BASICS OF ONE AND HALF CIRCUIT BREAKER SCHEME


PREPARED BY GOPALA KRISHNA PALEPU ADE/MRT(PROTECTION)

ONE & HALF BREAKER DESCRIPTION


BUS-1
1. IN THIS TWO BUSES ARE PRIOVIDED.

BUS-1

BUS-2

BUS-2

ONE & HALF BREAKER DESCRIPTION


BUS-1
2. THESE TWO BUSES ARE INTER-CONNECTED BY THREE CIRCUIT BREAKERS.

BUS-1

BUS-2

BUS-2

ONE & HALF BREAKER DESCRIPTION


BUS-1
1-52 CB
3. THEY ARE DESIGNATED AS 1-52 CB, 2-52 CB, 3-52 CB.

BUS-1

BUS-2

1-52 CB 2-52 CB

3-52 CB

2-52 CB

3-52 CB BUS-2

ONE & HALF BREAKER DESCRIPTION


BUS-1
1-52 CB
4. LINE - 1 IS CONNECTED IN BETWEEN 1-52 CB & 2-52 CB. 5. LINE - 2 IS CONNECTED IN BETWEEN 3-52 CB & 2-52 CB.

LINE-1

BUS-1

BUS-2

1-52 CB 2-52 CB

3-52 CB

LINE-2 2-52 CB

3-52 CB
LINE-1 LINE-2

BUS-2

ONE & HALF BREAKER DESCRIPTION


BUS-1
1-52 CB
6. LINE-1 HAVING TWO FEEDING PATHS i.e A. VIA BUS-1 & 1-52 CB B. VIA BUS-2, 3-52 CB & 2-52 CB 7. LINE-2 HAVING TWO FEEDING PATHS i.e A. VIA BUS-2 & 3-52 CB B. VIA BUS-1, 1-52 CB & 2-52 CB

LINE-1

BUS-1

BUS-2

1-52 CB 2-52 CB

3-52 CB

LINE-2

2-52 CB

3-52 CB
LINE-1 LINE-2

BUS-2

ONE & HALF BREAKER DESCRIPTION


BUS-1
1-52 CB
8. FOR INTURUPTING LINE-1 THE 1-52CB AND 2-52CB IS TO BE TRIPPED. 9. FOR INTURUPTING LINE-2 THE 3-52CB AND 2-52CB IS TO BE TRIPPED.

LINE-1

BUS-1

BUS-2

1-52 CB 2-52 CB

3-52 CB

LINE-2 2-52 CB

3-52 CB
LINE-1 LINE-2

BUS-2

ONE & HALF BREAKER DESCRIPTION


BUS-1
1-52 CB
10. FOR ANY PROBLEM IN LINE-1 OR LINE-2 ALONG WITH MAIN BREAKER THE MIDDLE BREAKER OR SAY TIE BREAKER (2-52 CB) MUST TRIP.

LINE-1

BUS-1

BUS-2

1-52 CB 2-52 CB

3-52 CB

LINE-2 2-52 CB

3-52 CB
LINE-1 LINE-2

BUS-2

ONE & HALF BREAKER DESCRIPTION


BUS-1
1-52 CB
11. NORMALLY IN ALL TYPES OF BUSBAR CONFIGUARATIONS ONE BREAKER IS SUFFICIENT FOR ONE FEEDER. 12. HERE TWO FEEDERS ARE CONTROLED BY THREE BREAKERS. 13. SO THESE TWO FEEDERS CONTROLLED BY THREE CIRCUIT BREAKERS IT IS CALLED ONE & HALF BREAKER SYSTEM.

LINE-1

BUS-1

BUS-2

1-52 CB 2-52 CB

3-52 CB

LINE-2 2-52 CB

3-52 CB
LINE-1 LINE-2

BUS-2

ONE & HALF BREAKER DESCRIPTION


MAIN BAY(1ST BAY) FOR FEEDER-1

BUS-1
1-52 CB

14. THE BAY BETWEEN BUS-1 & LINE-1 IS CALLED MAIN BAY FOR FEEDER-1.

LINE-1

BUS-1

BUS-2

MAIN BAY(1ST BAY) FOR FEEDER-1

1-52 CB

3-52 CB

2-52 CB

LINE-2

2-52 CB

3-52 CB
LINE-1 LINE-2

BUS-2

ONE & HALF BREAKER DESCRIPTION


MAIN BAY(1ST BAY) FOR FEEDER-1

BUS-1
1-52 CB

15. THE BAY BETWEEN LINE-1 & LINE-2 IS CALLED TIE BAY FOR FEEDER-1 & 2.

LINE-1

BUS-1

BUS-2

TIE BAY (2ND BAY ) FOR FEEDER-1 & 2

MAIN BAY(1ST BAY) FOR FEEDER-1

1-52 CB

3-52 CB

2-52 CB

LINE-2

2-52 CB

3-52 CB
LINE-1 LINE-2

BUS-2

TIE BAY (2ND BAY ) FOR FEEDER-1 & 2.

ONE & HALF BREAKER DESCRIPTION


MAIN BAY(1ST BAY) FOR FEEDER-1

BUS-1
1-52 CB

16. THE BAY BETWEEN BUS-2 & LINE-2 IS CALLED MAIN BAY FOR FEEDER-2.

LINE-1

BUS-1

BUS-2

TIE BAY (2ND BAY ) FOR FEEDER-1 & 2

MAIN BAY(1ST BAY) FOR FEEDER-1

1-52 CB

3-52 CB

2-52 CB

MAIN BAY(3RD BAY) FOR FEEDER-2

LINE-2

2-52 CB

3-52 CB BUS-2

LINE-1

LINE-2

TIE BAY (2ND BAY ) FOR FEEDER-1 & 2.

MAIN BAY(3RD BAY) FOR FEEDER-2

ONE & HALF BREAKER DESCRIPTION


1-52 CB
MAIN BAY(1ST BAY) FOR FEEDER-1

BUS-1

17. IN THIS SYSTEM FULL DIA MEANS 2 FEEDERS CONTROLLED BY 3 CBs. 18. HALF DIA MEANS 1 FEEDER CONTROLLED BY 2 CBs. (Nothing but Double CB System)

LINE-1

BUS-1

BUS-2

TIE BAY (2ND BAY ) FOR FEEDER-1 & 2

MAIN BAY(1ST BAY) FOR FEEDER-1

1-52 CB

3-52 CB

2-52 CB

MAIN BAY(3RD BAY) FOR FEEDER-2

LINE-2

2-52 CB

3-52 CB BUS-2

LINE-1

LINE-2

TIE BAY (2ND BAY ) FOR FEEDER-1 & 2.

MAIN BAY(3RD BAY) FOR FEEDER-2

ONE & HALF BREAKER DESCRIPTION


1-52 CB
MAIN BAY(1ST BAY) FOR FEEDER-1

BUS-1

GOPALA KRISHNA PALEPU ADE/MRT/ T&C/400KV SS/ O/O CE/400KV / L&SS/ VS APTRANSCO, HYDERABAD gk_aptransco@yahoo.co.in Mobile: 9440336984

LINE-1

BUS-1

BUS-2

TIE BAY (2ND BAY ) FOR FEEDER-1 & 2

MAIN BAY(1ST BAY) FOR FEEDER-1

1-52 CB

3-52 CB

2-52 CB

MAIN BAY(3RD BAY) FOR FEEDER-2

LINE-2

2-52 CB

3-52 CB BUS-2

LINE-1

LINE-2

TIE BAY (2ND BAY ) FOR FEEDER-1 & 2.

MAIN BAY(3RD BAY) FOR FEEDER-2

SUBSTATION DESIGN/LAYOUT
(I-CONFIGUARATION)
FEEDER1 FEEDER3 FEEDER5 FEEDER7

FEEDER9

FEEDER11

BUS-1 DIA1
BAY1

DIA2
BAY4

DIA3
BAY7

DIA4
BAY10

DIA5
BAY13

DIA6
BAY16

BAY14

BAY12

BUS-2

FEEDER2

FEEDER4

FEEDER6

FEEDER8

FEEDER10

BAY15

FEEDER12

BAY18

BAY3

BAY6

BAY9

BAY17

BAY11

BAY2

BAY5

BAY8

SUBSTATION DESIGN/LAYOUT
(D-CONFIGUARATION)
FEEDER1
BAY2

FEEDER2

FEEDER5
BAY8

FEEDER6

FEEDER9

FEEDER10
BAY14

BAY13

DIA1

DIA3

DIA5

BUS-1

BUS-2
BAY10 BAY12 BAY16

BAY15

BAY1

BAY3

BAY7

BAY9

DIA2

DIA4

DIA6

BAY5

BAY11

BAY17

FEEDER3

FEEDER4

FEEDER7

FEEDER8

FEEDER11

FEEDER12

BAY18

BAY4

BAY6

SUBSTATION DESIGN/LAYOUT
(DOUBLE BUS & DOUBLE BREAKER SYSTEM)
FEEDER1 FEEDER3 FEEDER1 FEEDER3

BUS-1
BAY2 BAY1 BAY5 BAY6

BAY1

BAY3

BAY5

BAY7

BUS-1 BUS-2
BAY2 BAY4 BAY6 BAY8 BAY4 BAY3 BAY7 BAY8

BUS-2

FEEDER2

FEEDER4

FEEDER2

FEEDER4

FOR ECONOMICAL& RELIABULITY PURPOSE THIS SYSTEM ADOPTED IN 800KV SYSTEM

FEEDER 8

FEEDER 1

FEEDER 2

1-52 CB

2-52 CB

8-52 CB

3-52 CB

FEEDER 7

MESH / RING LAYOUT


4-52 CB

FEEDER 3

7-52 CB

6-52 CB FEEDER 6 FEEDER 5

5-52 CB FEEDER 4

SUBSTATION DESIGN/LAYOUT
(DOUBLE MAIN BUS & TRANSFER BUS SYSTEM)
T/F-1 T/F-2

BUS-1
BUS COUPLER

BAY3

BAY4

BAY5

BAY1

BAY2

TRANSFER BUS COUPLER BAY6

BUS-2

TRANSFER BUS

BAY7

BAY8

FEEDER1 FEEDER2

FEEDER3 FEEDER4

FOR ECONOMICAL& RELIABULITY PURPOSE THIS SYSTEM ADOPTED IN 400 & 220 KV SYSTEM

SUBSTATION DESIGN/LAYOUT
(DOUBLE MAIN BUS & CB BYPASS ISO SYSTEM)
T/F-1 T/F-2

BAY1

BAY2

BAY4 BUS COUPLER

BAY6

BAY7

BUS-1

BUS-2

BAY3

BAY5

WHEN ANY CB PROBLEM OR FOR PREVENTIVE MAINTANENCE THEN ALL OTHER FEEDERS SHIFTED TO ANOTHER BUS OF FAULTED CB BUS AND CLOSE THE BYPASS ISOLATOR, THEN PROTECTION IS SHIFTED TO BUS COUPLER AND OPEN THE FAULTY CB.

