An overview
R-APDRp
Re-structured Accelerated Power Development Reforms Programme (APDRP-II)
Introduction
The Govt. of India has proposed to continue R-APDRP during the XI Plan with revised terms and conditions as a Central Sector Scheme. The focus of the programme shall be on actual, demonstrable performance in terms of sustained loss reduction. Establishment of reliable and automated systems for sustained collection of accurate base line data, and the adoption of Information Technology in the areas of energy accounting will be essential.
Scheme has four parts Part- A: Establishment of Base Line Data by employing system metering and using IT Applications for energy accounting/auditing & IT based consumer service centres. Implementation of SCADA/DMS System Part- B: System Revamping Works. These shall include regular distribution strengthening projects. Part- C: Capacity building/Trainings to J&KPDD staff. Audit by Third Party Independent Evaluation Agencies (TPIEA). Part- D: Incentive scheme for employees
2009 Wipro Ltd - Confidential
R-APDRp
R-APDRP Program
Reduce AT&C losses up to 15%
art A Increase Part B mplementation of consum Strengthening of er infrastructure for Distribution Network satisfact R-APDRP ase lining of Data Strategy for ion - Implementation of HVDS IT Consultant (ITC) distribution - Bifurcation of DT Capacit Reduce reforms IT Implementation Agency outages - Reducing of LT: HT ratio & ITIA) - Strengthening of interrupti Third Party Independent ons DT Capacity Evaluation Agency (TPIEA) - AB Cabling mplementation of SCADA - Up gradation of 33/11 KV identified Towns Sub Stations to meet SCADA/DMS Consultant (SDC) SCADA requirements SCADA Implementation Agency (SIA) TPIEA
Bring commerc ial viability
R-APDRP - Milestones
R-APDRP divided in 2 parts (PART-A & PARTB). PART-A involves engagement of IT Consultant, Ring Fencing, System Metering, DT metering, 3rd Party Monitoring of T&D losses, Appointment of Information Technology Implementing Agency, Appointment of SCADA Consultant. PART-B to strengthen Sub Transmission Distribution System including 66/33/11 kV Receiving stations, Improvement of HT / LT network, HVDS, ABC, replacement of
Timeline of R-APDRP
PART-A to be completed within 3 years from the date of sanction of the project. 3 years started from Dec 2010 and will end till Dec 2013. PART-B to be completed within 3 years from date of sanction of the project. 3 years started from Oct 2011 and will end till October2014. Timeline for completion of SCADA by 2013. Conversion of 100% PFC loan into grant of PART-A if completed by J&K State by Dec 2013. Conversion of 90% loan of PART-B into grant if J&K State completed PART-B by October 2014. In case of failure and / or in case the State does not achieve reduction of T&D losses @ 3% p.a. (Cum) for 5 years of the project period the whole amount
Items
Total population as per census 2001 (In Lacs) Total consumer (In lacs) Total Households (In Lacs) Energy consumed (p.a) M. U.s Energy Billed M. U.s (2010-11) T&D losses (%age) 2010-11 AT&C loss 2010-11 Total Receiving stations 66/33/11kV (In Nos.) Total 11 kV Feeders Total DTs Total Sub Division Offices Total domestic consumers (In lacs) Total consumer; Commercial / others (In Lacs) Total agreemented load (MWs) Total towns (2001 census) Revenue generated (2011-12) (Rs. In Crores)
J&K State
101.00 13.00 20.32 10972.06 4424.84 62 72 505 1489 35182 117 10.85 1.92 1589.053 69 802.82
Project Area
22.61 4.77 4.06 3775.91 1843.04 50 60 161 621 10457 64 3.74 1.05 777.912 30 375.60
R-APDRP PART-A
S. Items No. 1 Total estimated cost 2 GOI loan through PFC 3 State component 4 Funds released by PFC so far 5 Cumulative Expenditure ending March 2012
Financial (Rs. In crores)
R-APDRP PART-B
S. Items No. 1 Total estimated cost 2 GOI loan through PFC State share component @10% 3 4 Funds released by PFC so far 5 Total estimated cost of SCADA 6 Funds released by GOI through PFC loan for SCADA
Financial (Rs. In crores)
8 9
10 11 12
Date of sanction of SCADA DPRs by GOI Date of sanction of PART-B by GOI Date of Award of PART-B
18th Oct. 2011 18th Oct. 2011 Draft tender under evaluation
2 Ring Fencing
3 No
No
DT metering
No.
TPIEA
Towns Towns
No. No.
No.
S. No.
Civil works
No.
JKPCC
9 10 11 12 Column structure complete 01-Dec- d on 3 12 6 01-Jun 11 01-Jun-11 01-Jun-12 11 floors. 2 months months Slabs complete d
Data Center
Installation, Commissioni ng & Configuratio n of Hardware, Networks & Operating System Installation, Configuratio n& Customisatio n of Application Software User acceptance testing (UAT)
Lot
Wipro
Lot
Wipro
Lot
Wipro
Under developm ent and 31st May 29-Sep31-Oct9 1 01-Jan-12 testing 2011 12 12 months months (40% complete d) Will follow 20-June- 31st May 01-Oct- commissi 27-Nov5 1 12 2011 12 oning of 12 months months Data
2 Data Recovery No. Design Design Installation, Commissioni ng & Configuratio n of Lot Hardware, Networks & Operating Data System Recovery Installation, Center Configuratio n& Customisati Lot on of Application Software
Wipro
Wipro
UAT
Lot
Wipro
Under develop ment and 01-Jan- 31st May 29-Sep31-Oct9 1 testing 12 2011 12 12 months months (40% complete d) Will follow 20-Sep- 31st May 01-Apr- commissi 27-Dec15 8 11 2011 12 oning of 12 months months Data Center
Customer Care Centre No. Design Installation, Commissionin g& Configuration Lot of Hardware, Networks & Customer Operating System Care Centre Installation, (CCC) Configuration & Lot Customisation of Application Software User acceptance testing
9 10 11 12 Super structur 01-Jun- 01-Dec12 6 JKPCC 01-Jun-11 e 01-Jun-12 11 11 months months complet ed
Wipro
Wipro
Lot
Wipro
Under develop ment and 01-Sep- 31st May 29-July31-Nov14 4 testing 11 2011 12 12 months months (40% complete d) Will follow 20-Oct- 31st May 01-Aug- commissi 27-Dec14 4 11 2011 12 oning of 12 months months Data Center
