Beruflich Dokumente
Kultur Dokumente
LAND
WATER
VEGETATION
LAND
National Bureau of Soil Survey and Land Use and Planning(NBSS&LUP)
1 2 3 4 5 6 7
Water Erosion Wind Erosion Water logging/flooding Salinity/Alkalinity Soil acidity Complex problems Geographical Area
44.66
54.5
PRODUCTIVITY OF CROPS(KGs/Ha)
Sl. Country/State No Paddy Wheat Maize Groundnut (In shell) Sugarcane
1
2 3 4 6 7 8
World
India Pakistan China Egypt USA Andhra Pradesh
4112
3124 3164 6265 10598 7694 3345
2804
2619 2519 4455 6455 2825 ------
4815
1938 2906 5365 7887 3629 5263
2149
859 ----3118 ----2964 1449
68257
66945 49229 82528 120887 73833 82267
Sl.No Year
Population (crores)
Net availability of food grains per capita per day(grams) 394.9 468.7 468.8 454.8
1 2 3 4 6
1951 36.1 1961 43.92 (21.66%) 1971 54.81 (24.79%) 1981 68.43 (24.84%) 1991 84.63 (23.67%)
50.82 82.02 (61.39%) 108.42 (32.18%) 129.29 (19.24%) 176.39 (36.42%) 550
510.1
7
8 9
189.74 (2.15%)
200.90 (5.88%) 209.79 (4.42%)
195.92 (11.07%)
254.95( Required) (30.12%) 266.99( Required) (4.7%)
416.2
Low productivity and low input usage are two major issues confronting rainfed farming. Productivity per unit of land Productivity per unit of water are important for optimum production.
SPLASH EROSION
SHEET EROSION
GULLY EROSION
> 80
Very severe
ACID SOILS
SALINE SOILS
ALKALINE SOILS
3. Adding gypsum
4. Adding sulfur 5. Adding organic matter
Causes : Low rainfall, high evaporation rate, poor drainage, irrigation with saline water
SHIFTING CULTIVATION
WATER
Blue water is the source of supply. It is equivalent to the natural water resources (surface and groundwater runoff). Green water is the rainwater directly used and evaporated by non-irrigated agriculture, pastures and forests
Sl.No
1 2 3 4 5 6 7 8 RICE MAIZE SOYABEAM SUGARCANE COTTON GROUNDNUT SUNFLOWER WHEAT
CROP
VIRTUAL WATEER
Amount of water that is embedded in food or other products needed for its production Trade in VW allows scarce countries to import high water consuming products while exporting low water consuming products
Sl.No 1 2 3 4 5 6 PRODUCT Potato Maize Milk Wheat Rice Soyabean VW Content (m3/ tonne ) 160 900 900 1350 3000 2300 1 kg of wheat needs 1350 litres of water. 1 kg of rice needs 3000 litres of water. 1 kg maize needs 900 litres of water. 1 cup of coffee needs 140 litres of water 1 litre of milk needs 1000 litres of water.
WATERSHED
It is a logical unit for planning optimal development of its soil, water and biomass resources.
TYPES OF WATERSHEDS
1. MACRO WATERSHED
> 50000 ha
5. MINI WATERSHED
> 1 to 100 ha
MINISTRY OF AGRICULTURE (Since inception to 2006-07) Sl.No 1 2 3 4 5 6 PROGRAMME NWDPRA (1990-91) RVP&FPR (1962&81) WDPSCA(1974-75) RADAS(1985-86) WDF(1999-00) EAPs Total AREA (Lakh ha) 93.09 64.86 3.93 7.11 0.59 18.15 187.73 AMOUNT (Rs crores) 3025.56 2244.24 295.58 121.74 26.02 3967.35 9680.49
Ministry of Rural Development (Since inception upto 2006-07) Sl.No PROGRAMME AREA (Lakh ha) 137.27 AMOUNT (Rs crores) 4842.50
78.73
1949.88
3 4
Sl.No
PROGRAMME
NAEP(1989-90)
0.70
47.53
0.70 Total
47.53
MINISTRY OF AGRICULTURE
(XI FYP)
Sl.No PROGRAMME AREA (Lakh ha) AMOUNT (Rs crores)
1
2 3 4 5 6 7
NWDPRA
RVP&FPR WDPSCA RADAS WDF EAPs RADP Total
15.00
12.50 2.00 1.00 5.00 5.00 30.00 70.50
1500
1500 240 100 600 750 3300 7990
Ministry of Rural Development (XI FYP) Sl.No PROGRAMME AREA (Lakh ha) 240.00 AMOUNT (Rs crores) 15358
1 IWDP
PLANNING COMMISSION
Sl.No PROGRAMME AREA (Lakh ha) AMOUNT (Rs crores)
10
2500
National Rainfed Area Authority Ministry of Agriculture, Government of India NASC Complex, Dev Prakash Shastri Marg PUSA, New Delhi - 110012
Sl.No 1 2 3
BUDGET COMPONENT ADMINISTRATIVE COSTS MONITORING EVALUATION (I) PREPARATORY PHASE ( 1 -2 YEARS)
% OF THE BUDGET 10 1 1
4 5 6
ENTRY POINT ACTIVITIES INSTITUTION & CAPACITY BUILDING DETAILED PROJECT REPORT(DPR) (II) WATERSHED WORKS PHASE(2-3 YEARS)
4 5 1
7 8 9
WATERSHED DEVELOPMENT WORKS LIVELIHOOD ACTIVITIES FOR THE ASSETLESS PERSONS PRODUCTION SYSTEM & MICRO ENTERPRISES (III)CONSOLIDATION PHASE(1-2 YEARS) TOTAL
50 10 13 5 100
IWMP PROJECTS IN ANDHRA PRADESH Sl. No DISTRICT NUMBER OF MEGA WATERSHED PROJECTS 9 15 AREA (Ha) TOTAL PROJECT COST (Crores) 43.20 71.05
1 2
Adilabad Anantapur
36000 59205
3
4 5 6 7 8
Chittoor
Kadapa Khammam Kurnool Mahabubnagar Medak
9
7 2 13 16 5
38025
28000 10000 63010 64150 25300
45.63
33.60 12.00 75.61 76.98 30.36
Sl. No
DISTRICT
AREA (Ha)
9 10
Nalgonda Prakasam
34500 67600
11
12
Ranga Reddy
Srikakulam
7
4
28143
19508
33.77
23.41
The nation behaves well if it treats the natural resources as assets which it must turn over to the next generation increased, and not impaired, in value