FEEDER1

FEEDER2

FEEDER3

FEEDER4

FOR ECONOMICAL& RELIABULITY PURPOSE THIS SYSTEM ADOPTED IN 220KV SYSTEM

SUBSTATION DESIGN/LAYOUT
(SINGLE BUS & TRANSFER BUS SYSTEM)
T/F-1 T/F-2

TRANSFER BUS
TRANSFER BUS COUPLER

BUS-1
BAY1 BAY2 BAY3

BAY4

BAY5

BAY6

BAY7

FEEDER1

FEEDER2

FEEDER3

FEEDER4

FOR ECONOMICAL& RELIABULITY PURPOSE THIS SYSTEM ADOPTED IN 220 & 132 KV SYSTEM

CT METHODS IN ONE AND HALF CIRCUIT BREAKER SCHEME


PREPARED BY GOPALA KRISHNA PALEPU ADE/MRT(PROTECTION)

DIFFERENT CT METHODS OF ONE & HALF BREAKER SYSTEM

CB LINE CB LINE CB

CB 3 CT METHOD CB 4 CT METHOD CB 5 CT METHOD CB 6 CT METHOD

CB AT/F

CB
AT/F CB CB AT/F AT/F AT/F AT/F

LINE
LINE

CB CB

CB
6 CT METHOD CB 6 CT METHOD

CB
CB

LINE

CB LINE

ONE & HALF BREAKER SYSTEM


(3CT METHOD)
BUS-1 1-89 BUS-2 3-89

1-52CB

3-52CB
P2 P1 P2

1-CT 3
1-89A

P1

3-CT
3-89A

2-CT 2-89A 2-52CB 1-89L


P1 P2

3 3

2-89B 3-89T

LINE 1 T/F-1

ONE & HALF BREAKER SYSTEM


(4CT METHOD)
BUS-1 1-89 BUS-2 3-89

1-52CB

3-52CB
P2 P1 P2

1-CT 3
1-89A

P1

3-CT
3-89A

2-ACT

2-BCT
P1

P2

2-89A 1-89L

P1

P2

2-52CB

2-89B 3-89T

LINE 1 T/F-1

ONE & HALF BREAKER SYSTEM


(5CT METHOD)
BUS-1 1-89 BUS-2 3-89

1-52CB 1-CT 3 1-89A 2-CT


P1

3-52CB
P2
P1 P2 P1

3-CT 3-89A

2-89A 1-89L 1L-CT 3


P2 P1

P2

2-52CB

2-89B 3-89T
P2 P1

3T-CT

LINE 1 T/F-1

ONE & HALF BREAKER SYSTEM


(6CT METHOD)
BUS-1 1-89
P2 P1

BUS-2 3-89

1A-CT

3A-CT

P2 P1

1-52CB
P2

3-52CB

P1

1B-CT

3B-CT

P2 P1

1-89A 2A-CT
P2

3-89A 2B-CT
P1

P1

2-89A 1-89L

2-52CB

P2

2-89B 3-89T

T/F-1 LINE 1

ONE & HALF BREAKER SYSTEM


(6CT METHOD)
BUS-1 1-89 BUS-2 3-89

1-52CB
P2

3-52CB

P1

1-CT

3-CT

P2 P1

1-89A 2A-CT
P2

3-89A 2B-CT
P1

P1

2-89A 1-89L
P2 P1

2-52CB

P2

2-89B 3-89T

1L-CT

3T-CT

P2 P1

T/F-1 LINE 1

ONE & HALF BREAKER SYSTEM


(6CT METHOD)
BUS-1 1-89 BUS-2
P2

P2

P1

1-CT

P1

3-89 3-CT

1-52CB

3-52CB

1-89A 2A-CT
P2

3-89A 2B-CT
P1

P1

2-89A 1-89L
P2 P1

2-52CB

P2

2-89B 3-89T

1L-CT

3T-CT

P2 P1

T/F-1 LINE 1

TYPICAL ONE & HALF BREAKER SYSTEM ADOPTED IN GIS


DS : DISCONNECTOR SWITCH, GS: GROUNDING SWITCH, CT: CURRENT TRANSFORMER, VD: VOLTAGE DIVIDER

TYPICAL ONE & HALF BREAKER SYSTEM ADOPTED IN GIS


DS : DISCONNECTOR SWITCH, GS: GROUNDING SWITCH, CT: CURRENT TRANSFORMER, VD: VOLTAGE DIVIDER

1-1/2 CB SYSTEM (SIEMENS VATECH)


VD VD GS GS GS GS GS VD GS GS GS VD

CT DS CB

CT DS DS

CT CB

CT

CT

CT CB

DS

DS

DS

CORE WISE APLICATION OF CTs IN ONE AND HALF CIRCUIT BREAKER SCHEME
PREPARED BY GOPALA KRISHNA PALEPU ADE/MRT(PROTECTION)

CURRENT TRANSFORMER CONNECTIONS IN 3CT METHOD 1 CT 2 CT 3 CT

CORE 1
( PS)

BUSBAR-1 PROTECTION

2CTs SECONDARIES ARE CONNECTED IN PARALLEL AND CONNECTED TO MAIN PROTECTION FOR TRANSFORMER 2CTs SECONDARIES ARE CONNECTED IN PARALLEL AND CONNECTED TO BACKUP PROTECTION AFTER LBB/BFR FOR TRANSFORMER METERING & ENERGY METER FOR AT/F SPARE BUSBAR-2

CORE 2
( PS)

BUSBAR-1 CHECKUP PROTECTION (SPARE)

CORE 3
( 0.5 / 0.2)

SPARE

CORE 4
(0.5 / 0.2)

METERING & ENERGY METER FOR FEEDER

2CTs SECONDARIES ARE

CURRENT TRANSFORMER CONNECTIONS IN 3CT METHOD 1 CT 2 CT 3 CT CORE 1


( PS)

BUSBAR-1 PROTECTION

2CTs SECONDARIES ARE CONNECTED IN PARALLEL AND CONNECTED TO MAIN PROTECTION FOR TRANSFORMER 2CTs SECONDARIES ARE CONNECTED IN PARALLEL AND CONNECTED TO BACKUP PROTECTION AFTER LBB/BFR FOR TRANSFORMER SPARE BUSBAR-2 CHECKUP PROTECTION (SPARE)

CORE 2
( PS)

BUSBAR-1 CHECKUP PROTECTION (SPARE)

CORE 3
(0.5 / 0.2)

METERING & ENERGY METER FOR FEEDER 2CTs SECONDARIES ARE CONNECTED IN PARALLEL AND CONNECTED TO MAIN-2 PROTECTION AFTER LBB/BFR FOR

CORE 4
( PS)

CURRENT TRANSFORMER CONNECTIONS IN 4CT METHOD 1- CT CORE-1


(PS)
CT SECONDARY CORE IS CONNECTED TO BUSBAR-1 PROTECTION BUSBAR-1 CHECKUP PROTECTION (SPARE)

2-BCT
SPARE

2-ACT
SPARE

3-CT
CT SECONDARY CORE IS CONNECTED TO BUSBAR-2 PROTECTION BUSBAR-2 CHECKUP PROTECTION (SPARE)

CORE-2
(PS)

SPARE

SPARE

CORE-3
(0.5/0.2)

2CTs SECONDARIES ARE CONNECTED IN PARALLEL AND CONNECTED TO PANEL METERS & ENERGY METER 2CTs SECONDARIES ARE CONNECTED IN PARALLEL AND CONNECTED TO MAIN-2 PROTECTION AFTER LBB/BFR 2CTs SECONDARIES ARE CONNECTED IN PARALLEL AND CONNECTED TO MAIN-1 PROTECTION

2CTs SECONDARIES ARE CONNECTED IN PARALLEL AND CONNECTED TO PANEL METERS & ENERGY METER 2CTs SECONDARIES ARE CONNECTED IN PARALLEL AND CONNECTED TO BACKUP PROTECTION AFTER LBB/BFR 2CTs SECONDARIES ARE CONNECTED IN PARALLEL AND CONNECTED TO MAIN PROTECTION

CORE-4
(PS)

CORE-5
(PS)