S. N0.
Period of Original Slippage schedule original Progress Period of as per date of Schedule achieved Revised Total Date of Slippage original Name of Completio d date of upto Date of Item Unit Quantit Award by as per schedule Remarks Agency n as per completio ending completio y JKPDD PFC of sanction n as per March n Schedule completio issued by award 2012 n after PFC/GoI award 60% Infrastructu 31-May19 No. 64 JKPDD 15-Mar-11 30-June12 complete 30-Sep-12 6 months re Design 11 months d 4 towns DGPS Survey 31-Maycomplete No. 30 Wipro 30-May-11 31-May-12 31-Oct-12 Results 11 d 6 under progress Installation, Commissioni ng & Configuratio BoM under 31-Mayn of No. 64 Wipro 01-May-11 31-July-12 review by 25-Feb-13 11 Hardware, JKPDD Networks & Operating System Sub Installation, Division Configuratio Office n& (SDO) 31-May40% Customisatio Lot 1 Wipro 25-Jun-11 09-Aug-12 10-Mar-13 11 completed n of Application Software Integration with legacy Will follow applications 31-Maycommissio Lot 1 Wipro 01-Jul-11 09-Sep-12 10-Mar-13 & Data 11 ng of Data Centre Center network Will follow User 31-Maycommissio Acceptance Lot 1 Wipro 20-Aug-12 15-Oct-12 16-Mar-13 11 ng of Data testing Center 31-MayUser Training Lot 1 Wipro 10-Sep-12 27-Oct-12 26-Jan-13 11
S. No.
Period of Original Slippage schedule original Progress Period of as per date of Schedule achieved Revised Total Date of Slippage original Name of Completio d date of upto Date of Item Unit Quantit Award by as per schedule Remarks Agency n as per completio ending completio y JKPDD PFC of sanction n as per March n Schedule completio issued by award 2012 n after PFC/GoI award 60% Infrastructur 31-May19 No. 71 JKPDD 15-Mar-11 30-June12 complete 30-Sep-12 6 months e Design 11 months d 4 towns DGPS Survey 31-Maycomplete No. 30 Wipro 30-May-11 31-May-12 31-Oct-12 Results 11 d 6 under progress Installation, Commissionin g& Configuration of Hardware, Networks & Operating System Other Offices
No.
64
Wipro
01-May-11
Installation, Configuration & Lot Customisation of Application Software Integration with legacy applications & Lot Data Centre network User Acceptance testing User Training
Wipro
25-Jun-11
Wipro
01-Jul-11
Will follow 31-Maycommissio 09-Sep-12 10-Mar-13 11 ng of Data Center Will follow commissio 15-Oct-12 16-Mar-13 ng of Data Center 27-Oct-12 26-Jan-13
Lot
Wipro
Lot
Wipro
15.6
8.5 3 12.4 17 4.5 10 12 22 36 9 5.92 7.5 32 6.2
C o v e r a g e o f R-A P D R P
30 project areas of J&K State classified as Towns (urban) with population more than 10,000 as per Census, 2001 19 towns in Kashmir (population 13,88,238)
s#
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Project Area Population benefited
Anantnag Budgam Bandipora Baramula Bijbehara Duru-Verinag Ganderbal Handwara Kargil Kulgam Kupwara Leh Pattan Pulwama Shopian Sopore
97896 11767 25795 71896 19794 17236 13721 10638 10657 13136 14857 28639 11355 14229 12246 59624
4
5 6 7 8 9 10 11
Jammu
Kathua Kishtwar Poonch Rajouri Ranbir Singh Pora (Miran Sahib) Samba Udhampur
612163
51034 14936 23978 21580 14324 15914 86299
17 Srinagar
18 Sumbal 19 Tral
988210
10655 11651
SCADA/DMS for Srinagar and Jammu City Srinagar has 34.27% of total consumers Jammu has 32.21% of total consumers
Total No. of Offices Covered AT&C Losses at end of 2009-10 Pilot Town (Two) Data Centre / DR Centre Customer Care Centre No. of Sub- Divisions No. of Sub- Offices
21
71
Srinagar
Srinagar/Jammu
65.78%
R-APDRp
: Rs. 40.24
Part-A of R-APDRP
Covers establishing base line data for accurate measurement of losses at various levels and improving customer services for the utilities. Activities include
Consumer Survey, Indexing, Asset Mapping GIS Mapping of the entire distribution network of identified project areas Automatic Meter Reading (AMR) on DT & Feeder Automatic Data Logging for all Distribution Transformers and Feeders Asset Mapping of the entire distribution network at and below the 33kV transformers and includes the Distribution Transformers and Feeders, Low Tension lines, poles and other distribution network equipment. Feeder Segregation / Ring Fencing Adoption of IT applications for redressel of consumer grievances, Adoption of IT applications for meter reading, billing & collection. Energy accounting & auditing and MIS
Ac t i v i t i e s t o b e p e r f o rm e d b y P D D
Setting up an Information Technology Cell. (IT cells with adhoc setup constituted: Human Resource augmentation required) Civil works for Data Centre, Data Recovery Centre, SDO and other offices for IT setup. (Work awarded to JKPCC. Work on DC under progress. DR drawings finalised) Ring fencing/ Installation of Boundary meters at Import/Export points. (Total 247 Units. 40% Completed) System Metering/ Feeder Meters (AMR compatible). (1091 Units. LoI Issued) HT consumer meters and Distribution Transformer meters. (9610 Units. Tender for DT metering under process) 100% consumer metering. (Under progress)
