Major Objectives
600MW Steam turbine: Built from proven modules of existing 500 & 250 MW
OPTIONS
1. HP Turbine with Extraction & 565 Deg C HRH Temp 2. HP Turbine without Extraction & 537 Deg C HRH Temp
Salient features:
4 cylinder turbine (2 LPs) HP turbine with Extraction connection for 565 HRH Temp IP turbine suitable for 537/565 0C inlet temp.
Orders for 2 sets - N Chennai, 2 sets JITPL, 1 set -APGENCO & 2 sets Singareni received.
Orders for 4x600 MW Raigarh-III (Jindal), 2x600 MW Malwa, 2x600 MW each Avantha / Videocon/ Visa Raigarh/ DB Power & 1 x 600 MW Rayalaseema received .
5
Steam Turbine
Design Changes from existing 500 MW sets : HP module variant with Extraction 600MW Steam Turbine New Flow path in HP, IP & LP Turbines (with Advanced blading) Matching modifications in Rotors & Inner Casings New Bearing pedestal between 2 LP cylinders New design of Cross Around Pipe & its support Enhanced governing characteristics
4.3 %
500 MW
800 MW Super
INCREASE IN PRESSURE & MAIN AND REHEAT TEMP. > 537 Deg C RESULTS IN SIGNIFICANT IMPROVEMENT IN HEATRATE
8
Supercritical Cycles
Steam Power plant efficiency increases with increase in steam pressure and temperature. Power plant Cycles operating above critical pressure (221.2 bar) are classified as Supercritical cycles With higher cycle efficiency, the supercritical cycle offers the advantage of burn less fuel for the same output and lower emission.
10
UNIT ATA
oC
500 MW 660 MW 800 MW 170 537 1500 247 565 1919 247 565 2380
T/HR
REHEAT PRESSURE
RH TEMPERATURE FINAL FEED WATER TEMP.
ATA
oC oC
40.5
537 253
56
593 290
60
593 290
11
12
THREE HP HEATERS
250% TURBINE DRIVEN BFP ONE MOTOR DRIVEN BFP
13
500 MW
H30-100 M30-63 N30-2 x 10
660 MW
H30-100 M30-100 N30-2 x 12.5
800 MW
H30-100 M30-100 N30-4 x 8
HP VALVES
IP VALVES
2 x FV320
2xAV560
2 xFV250A
2xAV560A
2 xFV250A
2xAV560A
14
15
Salient Feature: New series of HP & IP modules for supercritical parameters Higher size LP module
247 ata Main Steam Pressure 565 0C Main Steam Temperature 593 0C Hot reheat Temperature
Order for 2x660 MW Barh- II/ DB Power & 3 x 660 Bara & Lalitpur TPP Other expected tenders 1 x 660 MW JITPL Angul, Jhabua Seoni, etc
16
17
Salient features: 4 cylinder turbine (2 LPs) New series of HP, IP & LP modules for super critical parameters
Orders for Yermarus (2x800 MW), & Edlapur (1x800 MW), JV between KPCL and BHEL
Order expected for NTPC 2 x 800 MW Gajmara TPP & Udangudi (2x800 MW), JV between
TNEB and BHEL
18
19
SINGLE FLOW, DOUBLE SHELL OUTER CASING BARREL TYPE IN TWO PIECES INNER CASING AXIALLY SPLIT MONO BLOCK DRUM TYPE ROTOR
21
DOUBLE FLOW, DOUBLE SHELL CASING MONO BLOCK DRUM TYPE ROTOR STEAM ADMISSION IN L/H FROM BOTH SIDES EXTRACTIONS CONNECTIONS IN LOWER HALF ONLY VALVES BOLTED TO THE CASING IN LOWER HALF
22
24
DOUBLE FLOW, DOUBLE SHELL OUTER CASING FABRICATED , INNER CASING CASTINGS MONO BLOCK ROTOR
25
26
LP TURBINE
500 MW
660 MW
27
28
29
30
GOVERNING
THROTTLE CONTROLLED GOVERNING WITH HIGH PRESSURE ELECTRO HYDRAULIC COMPACT ACTUATORS (160 BAR)
31
Turbine Governing
EXISTING DESIGN(500 MW)
THROTTLE GOVERNING ELECTRO HYDRAULIC (WITH 32 BAR PRESSURE)
32
Turbine Governing
ADVANTAGES OF EHA BASED SYSTEM
Simplified plant layout due to overall compact size Control oil piping reduced Faster response due to state of art electronic control and protection system Better interconnection with other system Ease of operation and maintenance Valve room is avoided
33
Turbine Governing
EHA SYSTEM CONSISTS OF
* * * * *
HYDRAULIC POWER SUPPLY UNIT HPSU CONTROL UNIT VALVES ACTUATORS CONTROLLERS PROTECTION SYSTEMS
34
OVERHAULING
35
SUMMARY
Proven Supercritical technology in collaboration with M/s Siemens
Steam Parameters up to 300 bar / 600C / 620C Modular Turbo set design to fit best customer needs High reliability & Availability Long Inspection intervals High efficiency by using modern CFD tools for flow path & blades
36