CURRENT TRANSFORMER CONNECTIONS IN 5CT METHOD


1-CT CORE-1 (PS) CORE-2 (PS) CORE-3 (0.5/0.2) CORE-4 (PS) CORE-5 (PS)
BUSBAR-1 PROTECTION BUSBAR-1 CHECKUP PROTECTION (SPARE)

1-LCT
TEED PROT-1 (BAY 1&2) TEED PROT-2 (BAY 1&2)

2-CT
TEED PROT-1 (BAY 2&3) TEED PROT-2 (BAY 2&3)

3-TCT
TEED PROT-1 (BAY 2&3) TEED PROT-2 (BAY 2&3)

3-CT
BUSBAR-2 PROTECTION BUSBAR-2 CHECKUP PROTECTION (SPARE)

SPARE

METERING & ENERGY METER MAIN-2 PROTECTION

SPARE

METERING & ENERGY METER BACKUP PROTECTION

SPARE

TEED PROT-2 (BAY 1&2) AFTER LBB/BFR (1-52) TEED PROT-1 (BAY 1&2)

TEED PROT-2 (BAY 1&2) AFTER LBB/BFR (2-52) TEED PROT-1 (BAY 1&2)

TEED PROT-2 (BAY 2&3) AFTER LBB/BFR (3-52) TEED PROT-1 (BAY 2&3)

MAIN-1 PROTECTION

MAIN PROTECTION

Paralleling of 2Nos CTs to the Main-1/Main-2/Backup line protection is not required. This gives better transient response. Separate STUB protection can be connected (Nothing BUT TEED Protection).

CURRENT TRANSFORMER CONNECTIONS IN 6CT METHOD


(GIS or AIS with DEAD TANK CBs)
1B-CT CORE-1 (PS) CORE-2 (PS)
BUSBAR-1
PROTECTION

1A-CT

2B-CT

2A-CT

3A-CT

3B-CT
BUSBAR-2
PROTECTION

2CTs SECONDARIES ARE CONNECTED IN PARALLEL AND CONNECTED TO MAIN-1 PROTECTION 2CTs SECONDARIES ARE CONNECTED IN PARALLEL AND CONNECTED TO MAIN-2 PROTECTION AFTER LBB/BFR 2CTs SECONDARIES ARE CONNECTED IN PARALLEL AND CONNECTED TO PANEL METERS & ENERGY METER

2CTs SECONDARIES ARE CONNECTED IN PARALLEL AND CONNECTED TO MAIN-1 PROTECTION 2CTs SECONDARIES ARE CONNECTED IN PARALLEL AND CONNECTED TO BACKUP PROTECTION AFTER LBB/BFR 2CTs SECONDARIES ARE CONNECTED IN PARALLEL AND CONNECTED TO PANEL METERS & ENERGY METER

BUSBAR-1 CHECKUP
PROTECTION

BUSBAR-2 CHECKUP
PROTECTION

(SPARE)

(SPARE)

CORE-3 (0.5/0.2)

SPARE

SPARE

CURRENT TRANSFORMER CONNECTIONS IN 6CT METHOD


1-CT CORE1 (PS) CORE2 (PS)
BUSBAR -1 PROTEC TION BUSBAR -1 CHECKU P
PROTECTIO N (SPARE)

1L-CT 2A-CT 2B-CT


TEED PROT-1 (BAY 1&2) TEED PROT-2 (BAY 1&2) SPARE SPARE

3T-CT
TEED PROT-1 (BAY 2&3) TEED PROT-2 (BAY 2&3)

3-CT
BUSBAR -2 PROTEC TION BUSBAR -2 CHECKU P
PROTECTI ON (SPARE)

SPARE

SPARE

CORE3 (0.5/0. 2)

SPARE

METERI NG & ENERGY METER

SPARE

SPARE

METERI NG & ENERGY METER

SPARE

CT CORES CONEECTION DIAGRAMS IN ONE AND HALF CIRCUIT BREAKER SCHEME


PREPARED BY GOPALA KRISHNA PALEPU ADE/MRT(PROTECTION)

BUS

3 3 3
2 1-52CB 1
P2

3
1-89 3 1

BUS BAR PROTECTION

BUS BAR CHECKUP PROT METERING

3 MAIN-2/BACKUP PROTECTION
MAIN-1 PROTECTION

3 3 3
2 3

BB-EVT / CVT

3 3 3

2 1-CT 5
P1

CORES 3 4

SINGLE BUS SYSTEM


3
1-89L

1-CVT

ONE & HALF BREAKER ( 3 CT METHOD) WITH PROTECTION SCHEME


87BB1

BUSBAR-1
79 CVT VBB1 VBB1 VL1 / VL2 OR VBB2 25 21M1 VL1

BF
87L 21M2 VL1 CVT VL1 FEEDER1 / LINE1 79

VL1 / VBB1 VL2 / VBB2

25

BF

FEEDER2 / LINE2

MAIN-1 BF
VBB2 CVT VBB2 VL2 / VL1 OR VBB1 79 25 BUSBAR-2 87BB2 MAIN-2

CVT VL2
PROTECTION OF LINE2 (OR TRANSFORMER, IF APPLICABLE)

FOR TRANSFORMER PROTECTION & METERING VOLTAGE SELECTION RELAYS FOR BUS-1, BUS-2& LINE ARE PROVIDED .

ONE & HALF BREAKER ( 4 CT METHOD) WITH PROTECTION SCHEME


87BB1

BUSBAR-1
79 CVT VBB1 VBB1 VL1 / VL2 OR VBB2 25 21M1 VL1

BF
87L 21M2 VL1 CVT VL1 FEEDER1 / LINE1

79

VL1 / VBB1 VL2 / VBB2

25

BF

FEEDER2 / LINE2

MAIN-1
BF VBB2 CVT VBB2 VL2 / VL1 OR VBB1 79 25 BUSBAR-2 87BB2 MAIN-2

CVT VL2
PROTECTION OF LINE2 (OR TRANSFORMER, IF APPLICABLE)

FOR TRANSFORMER PROTECTION & METERING VOLTAGE SELECTION RELAYS FOR BUS-1, BUS-2& LINE ARE PROVIDED .

ONE & HALF BREAKER ( 6 CT METHOD) WITH PROTECTION SCHEME


87BB1

BUSBAR-1
CVT VBB1 79 VBB1 VL1 / VL2 OR VBB2 25 BF VL1 21M1 VL1

87L 21M2

CVT

VL1 FEEDER1 / LINE1

79

VL1 / VBB1 VL2 / VBB2

25

BF

FEEDER2 / LINE2

MAIN-1
VL2 / VL1 OR VBB1 VBB2 79 25 BUSBAR-2 87BB2 BF MAIN-2

CVT VL2
PROTECTION OF LINE2 (OR TRANSFORMER, IF APPLICABLE)

VBB2 CVT

FOR TRANSFORMER PROTECTION & METERING VOLTAGE SELECTION RELAYS FOR BUS-1, BUS-2& LINE ARE PROVIDED .

ONE & HALF BREAKER ( 5 CT METHOD) WITH PROTECTION SCHEME


87BB1

BUSBAR-1
79 CVT VBB1 VBB1 VL1 / VL2 OR VBB2 25 21M1 87 TD1 HZ

VL1

BF

87 TD2 LZ

87L 21M2

VL1

CVT

VL1 FEEDER1 / LINE1

79 VL1 / VBB1 VL2 / VBB2 25

BF

FEEDER2 / LINE2

.
BF VBB2 CVT VBB2 VL2 / VL1 OR VBB1 79 25 87 TD1 HZ BUSBAR-2 87BB2

CVT VL2
MAIN-1

87 TD2 LZ

PROTECTION OF LINE2 (OR TRANSFORMER, IF APPLICABLE) MAIN-2 FOR TRANSFORMER PROTECTION & METERING VOLTAGE SELECTION RELAYS FOR BUS-1, BUS-2& LINE ARE PROVIDED .

ONE & HALF BREAKER ( 6 CT METHOD) WITH PROTECTION SCHEME


87BB1

BUSBAR-1
79 CVT VBB1 VBB1 VL1 / VL2 OR VBB2 25 21M1 87 TD1 HZ

VL1

BF

87 TD2 LZ

87L 21M2

VL1

CVT

VL1 FEEDER1 / LINE1

79

VL1 / VBB1 VL2 / VBB2

25

BF

FEEDER2 / LINE2

.
BF VBB2 CVT VBB2 VL2 / VL1 OR VBB1 79 25 87 TD1 HZ BUSBAR-2 87BB2

CVT VL2
MAIN-1

87 TD2 LZ

PROTECTION OF LINE2 (OR TRANSFORMER, IF APPLICABLE) MAIN-2 FOR TRANSFORMER PROTECTION & METERING VOLTAGE SELECTION RELAYS FOR BUS-1, BUS-2& LINE ARE PROVIDED .

ONE & HALF BREAKER ( 6 CT METHOD) WITH PROTECTION SCHEME


87BB1

BUSBAR-1
21M1 CVT VBB1 79 VBB1 VL1 / VL2 OR VBB2 25 BF 87 TD2 LZ 87 TD1 HZ

VL1

87L 21M2

VL1

CVT

VL1 FEEDER1 / LINE1

79

VL1 / VBB1 VL2 / VBB2

25

BF

VL2 / VL1 OR VBB1 VBB2 VBB2 CVT

FEEDER2 / LINE2 79

CVT VL2
25 MAIN-1

87 TD2 LZ
BF 87 TD1 HZ BUSBAR-2 87BB2

PROTECTION OF LINE2 (OR TRANSFORMER, IF APPLICABLE) MAIN-2 FOR TRANSFORMER PROTECTION & METERING VOLTAGE SELECTION RELAYS FOR BUS-1, BUS-2& LINE ARE PROVIDED .