Part-A of R-APDRP
Part-A of R-APDRP
Ac t i v i t i e s t o b e p e r f o rm e d b y I T I A
ITIA: Wipro Infotech (Go Live September 2012) Setting up of IT infrastructure at Data Centre, DR centre, Call Centre and other offices. (Target date: June 2012) Hardware (Target date : April 2012) Networking (Target date : April 2012) GIS system software and maps (13 Maps received from NRSC) Door to Door DGPS survey and Consumer indexing, Asset Mapping
(Work completed in pilot areas Pattan, R. S. Pura and Ganderbal and Kulgam. Work under progress in Srinagar) (Target date : July 2012)
Meter Data Acquisition System (Target date : June 2012) Software (Under development at NOIDA : 50% completed) Web portal (Under Development at Kolkatta: 45% Completed) Facility Management services for 5 years
: Srinagar
: Srinagar
Disaster Recovery Center (DR) : Jammu (Proposed at PDD Complex Gladni) AMR Data Logging : Data Center Billing / Customer Care : Sub-Division Offices Pilot Project Areas: Pattan - Kashmir R. S. Pura - Jammu
General Architecture
DB SAN Disaster Recovery Center Replication
Application server(s)(GIS, MDAS, MBC, NC, DC, EA etc)
Data Center
Internet
gateway (ISP) Customer Care Center MPLS/ VPN Cloud
Application server(s) (GIS, MDAS, MBC, NC, DC, EA etc
D B
SAN
Other Office
IPS4260
2960 L2 Switch
IPS4260
Access 6509-E
LDAP
Proxy DNS
IPS4260
Distribution 6509-E
NMS
Internal LAN
Network Architecture
DC
ISP
Internet Router CORE ROUTER
MPLS CLOUD
Data Centre: Srinagar 2800 Sq.ft Data Recovery Centre: Jammu - 2800 sq.ft.
Sub-Div & Other offices Sub-Div & Other-Office
Media Gateway
IP PBX
IVR
ACD
Logger
CRM
PC
PC
PC
PC
Agent
Agent
Agent
Agent
PC
Supervisor
DR
39
Validation by TPIEA Validation of the Works Done Conversion of Loan into Grant
40
Rollout by Wipro Application Development for MBC, NC&DC, MDAS, GIS & NAM CI and Asset Mapping for 30 Towns Installation of Modems at DTs and Feeder Meters Installation of HW and Software at DC/DRC/CCC/ SDO & Other Offices. Connectivity of SDO & Other offices with the Data Center through MPLS/ VPN 2009Connectivity Wipro Ltd - Confidential
Roll Out by PDD Ring Fencing DT Metering Civil Works for DC/DRC/CCC. Up gradation of SDO for Installation of IT Infrastructure. E.g Earthing and civil Works.
Subscribers
Data Centre
Network Analysis
Business Intelligence
DGPS Survey for the pilot and other towns FMS Framework Setup
Pilot Rollout
Complete Rollout
42
Part-B of R-APDRP
Covers regular distribution strengthening projects. Activities include
Renovation, modernization and strengthening of 11kV level Substations. Re-conductoring of lines at 11kV level and below. Load Bifurcation, Feeder Separation. Load Balancing, reorientation of Feeders. HVDS (11kV). Aerial Bunched Cabling in dense areas. Replacement of electromagnetic energy meters with tamper proof electronic meters. Installation of capacitor banks and mobile service centers etc. In exceptional cases, where the sub-transmission system is weak, strengthening at 33kV or 66kV levels may also be considered.
Pa r t B Pro j e c t : Fu n d i n g S t r u c t u re
% of Project Cost as loan % of Project through Cost as loan Gross from Budgetary PFC/REC/ Support Own/ Other (GBS) from Sources GOI Upto 25 Upto 75
Category of States
Remarks
Non-special Category Special Category States (All NorthEastern States, Sikkim, Uttarakhand, Himachal Pradesh and Jammu &
Upto 90
Upto 10
Upto 50% (90% for special category states) loan shall be converted into grant in five 5 annual tranches on achieving 15% AT&C loss in the project area.
Pa r t B Pro j e c t D P R s
Cost Abstract of Part-B Schemes of R-APDRP in respect of Kashmir Region appraised by PFC
S. No. Name of town 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Srinagar Anantnag Bandipore Baramulla Bijbehara Budgam Dooru-Verinag Ganderbal Handwara Kargil Kulgam Kupwara Leh Pattan Pulwama Shopian Sopore Sumbal Tral Total Kashmir Appraised Cost (In Rs. Crores) 669.3 6 31.54 8.40 32.80 8.62 10.15 4.54 15.96 7.39 7.90 6.16 7.39 9.30 4.57 11.79 6.65 36.38 4.70 5.96 889.5 6
Pa r t B Pro j e c t D P R s
Cost Abstract of Part-B Schemes of R-APDRP in respect of Jammu Region appraised by PFC
S. No. 1 2 3 4 5 6 7 8 9 10 11
Name of town Jammu Aknoor Badherwah Doda Kathua Kishtwar Poonch Rajouri Ranbir Singh Pora Samba Udhampur Total Jammu Total J&K PDD
Appraised Cost (In Rs. Crores) 610.48 13.64 6.75 7.28 62.41 7.42 7.74 11.72 12.36 10.08 25.83 775.71 1665.27
S C A DA D P R s
Cost Abstract of SCADA DPRs of R-APDRP in respect of Jammu and Kashmir Region appraised by PFC
