Beruflich Dokumente
Kultur Dokumente
SUPPLIER
Our survival is linked to our companys growth. Our companys growth largely depends on customer satisfaction. Customer satisfaction depends on Quality, Price, and Delivery. Quality, Price, and Delivery are linked to Process Capability. Process Capability is greatly limited by process variation. Process variation leads to an increased number of rejects, higher costs, and longer production time.
Company Confidential
Profit
Theoretical Costs
Theoretical
Theoretical
COSTS
COSTS
a.
Note: COPQ = Cost Of Poor Quality
b.
c.
d.
Company Confidential
Costs that are associated with Internal Failure Costs External Failure Costs Appraisal Costs Prevention Costs Lost Opportunity Costs
Copyright NN, Inc. 2007 Company Confidential
Company Confidential
Company Confidential
Company Confidential
Company Confidential
Company Confidential
Why Six Sigma ?? There is a correlation between a companys COPQ and the rating of its key processes
45 40 35 30 25 20 15 10 5 0
1 2 3 4 5
COPQ (% Sales)
Sigma Rating
Copyright NN, Inc. 2007 Company Confidential
The Necessity of Training Farm Hands for First Class Farms in the
Fatherly Handling of Farm Live Stock is Foremost in the Eyes of Farm Owners. Since the Forefathers of the Farm owners Trained the Farm
Hands for First Class Farms in the Fatherly Handling of Farm Live Stock,
the Farm Owners Feel they should carry on with the Family Tradition of Training Farm Hands of First Class Farmers in the Fatherly Handling of Farm Live Stock Because they Believe it is the Basis of Good Fundamental Farm Management.
Company Confidential
People
Inspectors:
Expected:
Total Expected:
36
Observed:
#
Copyright NN, Inc. 2007
%
Company Confidential
0.00%
Escaping PPM
99%
2 3
90%
4
99%
80%
5 6
90%
70%
7 8
80%
10
70%
11
Sigma Level
3.0
2.0 1.0 0.0 1 2 3 4 5 6 7
Example: If the likelihood of detecting the defect is 70%, it would require about 10 consecutive inspectors to have a Six Sigma level of confidence that the defect will be detected.
10
Company Confidential
Step Y
US
Product
No Defect No Defect
Defect
Defect
Defect
Defect
Test
Analyze
}*
Company Confidential
Test
Analyze
}*
Fix
Fix
Every time a defect is created during a process step, it takes additional cycle time to test, analyze and fix. These non-value added activities typically require additional floor space, capital equipment, material, and people.
Copyright NN, Inc. 2007
$14.5 Billion in Warranty Costs 2004 Audi - 101,000 cars affected by faulty Circuit Boards (2001-2003 model year) Toyota software glitch on 2004 and 2005 Prius 70% of all returns to Dealer from Electronics Malfunction Volvo 200,000 to 300,000 cars with faulty Electronic Throttle Modules (1999- 2002 model year)
*Industry Week March 2006
Company Confidential
Quality problems 2005 Model 21 supply to Los Angeles Police Department Misfires, followed by ineffective Corrective Action 1600 Officers informed to switch Firearms
Industry Week March 2006
Company Confidential
Liverpool, England Manufacturer of Vaccine 2004 contamination led to destruction of 52 million doses 50% of U.S. supply affected Industry Week March 2006
Copyright NN, Inc. 2007 Company Confidential