KAIZEN

Event On
To Ramp up PDI Production from 70 / Shift to 100 /

Shift
www.ebz-gmbh.de
At TCF 1C Shop

Uttarakhand
Responsibility : Ranjit Singh
FROM 18.01.2013 to 25.01.2013

KPO/UKE346/Ranjit Singh To Ramp up PDI production from 70 / Shift to 100 / Shift.

SUPER ACE & VENTURE Project


TATA MOTORS LTD. Pantnagar

Team Members Participation

www.ebz-gmbh.de

KPO/UKE346/Ranjit Singh To Ramp up PDI production from 70 / Shift to 100 / Shift.

SUPER ACE & VENTURE Project


TATA MOTORS LTD. Pantnagar

Team Members Participation

www.ebz-gmbh.de

91.1 %

KPO/UKE346/Ranjit Singh To Ramp up PDI production from 70 / Shift to 100 / Shift.

SUPER ACE & VENTURE Project


TATA MOTORS LTD. Pantnagar

Reason for selecting the theme To Ramp up PDI Production from 70 to 100 / Shift
1 .AS WE HAD ACHIEVED ROLL OUT OF 100 / SHIFT THERE IS PROBLEM IN CLEARENCE AT PDI 2.30 % output loss due to Rework

3. 30 Mins to 120 Mins time is required for Rework of BIW, Trim, UB & Mech Line.

www.ebz-gmbh.de

REDUCE DEFECTS

Ramp up PDI Output

KPO/UKE346/Ranjit Singh To Ramp up PDI production from 70 / Shift to 100 / Shift.

SUPER ACE & VENTURE Project


TATA MOTORS LTD. Pantnagar

Activity Plan

www.ebz-gmbh.de

KPO/UKE346/Ranjit Singh To Ramp up PDI production from 70 / Shift to 100 / Shift.

SUPER ACE & VENTURE Project


TATA MOTORS LTD. Pantnagar

Objective, Target & Deliverables


OBJECTIVE
- To Eliminate top 5 defects at PDI.

To modify layout of Shower & PDI for better retrieval of parts.

- To improve material feeding system.

- To improve rejection clearance system.

www.ebz-gmbh.de

TARGET & DELIVERABLES :


-Output / Shift to be increased from 70 / shift to 100 / shift. -To reduce DPV from 10 to 5. -Design new count free & easily retrieved trolleys . -Educate and trained supplier / TML people. -100 % dedicated Location along with Identification
KPO/UKE346/Ranjit Singh To Ramp up PDI production from 70 / Shift to 100 / Shift. SUPER ACE & VENTURE Project
TATA MOTORS LTD. Pantnagar

Problem Solving Approach

DATA COLLECTION

KAIZEN SUSTENANCE

PLAN

ACT DATA INTERPRETATION KAIZEN VALIDATION

DO

www.ebz-gmbh.de

CHECK

PROBLEM DEFINITION

KAIZEN IMPLEMENTATION

4M Analysis

KAIZEN IDENTIFICATION

KPO/UKE346/Ranjit Singh To Ramp up PDI production from 70 / Shift to 100 / Shift.

SUPER ACE & VENTURE Project


TATA MOTORS LTD. Pantnagar

Data Collection & Interpretation

www.ebz-gmbh.de

KPO/UKE346/Ranjit Singh To Ramp up PDI production from 70 / Shift to 100 / Shift.

SUPER ACE & VENTURE Project


TATA MOTORS LTD. Pantnagar

Pictorial View of Defects

www.ebz-gmbh.de

KPO/UKE346/Ranjit Singh To Ramp up PDI production from 70 / Shift to 100 / Shift.

SUPER ACE & VENTURE Project


TATA MOTORS LTD. Pantnagar

Problem Definition 5W1H

www.ebz-gmbh.de

KPO/UKE346/Ranjit Singh To Ramp up PDI production from 70 / Shift to 100 / Shift.

SUPER ACE & VENTURE Project


TATA MOTORS LTD. Pantnagar

ROOF LAMP GAP NG

www.ebz-gmbh.de

ANALYSIS

Roof lamp mtg bkt required 21 mm from roof but in actual its coming 26-27 mm (variation of 5-6 mm). Reason - No fixture for roof spotting.
KPO/UKE346/Ranjit Singh To Ramp up PDI production from 70 / Shift to 100 / Shift. SUPER ACE & VENTURE Project
TATA MOTORS LTD. Pantnagar

www.ebz-gmbh.de

KPO/UKE346/Ranjit Singh To Ramp up PDI production from 70 / Shift to 100 / Shift.

SUPER ACE & VENTURE Project


TATA MOTORS LTD. Pantnagar

Name of employee: Operation/Machine

Ticket No:

Shop/Area: Tcf1c

Line/Station

Date:

Problem
Gap observed after fitment of Roof liner & roof lamp

Measure Taken
Roofliner foam thickness increased to 5 mm to absorb variation

Results
Result OK both at TR 30 & PDI. Fixture for roof spoting is in process at BIW

Roof lamp fitment

Before Kaizen

After Kaizen

www.ebz-gmbh.de

KPO/UKE346/Ranjit Singh To Ramp up PDI production from 70 / Shift to 100 / Shift.

