Prepared by:
1. States Market
Demand
Supply
2. Countrys Economy
Economic Growth
Purchasing Power Level of Income
Cost + 20% (profit) = Price [Cost + x% (profit) + tax] = Price [Cost + x% (profit) + tax] subsidy = Price
4. Marketing Cycle
Wholesellers Price
Market Price
Retailers Price
Price
Other Factors Based upon Offer Price/ Market testing
4. Professional (fees) Costs (based on needs of Prop. Dev.) 5. Preliminary Costs (site & legal) 6. Preliminary Costs (site) 7. Contingencies
8. Interest On Loan
9. Project Management Fees Etc.
Premium Subdivision Preliminary Survey costs Planning costs Devt. & Building Plan Fees Etc.
Site clearance Building demolition Levelling of site Dev. & Building Plan Fees Etc.
Then, what is
1. Sunken Cost ? 2. Cost allocation ?
Cost Price
Cost Price refers to a list of Prices Offered as Price for Development Cost Consists of: 1. Tender Price
2. Estimation Cost from QS (BQ) 3. Estimation Cost from QS (Detailed list)
To a layman:
Profit or Loss = Sales Price - Cost Professional Opinion
Overall Sales Value less Overall Cost Time Factor Additional Related Costs Changes in current Interest Rate (Base Lending Rate + Fixed Rate) Cash Flow Taxation
Price Equilibrium
Total surplus
Price Equilibrium
Market Price
Past, Present, Future Obtaining Past & Present market prices data will expedite determination of future price.
Market Influence
Determinant to the success of a property development. Directly related with: Offer Price Demand Factors: Prop. Types Needed Groups of people No. of people existing, birth rate, migration
Market Influence
Supply Factors
Property Types Offered existing stock completed, current construction stock, stock being planned Size/magnitude of property stock existing development eg. housing estates, being constructed, being planned
Market Influence
Design Factors
Very influential in certain property types, particularly medium and high costs Implication of design - external and internal features of buildings - internal layout of buildings
Market Influence
Layout of Development
Quality of Construction Materials
- type of bricks, floor finishes,
type of doors/windows, quality of wood, electrical points, pipings etc.
PRICE ALLOCATION
Depending on respective State policies. Impacts demand and supply, and hence, PRICE.
Done in Market Forecasts In-depth study done and implemented through phasing of sales, taking into account of suitable time frames Linked to sales time frame and completion of a particular phase
Eg.
Phase 1 100 units
Phase 2
100 units
Period (6 months)
? % ____
Price is raised to a reasonable level, for profit optimisation and floatation of increase in building costs
Price
Amplitude
Duration
Time
12
1
Recession 2 3 Bottom 4
5 Recovery
Demand
Declining
Strong, greater Positive but than new slowing supply Declining to low Positive growth Increase to balanced rate Positive growth but slowing
Vacancy Rents
Capitalization Rate
Investors Value Impacts
Increasing
No transaction Income declining with increasing cap. rates
Starting to decline
Interested Income improving with decreasing cap. rates
Rent As A Surplus
Theory Of Economic Rent
Rent is paid: When potential users of land consider revenue-earning potential exceeds all factor costs including sufficient profits.
Rent As A Surplus
Theory Of Economic Rent
What determines amount of rent? The amount of rent is determined by the surplus expected from using the land for its most profitable use.
What causes rental value to change? The rental value of land changes over time due to changes in the surplus of the revenue over the cost of using the land.
Yield on property is defined as Initial Return ie. the income an investor receives on the money he lays out to buy a property. INCOME x 100 PRICE PAID
Investors expectations growth in Rental Income and Capital Value ie. Total Return or Overall Return.
Value of property is expressed in terms of its yield, ie. initial rent X Years Purchase (YP) or 100 YIELD Prime Yield at which the highest quality property would be valued.
If rental growth increases, yield on which property will be valued will drop. YP rises, and value rises. (Which phase?) If rental remains but there is shortage of investments, value of investments rise and yields drop. (Which phase?)
ACTIVITY
What Are Property Cycles?