S. No.
Name of town
1 2
S. No.
1 2 2a 3 4 5 6 7 8 9 10 10a 11
Major Works
33/11 KV or 66/11 KV SS: New creation 33/11 KV or 66/11 KV SS: Transformer cap. enhancement 33/11 KV or 66/11 KV SS : Addl. X-MER 33 KV Feeders: New/Bifurcation 33 KV Feeders: Conversion/Underground 11 KV Feeders: New Feeder/Interconnection 11 KV Feeders: New lines for DTs DTs & HVDS: New Installation
Quantity/Description
6 No./ (4No 2x6.3 MVA ,1No. 1x10 MVA & 1No.2x10 MVA 33/11 KV) 27 No. /( 6.3 MVA to 10 MVA) 13 No. / (10x6.3 MVA & 3x10 MVA) 17 Km 158 Km Bare Conductor 233 Km. ABC 670 Km 399 No. Conventional (100kVA-96/250kVA-297,400kVA-6) 12288 No. HVDS (16kVA-427,25kVA-9547,63kVA-1024,100kVA-1290) 198 No. (2 No. 63 to 250, 80 No. 100 to 250 91 No. 250 to 400, 25 No. 400 to 630) 2824 Km 74707 Nil
23353.95
DTs Capacity Augmentation LT Line Augmentation/New Feeder/AB Cable Metering 1 Ph Electronic HT/LT Metering 3 Ph Electronic HT/LT
Others
9428.2
63354.17
PART B: DISTRIBUTION SCHEME OF JK PDD FOR SRINAGAR TOWN (Contd.) A. Parameters of Town - Srinagar 1 Total project cost proposed for sanction 669.36 Crs. 2 Project cost proposed by Utility 675.35 Crs. 3 Total Population (as per 2001 census) 988210 No. 4 Total Number of Consumers 168586 No. 5 Geographical Area 192 Sq. Km. 6 Energy Input 1938.85 MUs 7 Avg Load growth 15 % Total Part-B (in Lacs) 63354.17 C. SCADA compatible items (RMUs FPIs etc.) S. No. 1 2 3
Major Works
Installation of automated RMUs alongwith Aux. power supply Installation of Remote Comm. FPIs Others Total C(in Lacs) Total B + C (in Lacs)
Quantity/Description
16 No. 11 KV 3 Way, 1 No.11 KV 4 Way, 5 No. 33 KV 3 Way 335
Total B + C
669.36
Crores
S. No.
1 2 2a 3 4 5 6 7 8 9 10 10a 11
Major Works
33/11 KV or 66/11 KV SS: New creation 33/11 KV or 66/11 KV SS: Transformer cap. enhancement 33/11 KV or 66/11 KV SS : Addl. X-MER 33 KV Feeders: New/Bifurcation 33 KV Feeders: Conversion/Underground 11 KV Feeders: New Feeder/Interconnection 11 KV Feeders: New lines for DTs DTs & HVDS: New Installation DTs Capacity Augmentation LT Line Augmentation/New Feeder/AB Cable Metering 1 Ph Electronic HT/LT Metering 3 Ph Electronic HT/LT Others
Quantity/Description
Nil Nil Nil Nil 21 Km Bare Conductor 8Km. ABC 50 Km 170 No. HVDS (,25kVA-129,63kVA-29,100kVA-12) Nil 330 Km 2000 Nil
Total Part-B
31.54
Crores
S. No.
1 2 2a 3 4 5 6 7 8 9 10 10a 11
Major Works
33/11 KV or 66/11 KV SS: New creation 33/11 KV or 66/11 KV SS: Transformer cap. enhancement 33/11 KV or 66/11 KV SS : Addl. X-MER 33 KV Feeders: New/Bifurcation 33 KV Feeders: Conversion/Underground 11 KV Feeders: New Feeder/Interconnection 11 KV Feeders: New lines for DTs DTs & HVDS: New Installation DTs Capacity Augmentation LT Line Augmentation/New Feeder/AB Cable Metering 1 Ph Electronic HT/LT Metering 3 Ph Electronic HT/LT Others Total B (in Lacs)
Quantity/Description
Nil Nil Nil Nil Nil Bare Conductor 18 Km. ABC 3 Km 228 No. HVDS (25kVA-70,63kVA-158) Nil 20Km 300 Nil
Total Part B
8.40
Crores
S. No.
1 2 2a 3 4 5 6 7 8 9 10 10a 11
Major Works
33/11 KV or 66/11 KV SS: New creation 33/11 KV or 66/11 KV SS: Transformer cap. enhancement 33/11 KV or 66/11 KV SS : Addl. X-MER 33 KV Feeders: New/Bifurcation 33 KV Feeders: Conversion/Underground 11 KV Feeders: New Feeder/Interconnection 11 KV Feeders: New lines for DTs DTs & HVDS: New Installation DTs Capacity Augmentation LT Line Augmentation/New Feeder/AB Cable Metering 1 Ph Electronic HT/LT Metering 3 Ph Electronic HT/LT Others
Quantity/Description
1No./ (1No 1x 6.3 MVA 33/11 KV) Nil Nil 4 Km Nil Bare Conductor 126.15 Km. ABC 40 Km 1574 No. HVDS (25kVA-800,63kVA-87,100kVA-43) Nil 15 Km 2400 Nil
Total Part-B
32.80
Crores
S. No.
1 2 2a 3 4 5 6 7 8 9 10 10a 11
Major Works
33/11 KV or 66/11 KV SS: New creation 33/11 KV or 66/11 KV SS: Transformer cap. enhancement 33/11 KV or 66/11 KV SS : Addl. X-MER 33 KV Feeders: New/Bifurcation 33 KV Feeders: Conversion/Underground 11 KV Feeders: New Feeder/Interconnection 11 KV Feeders: New lines for DTs DTs & HVDS: New Installation DTs Capacity Augmentation LT Line Augmentation/New Feeder/AB Cable Metering 1 Ph Electronic HT/LT Metering 3 Ph Electronic HT/LT Others
Quantity/Description
Nil Nil Nil Nil Nil Bare Conductor 5Km Nil 50 No. Conventional (100kVA-50) 108 No. HVDS (25kVA-108) Nil 80 Km 183 Nil Nil
