated rural areas. The optical fiber warning tape is used at 75 cm from bottom of the trench and then back filling with same material.

Excavation of trench in Sandy area


The trench depth and width should be same as for normal size. If the bottom of the trench is hard, sand be 10 cm thick above and below the cable shall be provided. The single layer brick protection shall be provided. If the trench bed is already contain soft sand bed then additional sand bed of 10 cm above and below the cable not needed.

Excavation of trench in water log area


Trench specification same as for normal soil. Water deposited shall be removed with pump before preparation of trench. The sand bed of 10 cm thick shall be provided along the bottom above and below. The back filling of the trench should be immediately.

Laying in standing water area


If the height of water is one meter or above other than seasonal water. The cable shall be laid directly on the surface of the earth. The cable should cover with grouted back (dry) with cement sand ratio 1:8. The size of bags (100*50*20 cm) shall be placed longitudinally on cable.

Excavation of trench in Rocky soil


The trench depth shall be 110 cm. The top width 40 cm and bed 35-40 cm. All the sharp edges of rock should be removed. The sand cushion 20 cm thick above and below the cable shall be provided. The small pebbles shall be dropped first in the trench gently till the level of warning tape. material The optical fiber warning tape is used at 50 cm from bottom of the trench and then back filling with same

River Crossing
When the trench cross a river where small quantity of water flows then the river shall be crossed through bore using GI-pipe sub ducted with PVC pipe and slab shall be used.

Rain Washable Areas


The depth of the trench shall be as per specification but instead of using bricks, the sand bed above the cable shall be covered with 15cm thick concrete. Under no circumstances the cable shall be directly concreted.

Slope Crossing
When slope to be passed down, the cable shall be laid in GI/PVC pipe. The trench depth shall be one meter at the base of the slope and 50cm at the top. Concrete step wall having 1m Length, 0.5m Height and 0.15m Thickness shall be constructed after every 2 meters across the trench. The wall shall be constructed from the level of pipe in trench.

Laying of cable in a Trench


The handling of Fiber cable is critical and care shall be taken. Cable shall be laid in a straight line along the bottom and center of the trench. Cable shall be carefully rolled off the drum preventing sharp bends and kinks. It is necessary to remove the cable from the drum and store in the shape of EIGHT (8) when the cable is to pass through a pipe.