Ultra Mega Thermal Power Plant

Power Scenario of India


Total Installed capacity in India Is 209.27 GW up to date 31-10-2012 .

Power generation through Thermal Power Plant is 140.20 GW . It is 70% of the Total Installed capacity .
For 2011-12 year ,a Base load energy deficit and peaking shortage was 10.3 and 12.9 % respectively.
The Energy Demand for 2016-17 is expected to be

218 GW.
* Source: Central Electricity Authority , Energy Statistics 2012,
of India Report Power Survey

India has Plan to capacity addition of 88000MW in 12th Five year plan . Growth of Power sector will be around 5.17 % In 12th five year plan . Thermal power Generation achieved a growth rate of 3.81 % in year 2010-11 .coal based generation growth rate was 3.99% in same year . For meeting the demand require of large generation unit by developing the Ultra Mega Power Projects (UMPPs)

Ultra Mega Power Plant


Salient Features of the Plant and technology used Large Size projects each capacity approximately 4000MW.
Based on Super critical technology with high level of fuel efficiency result in fuel saving and lower green house gas emission . Flexibility in unit size subject to adoption of specific minimum Supercritical Parameters.

Integrate Power Projects with dedicated captive coal blocks for pithead Projects . Costal Projects to use Imported coal Need 10000 Acre of land for establishing a UMPPs project Cost is around 4 billion USD .
*Source : Powermin.nic.in

Present Scenario Of UMPPs In India


Tata Power and Reliance Power are the successful developer of the UMPPs project In India. Out of 9 Projects 4 are under operation and remaining 5 are in the Pipeline.
1. 2. 3. 4. 5. 6. 7. 8. 9. Sasan Power Limited (Sasan, Madhya Pradesh),awarded to Reliance Power. Coastal Gujarat Power Limited (Mundra, Gujarat),awarded to Tata Power. Coastal Karnataka Power Limited (Tadri, Karnataka) Coastal Andhra Power Limited (Krishnapatnam, A.P.),awarded to Reliance Power. Coastal Tamil Nadu Power Limited (Cheyyur, T.N.) Coastal Maharashtra Power Limited (Girye, Maharastra) Orissa Integrated Power Limited (Sundergarh district, Orissa) Jharkhand Integrated Power Limited (Tilaiya, Jharkhand),awarded to Reliance Power. Akaltara Power Limited (Aklatara, Chattisgarh)

UMMPs in Map Location

Site for Setting up of UMMPs


MoP has identified 9 Projects , 4 at Pithead and 5 at costal location

Large Space Requirement


(Around 10000 Acre land requirement remote to the populated area)

New rail lines for Transportation of the Coal from Mines to Power station which are in the costal area. More Transmission Infrastructure needed
Source: Powermin.nic.in ,CEA

Agency Involved

Ministry of Power Policy Interventions Inter-Ministerial co-ordination State Government support Central Electricity Authority Site selection Resolution of Technical Issues Power Finance Corporation Ltd. Nodal agency for setting up Shell Companies (SPVs) for each project. Managing the bid process.

Financial Aspect

For achieving financial closure, past experience highlights critical importance for Government intervention to:

secure reliable fuel supply. obtain environmental clearances. land acquisition and resolution of R&R issues. co-ordination with states & bulk power purchasers.