Total Part-B
8.62
Crores
S. No.
1 2 2a 3 4 5 6 7 8 9 10 10a 11
Major Works
33/11 KV or 66/11 KV SS: New creation 33/11 KV or 66/11 KV SS: Transformer cap. enhancement 33/11 KV or 66/11 KV SS : Addl. X-MER 33 KV Feeders: New/Bifurcation 33 KV Feeders: Conversion/Underground 11 KV Feeders: New Feeder/Interconnection 11 KV Feeders: New lines for DTs DTs & HVDS: New Installation DTs Capacity Augmentation LT Line Augmentation/New Feeder/AB Cable Metering 1 Ph Electronic HT/LT Metering 3 Ph Electronic HT/LT Others
Quantity/Description
Nil 1 No. /( 24 MVA to 26.3 MVA) Nil Nil 11 Km Bare Conductor 9.5 Km. ABC 29.1 Km 10 No. Conventional (100kVA-10) 149 No. HVDS (25kVA-69,63kVA-40,100kVA-40) 9 No. (7 No. 63 to 100, 2 No. 400 to 630) 25 Km 380 Nil
103.85
Total Part B
10.15
Crores
S. No.
1 2 2a 3 4 5 6 7 8 9 10 10a 11
Major Works
33/11 KV or 66/11 KV SS: New creation 33/11 KV or 66/11 KV SS: Transformer cap. enhancement 33/11 KV or 66/11 KV SS : Addl. X-MER 33 KV Feeders: New/Bifurcation 33 KV Feeders: Conversion/Underground 11 KV Feeders: New Feeder/Interconnection 11 KV Feeders: New lines for DTs DTs & HVDS: New Installation DTs Capacity Augmentation LT Line Augmentation/New Feeder/AB Cable Metering 1 Ph Electronic HT/LT Metering 3 Ph Electronic HT/LT Others
Quantity/Description
Nil Nil Nil Nil Nil Nil ABC 9 Km 77 No. HVDS (25kVA-40,63kVA-32,100kVA-5) Nil 45 Km 450 65
Total Part B
4.54
Crores
S. No.
1 2 2a 3 4 5 6 7 8 9 10 10a 11
Major Works
33/11 KV or 66/11 KV SS: New creation 33/11 KV or 66/11 KV SS: Transformer cap. enhancement 33/11 KV or 66/11 KV SS : Addl. X-MER 33 KV Feeders: New/Bifurcation 33 KV Feeders: Conversion/Underground 11 KV Feeders: New Feeder/Interconnection 11 KV Feeders: New lines for DTs DTs & HVDS: New Installation DTs Capacity Augmentation LT Line Augmentation/New Feeder/AB Cable Metering 1 Ph Electronic HT/LT Metering 3 Ph Electronic HT/LT Others
Quantity/Description
Nil 2 No. ( 2.5MVA to 6.3mVA & 6.3 MVA to 10 MVA) Nil Nil 26 Km Bare Conductor 38 Km. ABC 1 Km 11 No. Conventional (100kVA-8,250kVA-8) 414No. HVDS(25kVA-414) 5 No. (2 No. 63 to 250, 3 No. 100 to 250) 19 Km 500 Nil
Total Part B
15.96
Crores
S. No.
1 2 2a 3 4 5 6 7 8 9 10 10a 11
Major Works
33/11 KV or 66/11 KV SS: New creation 33/11 KV or 66/11 KV SS: Transformer cap. enhancement 33/11 KV or 66/11 KV SS : Addl. X-MER 33 KV Feeders: New/Bifurcation 33 KV Feeders: Conversion/Underground 11 KV Feeders: New Feeder/Interconnection 11 KV Feeders: New lines for DTs DTs & HVDS: New Installation DTs Capacity Augmentation LT Line Augmentation/New Feeder/AB Cable Metering 1 Ph Electronic HT/LT Metering 3 Ph Electronic HT/LT Others
Quantity/Description
Nil 1 No. /( 11.3 MVA to 16.3 MVA) Nil 0.2 Km Nil Bare Conductor 7 Km. ABC 10 Km 304No. HVDS (16kVA-45,25kVA-259) Nil 4.38 Km 350 Nil
Total Part B
7.39
Crores
S. No.
1 2 2a 3 4 5 6 7 8 9 10 10a 11
Major Works
33/11 KV or 66/11 KV SS: New creation 33/11 KV or 66/11 KV SS: Transformer cap. enhancement 33/11 KV or 66/11 KV SS : Addl. X-MER 33 KV Feeders: New/Bifurcation 33 KV Feeders: Conversion/Underground 11 KV Feeders: New Feeder/Interconnection 11 KV Feeders: New lines for DTs DTs & HVDS: New Installation DTs Capacity Augmentation LT Line Augmentation/New Feeder/AB Cable Metering 1 Ph Electronic HT/LT Metering 3 Ph Electronic HT/LT Others
Quantity/Description
Nil Nil Nil Nil Nil Nil ABC 30.5 Km 153 No. HVDS(25kVA-98,63kVA-55) Nil 40 Km Nil Nil
Total Part B
7.90
Crores
S. No.
1 2 2a 3 4 5 6 7 8 9 10
Major Works
33/11 KV or 66/11 KV SS: New creation 33/11 KV or 66/11 KV SS: Transformer cap. enhancement 33/11 KV or 66/11 KV SS : Addl. X-MER 33 KV Feeders: New/Bifurcation 33 KV Feeders: Conversion/Underground 11 KV Feeders: New Feeder/Interconnection 11 KV Feeders: New lines for DTs DTs & HVDS: New Installation DTs Capacity Augmentation LT Line Augmentation/New Feeder/AB Cable Metering 1 Ph Electronic HT/LT
Quantity/Description
Nil Nil Nil Nil Nil Nil ABC 12 Km 13 No. Conventional (100kVA-13) 54 No. HVDS (25kVA-10,100kVA-44) Nil 35.5 Km 200 Nil
