RAJIV LIFT IRRIGATION SCHEME (BHIMA)

1 Project Profile : Lifting of 20 tmc of water from foreshore of PJP and Ookachettivagu Project Pondage : G. O. Ms. No. 166, I & CAD, Dt: 30-102003 for Rs. 1426.30 Crores : 13 Nos. : Rs. 1417.92Crs.

2 3 4

Administrative Sanction No. of EPC Packages Agt. Value of 13 Pkgs

5
6

Budget Provision for 2006-07


Expenditure

: Rs. 193.20 Crs.

2004-05 : Rs. 108.68 Crs. (Incl. Sangambanda BR) 2005-06 : Rs. 238.50 Crs. TOTAL : Rs. 347.18 Crs. 7 8 Utilisation Ayacut New Ayacut : 20 TMC : 2,03,000 Acres

Stabilization

: 4,000 Acres

RAJIV LIFT IRRIGATION SCHEME (BHIMA)


9 Lift-I Lift Height No. of Pumps Total pumps capacity 10 Lift-II : 67 M : 6 Nos. : 48 MW

Lift Height
No. of Pumps Total pumps capacity 11 Total Power required

: 61 M
: 6 Nos. : 48 MW : 96 MW

RAJIV LIFT IRRIGATION SCHEME (BHIMA)


12 Land Acquisition Required : 21,641 acres 8,278 acres 13,000 acres Rs. 120 Crs. Rs. 40 Crores Recovered 14.99 Crs.

Acquired :
Requisitioned : 13 Est. Cost for LA Est. Cost for R & R Mobilisation Advance :

14
15

: Paid 2004-05 : 2005-06 : 62.57 Crs

22.10 Crs.

84.78 Crs. Total : Rs. Crs.


16 Target date for completion : 9/2007

Rs.14.99

RAJIV LIFT IRRIGATION SCHEME


(BHIMA PROJECT)
PKG No. Bid Amount Rs. in Crs.

Description

Awarded

CATEGORY-II
Excavation of High level right main canal, distributary system including construction of CM & CD works from Sangambanda BR to feed ayacut of 18400 Acres. Excavation of High level left main canal, distributary system including construction of CM & CD works etc. to feed an ayacut of 35,800 Ac. Under Sangambanda BR Investigation, design, estimation and excavation of canal distributary system including construction of CM & CD works from Yenukunta BR, Waddewata (V), Kottakota (M), Mahabubnagar (D) to feed about 14,000 Acres upto Rangasamudram BR. Excavation of canal distributary system including constrction of CM & CD works from Ranga Samudram to feed an ayacut of 21,000 Acres Investigation, design, estimation and execution for converting the existing Rangasamudram tank, near Sri Rangapuram (V) Pebbair (M), Mahabubnagar district as balancing reservoir under Bhima Lift Irrigation Project (Lift-II) Investigation, design, estimation and execution for convesting the existing Shankarasamudram tank, near Knaipally (V) Kothakota (M), Mahabubnagar district as balancing reservoir under Bhima Lift Irrigation Project (Lift-II) M/s. R.M.M. & BRC (JV)

13

57.97

14

M/s. VPR-Cromandal (JV)

68.94

15

M/s. Prathibha-Ch MR (JV)

51.270

16

M/s. RNS-GSR & CO (JV)

70.800

17

M/s. ALS-KVR (JV)

41.540

18

M/s. Sri Avanthi Saivenkata (JV)

42.100

RAJIV LIFT IRRIGATION SCHEME


(BHIMA PROJECT)
Pkg No.

