Laying means installation on supervision basis for successful project completion. Cable ends should be sealed. Exposed cables should be protect from public traffic. Cable should not be more pull by the manufacturer recommendation. Cable bend should not be reduced from the manufacturer recommendation. The minimum bend formula r = 20*diameter of OFC. Loading, unloading and moving of OFC shall be properly. Cable drum shall always be carry on their flanges. Use of nails shall be avoided on drums of cable because of varying flange thickness.
River Crossing
When the trench cross a river where small quantity of water flows then the river shall be crossed through bore using GI-pipe sub ducted with PVC pipe and slab shall be used.
Slope Crossing
When slope to be passed down, the cable shall be laid in GI/PVC pipe. The trench depth shall be one meter at the base of the slope and 50cm at the top. Concrete step wall having 1m Length, 0.5m Height and 0.15m Thickness shall be constructed after every 2 meters across the trench. The wall shall be constructed from the level of pipe in trench.