Total Part B
6.16
Crores
S. No.
1 2 2a 3 4 5 6 7 8 9 10
Major Works
33/11 KV or 66/11 KV SS: New creation 33/11 KV or 66/11 KV SS: Transformer cap. enhancement 33/11 KV or 66/11 KV SS : Addl. X-MER 33 KV Feeders: New/Bifurcation 33 KV Feeders: Conversion/Underground 11 KV Feeders: New Feeder/Interconnection 11 KV Feeders: New lines for DTs DTs & HVDS: New Installation DTs Capacity Augmentation LT Line Augmentation/New Feeder/AB Cable Metering 1 Ph Electronic HT/LT
Quantity/Description
Nil Nil Nil Nil Nil Bare Conductor 9.21 Km. ABC 19 Km 176No. HVDS (25kVA-156,63kVA-9,100kVA-11) Nil 10.32 Km 455 Nil
Total Part B
7.39
Crores
S. No.
1 2 2a 3 4 5 6 7 8 9 10 10a 11
Major Works
33/11 KV or 66/11 KV SS: New creation 33/11 KV or 66/11 KV SS: Transformer cap. enhancement 33/11 KV or 66/11 KV SS : Addl. X-MER 33 KV Feeders: New/Bifurcation 33 KV Feeders: Conversion/Underground 11 KV Feeders: New Feeder/Interconnection 11 KV Feeders: New lines for DTs DTs & HVDS: New Installation DTs Capacity Augmentation LT Line Augmentation/New Feeder/AB Cable Metering 1 Ph Electronic HT/LT Metering 3 Ph Electronic HT/LT Others
Quantity/Description
Nil Nil Nil Nil Nil Bare Conductor 51 Km. ABC 4 Km 247 No. HVDS (25kVA-247) Nil 18 Km Nil Nil
Total Part B
9.30
Crores
S. No.
1 2 2a 3 4 5 6 7 8 9 10
Major Works
33/11 KV or 66/11 KV SS: New creation 33/11 KV or 66/11 KV SS: Transformer cap. enhancement 33/11 KV or 66/11 KV SS : Addl. X-MER 33 KV Feeders: New/Bifurcation 33 KV Feeders: Conversion/Underground 11 KV Feeders: New Feeder/Interconnection 11 KV Feeders: New lines for DTs DTs & HVDS: New Installation DTs Capacity Augmentation LT Line Augmentation/New Feeder/AB Cable Metering 1 Ph Electronic HT/LT
Quantity/Description
Nil 1 No. /( 6.3 MVA to 10 MVA) Nil 0.2 Km Nil Nil ABC 7.1 Km 64 No. HVDS (16kVA-1,25kVA-12,163kVA-41,100kVA-10) Nil 19.10 Km 350 Nil
Total Part B
4.57
Crores
S. No.
1 2 2a 3 4 5 6 7 8 9 10 10a 11
Major Works
33/11 KV or 66/11 KV SS: New creation 33/11 KV or 66/11 KV SS: Transformer cap. enhancement 33/11 KV or 66/11 KV SS : Addl. X-MER 33 KV Feeders: New/Bifurcation 33 KV Feeders: Conversion/Underground 11 KV Feeders: New Feeder/Interconnection 11 KV Feeders: New lines for DTs DTs & HVDS: New Installation DTs Capacity Augmentation LT Line Augmentation/New Feeder/AB Cable Metering 1 Ph Electronic HT/LT Metering 3 Ph Electronic HT/LT Others
Quantity/Description
Nil Nil Nil Nil Nil Nil ABC 6.7 Km 26 No. HVDS (100kVA-26) Nil 95 Km 3000 Nil
Total Part B
11.79
Crores
S. No.
1 2 2a 3 4 5 6 7 8 9 10 10a 11
Major Works
33/11 KV or 66/11 KV SS: New creation 33/11 KV or 66/11 KV SS: Transformer cap. enhancement 33/11 KV or 66/11 KV SS : Addl. X-MER 33 KV Feeders: New/Bifurcation 33 KV Feeders: Conversion/Underground 11 KV Feeders: New Feeder/Interconnection 11 KV Feeders: New lines for DTs DTs & HVDS: New Installation DTs Capacity Augmentation LT Line Augmentation/New Feeder/AB Cable Metering 1 Ph Electronic HT/LT Metering 3 Ph Electronic HT/LT Others
Quantity/Description
2 No./ (1No 6.3 MVA ,1No. 10 MVA 33/11 KV) Nil Nil 11 Km 11 Km Bare Conductor 14.65 Km. ABC 55Km 984 No. HVDS (16kVA-8,25kVA-493,63kVA-429,100kVA-54) Nil 75 Km 2000 Nil
Total Part B
36.38
Crores
S. No.
1 2 2a 3 4 5 6 7 8 9
Major Works
33/11 KV or 66/11 KV SS: New creation 33/11 KV or 66/11 KV SS: Transformer cap. enhancement 33/11 KV or 66/11 KV SS : Addl. X-MER 33 KV Feeders: New/Bifurcation 33 KV Feeders: Conversion/Underground 11 KV Feeders: New Feeder/Interconnection 11 KV Feeders: New lines for DTs DTs & HVDS: New Installation DTs Capacity Augmentation LT Line Augmentation/New Feeder/AB Cable
Quantity/Description
Nil Nil Nil 9Km Nil Bare Conductor 10Km. ABC 3 Km 1 No. Conventional (250kVA-1) 99 No. HVDS (25kVA-68,63kVA-22,100kVA-9) Nil 11 Km Nil Nil
Total Part B
4.70
Crores
S. No.
1 2 2a 3 4 5 6 7 8 9 10 10a 11
Major Works
33/11 KV or 66/11 KV SS: New creation 33/11 KV or 66/11 KV SS: Transformer cap. enhancement 33/11 KV or 66/11 KV SS : Addl. X-MER 33 KV Feeders: New/Bifurcation 33 KV Feeders: Conversion/Underground 11 KV Feeders: New Feeder/Interconnection 11 KV Feeders: New lines for DTs DTs & HVDS: New Installation DTs Capacity Augmentation LT Line Augmentation/New Feeder/AB Cable Metering 1 Ph Electronic HT/LT Metering 3 Ph Electronic HT/LT Others
Quantity/Description
Nil Nil Nil Nil Nil Bare Conductor 5.6Km. ABC 8Km 42 No. HVDS (63kVA-30,100kVA-12) Nil 40 Km 1200 Nil