CATEGORY-II

Description

Awarded
M/s. G.H. Reddy & Associate K.K.R & Co (JV) M/s. KNR-SLEC (JV)

Bid Amount Rs. in Crs. 36.90

19

Shankara Samudram Balancing Reservoir Right Main canal. (i) Formation of Earth Dam with FRL +352m (ii) Construction of spillway, (iii) Construction of Head Regulator to let out into left and right main canals. Budpur Balancing Reservoir Investigation, Designs and excavation of left main canal, distributary system including construction of CM & CD works from budpur Balancing reservoir, Budpur (V), Atmakur (M), Mahabubnagar (D) to feed about 32,000 Acres
Investigation, Designs and excavation of right main canal, distributary system including construction of CM & CD works from budpur Balancing reservoir, Budpur (V), Atmakur (M), Mahabubnagar (D) to feed about 32,000 Acres

20

36.98

21

M/s. S.V.E.C. Co.,

60.39

22

M/s. S.V.E.C. Co.,

26.73

27

Investigation, Design, excavation of left main canal, distributary system including construction of CM & CD works from Sankarsamudam Balancing Reservoir . LIFT-I : Design, manufacture, supplying & erection of pumps, motors, electro mechanical works, including tunnel, cistern and pump house etc. Design and execution of Stage-I and stage-II pumping stations of LIFT-II at Thirumalayapalli & Kothakota (M), Mahabubnagar (D) on EPC basis. TOTAL

M/s. KNR Const. Ltd. & BPL (JV)

149.40

OC

M/s. Patel Engg. Ltd.

383.349

OC

M/s. NEC-NCCMAYTAS (JV)

391.55

1417.919

RAJIV LIFT IRRIGATION SCHEME


(BHIMA PROJECT)
Package No. 13/Cat-II : Excavation of High level
right main canal, distributary system including construction of CM & CD works from Sangambanda BR to feed ayacut of 18400 Acres.

Name of the Contractor : M/s R.M.M &BRC (JV)


Agreement Amount Agreement Date Period of Completion Date of completion : Rs. 57.97Crs. : 03-03-2005 : 24 Months (8 milestones) : 03-03-2007

Investigation completed
Designs Execution (Main canal) Qty. of earth work done No. of Machinery
1No.)

: Completed
: 9.2 KM approved against 24 KM : 15 KM length in progress against total length of 24.00KM : 6.00Lakh Cum against 37.32 Lakh Cum. : Deployed = 15Nos (Excavators =2 Nos.,Tipper-8Nos., T Roller-

Qty. of concrete work done : 500 cum against 3500 cum


2Nos., Dozers = 1 Nos., Water tank -1No.Crushing plant-

Land Acquisition acres Expenditure Mob. Adv. Paid Mob. Adv. Recovered

: Required 1000 Acres, Requisition : 260 acres, Acquired 81 : Rs. 14.90 Crs. against Rs. 57.97 Crs., : Rs. 2.90 Crs. : Rs. 2.90 Crs.

RAJIV LIFT IRRIGATION SCHEME


(BHIMA PROJECT)
Name of the Contractor : M/s VPR Coromandal (JV)

Package No. 14/Cat-II : Excavation of High level


left main canal, distributary system including construction of CM & CD works etc. to feed an ayacut of 35,800 Ac. Under Sangambanda BR,

Agreement Amount Agreement Date Period of Completion

: Rs. 68.94Crs. : 05-03-2005 : 24 Months (8 milestones)

Date of completion

:24-02-2007

Investigation Designs

: Completed (40.645 KM) : Main canal completed (40.465 KM)

Execution (main canal)


Qty. of earth work done No. of Machinery 21Nos. etc)

: 28.75KM length in progress against total length of 40.645 KM


: 18 Lakh Cum against 26.20 Lakh Cum. : Deployed = 29Nos (Excavators = 6 Nos., Dozers = 2 Nos, Tippers = : Rs. 29.88 Crs. against Rs. 68.94 Crs., : Rs. 6.88 Crs. : Rs. 1.68 Crs.

