HD200 Road steel bridge installation instruction

CRSBG 2012/06

1.Quantity of Supply()
Quantity of Supply() No.() 1 2 Span() 15.3m 18.3m Unit( each() each() Quantity() 3 5

3
4 5 6

24.4m
30.5m 36.6m Tools

each()
each() each() set

7
4 3 3

2.Description of member()

3.Description of Tools()

4.Launching site layout:

0.751m 6m

the rock rollers are only displaced on both pushing side

and landing side of the gap where the the bridge will be
erected. the rock roller is 0.75--1m off the bearings and layout in the direction of bridge launching. Temporary

packings should be applied to stable the rollers.


plain roller should be displaced in a distance of 6m from each other, care should be taken to the directions

5. Nose beam: when pushing the panels, firstly utilize the nose beam to stable the pushing process. usually a nose beam is assemblied out of a single collum and a single layer.

21 21 nose beam= bridge spans/2+1, cardinal bridge span, to have stability, use temporay

supporting frame

Launching line principle of installing the launching link 1

when the steel panel being pushing forward, there is a problem to make the bridge cantilever to the right position to the roller on the opposite site,hence a launching link is displaced to assure the right level and hight. 2)1 23 max. nose beams for the luaching link is 4, add links to 2,3 section if one is not enough. 3

never install two launching links on the same position.


4 temporay packings are necesssary for this process.

(mm) nose beam height

6. bridge

assembling

single truss single layer


bridge assembling sequence, please refer to the diaphram

double truss single layer bridge assembling sequence.

stick to the worshop drawings, utilize chord tothe male and famale end

deck panel can be fixed before the truss beam is pushed, and fix the rest of the beam anchors.

7.pullpush and beam placement 1 to avoid bridge truss and span movement during the erection, make sure that the whole process can be controlled by break 2 use counter weight at the rear of the bridge 3 make becessary adjustment during the pulling and push process. 4 when instal the bridge beam, please make sure that nose beam and counter weight are removed. 5 use rocl roller to break when dismantling front end luanching link beam. 6 before displace the bridge truss, make sure all the bolts are sufficiently tightened 7 use jack to the rock roller, and place packings with the same hieght under each beam,2 use jack to lower the packing height and the bridge truss. repeat the process until all the panel being correcly installed. 8 when jacking the bridge truss, make the both ends proceed simultaneously 9 for safety, please displace one end after another.