Sie sind auf Seite 1von 15

Prem kant panjiyara

EE 906405218286 RIMT -IET

Undergoing summer training at USHA MARTIN LTD, RANCHI was a very nice experience. We would like to extend our heartiest thanks to Mr. sanjay srivastav and Mr. B.P. singh for their guidance and cooperation. In spite of their busy daily work they guided us in learning the power distribution at USHA MARTIN LTD, RANCHI in a short span of time. We also thank, Mr. Arvind kumar of HRD dept. of USHA MARTIN LTD, RANCHI for conducting such a training programme for us.

Premkant Panjiyara 90640518286

UML is the 2nd largest wire and rope manufacturer in the world and has the largest variety in South East Asia. It is multi product, diversified engineering conglomerate with 10 production units in India,1 in Thailand,1 in UK and 1 in Dubai. It is saving valuable foreign exchange by exporting by exporting its products to 42 countries like USA, Africa and Middle East, conforming to the strictest product quality standards. It got the ISO 9000 Certification by BVQI in 1994. ICICI (BCB) did the business process re-engineering in 1996 and line system was set up to enhance performance.

With the modern concepts like TPM, value engineering, QC, suggestions scheme, customer satisfaction and human resource development, UML is trying to reach unparalleled heights.
UML is serving through a leading daily Prabhat Khabar, Krishi Gram Vikas Kendra, Usha Martin Technical Institute.

USHA MARTIN substation receives 33 kv from JSEB(Jharkhand state electricity board). A current and potential transformer unit (CT /PT) measure incoming voltage and current at substation. These readings are shield in a room for JSEB observation. The company measure tha incoming current by installin its own current transformer(CT). An isolator or air break switch is provided for isolation of CT and transformer under circumstances like high high power flow maintenance fault repairing from isolator supply connection goes to O.C.B. An O.C.B(oil circuit breaker) is used to break the circuit in case of undesirable high power flow.O.C.B automatically breaks the circuits as the current increase beyond safe limit. Some time the circuit is open manually during fault repair in substation. After O.C.B the supply power passes through CT where the supply current is measured from companys observation. Incoming power from CT is given to a 33 kv swing busbar from where it is distributed in many ways. A Potential transformer(PT) at one end of the bus bar is connected to measure the incoming voltage for companys observation. Five transformers are connected to this busbar. Transformer 1(3mva. 33 kv/11kv) connected to the busbar indirectly through air break switch and O.C.B converts 33 kv to 11kv secondary side. Similary transformer no 2&3 of same rating are connected to 33 kv bus bar. Transformer no.4 connected in similar way but of different rating that is 33kv/433kv provides 433v to ROPERY and FURNACE.

Transformer Distribution panel Air break switch Oil circuit breaker Air circuit breaker U.P.S Diesel generator Disc insulator Pin insulator Lighting arrestor Bus coupler Bus bar Contactors Power factor unit

Das könnte Ihnen auch gefallen