Qty. of concrete work done : 1500 cum

Expenditure Mob. Adv. Paid Mob. Adv. Recovered

RAJIV LIFT IRRIGATION SCHEME


(BHIMA PROJECT)
Package No. 15/Cat-II : Investigation, design, Name of the Contractor : M/s Prathibha Ch MR- (JV)
estimation and excavation of canal distributary Agreement Amount system including construction of CM & CD works from Yenukunta BR, Waddewata (V), Kottakota (M), Agreement Date Mahabubnagar (D) to feed about 14,000 Acres upto Period of Completion Rangasamudram BR. Date of completion : Rs. 51.27 Crs. : 05-03-2005 : 24 Months (8 milestones) : 05-03-2007

Investigation Design

: Completed (30.25 KM) : 26.75 KM approved against 30.25 KM

Execution (main canal) : 13 KM length in progress against total length of 30.25 KM Qty. of earth work done : 5,70,000 Cum against 20,00,000 Cum No. of Machinery
=2No.)

: Deployed = 28Ns (Excavators = 6 Nos., Tippers=20Nos, Leveller

Land Acquisition

: Required 943 Acres, Requisition :407Acs. Acquired

218.71Acs.

RAJIV LIFT IRRIGATION SCHEME


(BHIMA PROJECT)
Package No. 16/Cat-II : Excavation of canal Name of the Contractor : M/s RNS-GSR & Co. (JV)
distributary system including construction of CM & CD works from Ranga Samudram to feed an ayacut of 21,000 Acres. Agreement Amount Agreement Date Period of Completion Date of completion : Rs. 70.80Crs : 02-03-2005 : 24 Months (8 milestones) : 02-03-2007

Investigation (HPs)
Execution
81.00 KM

: Length 58Kms finalised against 81Kms


: Excavation in 1.5 KM length in progress against total length of

Qty. of earth work done : 10,000 Cum against 16,00,000 Cum


No. of Machinery
S.Crushers-

: Deployed = 15 Nos (JCB-1No.Excavators = 4 Nos, Tippers-2Nos,


2Nos, Hard top jeep-4Nos)

Expenditure
Land Acquisition

: Rs. 3.54Crs. (Mob. Adv. Only) against Rs. 70.80 Crs.


: Required 1415 Acres, Requisition: 162.34Acres Acquired Nil

RAJIV LIFT IRRIGATION SCHEME


(BHIMA PROJECT)
Package No. 17/Cat-II : Investigation, design,
estimation and execution for converting the existing Rangasamudram tank, near Sri Rangapuram (V) Pebbair (M), Mahabubnagar district as balancing reservoir under Bhima Lift Irrigation Project (Lift-II) Name of the Contractor : M/s A L S-KVR(JV) Agreement Amount Agreement Date Period of Completion Date of completion : Rs. 41.50 Crores : 07-03-2005 : 24 Months (8 milestones) : 07-03-2007

Investigation

: Completed

Designs (Earth Bund & Weir) : 80% approved Execution Qty. of earth work done : Started : Cut off trench excavated for a length of 1.50 KM

Expenditure
Land Acquisition Nil

: Rs. 2.08 Crs. (Mob. Adv. Only) against Rs. 41.50 Crs.
: Required 2452.30Acres, Requi.: 2526.11Acrs Acquired

RAJIV LIFT IRRIGATION SCHEME


(BHIMA PROJECT)
Package No. 18/Cat- : Investigation, design,
estimation and execution for convesting the existing Shankarasamudram tank, near Knaipally (V) Kothakota (M), Mahabubnagar district as balancing reservoir under Bhima Lift Irrigation Project (Lift-II) Name of the Contractor : M/s Sri Avanthika Saivenkata (JV) Agreement Amount Agreement Date Period of Completion Date of completion : Rs. 42.10 Crores : 14-03-2005 : 24 Months(8 Mile Stones) : 14-03-2007

Investigation

: Completed (3.69 KM)

Designs (Earth bund & Weir) : 80% of designs approved. Execution for : Yet to start (Water in the Tank & objections of Kanepally (V) want of inclusion of village in R & R Package. : Rs. 2.11 Crs. (Mob. Adv. only) against Rs. 42.10 Crs.