COMPARISION BETWEEN DIFFERENT CT METHODS


CT PURPOSE
BUSBAR & BUSBAR CHECKUP PROTECTION

3 CT METHOD
1 CT

4 CT METHOD
1 CT

6 CT (S) METHOD
1B CT &

5 CT METHOD
1 CT

6 CT (T1) METHOD
1 CT

6 CT (T2) METHOD
1 CT

ABOVE FOR BUS-1 3 CT 1 - CT & 2 CT 3 CT 1 CT & 2 B - CT 3B CT 1 A CT & 2 B CT

BELOW FOR BUS-2 3 CT 1 L - CT 3 CT 1 L - CT 3 CT 1 L - CT

MAIN-1 MAIN-2 PROTECTION & METERING

ABOVE CT SECONDARIES ARE CONNECTED PARALLEL FOR FEEDER-1 BELOW CT SECONDARIES ARE CONNECTED PARALLEL FOR FEEDER-2 3 - CT & 2 CT 3 - CT & 2 A - CT 3 A - CT & 2 A - CT

ABOVE FOR FEEDER-1 BELOW FOR FEEDER-2

3 L - CT

3 L - CT

3 L CT

STUB-1 & STUB-2 PROTECTION FOR LINE & AT/F


ADDITIONAL PROTECTION AVAILABLE

TEED-1 & TEED-2 PROTECTION FOR LINE & AT/F TEED1 IS NORMALLY HIGH IMPEDENCE DIFFERENTIAL RELAY & TEED-2 IS NORMALLY LOW IMPEDENCE DIFFERENTIAL RELAY. THESE ARE NOT INBUILT FUNCTIONS OF MAIN-1 & MAIN-2 RELAYS.

STUB-1 & STUB-2 PROTECTION IS A NORMALLY INBUILT PROTECTION FOR MAIN-1 & MAIN-2 RELAYS, IN CASE OF LATEST NUMERICAL RELAYS. STUB PROTECTION WORKS WHEN LINE ISOLATOR OPEN CONDITION ONLY.

BLIND ZONE

A FAULT BETWEEN CIRCUIT BREAKERS AND CT (END FAULT) MAY THEN STILL BE FED FROM ONE SIDE EVEN WHEN THE BREAKER HAS BEEN OPENED. CONSEQUENTLY, FINAL FAULT CLEARING BY CASCADED TRIPPING HAS TO BE ACCEPTED IN THIS CASE. THIS SITUATION LBB/BFR OPERATES AND TIME TAKEN TO CLEAR FAULT IS ABOUT 300 mSECs. THIS IS BLIND ZONE AREA.

400KV C.T. INFORMATION


PRIMARY CONNECTIONS : P1 P2 CURRENT RATING : 2000 AMPS

P1 P1 P2

P2

COR ES

CLA SS

PURPO SE

SECONDARY CONNECTIONS CURRENT RATING : 1A


2000/ 1A 1S1 1S3 1000/ 1A 1S1 1S2 1S2 1S3 2S1 2S2 2S2 2S3 500/ 1A __

COR E-2

PS

2S1 2S3

__

EYE BOLT DESIGN

DEAD TANK DESIGN

BUSBA R CHECK UP PROTE CTION

3
3S1 3S2 3S3 3S4

PS

HAIR PIN / U SHAPE DESIGN

COR E-1

BUSBA R PROTE CTION

1S1 1S2 1S3

2S1 2S2 2S3

3 3

3 3

5S1 5S2 5S3 5S4 4S1 4S2 4S3 4S4

U U
3S1 3S2 3S3 3S4

MAIN-1, MAIN-2 PROTECTION & METERING FOR LINE ADOPTED IN ONE AND HALF CIRCUIT BREAKER SCHEME

PREPARED BY GOPALA KRISHNA PALEPU ADE/MRT(PROTECTION)

NORMS OF PROTECTION FOLLOWED IN APTRANSCO


FOR TRANSMISIION LINES & DISTRIBUTION LINES ( FEEDER / LINE PROTECTION )

Sr. No
1. 2. 3. 4.

VOLTAG E 11 KV LINES 33 KV LINES 66 KV LINES 132 KV LINES

MAIN- 1 PROTECTION
2 O/L + E/F ( 51 + 51N ) 3 O/L + E/F ( 51 + 51N ) SWITCHED DISTANCE SCHEME OR NUMERICAL DISTANCE SCHEME (21P+ 21N) NON SWITCHED DISTANCE SCHEME OR NUMERICAL DISTANCE SCHEME (21P + 21N) NUMERICAL DISTANCE SCHEME (21P + 21N) + in BUILT DEF RELAY(67N)

MAIN-2 PROTECTION/ BACKUP PROTECTION

DIRECTIONAL O/L & E/F RELAYS WITH HIGH SET ( 67 + 67N ) SWITCHED DISTANCE SCHEME OR NUMERICAL DISTANCE SCHEME (21P+ 21N) NUMERICAL DISTANCE SCHEME (21) OR LINE DIFFERENTIAL SCHEME (87L) WITH 67N NUMERICAL DISTANCE SCHEME (21) OR LINE

5.

220 KV LINES 400 KV LINES 765 KV

6.

7.

NUMERICAL DISTANCE SCHEME (21P + 21N) + in

MAIN-1 PROTECTION FOR LINE


P2 P2 P2 CT MB 1-CT
CTR: 2000-1000-500/1A

(4CT METHOD)
IR5 / A511 IY5 / A531 IB5 / A551

CLASS: PS
3 CT METHOD : 1-CT & 2-CT 4 CT METHOD : 1-CT & 2-BCT 6 CT METHOD : 1-ACT & 2-BCT

2-BCT
CTR: 2000-1000-500/1A

CLASS: PS

3 3 3

CORE-5

3 3 3
5S4 5S4 5S2 5S2 5S2 5S2

CORE-5

REL 521
ACTIVE START TRIP

5S4 5S2

VR11 / E111 VY11 / E131 VB11 / E151 VN11 / E171 1-CVT

IN5 / A571

DISPLAY C E
CT MB

CORE 1 200VA CLASS: 3P

5S2 5S4

5S4

5S4

P2 P2 P2

MAIN-1 PROTECTION FOR LINE


(4CT METHOD) (NEW DEVELOPMENT)
P2 P2 P2 CT MB 1-CT
CTR: 2000-1000-500/1A

CLASS: PS
3 CT METHOD : 1-CT & 2-CT 4 CT METHOD : 1-CT & 2-BCT 6 CT METHOD : 1-ACT & 2-BCT

2-BCT
CTR: 2000-1000-500/1A

CLASS: PS

3 3 3

CORE-5

3 3 3
5S4 5S4 5S2 5S2 5S2 5S2 5S4 5S4

CORE-5

IR5 / A511 IY5 / A531 IB5 / A551


5S4

5S2

IN5 / A571

IA =250.10 A IB =250.10 A IC =250.10 A VAB =400.0 KV VBC =400.0 KV VCA =400.0 KV

VR11 / E111 VY11 / E131 VB11 / E151 VN11 / E171

1-CVT CORE 1 200VA CLASS: 3P

ESC

ENT

CT MB

ENABLED TRIP

TARGET RESET

IN5 / A571
5S2
5S4

INST TIME COMM SOTF ZONE1 ZONE2 ZONE3 ZONE4

PH-A PH-B PH-C GND 50 51 79 RESET 79 LOCKOUT

IB5 / A551 IY5 / A531 IR5 / A511

P2 P2 P2

SEL

SEL- 421
PROTECTION AUTOMATION CONTROL

MAIN-1 PROTECTION FOR LINE


(5CT METHOD)
P2 P2 P2 CT MB 1-LCT
CTR: 2000-1000-500/1A

CLASS: PS

3 3 3
5S4 5S4 5S2 5S2

CORE-5

IR5 / A511 IY5 / A531 IB5 / A551


5S4

REL 521
ACTIVE START TRIP

VR11 / E111 VY11 / E131 VB11 / E151 VN11 / E171 1-CVT

5S2

IN5 / A571

DISPLAY C

CORE 1 200VA CLASS: 3P

MAIN-2 PROTECTION FOR LINE


(4CT METHOD)
50Z
P2 P2 P2 CT MB 1-CT
CTR: 2000-1000-500/1A

RAICA
4S4 4S4 4S4

CLASS: PS
3 CT METHOD : 1-CT & 2-CT 4 CT METHOD : 1-CT & 2-BCT 6 CT METHOD : 1-ACT & 2-BCT

2-BCT
CTR: 2000-1000-500/1A

CLASS: PS

3 3 3

CORE-4

3 3 3
4S2 4S2 4S2 4S2 4S4 4S4

CORE-4

IR4 / C411 IY4 / C431 IB4 / C451 IN4 / C471

LBB / BFR

REL 316
ACTIVE START TRIP

VR21 / E211 VY21 / E231 VB21 / E251 VN21 / E271 1-CVT

4S2

DISPLAY C

CORE 2 200VA CLASS: 3P

E
CT MB

4S2
4S4

RAICA
LBB / BFR
P2 P2 P2

50ZT

MAIN-2 PROTECTION FOR LINE


(4CT METHOD) ( NEW DEVELOPMENT)
P2 P2 P2 CT MB 1-CT
CTR: 2000-1000-500/1A

CLASS: PS
3 CT METHOD : 1-CT & 2-CT 4 CT METHOD : 1-CT & 2-BCT 6 CT METHOD : 1-ACT & 2-BCT

2-BCT
CTR: 2000-1000-500/1A

CLASS: PS

3 3 3

CORE-4

3 3 3
4S4 4S4 4S2 4S2 4S2 4S2 4S4 4S4

CORE-4

IR4 / C411 IY4 / C431 IB4 / C451


4S4

VR21 / E211 VY21 / E231 VB21 / E251 VN21 / E271

1-CVT CORE 2 200VA CLASS: 3P

4S2

IN4 / C471

CT MB

IN4 / C471
4S2
4S4

IB4 / C451 IY4 / C431 IR4 / C411

P2 P2 P2

MULTI FUNCTION NUMERICAL RELAY FOR MULTI BREAKER, MULTI CT & CVT/PT APPLICATION
(NEW APPLICATION) (ONE & HALF BREAKER SYSTEM or RING BUS SYSTEM)
1-52 CB 2-52 CB

