project is a collection of tasks that must be completed in minimum time or at minimal cost.
Project
schedule consists of a list of a project's terminal elements with intended start and finish dates. elements are the lowest element in a schedule, which is not further subdivided. Those items are often estimated in terms of resource requirements, budget and duration.
Terminal
Completing the project as early as possible by determining the earliest start and finish of each activity. Calculating the likelihood a project will be completed within a certain time period. Finding the minimum cost schedule needed to complete the project by a certain date. Investigating the results of possible delays in activitys completion time. Progress control. Smoothing out resource allocation over the duration of the project.
The
PERT/CPM
is used for scheduling activities such that the projects completion time is minimized.
Gantt
charts are used as a tool to monitor and control the project progress.
Gantt Chart is a graphical presentation that displays activities as follows:
Time is measured on the horizontal axis. A horizontal
bar is drawn proportionately to an activity s expected completion time. Each activity is listed on the vertical axis.
In
an earliest time Gantt chart each bar begins and ends at the earliest start/finish the activity can take place.
Gantt
chart can be used as a visual aid for tracking the progress of project activities. percentage of a bar is shaded to document the completed work. manager can easily see if the project is progressing on schedule (with respect to the earliest possible completion times).
Appropriate
The
It
is desired that resources are evenly spread out throughout the life of the project. leveling are designed to:
Resource
over time.
"Failing
to plan means planning to fail Forces detailed thinking and planning Improves communication Provides a goal Lets you know when you are off track Reduces costs See problems early Increases productivity Enables project manager to control the project instead of the project having control of them