Expenditure

Land Acquisition

: Required 2220 Acres, Requisitioned: 1491Ac. Acquired

RAJIV LIFT IRRIGATION SCHEME


(BHIMA PROJECT)
Package No. 19/Cat-II : Shankara Samudram Balancing Reservoir Right Main canal.
Agreement Amount K.K.R & Co. (JV), : Rs. 36.90 Crores

Name of the Contractor : M/s G. H. Reddy & Associate

Agreement Date
Period of Completion

: 19-02-2005
: 24 Months (Milestones : 8)

Investigation

: Completed (39 KM)

Designs (HPs & Structures) : approved

Execution

: 34 KM length in progress against total length of 39 KM

Qty. of earth work done : 5.5 Lakh Cum against 6 Lakh Cum. Qty. of concrete work done: 2500 cum against 30,000 cum Structure Expenditure Mob. Adv. Paid Mob. Adv. Recovered : 25 Nos. executed against 110 Nos. : Rs. 16.68 Crs. against 36.79Crores : Rs. 3.68 Crs. : Rs. 0.70 Crs.

Land Acquisition

: Required 800 Acres, Requisitioned 459 Acs Acquired 236

RAJIV LIFT IRRIGATION SCHEME


(BHIMA PROJECT)
Package No. 20/Cat- : (i) Formation of Earth Dam of Budpur with FRL +352m (ii) Construction of spillway, (iii) Construction of Head Regulator to let out into left and right main canals. Investigation Designs Execution Expenditure
Name of the Contractor : M/s KNR-SLEC (JV), Hyd. Agreement Amount Agreement Date Period of Completion : Rs. 36.98Crs : 07-03-2005 : 24 Months (8 milestones)

: Completed (6.10 KM) : Approved : Qty. of earth work 5.64 Lakh cum completed. : Rs. 15.43 Crs. (Inc. Mob. Adv. Rs. 3.43 Crs.) against Rs. 36.98Crs.

Mob. Adv. Recovered


Machinery deployed Land Acquisition

: Rs. 1.37 Crs.


: Excavator-1No., Tippers-5No., Dozer-1No., Other M/C-7Nos. : Required 2073.11 Acres, Requisitioned- 2073.11 Acs Acquired

RAJIV LIFT IRRIGATION SCHEME


(BHIMA PROJECT)
Package No. 21/Cat-II : Investigation, Designs and excavation of left main canal, distributary system including construction of CM & CD works from budpur Balancing reservoir, Budpur (V), Atmakur (M), Mahabubnagar (D) to feed about 32,000 Acres Investigation : completed (32 KM)
Name of the Contractor : M/s S.V.E.C Co., Hyd. Agreement Amount Agreement Date Period of Completion : Rs. 60.39 Crores : 25-02-2005 : 24 Months (milestones)

Designs (HPs & Structures) : Length 28.65 Km approved against 37.825Kms. Execution (Canal) Structures Machinery deployed Land Acquisition Acs. : 28.10 KM length in progress against total length of 37.825KM
: 13 Nos. executed against 79 Nos.

: 10Nos. (Tippers-4Nos, Poclains-4Nos, DRR-1No,Dozer-1No.) : Required 1386 Acres, Requisitioned: 316Acs Acquired 98

Expenditure Crs.

: Rs. 18.04 Crs. (inc. mob. Adv. Rs. 6.04 Crs.) against Rs. 60.39

RAJIV LIFT IRRIGATION SCHEME


(BHIMA PROJECT)
canal, Package No. 22/Cat- : Investigation, Designs and excavation of right main distributary system including construction of
Name of the Contractor : M/s S.V.E.C Co., Hyd. Agreement Amount Agreement Date : Rs. 26.73 Crores : 25-02-2005

CM & CD works from budpur Balancing


reservoir, Budpur (V), Atmakur (M),

Period of Completion

: 24 Months (8 milestones)

Mahabubnagar (D) to feed about 32,000 Acres Investigation : Completed (15.025 KM)

Design (HPs)
Execution (Canal)

: Approved
: 14.50 KM length in progress against total length of 15.025KM

Qty. of earth work done : 2.86 Lakh cum against 2.95 Lakh cum Qty. of concrete work done: 5200 cum

Structures
Expenditure Crs. Mod. Adv. Recovered

: 23 Nos. executed against 54 Nos.