3-52 CB

59

50 BF-1 50 BF-2 25-2


1-52,2-52: MAIN & TIE CIRCUIT BREAKER 21P: PHASE DISTANCE PROTECTION 21N: GROUND DISTANCE PROTECTION 27: UNDER VOLTAGE RELAY 67: DIRECTIONAL RELAY 50: INST OVER CURRENT RELAY 51: TIME OVER CURRENT RELAY 59: OVER VOLTAGE RELAY 64: EARTH FAULT RELAY 50BF-1: LBB/BFR OF MAIN CB 50BF-2: LBB/BFR OF TIE CB 79-1,2: AUTO RECLOSURE RELAY OF MAIN & TIE CB 25-1,2: CHECK SYNCHRONISAM RELAY FOR MAIN & TIE CB

79-1 79-2 25-1

21P 50P 51P 67P

27
21N 50N 51N 67N

LINE CVT LINE

BUS-1 PT

BUS-2 PT

MAIN-2 PROTECTION FOR LINE


(5CT METHOD)
P2 P2 P2 CT MB 1-LCT
CTR: 2000-1000-500/1A

CLASS: PS

3 3 3
4S4 4S4 4S2 4S2

CORE-4

IR4 / C411 IY4 / C431 IB4 / C451


4S4

REL 316
ACTIVE START TRIP

VR21 / E211 VY21 / E231 VB21 / E251 VN21 / E271 1-CVT

4S2

IN4 / C471

DISPLAY C

CORE 2 200VA CLASS: 3P

MULTI FUNCTION PANEL METERING & ENERGY METER


(4CT METHOD)
P2 P2 P2 CT MB 1-CT
CTR: 2000-1000-500/1A

CLASS: 0.5
3 CT METHOD : 1-CT & 2-CT 4 CT METHOD : 1-CT & 2-BCT 6 CT METHOD : 1-ACT & 2-BCT

2-BCT
CTR: 2000-1000-500/1A

CLASS: 0.5

3 3 3

CORE-3

3 3 3
3S4 3S4 3S2

CORE-3

IR3 / D311 IY3 / D331 IB3 / D351


3S4 3S2

3S2

IN3 / D371

CT MB

VR31 / E311 VY31 / E331 VB31 / E351

3S2

3S2

3S2 3S4

VN31 / E371
1-CVT CORE 3 100VA CLASS: 0.5/0.2

3S4

3S4

P2 P2 P2

MULTI FUNCTION PANEL METERING & ENERGY METER


(5CT METHOD)
P2 P2 P2 CT MB 1-LCT
CTR: 2000-1000-500/1A

CLASS: 0.5/0.2 IN3 / D371

3 3 3
3S4 3S4 3S2

CORE-3

IR3 / D311 IY3 / D331 IB3 / D351


3S4 3S2

3S2

VR31 / E311 VY31 / E331 VB31 / E351

VN31 / E371
1-CVT CORE 3 100VA CLASS: 0.5/0.2

LBB & BUSBAR PROTECTION SCHEMES ADOPTED IN ONE AND HALF CIRCUIT BREAKER SCHEME PREPARED BY
GOPALA KRISHNA PALEPU ADE/MRT(PROTECTION)

BASICS OF LBB/BFR PROTECTION


LOCAL BREAKER BACKUP PROTECTION
A PROTECTION WHICH IS DESIGNED TO CLEAR A SYSTEM FAULTY BY INITIATING TRIPPING OTHER CIRCUIT BREAKER(S) IN THE CASE OF FAILURE TO TRIP OF THE APPROPRIATE CIRCUIT BREAKER. IN MODERN NETWORKS THE CRITICAL FAULT CLEARING TIME MAY BE LESS THAN 200ms. HENCE, IF THE FAULT IS NOT CLEARED DUE TO FAILURE OF THE PRIMARY PROTECTIVE RELAYS OR THEIR ASSOCIATED CIRCUIT BREAKER, A FAST ACTING BACKUP PROTECTIVE RELAY MUST CLEAR THE FAULT. THERE ARE TWO BASIC FORMS. REMOTE BACK-UP. LOCAL BACK-UP.

REMOTE BACK-UP
PROVIDES BACK-UP PROTECTION FOR THE BOTH THE RELAYS (MAIN-1 & MAIN-2) AND BREAKERS AT REMOTE SUBSTATION.

LOCAL BACK-UP
LOCAL BACK-UP PROTECTION CAN BE DEVIDED INTO TWO CATAGORIES. RELAY BACK-UP BREAKER BACK-UP

RELAY BACK-UP

DUPLICATE PRIMARY PROTECTION. i.e ONE IS NON SWITCHED DISTANCE PROTECTION AND ANOTHER IS SWITCHED DISTANCE SCHEME OR OTHER WISE BOTH SCHEMES CHARECTERSTICS ARE DIFFERENT (QUADRALATERAL, MHO CIRCULAR, TAMOTO & OPTICAL ) OR DIFFERENT MANUFACTURERS(ABB, ALSTOM, SIEMENS, EASUN REYROLL, SEL, GE, NXT PHASE OR BASLER) OR DIFFERENT METHODS (i.e ELECTROMECHANICAL, STATIC, NUMERICAL{MICROPROCESSOR &DSP}). IF MAIN-1 & MAIN-2 ARE NUMERICAL RELAYS BOTH SHOULD BE SEPARATE CHARECTERESTICS AND SEPARATE MODELS AND ALL FEATURES SHOULD BE AVAILABLE IN BOTH SCHEMES AND BOTH RELAYS SHOULD BE 100% REDENDENCY IN ALL ASPECTS. TO INCREASE THE SECURITY, THE CIRCUIT BREAKER HAS TWO TRIP COILS, ONE IS CONNECTED TO MAIN-1 PROTECTION AND ANOTHER IS CONNECTED TO MAIN-2 PROTECTION.

BREAKER BACK-UP
BECAUSE OF THE HIGH COST OF HIGH VOLTAGE CIRCUIT BREAKERS, IT IS NOT FEASIBLE TO DUPLICATE THEM. IN CASE OF A BREAKER FAILURE THE OTHER CIRCUIT BREAKERS CONNECTED TO THE SAME BUS AS THE FAULTED BREAKER MUST THERE FORE BE TRIPPED.

LBB/BFR FLOW CHART


MAIN PROTECTION OPERATED YES TRIP MAIN BREAKER FAULT CLEARED YES RESET BREAKER FAILURE SCHEME

RETRIP

NO

YES

INITIATE BFR

WAIT FOR FAULT CLEARENCE

AND

TRIP BACK-UP/ Adjacent BREAKERS

The Breaker Failure Protection (LBB/BFR) can operate single-stage/two-stage. When used as single-stage protection, the Bus trip command is given to the adjacent Circuit Breakers if the protected feeder Breaker fails. When used as two-stage protection, the first stage can be used to repeat the trip command to the relevant feeder Breaker, normally on a different trip coil, if the initial trip command from the feeder protection is not successful. The second stage will result in a Bus trip to the adjacent Breakers, if the command of the first stage is not successful.

LBB/BFR TIME CO-ORDINATION CHART


FAULT OCCURS

NORMAL CLEARING TIME

NORMAL CLEARING
PROTECTIVE RELAY FOR EX: DISTANCE RELAY BREAKER INTURUPTING TIME RESETTING TIME OF THE CURRENT MEASURING UNITS

MARGIN

~30ms

~60ms

<12ms
TRIPPING RELAY TIME BACK-UP BREAKER INTERUPTING TIME MARGIN

SET TIME OF THE TIME MEASURING UNIT

INOPERATIVE BREAKER

BREAKER FAILURE RELAY START TOTAL CLEARING TIME OF THE BREAKER FAILURE RELAY MAXIMUM FAULT CLEARING TIME BEFORE SYSTEM INSTABILITY

LBB/BFR LOGIC
CURRENT INPUTS PHASE L1 PHASE L2/E PHASE L3

A/D CONVERTER PHASE CURRENT SET POINT

~
|||

I > ISET I > ISET


EARTH CURRENT SET POINT

& &

LED (PHASE START) ALARM RELAY (PHASE START)

>1
ALARM RELAY (EARTH START) LED (EARTH START)