SUPER ACE & VENTURE Project


TATA MOTORS LTD. Pantnagar

Door to Weather Strip Gap NG

ANALYSIS
www.ebz-gmbh.de

Gap observed between weathger strip & door pad. Weather strip lip NG. Require = 10 mm & actual = 8 mm. On the basis of 4M analysis we found that Weather strip is NG On the basis of 4M we found that in Machine Die issue, Pressing NG on LH side resulting more gap on one side.
KPO/UKE346/Ranjit Singh To Ramp up PDI production from 70 / Shift to 100 / Shift. SUPER ACE & VENTURE Project
TATA MOTORS LTD. Pantnagar

Name of employee: Operation/Machine

Ticket No:

Shop/Area: Tcf1c

Line/Station:

Date:

Problem
Door pad to weather strip gap observed

Measure Taken
Length of lip in creased from 8 mm to 10 mm -- Tejpal

Results
No gap observed at PDI

Weather strip fitment

Defect Zero

Before Kaizen

After Kaizen

www.ebz-gmbh.de

KPO/UKE346/Ranjit Singh To Ramp up PDI production from 70 / Shift to 100 / Shift.

SUPER ACE & VENTURE Project


TATA MOTORS LTD. Pantnagar

Load Body hook / hinge fouling

ANALYSIS
www.ebz-gmbh.de
Hook Fouling 1. Uneven gap between tailgate/ side panel wrt Load body floor 2. Front panel flushness NG wrt side panel 3. Load body hook setting done on trim line in TCF, at that time, vehicle body is on conveyor. After drive load body adjust itself results in small hook fouling at PDI. Hinge fouling 1. Uneven gap between tailgate / side panel wrt Load body floor. 2. Waviness in skirt panel. 3. Hinge slot not OK.
KPO/UKE346/Ranjit Singh To Ramp up PDI production from 70 / Shift to 100 / Shift. SUPER ACE & VENTURE Project
TATA MOTORS LTD. Pantnagar

Name of employee: Operation/Machine

Ticket No:

Shop/Area: Tcf1c

Line/Station:

Date:

Problem
Load body hook fouling 1.
2.

Measure Taken
Stud length decreased by 15 mm. Triangle jig made at supplier end to control flushness of front panel. 100 % inspection of load body hook at shower by BIW.

Results
Even gap achieved PDI defect reduced

Load body, toggle clamp fitment

3.

Before Kaizen

After Kaizen

www.ebz-gmbh.de

KPO/UKE346/Ranjit Singh To Ramp up PDI production from 70 / Shift to 100 / Shift.

SUPER ACE & VENTURE Project


TATA MOTORS LTD. Pantnagar

Name of employee: Operation/Machine

Ticket No:

Shop/Area: Tcf1c

Line/Station:

Date:

Problem
Load body hinge fouling
1. 2.
3. 4.

Measure Taken
Stud length decreased by 15 mm. Child part added in skirt panel to avoid waviness. Hinge slot shift by 2 mm New type of hinge implemented. Mr. Dilip Singh (SQIG)

Results
Result OK but activities in process. Defect decreased at PDI

Load body fitment

Before Kaizen

After Kaizen

www.ebz-gmbh.de

KPO/UKE346/Ranjit Singh To Ramp up PDI production from 70 / Shift to 100 / Shift.

SUPER ACE & VENTURE Project


TATA MOTORS LTD. Pantnagar

Bumper gap & flushness NG

www.ebz-gmbh.de

ANALYSIS

Flushness of bumper wrt side bonnet not ok. Bumper not locked properly with side bonnet.
KPO/UKE346/Ranjit Singh To Ramp up PDI production from 70 / Shift to 100 / Shift. SUPER ACE & VENTURE Project
TATA MOTORS LTD. Pantnagar

Name of employee: Operation/Machine

Ticket No:

Shop/Area: Tcf1c

Line/Station:

Date:

Problem
Gap & flushness between bumper & side bonnet

Measure Taken
Bumper mtg stopper bkt shifted by 2. 5 mm in Z direction. Checking unit added at supplier end for bumper mtg bkt in frame. Mr. Ritesh Chattoo (SQIG)

Results
Locking of bumper & side bonnet improved results in better gap & flushness.

Bumper fitment

Before Kaizen

After Kaizen
Bkt shifted 2.5mm in Z direction

www.ebz-gmbh.de

KPO/UKE346/Ranjit Singh To Ramp up PDI production from 70 / Shift to 100 / Shift.

