Sie sind auf Seite 1von 23

FORMAT FOR

SEA TRIAL REPORT

TRIAL REPORT OF

NAME OF VESSEL: BUILDERS YARD NO: FOR OWNER

BUILDER ADDRESS. CHOWGULE & COMPANY LIMITED, SHIPBUILDING DIVISION, LOUTULIM, GOA.

CHOWGULE & COMPANY LIMITED SHIPBUILDING DIVISION LOUTULIM GOA


NAME OF VESSEL

BUILDER,S YARD NO
REGISTRATION NO OWNER DATE OF TRIAL
The sea trial is carried out in the presence of the following dignitaries:

IR S

SURVEYOR

OWNER
STATUTORY SURVEYOR BUILDERS REPRESENTATIVE

CHOWGULE & COMPANY LIMITED SHIPBUILDING DIVISION LOUTULIM GOA


NAME OF VESSEL BUILDERS YARD NO REGISTRATION NO OWNER TYPE OF VESSEL DATE OF TRIAL PLACE OF TRIAL

SEA CONDITION
AMBIENT TEMPERATURE DRAFT FORWARD DRAFT MIDSHIP DRAFT AFT WATER DEPTH NO OF PERSONS ON BOARD TIME OF DEPARTURE

Builders Representative

IRS Surveyor

Owner

CHOWGULE & COMPANY LIMITED SHIPBUILDING DIVISION LOUTULIM GOA


NAME OF VESSEL: BUILDERS YARD NO: DATE OF TRIAL:

BASIN TRIAL
Bilge /Ballast/Fire Pump
Sr no Bilge/ballast/Fire Suction from Discharge Pump Obd Obd Obd Obd Obd Obd Obd Obd Obd Obd Obd Means of Pumping Port & stbd bilge / GS pump Bilge pipe Bilge pipe Bilge pipe Bilge pipe Bilge pipe Bilge pipe Bilge pipe Bilge pipe Bilge pipe Bilge pipe Ballast/Deballast pipes Performance

1 2 3 4 5 6 7 8 9 10 11 12

Bilge Bilge Bilge Bilge Bilge Bilge Bilge Bilge Bilge Bilge Ballast / Deballast Semi rotary hand pump

Ford store Cargo hold bilge well P&S forward & Aft DB-no1 P&S DB-no2 P&S DB-no3 P&S WT no1 P&S WT no2 P&S WT no3 P&S Engine room bilges & emergency bilge Steering compartment Aft ballast tanks P&S Chain Locker

Builders Representative

IRS Surveyor

Owner

CHOWGULE & COMPANY LIMITED SHIPBUILDING DIVISION LOUTULIM GOA


BASIN TRIAL
NAME OF VESSEL: BUILDERS YARD NO: DATE OF TRIAL:

Sr no 1 2 a b

Type of Trial F.O transfer system with semi rotary hand pump Functioning of all Q.C.V. Fuel oil storage tanks P& S Fuel oil daily service tank P & S

Performance

Builders Representative

IRS Surveyor

Owner

CHOWGULE & COMPANY LIMITED SHIPBUILDING DIVISION LOUTULIM GOA


SPEED TRIAL
NAME OF VESSEL: BUILDERS YARD NO: DATE OF TRIAL:

Sr no 1

Engine RPM

Run

Time

Speed in knots

2
3

Average Speed achieved is = NOTE: The speed is recorded with GPS

Knots

Builders Representative

IRS Surveyor

Owner

CHOWGULE & COMPANY LIMITED SHIPBUILDING DIVISION LOUTULIM GOA


NAME OF VESSEL: BUILDERS YARD NO: DATE OF TRIAL:

SAFETY CUT OUTS (TRIPS) OF THE MAIN ENGINE(PORT)


Sr no Function Normal working value recommended by engine manufactures Set Point for the Switch Performance

M.E Low lub oil pressure trip (port) M.E High water temp trip (port)

Over speed trip (Port)

Builders Representative

IRS Surveyor

Owner

CHOWGULE & COMPANY LIMITED SHIPBUILDING DIVISION LOUTOLIM GOA


NAME OF VESSEL: Main Engine (PORT) Manufacturer Model/Type Power/Rating Serial Number
Sr No. 1 2 3 4 5 6 7 8 9 10 11 Description Time Wheel house rpm Engine RPM Shaft RPM M.E Lub.Oil Pressure in Kg/cm2 M.E Lub.Oil Temperature in
oc