OUT PUT OF DISTANCE RELAY OR SHORT CIRCUIT CURRENT RELAY BINARY INPUT

CIRCUIT BREAKER FAILURE INITIATE

TIMING/OUTPUT STAGE

TIME STAGE T1

TRIP T1 RELAY

&
0
TIME STAGE T2 SWITCHED OFF TIME STAGE T2

LED

&
>1

ALARM T1 RELAY TRIP T2 RELAY

O&
0 1

LED LED
CB FAILURE INITIATE

LBB/BFR PROTECTION
LINE1 BUS-1 1-52CB 2-52CB 3-52CB AT/F-1 BUS-2

LBB/BFR IS LOCAL BREAKER BACKUP PROTECTION/ BREAKER FAILURE RELAY. 1No RELAY IS PROVIDED FOR EACH BREAKER. THIS IS CURRENT OPERATED RELAY. THIS RELAY IS ENERGISED WHEN MASTER TRIP RELAY(86-A OR/AND 86-B) OPERATES OR SINGLE PHASE TRIP RELAYS OPERATES AND GIVEN SIGNAL TO BREAKER FOR TRIP. IN THIS RELAY TIME DELAY IS PROVIDED. THIS RELAY OPERATES WHEN THE BREAKER IS UNDER TROUBLE/ FAILS TO OPERATE. AFTER ENERGISED THE RELAY AND TIME DELAY COMPLETES, EVEN CURRENT IS THERE THIS THINKS

50Z

50ZT

50Z

1-52 CB LBB/BFR OPERATION


ABB REL521 MAIN-1 86-A 86-A 2-52CB TC-2 TC-1 86-B

ABB REL316 MAIN-2

DIRECT TRIP 1&2 VIA CARRIER TO OTHER END BUSBAR-1 PROTECTION OPTD AND BUSBAR-1 ISOLATED

50Z

86-B

TO 86-B TRIP RELAY OF TIE CB(2-52CB)

1-52CB TC-1 BUS-1 TC-2

3-52CB BUS-2

2-52 CB LBB/BFR OPERATION


ABB REL521 MAIN-1 ABB RET521 MAIN-1 86-A

ABB REL316 MAIN-2


50ZT
DIRECT TRIP 1&2 VIA CARRIER TO OTHER END TO 86-B TRIP RELAY OF LINE CB(1-52CB)

ABB RET316 MAIN-2


INTER TRIP TO LVCB & TBCCB

86-B

TO 86-B TRIP RELAY OF AT/F(ICT) CB (3-52CB)

1-52CB TC-1 BUS-1

2-52CB

3-52CB

TC-2
BUS-2

3-52 CB LBB/BFR OPERATION


ABB RET521 MAIN-1 86-A 86-A 86-B
50Z
INTER TRIP TO LV CB & TBC CB BUSBAR-2 PROTECTION OPTD AND BUSBAR-2 ISOLATED

ABB RET316 MAIN-2

1-52CB TC-1 BUS-1

2-52CB TC-2 TC-2

86-B

TO 86-B TRIP RELAY OF TIE CB(2-52CB)

3-52CB TC-1 BUS-2

BASICS OF BUSBAR PROTECTION


NEED FOR BUSBAR PROTECTION
IN ITS ABSENCE FAULT CLEARING TAKES PLACE IN ZONE-2 OF DISTANCE RELAY BY REMOTE END TRIPPING. THIS MEANS SLOW AND UNSELECTIVE TRIPPING AND WIDE SPREAD BLACKOUT.

EFFECT OF DELAYED CLEARENCE


GREATER DAMAGE AT FAULT POINT.
INDIRECT SHOCK TO CONNECTED EQUIPMENT LIKE SHAFTS OF GENERATOR AND WINDINGS OF TRANSFORMER.

BASIC THEORY
KIRCHOFFs CURRENT LAW STATES THAT THE SUM OF THE CURRENTS ENTERING A
GIVEN NODE MUST BE EQUAL TO THE CURRENTS LEAVING AT THAT NODE.

BUS BAR PROTECTION SYSTEMS


1. 2. 3. 4. HIGH IMPEDENCE DIFFERENTIAL PROTECTION MODERATE-IMPEDENCE DIFFERENTIAL PROTECTION LOW-IMPEDENCE DIFFERENTIAL PROTECTION NUMERICAL BUS DIFFERENTIAL PROTECTION

HIGH IMPEDENCE DIFFERENCIAL PROTECTION


THE HIGH IMPEDENCE PROTECTION SCHEME, ON THE OTHER HAND, IS A GOOD SOLUTION FOR SINGLE BUSBAR ARRANGEMENTS , ONE & HALF BREAKER SYSTEMS OR RING BUSBARS, PROVIDING THAT APPROPRIATE DEDICATED CT CORES ARE AVAILABLE FOR THIS USE ALONE. IT IS SENSTIVE, STABLE & FAST PROTECTION. HOWEVER, SPECIAL CT REQUIREMENTS, ADDITIONAL HIGH VOLTAGE DEVICE PROTECTION, DEMANDING MAINTANENCE etc PUT RESTRICTIONS IN ITS APPLICATIONS. A MEASURING CIRCUIT COMPRISES A HIGH-IMPEDENCE STABILIZING RESISTOR CONNECTED ACROSS THE CIRCULATING CURRENT ARRANGEMENT OF ALL THE CTs IN PARALLEL. THE VALUE OF THE STABILIZING RESISTOR IS CHOOSEN SUCH THAT THE VOLTAGE DROP ACROSS THE RELAY CIRCUIT IS INSUFFICIENT TO OPERATE THE FAULTS OUTSIDE THE PROTECTED ZONE.

LIMITATIONS OF CONVENTIONAL HIGH IMPEDENCE DIFFERENTIAL RELAY

PUTS STRINGENT REQUIREMENTS ON CTs. Class X for all CT Cores. NEED FOR DEDICATED CT CORES. Separate CT Cores for BUSBAR and CHECK ZONE Protection. IDENTICAL CT RATIO, MAGNETISING IMPEDENCE. AUX CTs RATIO CORRECTIONS UNACCEPTABLE. IN ABILITY TO COPE WITH INCREASING FAULT CURRENT. SLOW RESPONSE. Advantage of Numerical Protection Technology (e.g. Fault recording, Communication etc) not available. BASIC OPERATING TIME EXCLUDING RELAY TIME IS 15 20ms. THIS RELAY REQUIRES CHECK ZONE FEATURE. THE TRIP COMMAND IS ONLY GIVEN WHEN BOTH A DISCRIMINATING & CHECK ZONE SYSTEM OPERATES.

MEDIUM IMPEDENCE DIFFERENTIAL PROTECTION


MANY OF THE LIMITATIONS OF HIGH IMPEDENCE PROTECTION CAN BE OVERCOME USING MODERATE MEDIUM IMPEDENCE PROTECTION (OR STABILIZED HIGH-IMP SCHEME), WHICH IS A COMBINATION OF THE NORMAL HIGH-IMP AND STABILIZED DIFFERENTIAL SCHEMES.

LOW IMPEDENCE DIFFERENTIAL PROTECTION


LOW IMPEDENCE PROTECTION(PERCENTAGE BIASED BUS DIFFERENTIAL RELAY) IS MOST SUITABLE PROTECTION SCHEME FOR DOUBLE AND MULTIPLE BUSBAR SYSTEMS (WITH OR WITHOUT TRANSFER BUS) WITH FEEDERS BEING SWITCHED BETWEEN SECTIONS OF BUSBAR, WHICH OPERATES WITH FULL SELECTIVITY FOR ALL POSSIBLE BUSBAR CONFIGUARATIONS.

ADVANTAGES
FREE OF ANY NEED FOR MATCHED CT CHARACTERESTICS OR RATIOs, LOW LEAKAGE REACTANCE OR RESISTANCE. OTHER PROTECTIVE RELAYS CAN BE INCLUDED IN THE SAME CIRCUIT. STABLE FOR INFINITE FAULT LEVELS. INSENSITIVE TO CT SATURATION. DETECTS FAULTS WITHIN 1 2ms & INITIATES TRIPPING WITHIN 5 7ms.

BASICS OF BUS BAR PROTECTION


BASIC THEORY
KIRCHOFFs CURENT LAW STATES THAT THE SUM OF THE CURRENTS ENTERING A GIVEN NODE MUST BE EQUAL TO THE CURRENTS LEAVING THAT NODE

EXTERNAL FAULT
I1 I2 I3 I4 I5 I6 I5 I3 I1

INTERNAL FAULT
IF

I2

I4

I6

IF

IF= I6= I1+I2+I3+I4+I5

IF= I1+I2+I3+I4+I5+I6

HIGH IMPEDENCE BUSBAR PROTECTION


87BBC
96 BBC : BUSBAR CHECK TRIPPING RELAY

87BBM

U U U U U U

U U

U U

U U

U U U U U U U U U U U U
52 CIRCUIT BREAKER TRIP COIL

- VE
A varistor is normally applied across the relay input terminals to limit the voltage to a value safely below the insulation voltage of the secondary circuits + VE
96 BBM : BUSBAR MAIN TRIPPING RELAY

U U

U U

U U

U U

U U
Is

OPERATING COIL

OVER CURRENT COIL

52 CIRCUIT BREAKER TRIP COIL

LOW IMPEDENCE BUSBAR PROTECTION

96 BUS BAR TRIPPING RELAY

OVER CURRENT STARTER RELAYS

U U
RESTRAINT COIL

Id

+VE

-VE

DIFFERENCE BETWEEN BUSBAR SCHEMES


DETAILS

HIGH IMPEDENCE BUSBAR PROTECTION


THE CURRENTS ENTERING AND LEAVING THE BUSBAR ARE COMPARED CONTINUOSLY. IT INVOLVES CHOOSING OF IMPEDENCE HIGH ENOUGH STABLISE THE RELAY FOR HEAVY EXTERNAL FAULTS. THIS IS CIRCULATING CURRENT PRINCIPLE. IT REQUIRES ALL IDENTICAL CT RATIOs & TURNS RATIO. LOW RESISTANCE OF SECONDARY WINDING. Class X for all CT Cores. MINIMUM KNEE POINT VOLTAGE OF 300500V. LOW MAGNETISING CURRENT(FEW MILLIAMPS).