Total Part B
6.65
Crores
S. No.
1 2 2a 3 4 5 6 7 8 9 10 10a 11
Major Works
33/11 KV or 66/11 KV SS: New creation 33/11 KV or 66/11 KV SS: Transformer cap. enhancement 33/11 KV or 66/11 KV SS : Addl. X-MER 33 KV Feeders: New/Bifurcation 33 KV Feeders: Conversion/Underground 11 KV Feeders: New Feeder/Interconnection 11 KV Feeders: New lines for DTs DTs & HVDS: New Installation DTs Capacity Augmentation LT Line Augmentation/New Feeder/AB Cable Metering 1 Ph Electronic HT/LT Metering 3 Ph Electronic HT/LT Others
Quantity/Description
Nil Nil Nil Nil Nil Bare Conductor 2.5Km. ABC 1.5 Km 7No. Conventional (100kVA-4,63kVA-3) 148 No. HVDS (100kVA-148) Nil 52 Km 600 Nil
Total Part B
5.96
Crores
Part- A:
1) 3) 4) 5) 6) 7) 8) 1) 9)
progress
Selection of IT Consultant (CMC) Preparation of base DPRs for Part-A works. Sanction of DPRs for all 30 project areas. ITIA award (Wipro) Ring Fencing (Boundary metering) and feeder metering award (Prominent) Appointment of SCADA Consultant (NDPL) Sanction of SCADA DPRs for 2 project areas Preparation of DPRs for Part-B works. Sanction of DPRs for all 30 project areas
2009 Wipro Ltd - Confidential
Part- B:
S#
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Town
Achabbal (NAC) Kokernag (NAC) Chhatar Gul Uttarsoo Shangas Nowgam Kothar Sagam Soaf Shalli Deval Gam Gadool Ahlan Pahalgam (NAC) Salar Grand Aish Salia Ponchal Pora Seer Kanli Gund (Seer Hamdan) Mattan (NAC) Ranbir Pora Awantipora (NAC) Giru (Nor Pora) Pari Gam Jagir
5834 4863 4693 6636 6354 4432 4834 4016 9325 9476 6066 6553 5480 4140 5463 6537 4615 6252 5141 4023
8751 7295 7040 9954 9531 6648 7251 6024 13988 14214 9099 9830 8220 6210 8195 9806 6923 9378 7712 6035
1750 1459 1408 1991 1906 1330 1450 1205 2798 2843 1820 1966 1644 1242 1639 1961 1385 1876 1542 1207
Note: SDOs' of areas marked in red are already included in Part-A of R-APDRP and will not require computer and networking 2009 Wipro Ltdhardware. - Confidential
Town
Toknu Arin Dard Pora Sumblar Shok Baba Chithi Bandi Shah Gund Dilna Beerwah (NAC) Magam (NAC) Rathsun Khag Marhama Sir Hama Khiram Waghama Nanilang Jabli Pora Arwani Khan Sahib (NAC) Ichgam Kachwari
Expected Expected Population Connections as on 31-3-2011 as on ( 50 % increase) 31-3-2011 8505 1701 7170 1434 7473 1495 9527 1905 8306 1661 10271 2054 9443 1889 6468 1294 6954 1391 6996 1399 18200 3640 7077 1415 11714 2343 6146 1229 8409 1682 9611 1922 7313 1463 3057 611 9111 1822 10080 2016
Note: SDOs' of areas marked in red are already included in Part-A of R-APDRP and will not require computer and networking hardware.
2009 Wipro Ltd - Confidential
Town
Now Gam Chatar Gam Chinar Bagh (Puhroo) Nagam Sursyar Brenwar Chari-Sharief (NAC) Chelen Chunt Nar Darwan Nowgam Damhal Hanji Pora Manzgam Ahmad Abad Qasba Khul Nandimarg Dano Kandi Marag Fateh Pora Hillar Arhama Lok Bawan Larki Pora Hakura Badas Gam Bata Gund
TOTAL Expected Expected POPULATION Population Connections (as per Census as on 31-3-2011 as on 2001) ( 50 % increase) 31-3-2011 4123 6185 1237 4726 7089 1418 4595 6893 1379 5770 8655 1731 4019 6029 1206 4500 6750 1350 7374 11061 2212 4013 6020 1204 4914 7371 1474 4005 6008 1202 5629 8444 1689 4210 6315 1263 4211 6317 1263 4925 7388 1478 7123 10685 2137 4702 7053 1411 4482 6723 1345 4032 6048 1210 6307 9461 1892 6283 9425 1885
Note: SDOs' of areas marked in red are already included in Part-A of R-APDRP and will not require computer and networking hardware.
2009 Wipro Ltd - Confidential
Town
Now Gam Shah Abad Hajin (NAC) Sadhunara Hasti Khan Ajas Gund Sadra Kote Bahar Abad (Amcha Kundal) Sultan Pora Khai Magam Kandi Khas Bana Koot Mantrigam Koyal Mukam Malan Gam Aloosa Ashtongu Qazipora Patushi Chater Gul Wangat Kangan Hari Ganiwan
TOTAL Expected Expected Parented to POPULATION Population Connections (as per Census as on 31-3-2011 as on SDO 2001) ( 50 % increase) 31-3-2011 Dooru 4481 6722 1344 Hajin 9972 14958 2992 Hajin 7390 11085 2217 Hajin 9870 14805 2961 Hajin 5722 8583 1717 Hajin 4352 6528 1306 Hajin 6720 10080 2016 Handwara 6526 9789 1958 Handwara 4556 6834 1367 Kaloosa 7011 10517 2103 Kaloosa 5353 8030 1606 Kaloosa 5437 8156 1631 Kaloosa 6703 10055 2011 Kaloosa 7925 11888 2378 Kaloosa 4275 6413 1283 Kaloosa 5241 7862 1572 Kangan 5919 8879 1776 Kangan 4910 7365 1473 Kangan 4027 6041 1208 Kangan 5000 7500 1500
Note: SDOs' of areas marked in red are already included in Part-A of R-APDRP and will not require computer and networking hardware.