BUILDERS YARD NO: Gear box (PORT) Manufacturer Model/Type Power/Rating Ratio Serial Number
Readings

DATE OF TRIAL:

M.E F.W Temperature in o c Gear box Lub oil pressure (bar) Gear box lub oil Temperature (DEG) Engine Room temp Exhaust temperature (DEG)

Builders Representative

IRS Surveyor

Owner

CHOWGULE & COMPANY LIMITED SHIPBUILDING DIVISION LOUTULIM GOA


TURNING CIRCLE TRIAL
NAME OF VESSEL: BUILDERS YARD NO: DATE OF TRIAL:

Turning Circle STBD Side PORT Side

Time taken to complete one circle

Diameter of the circle

Engine Rpm (p & s)

Performance

Builders Representative

IRS Surveyor

Owner

CHOWGULE & COMPANY LIMITED SHIPBUILDING DIVISION LOUTULIM GOA


NAME OF VESSEL: BUILDERS YARD NO: DATE OF TRIAL:

STEERING TRIAL Engine RPM:


Sr.No Coarse Time Taken In SECS

1
2 3 4 5 6

0 to 35 PORT
35 PORT to 35 STBD to 35 STBD 35 PORT 0

35 PORT to

0 to 35 STBD 35 STBD to 0

HAND STEERING TRIAL Engine RPM:


Sr No Coarse 0 to 15 PORT 15 PORT to 15 STBD to 15 STBD 15 PORT 0 Time Taken In Secs Number of Turns

15 PORT to

0 to 15 STBD 15 STBD to 0

Builders Representative

IRS Surveyor

Owner

CHOWGULE & COMPANY LIMITED SHIPBUILDING DIVISION LOUTULIM GOA


NAME OF VESSEL: BUILDERS YARD NO: DATE OF TRIAL:

CRASH STOP

TRIALS

Sr No

DISCRIPTION

TIME TAKEN

1
2 3 4

Full Ahead To Crash Stop


Full Ahead To Astern Astern To Stop Astern To Full Ahead

Builders Representative

IRS Surveyor

Owner

CHOWGULE & COMPANY LIMITED SHIPBUILDING DIVISION LOUTULIM GOA


NAME OF VESSEL: BUILDERS YARD NO: ANCHORING TRIAL
Sr No 1 2 3 4 5 Item Discription Anchor in use Forward STBD Anchor in use Forward PORT AFT Anchor Chain in use Forward STBD Chain in use Forward PORT Certificate No

DATE OF TRIAL:

Trial Data : Anchor Windlass


1 2 3 4 5 Average depth of water Sea condition Time Taken for 27.5 Mtr length (port) Time Taken for 27.5 Mtr length (STBD) Observation

Builders Representative

IRS Surveyor

Owner

CHOWGULE & COMPANY LIMITED SHIPBUILDING DIVISION LOUTOLIM GOA


NAME OF VESSEL: Main Engine (STBD) Manufacturer Model/Type Power/Rating Serial Number
Sr No. 1 2 3 4 5 6 7 8 9 10 11 Description Time Wheel house rpm Engine RPM Shaft RPM M.E Lub.Oil Pressure in Kg/cm2 M.E Lub.Oil Temperature in
oc

BUILDERS YARD NO: Gear box (STBD) Manufacturer Model/Type Power/Rating Ratio Serial Number
Readings

DATE OF TRIAL:

M.E F.W Temperature in o c Gear box Lub oil pressure (bar) Gear box lub oil Temperature (DEG) Engine Room temp Exhaust temperature (DEG)

Builders Representative

IRS Surveyor

Owner

CHOWGULE & COMPANY LIMITED SHIPBUILDING DIVISION LOUTULIM GOA


SAFETY CUT OUTS (TRIPS) OF THE MAIN ENGINE(STBD)
NAME OF VESSEL: BUILDERS YARD NO: DATE OF TRIAL:

Sr no

Function

Normal working value recommended by engine manufactures

Set Point for the Switch

Performance

M.E Low lub oil pressure trip (stbd) M.E High water temp trip (stbd)

Over speed trip (stbd)

Builders Representative

IRS Surveyor

Owner

Das könnte Ihnen auch gefallen