PERCENTAGE BIASED LOW IMPEDENCE BUS BAR PROTECTION


IT HAS DIFFERENTIAL AND BIAS SETTING. THE RESULTANT BIAS IS PROPOTIONAL TO ARITHMATIC SUM OF ALL CURRENTS, WHEREAS THE OPERATING CURRENT IS VECTOR SUM OF ALL CIRCUIT CURRENTS. IT CAN WORK WITH CTs OF UNEQUAL RATIOS ALSO. FREE OF ANY NEED OF MATCHED CT CHARACTERESTIC OR RATIOs LOW LEAKAGE REACTANCE OR RESISTANCE. OTHER PROTECTIVE RELAYS CAN BE INCLUDED IN THE SAME CIRCUIT.

PRINCIPL E

CTs

BURDEN CT SATURATI ON

IMPOSES COMPARATIVELY HIGH IMPOSES LESS BURDEN ON CTs. BURDEN ON CTs. AUXILIARY CTs AUXILIARY CTs HAVE NO EFFECT ON REDUCE THE PERFORMANCE OF THE PERFORMANCE OF SCHEME. SCHEME OPERATION OF SCHEME EVEN WHEN OPERATION OF SCHEME EVEN WHEN CTs GET SATURATED DURING INTERNAL CTs GET SATURATED DURING FAULTS. INTERNAL FAULTS. INSENSITIVE TO CT SATURATION.

BUS BAR MAIN & CHECHUP PROTECTION


(ANY CT METHOD)
P2 P2 P2 CT MB

1-CT
CTR: 2000-1000/1A

REB 521
IN1 / B171
1S3 1S3 1S3 1S1

CLASS: PS

3-CT
CTR: 2000-1000/1A

CLASS: PS

3 3 3

CORE-1

3 3 3
1S1 1S1 1S1 1S1 1S3 1S3

CORE-1

ACTIVE START

TRIP

IB1 / B151 IY1 / B131 IR1 / B111

BUS BAR PROTECTION FOR BUS-1

DISPLAY

C
E
CT MB IR1 / B111 IY1 / B131 IB1 / B151
1S1 1S3

RED 521
ACTIVE START TRIP

IN1 / B171

DISPLAY C

P2 P2 P2

BUS BAR PROTECTION FOR BUS-2

3-52
3-CT 1-CT

BUS-2

BUS-1

U U
2-52
1-52

U U

6-52 6-CT 4-CT

BUS BAR PROTECTION

87 BB2 U U
5-52 4-52

87 BB1

U U

9-52

9-CT

U U
8-52

7-CT

U U

7-52

12-52

12-CT

U U

11-52

10-CT

U U

10-52

15-52

BUS BAR-2 PROTECTION


15-CT

BUS BAR-1 PROTECTION


13-52

U U

14-52

13-CT

U U

18-52

18-CT

U U

17-52

16-CT

U U

16-52

21-52

21-CT

U U

20-52

19-CT

U U

19-52

BUSBAR-1 PROTECTION TRIPPING SCHEME


1-52 CB PANEL
TRIP FROM 50 LBB TO START 50 LBB

HIGH SPEED TRIP RELAY FOR 1-52 CB HIGH SPEED TRIP RELAY FOR 4-52 CB HIGH SPEED TRIP RELAY FOR 7-52 CB HIGH SPEED TRIP RELAY FOR 10-52 CB HIGH SPEED TRIP RELAY FOR 13-52 CB HIGH SPEED TRIP RELAY FOR 16-52 CB

1-52 CB PANEL
TO CLOSE CKT INTERLOCK TO BLOCK A/R TO TRIP COIL-1 TO TRIP COIL-2 DIRECT TRIP SEND CH-1 DIRECT TRIP SEND CH-2 TO DISTURBENCE RECORDER

4-52 CB PANEL

4-52 CB PANEL
TO CLOSE CKT INTERLOCK TO BLOCK A/R TO TRIP COIL-1 TO TRIP COIL-2 DIRECT TRIP SEND CH-1 DIRECT TRIP SEND CH-2 TO DISTURBENCE RECORDER

REB 521
ACTIVE START TRIP

TRIP FROM 50 LBB TO START 50 LBB

7-52 CB PANEL
TRIP FROM 50 LBB TO START 50 LBB

7-52 CB PANEL
TO CLOSE CKT INTERLOCK TO BLOCK A/R TO TRIP COIL-1 TO TRIP COIL-2 DIRECT TRIP SEND CH-1 DIRECT TRIP SEND CH-2 TO DISTURBENCE RECORDER

DISPLAY
10-52 CB PANEL
TRIP FROM 50 LBB

10-52CB PANEL
TO CLOSE CKT INTERLOCK TO BLOCK A/R TO TRIP COIL-1 TO TRIP COIL-2 DIRECT TRIP SEND CH-1 DIRECT TRIP SEND CH-2 TO DISTURBENCE RECORDER

TO START 50 LBB

13-52 CB PANEL
TO CLOSE CKT INTERLOCK TO BLOCK A/R TO TRIP COIL-1 TO TRIP COIL-2 DIRECT TRIP SEND CH-1 DIRECT TRIP SEND CH-2 TO DISTURBENCE RECORDER

13-52 CB PANEL
TRIP FROM 50 LBB TO START 50 LBB

16-52 CB PANEL
TRIP FROM 50 LBB TO START 50 LBB

16-52 CB PANEL
TO CLOSE CKT INTERLOCK TO BLOCK A/R TO TRIP COIL-1 TO TRIP COIL-2 DIRECT TRIP SEND CH-1 DIRECT TRIP SEND CH-2 TO DISTURBENCE RECORDER

+VE

BUSBAR PANEL

BUSBAR-2 PROTECTION TRIPPING SCHEME


3-52 CB PANEL
TRIP FROM 50 LBB TO START 50 LBB

HIGH SPEED TRIP RELAY FOR 3-52 CB HIGH SPEED TRIP RELAY FOR 6-52 CB HIGH SPEED TRIP RELAY FOR 9-52 CB HIGH SPEED TRIP RELAY FOR 12-52 CB HIGH SPEED TRIP RELAY FOR 15-52 CB HIGH SPEED TRIP RELAY FOR 18-52 CB

3-52 CB PANEL
TO CLOSE CKT INTERLOCK TO BLOCK A/R TO TRIP COIL-1 TO TRIP COIL-2 DIRECT TRIP SEND CH-1 DIRECT TRIP SEND CH-2 TO DISTURBENCE RECORDER

6-52 CB PANEL

6-52 CB PANEL
TO CLOSE CKT INTERLOCK TO BLOCK A/R TO TRIP COIL-1 TO TRIP COIL-2 DIRECT TRIP SEND CH-1 DIRECT TRIP SEND CH-2 TO DISTURBENCE RECORDER

REB 670
ACTIVE START TRIP

TRIP FROM 50 LBB TO START 50 LBB

9-52 CB PANEL
TRIP FROM 50 LBB TO START 50 LBB

9-52 CB PANEL
TO CLOSE CKT INTERLOCK TO BLOCK A/R TO TRIP COIL-1 TO TRIP COIL-2 DIRECT TRIP SEND CH-1 DIRECT TRIP SEND CH-2 TO DISTURBENCE RECORDER

DISPLAY
12-52 CB PANEL
TRIP FROM 50 LBB

12-52CB PANEL
TO CLOSE CKT INTERLOCK TO BLOCK A/R TO TRIP COIL-1 TO TRIP COIL-2 DIRECT TRIP SEND CH-1 DIRECT TRIP SEND CH-2 TO DISTURBENCE RECORDER

TO START 50 LBB

15-52 CB PANEL
TO CLOSE CKT INTERLOCK TO BLOCK A/R TO TRIP COIL-1 TO TRIP COIL-2 DIRECT TRIP SEND CH-1 DIRECT TRIP SEND CH-2 TO DISTURBENCE RECORDER

15-52 CB PANEL
TRIP FROM 50 LBB TO START 50 LBB

18-52 CB PANEL
TRIP FROM 50 LBB TO START 50 LBB

18-52 CB PANEL
TO CLOSE CKT INTERLOCK TO BLOCK A/R TO TRIP COIL-1 TO TRIP COIL-2 DIRECT TRIP SEND CH-1 DIRECT TRIP SEND CH-2 TO DISTURBENCE RECORDER

+VE

BUSBAR PANEL

DISTRIBUTED LBB & NUMERICAL CENTRALISED BUS BAR PROTECTION


(REB 500) ABB (7 SS 52) SIEMENS (MICOM P740) AREVA

OR
BUS-1

OR

10-52

11-52

BUS-2

OR

OR

12-52

15-52

3-52

6-52

9-52

14-52

2-52

5-52

8-52

13-52

1-52

4-52

7-52

LATEST DEVELOPMENT IN NUMERICAL CENTRALISED BUS BAR PROTECTION

ABB
BUSBAR PROTECTION CENTRAL UNIT BAY UNIT
ABB Network Partner AG REL531

SIEMENS

AREVA

ABB Network Partner AG

REC 316*4

LINE PROTECTION
MAIN -1
ABB Network Partner AG REL531

1 2 3 4 5 6 7 8

9 10 11 12 13 14 15 16

C C E E

MAIN -2
ABB Network Partner AG REC 316*4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

MAIN -1

MAIN -2

MAIN -1

MAIN -2

TRANSFORMER PROTECTION
MAIN 1. 2. 3.