SUPER ACE & VENTURE Project


TATA MOTORS LTD. Pantnagar

Seat toggle clamp centering not ok

www.ebz-gmbh.de

ANALYSIS

Seat shifts towards left of the vehicle during tightening of seat mounting bolts. On the basis of 4M analysis we found that Method is NG.
KPO/UKE346/Ranjit Singh To Ramp up PDI production from 70 / Shift to 100 / Shift. SUPER ACE & VENTURE Project
TATA MOTORS LTD. Pantnagar

Name of employee: Operation/Machine

Ticket No:

Shop/Area: Tcf1c

Line/Station:

Date:

Problem
Seat toggle clamp offset wrt seat lock

Measure Taken
Process changed. First operator hand tight seat mtg bolt then he will lock seat toggle clamp. Afterwards he will tight with gun

Results
. Result coming OK but still in process

Seat Fitment

Before Kaizen

After Kaizen

www.ebz-gmbh.de

KPO/UKE346/Ranjit Singh To Ramp up PDI production from 70 / Shift to 100 / Shift.

SUPER ACE & VENTURE Project


TATA MOTORS LTD. Pantnagar

Name of employee: Operation/Machine

Ticket No:

Shop/Area: Tcf1c

Line/Station:

Date:

Problem
Rack placed and lots of covers kept at PDI

Measure Taken
Dedicated trolley made for PVC covers

Results
. 2S maintained

PVC Cover fitment

Before Kaizen

After Kaizen

www.ebz-gmbh.de

KPO/UKE346/Ranjit Singh To Ramp up PDI production from 70 / Shift to 100 / Shift.

SUPER ACE & VENTURE Project


TATA MOTORS LTD. Pantnagar

Name of employee: Operation/Machine

Ticket No:

Shop/Area: Tcf1c

Line/StationDate:

Problem
Rack placed and lots of covers kept at PDI

Measure Taken
Dedicated trolley for side console placed at PDI and rack eliminated

Results
. 2S maintained

Side console fitment

Before Kaizen

After Kaizen

www.ebz-gmbh.de

KPO/UKE346/Ranjit Singh To Ramp up PDI production from 70 / Shift to 100 / Shift.

SUPER ACE & VENTURE Project


TATA MOTORS LTD. Pantnagar

Name of employee: Operation/Machine

Ticket No:

Shop/Area: Tcf1c

Line/Station:

Date:

Problem
Wheel rim cover kept in cartoon boxes

Measure Taken
Dedicated trolley made for keeping wheel rim covers

Results
. 2S maintained

Wheel rim cover fitment

Before Kaizen

After Kaizen

www.ebz-gmbh.de

KPO/UKE346/Ranjit Singh To Ramp up PDI production from 70 / Shift to 100 / Shift.

SUPER ACE & VENTURE Project


TATA MOTORS LTD. Pantnagar

Vehicle Flow in Shower & PDI - Before


T/U Line PDI Line Shower

TR Repair

T/U Repair

www.ebz-gmbh.de

Front Panel, Bumper fitment & PVC cover fitment, Door setting gap & flushness, Side Console, Child parts DT

KPO/UKE346/Ranjit Singh To Ramp up PDI production from 70 / Shift to 100 / Shift.

SUPER ACE & VENTURE Project


TATA MOTORS LTD. Pantnagar

Vehicle Flow in Shower & PDI - After


T/U Line PDI Line Door Setting gap & flushness

Shower

TR Repair

T/U Repair

www.ebz-gmbh.de

Side Console & Child Parts

Front Panel, Bumper fitment & PVC cover fitment DT

KPO/UKE346/Ranjit Singh To Ramp up PDI production from 70 / Shift to 100 / Shift.

SUPER ACE & VENTURE Project


TATA MOTORS LTD. Pantnagar

Kaizen Newspaper

www.ebz-gmbh.de

KPO/UKE346/Ranjit Singh To Ramp up PDI production from 70 / Shift to 100 / Shift.

SUPER ACE & VENTURE Project


TATA MOTORS LTD. Pantnagar

Kaizen Even Results


10 9 8 7 6 5 10
140 120

7 Before Current Target

100 80 60 40 20 0 Avg. PDI Nov'12 Dec'12 Jan'13

www.ebz-gmbh.de

4 3 2 1 0 DPV

KPO/UKE346/Ranjit Singh To Ramp up PDI production from 70 / Shift to 100 / Shift.

SUPER ACE & VENTURE Project


TATA MOTORS LTD. Pantnagar

WAY FORWARD

www.ebz-gmbh.de

KPO/UKE346/Ranjit Singh To Ramp up PDI production from 70 / Shift to 100 / Shift.

SUPER ACE & VENTURE Project


TATA MOTORS LTD. Pantnagar

www.ebz-gmbh.de

KPO/UKE346/Ranjit Singh To Ramp up PDI production from 70 / Shift to 100 / Shift.

SUPER ACE & VENTURE Project


TATA MOTORS LTD. Pantnagar

Das könnte Ihnen auch gefallen