Linked materials
COST
Direct Costs
Indirect Costs
Overhead Costs
COST
1. Direct costs are those that can be related to the production, such as the cost of labor and material that remains as part of the permanent facility (e.g. concrete, formwork, steel bars). 2. Indirect costs include labor, material and expenses that are incurred but cannot be readily apportioned to a particular part of a project and are normally applied as a percentage of direct costs (e.g. supervision, temporary access road, licenses, permits, safety tools).
COST
3. Overhead costs are home office costs that are charged to a project on a predetermined basis. General overhead costs include home office facilities, insurance, executive management and other costs required to carry out the normal course of company business.
COST
Direct Cost Labour cost can be determined by obtaining the number of hours (man/day) spent on each part of the job by each worker. Full use of man-hour information cannot be made without knowing the quantity of work. For effective cost control, quantity report is used to measure the work done to determine the budgeted and actual quantities of work done and cost variance.
COST
Direct Cost (Labour cost)
The forecast quantity is normally estimated, taking into account any changes.
The difference between the forecast and the original estimate is compared and listed to record the variance and to let the project manager determine any corrective efforts to improve the cost baseline.
COST
Direct Cost- Material Costs
Material cost feedback is generated mainly through a purchase requisition control procedure. A good definitive estimate and a bill of materials will provide excellent control documents by which the material cost can be kept in check on a project.
To exercise control, it is essential that the project site maintain a record of purchases and delivered products.
If the quantity and cost of materials for an activity do not match its estimates and budget, the quantity surveyor or cost engineer must determine the reasons for the discrepancy and report to the project manager.
COST
Direct Cost Steel bars quantity of steel required for the project should be estimated (quantity taking-off exercise) by the QS and information given to the project supervisor incharge. Actual delivered and actual installed can be measured and these three data can be compared to determine any variance. Any negative variance in excess of 1.5% (allowance for wastage) is questionable and should be investigated. In smaller projects, due to the smaller quantities required and the size of the bars, the variance should be about 3%.
COST CONTROL
Direct Cost
Concrete similar procedure as steel bars, and normal wastage permitted is 3%.
COST CONTROL
Direct Cost Formwork (is slightly complicated) the QS must be capable to estimate the various timber type to be used, plywood, and scaffoldings and possibly steel moulds. In certain projects, organization may classify scaffolding as capital expenditure, of which a certain percentage cost will be applied for the project (normally 20% of total cost of purchase). If they are rented from third party suppliers, then the total rental cost will be applied.
COST CONTROL
Direct Cost
Equipment costs Equipment costs must be charged to work items based on hourly rate for each of the equipment required. Hours of operation can be accumulated from equipment time cards. Equipment idle time should be distributed to items of work and prorated to the distributed working time or captured in a separate idle time account.
COST CONTROL
Direct Cost
(Equipment costs)
Idling time should be distributed to specific activities. This may require a lot of effort and very often, a company may decide to aggregate into one account for all activities, or may provide specific sum in the initial budget for machinery and equipment utilization.
COST CONTROL
Indirect Cost Indirect costs for items such as supervision, temporary access road, licenses, permits, safety tools, are controlled by periodically comparing a report of actual expenditure with estimated costs. A prefix and agreed rate during the budgeting period, normally a percentage of the direct cost of work is added to the estimated costs.
COST CONTROL
Indirect Cost Indirect costs include costs of mobilization and demobilization, site staff, security guards, site cleaning and housekeeping, permits, license, bonds and insurances. Feedback on such costs is in the form of a monthly statement, comparing expenditure on these work items with provisions in the budget. In most construction contracts, there is always provision in the first bill of quantities for pricing preliminary and mobilization items. At such, some of this indirect cost can be apportioned as an activity within the budget provision.
COST CONTROL
Overhead Cost Salaries of field staff, home office staff, stationeries, utility bills, project vehicles, food and beverages for site office, and entertainment bills, are collected under overhead costs. Home office overheads will be taken at a percentage derived from the ratio between the overhead costs and normal business volume and are to be agreed upon between the project manager, finance manager, contract manager and the project sponsor.
COST CONTROL
Overhead Cost Periodically, the overhead cost is distributed over the total value of work done on the project. The feedback for control of overhead consists of a monthly statement comparing actual expenditure incurred on overhead items with the budgeted provision.
Price Equilibrium