: Rs. 14.68 Crs. (Inc. Mob. Adv. Rs. 2.68 Crs.) against Rs. 26.73 : Rs. 0.73 Crs.

Machinery deployed
Land Acquisition

: 13Nos. (Tippers-4Nos, Poclains-7Nos, DRR-1No,Dozer-1No.)


: Required 354 Acres, Requisitioned: 212Acres Acquired 128

RAJIV LIFT IRRIGATION SCHEME


(BHIMA PROJECT)
Package No. OC (Pkg. 27): Investigation, Name of the Contractor : M/s KNR Const. Ltd. & Design, excavation of left main canal,
BPL (JV)

distributary system including construction of CM & CD works from Sankarsamudam

Agreement Amount Agreement Date

: Rs. 149.40Crs. : 9/2005

Balancing Reservoir .

AGREEMENT DATE :

9/2005

INVESTIGATION and DESIGNS are in PROGRESS


Financial Rs. 7.47 Crores (Mob. Adv. Only) against Rs. 149.40 Crores Land Acquisition: Required Requisitioned Acquired : 3,000 Acs. : 169.95 Acs. : Nil

RAJIV LIFT IRRIGATION SCHEME


(BHIMA PROJECT)
Package No. EPC / OC- : LIFT-I : Design, manufacture, supplying & erection of pumps, motors, electro mechanical works, including tunnel, cistern and pump house etc. Investigation

Name of the Contractor : M/s Patel Engineering Ltd. Agreement Amount : Rs. 383.349Crores

Agreement Date
Period of Completion

: 07-03-2005
: 30 Months (10 milestones)

:Completed (3.0725 KM)

Designs (Tunnel, Pump House, Surge pool, Cistern) : 2.70 KM approved against 3.0705 Execution
house)

: Excavation in progress (approach channel, tunnel, surge pool & Pump

Qty. of earth work done : 5.50 Lakh Cum against 7.82 Lakh Cum.

No. of Machinery
Land Acquisition Acs.

: Deployed = 8 Nos (Excavators = 6 Nos., Dozers = 2 Nos. etc)


: Required 250 Acres, Requisitioned 218Acs Acquired 111

Expenditure 19.58 Crs.)

: Rs. 52.16 Crs. against Rs. 383.34 Crs. (Mob. Adv paid Rs.

RAJIV LIFT IRRIGATION SCHEME


(BHIMA PROJECT)
Package No. EPC / OC- : Design and execution of Stage-I and stage-II pumping stations of basis. Investigation lift-II at Thirumalayapalli & Kothakota (M), Mahabubnagar (D) on EPC

Name of the Contractor : M/s NEC NCC MAYTAS (JV Agreement Amount Agreement Date Period of Completion : Rs. 391.55 Crores : 14-03-2005 : 30 Months

: Completed (3.132 Kms)

Designs (Tunnel, Pump House, Surge pool, Cistern) : Approved Execution : Excavation 0.383Km in progress (approach channel, tunnel, surge pool & Pump house)

Qty. of earth work done : 1,70,000 Cum against 5 Lakh Cum. No. of Machinery Land Acquisition Expenditure Mob. Adv. Paid Mob. Adv. Recovered : Deployed = 18 Nos (Excavators = 4 Nos., Dumpers = 12 Nos.,
Dozers = 2 Nos. etc)

: Required 135 Acres, Requisitioned 67 Acs. Acquired Nil : Rs. 71.58 Crs. against Rs. 391.55 Crs. : Rs. 19.58 Crores. : Rs. 6.00 Crores.