2009 Wipro Ltd - Confidential
Town
Red Wana Kaimoh Ashmji Khalsa Khurhama Sever Thendi Pora Warnow Kuhigam Maidan Pora Dara Pora Lal Pora Dever Inder Bug Teki Pora Sogam Gagal Sorigam Khumriyal Kalarooch Manigah Hayihama Halmat Pora
TOTAL Expected Expected POPULATION Population Connections (as per Census as on 31-3-2011 as on 2001) ( 50 % increase) 31-3-2011 5821 8732 1746 7454 11181 2236 4097 6146 1229 4582 6873 1375 4711 7067 1413 6213 9320 1864 4403 6605 1321 5272 7908 1582 4466 6699 1340 11894 17841 3568 7442 11163 2233 5472 8208 1642 6890 10335 2067 4599 6899 1380 4342 6513 1303 4874 7311 1462 25970 38955 7791 6245 9368 1874 18446 27669 5534 5226 7839 1568
Note: SDOs' of areas marked in red are already included in Part-A of R-APDRP and will not require computer and networking hardware.
2009 Wipro Ltd - Confidential
Non R-APDRP; NACs and towns of Kashmir region (With Population > 4000 as per Census 2001)
S# 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120
Town
Sool Koot Ander Hama Drug Mulla Chunt Valiwar Mani Gam Wail Uri (NAC) Nambla Ghar Kote Lal Pora Feroz Pora Sozeth Gori Pora Kawsa Khalisa Soya Bug Kaka Pora Romu Pampore (NAC) Khrew (NAC) Owan Shar-I- Shali
Parented to SDO
Kupwara Kupwara Kupwara Manigam Manigam Manigam Mohra Mohra Mohra Mohra Mohra Narbal Narbal Narbal Newa Newa Pampore Pampore Pampore Pampore
TOTAL Expected Expected POPULATION Population Connections (as per Census as on 31-3-2011 as on 2001) ( 50 % increase) 31-3-2011 4600 6900 1380 4960 7440 1488 9062 13593 2719 4523 6785 1357 5354 8031 1606 7069 10604 2121 4246 6369 1274 6042 9063 1813 4285 6428 1286 6142 9213 1843 5039 7559 1512 5992 8988 1798 4763 7145 1429 8178 12267 2453 4563 6845 1369 4060 6090 1218 16963 25445 5089 7166 10749 2150 5247 7871 1574 4292 6438 1288
Note: SDOs' of areas marked in red are already included in Part-A of R-APDRP and will not require computer networking hardware. 2009 Wipro Ltd and - Confidential
Town
Ledhu Let Pora Taper Wari Pora Palhallan Nihal Pora Mati Pora Hanji Wera Ratni Pora Qazigund (NAC) Kelam Bozgam Chowgam Brinial Lamar Khuri Bata Pora Khalsa Panzat Wan Pora Drabh Gam Frisal Hir Pora Achha Bal Seer Jagir Tarazuea
TOTAL Expected Expected POPULATION Population Connections (as per Census as on 31-3-2011 as on 2001) ( 50 % increase) 31-3-2011 4437 6656 1331 4819 7229 1446 4339 6509 1302 11773 17660 3532 5549 8324 1665 7717 11576 2315 7978 11967 2393 4711 7067 1413 3537 5306 1061 4858 7287 1457 4020 6030 1206 6745 10118 2024 7073 10610 2122 4274 6411 1282 4062 6093 1219 4863 7295 1459 6579 9869 1974 5858 8787 1757 8849 13274 2655 6530 9795 1959
Note: SDOs' of areas marked in red are already included in Part-A of R-APDRP and will not require computer and networking hardware.
2009 Wipro Ltd - Confidential
Town
Haigam Tujar Pahle Har Hardushuo Danger Pora Wara Pora Khonmoh Bimna Lasjan Sadat Pora (Naid Khi) Safa Pora Nowgam Tangdhar Nowangabra Kunzer (NAC) Gulmarg (NAC) Dadh Sara Gulgam Auwoora Heri Trehgam
TOTAL Expected Expected POPULATION Population Connections (as per Census as on 31-3-2011 as on 2001) ( 50 % increase) 31-3-2011 5297 7946 1589 5714 8571 1714 5180 7770 1554 7280 10920 2184 5046 7569 1514 8307 12461 2492 7179 10769 2154 4644 6966 1393 7278 10917 2183 7792 11688 2338 4729 7094 1419 6064 9096 1819 4801 7202 1440 1901 2852 570 878 1317 263 4529 6794 1359 8755 13133 2627 9705 14558 2912 4864 7296 1459 9054 13581 2716
Note: SDOs' of areas marked in red are already included in Part-A of R-APDRP and will not require computer and networking hardware.
2009 Wipro Ltd - Confidential
S#
Town
Kral Pora Dard Sun Resh Gund Warsun Dard Pora Panzgam Yan Goora Tulmulla Ruhama Naid Hal
Note: SDOs' of areas marked in red are already included in Part-A of R-APDRP and will not require computer and networking hardware.
2009 Wipro Ltd - Confidential
Non R-APDRP towns of Ladakh (With Population > 4000 as per Census 2001)
Parented to SDO Kargil-I Leh-I Leh-I
TOTAL Expected Expected POPULATION Population Connections (as per Census as on 31-3-2011 as on 2001) (50 % increase) 31-3-2011
S# 1 2 3
Note: SDOs' of areas marked in red are already included in Part-A of R-APDRP and will not require computer and networking hardware.
THANK YOU
80