C E

C E

B/U

MAIN

B/U

MAIN

B/U

DESCRIPTION

IN THIS NO SEPARATE CORE IS REQUIRED FOR EITHER BUSBAR PROTECTION OR LBB / BFR. CENTRALISED BUSBAR IS CONNECTED FROM BAY UNIT OR LBB OR BFR THROUGH FIBRE OPTIC. BAY UNIT / BFR / LBB IS CONNECTED FROM MAIN-1 & MAIN-2 OF LINE PROTECTION OR MAIN & BACKUP PROTECTION OF TRANSFORMER THROUGH FIBRE OPTIC FOR REDUNDANCY TO BAY

MISCELENEOUS RELAYS & PROTECTIONS ADOPTED FOR LINE IN ONE AND HALF CIRCUIT BREAKER SCHEME
(STUB, TEED AND AUTO RECLOSURE FUNCTIONS) PREPARED BY
GOPALA KRISHNA PALEPU ADE/MRT(PROTECTION)

STUB-1/ STUB-2 PROTECTION


3 3
BUS-1
1-52CB

2-52CB

3-52CB

BUS-2

LINE-1

STUB-1&2 (BAY 1&2) 1-89L

REL 521
REL 316

DISTANCE / ATF RELAYS CONVERTED TO STUB/BUS OVER LOAD RELAYS WHEN LINE ISOLATOR OPENS

STUB-3&2 (BAY 3&2) 3-89T

AT/F-1

RET 521
RET 316

WHEN A LINE IS SUPPLIED VIA TWO CIRCUIT BREAKERS IN A ONE & HALF CIRCUIT BREAKER ARRANGEMENT, THE LINE PROTECTION INCLUDES THE AREA BETWEEN THE TWO CTs. HOWEVER, WHEN THE LINE ISOLATOR IS OPEN THE LINE CVTs FOR THE DISTANCE PROTECTION ARE CONNECTED TO THE LINE AND CANNOT PROVIDE THE CORRECT VOLTAGE FOR THE STUB END.(i.e THE AREA BETWEEN THE LINE ISOLATOR AND CTs) (STUB = DEAD END) TO PROVIDE PROTECTION FOR A FAULT IN THIS AREA, REL 521/ REL 316 IS PROVIDED WITH A STUB PROTECTION WHICH GIVES AN BUS OVER CURRENT TRIP IF THE LINE ISOLATOR IS OPEN AND THE CURRENT EXCEEDS THE SET VALUE IN ANY PHASE.

STUB-1 (BAY 1&2 OR BAY 3&2) OPERATES


STUB-2 (BAY 1&2 OR

IT OPERATES THE 3-PH TRIP GR-A MAIN CB (1-52CB OR 3-52CB) AND 3-PH TRIP GR-A TIE CB (2-52CB) IT OPERATES THE 3-PH TRIP GR-B MAIN

TEED-1/ TEED-2 PROTECTION


3 3 3
BUS-1
1-52CB TEED-1&2 (BAY 1&2) 2-52CB 3-52CB TEED-1&2 (BAY 2&3) BUS-2

LINE-1 AT/F-1 TEED PROTECTION IS BASED ON KIRCHOFFS CURRENT LAW. THREE SETS OF CTS ARE CONNECTED IN STAR FASHION. SOME OF THE CURRENTS MUST BE ZERO. IF ANY UNBALANCE CURRENTS ARE NOTICED THEN IMMEDIATELY TEED PROTECTION OPERATES. IF TEED PROTECTION BAY 1&2 OPERATED THEN IT TRIPS 1-52CB & 2-52CB. SIMILARLY IF TEED PROTECTION BAY 2&3 OPERATED THEN IT TRIPS 2-52CB & 3-52CB.
SUMMATION OF INDIVIDUAL PHASES OF T-SHAPED 3 CTs BEFORE REACHING TO RELAY. THIS IS CIRCULATING CURRENT PRINCIPLE. THE CURRENT FLOWING THROUGH IS ZERO DURING BALANCED CONDITION. HIGH IMPENDENCE THREE PHASE DIFFERENTIAL RELAY IS USED AS TEED-1 PROTECTION.

TEED-1 PROTECTION

TEED-2 PROTECTION

T- SHAPED 3 CTs ARE CONNECTED TO RELAY. THE RELAY HAVING OPERATING COIL & RESTAIRING COIL. BASED ON THE DIFFERENTIAL CURRENT FLOWING THROUGH THE OPERATING COIL THE RELAY OPERATES. LOW IMPEDENCE PERCENTAGE BIASED THREE TERMINAL THREE PHASE DIFFERENTIAL RELAY IS USED AS TEED-2 PROTECTION.

TEED-1 PROTECTION
P2 P2 P2 1-CT
CTR: 2000-1000-500/1A

{BAY1&2}(5CT METHOD)
IR5 IY5 IB5

CLASS: PS

2-CT
CTR: 2000-1000-500/1A

CLASS: PS

1-LCT CORE-1
CTR: 2000-1000/1A

CLASS: PS

3 3 3

CORE-5

3 3 3
5S4 5S4 5S2 5S2 5S4 5S4

CORE-5

5S4 5S2

IN5

RADHA
P1 P1 P1 P2 P2 P2

IR5 IY5 IB5


IN5

ACTIVE START

TRIP

5S4 5S2

DISPLAY C E

5S2

5S2

P1 P1 P1 P2 P2 P2

IT WORKS ON CIRCULATING CURRENT PRINCIPLE AND IT IS HIGH IMPEDENCE DIFFERENTIAL RELAY. TEED-1 PROTECTION FOR BAY 2&3 IS ALSO SAME AS ABOVE AND THE FOLLOWING CTs & CORES ARE USED 3-CT(CORE-5), 2-CT(CORE-1) & 3-TCT(CORE-1) ARE STARRED AND CONNECTED TO TEED-1 PROTECTION

IN1

3 3 3
1S2 1S2

1S3

1S3

1S3 1S2

IB1 IY1 IR1


P1 P1 P1

TEED-2 PROTECTION
{BAY1&2}(5CT METHOD) RAICA LBB/BFR
P2 P2 P2 CT MB 1-CT
CTR: 2000-1000-500/1A

CT MB

P2 P2 P2

CLASS: PS

1-LCT CORE-2
CTR: 2000-1000/1A

CLASS: PS

3 3 3
4S4 4S4 4S2 4S2

CORE-4

4S4 4S2

RAICA LBB/BFR

RADSB
ACTIVE START TRIP

4S4 4S2

3 3 3
4S2 4S2

4S4

4S4

2-CT

DISPLAY
P2 P2 P2 CT MB

CORE-4
CTR: 2000-1000-500/1A

CLASS: PS

2S3

2S3

2S3 2S2

2S2

2S2

TEED-2 PROTECTION FOR BAY 2&3 IS ALSO SAME AS ABOVE AND THE FOLLOWING CTs & CORES ARE USED. 3-CT(CORE-4), 2-CT(CORE-2) & 3-TCT (CORE-2) ARE CONNECTED TO TEED-2 PROTECTION. IT WORKS ON KIRCHOFFS CURRENT PRINCIPLE & IT IS PERCENTAGE BIASED LOW IMPEDENCE DIFFERENTIAL RELAY

3 3 3

TEED PROTECTION TRIP SCHEME


ABB RADHA TEED-1 86-A MTR/ HSTR OR ABB (BAY 1&2) REL521 STUB-1
(BAY 1&2) (BAY 1&2)

ABB RADHA TEED-1 86-A MTR/ HSTR OR ABB RET521 STUB-1


(BAY 2&3) (BAY 2&3)

86-A MTR/ HSTR

TRIP COIL-1 1-52CB TRIP COIL-2 BUS-1 86-B ABB REL521 MTR/ MAIN-1 HSTR

TRIP COIL-1 2-52CB TRIP COIL-2

TRIP COIL-1 3-52CB

ABB RADSB TEED-2 OR ABB REL316 STUB-2

ABB RADSB TEED-2


OR ABB RET316 STUB-2

TRIP COIL-2 BUS-2


86-B MTR/ HSTR

86-B MTR/ HSTR

86-A : GROUP-A MASTER TRIP RELAY / HIGH SPEED TRIP RELAY 86-B : GROUP-B MASTER TRIP RELAY / HIGH SPEED TRIP RELAY LINE/TRANSFORMER ISOLATOR OPENS THIS INTERLOCK WILL INITIATE MAIN-1 REL 521/ RET 521 & MAIN-2 REL 316/ RET 316 CONVERTED STUB-1 & 2 PROTECTION

AUTO RECLOSURE BASICS


FAULTS ARE THREE TYPES 1. TRANSIENT FAULT: These are cleared by the immediate tripping of Circuit Breakers and do not reoccur when the line is re-energized. 2. SEMI-PERMANENT FAULTS: These require a time interval to disappear before a line is charged again. 3. PERMANENT FAULTS: These are to be located and repaired before the line is re-energized. About 80-90% of the faults occurring are transient in nature. Hence the Automatic Reclosure of breaker (after tripping on Fault) will result in the line being successfully re-energized. ADVANTAGES: A. Decreasing outage time. B. Improving Reliability. C. Improving system stability. D. Reduce fault damage and Maintenance Time. DEAD TIME: The time between the Auto-reclosing Scheme being energized and the operation of the contacts which energize the Circuit Breaker closing circuit. RECLAIM TIME: The Time Following a successful closing operation measured from the instant the Auto-Reclosing relay closing contacts make which must elapse before the Auto-Reclosing relay initiates another reclosing attempt. In other words, it may be said to be the time between 1st and 2nd Auto-Reclosure.

TYPES OF AUTO-RECLOSING SCHEMES: 1. BASED ON PHASE A. THREE PHASE AUTO-RECLOSING: This type of Auto-Reclosing causes an immediate drift part of the two systems and hence no interchange of synchronizing power can take place during the dead time. B. SINGLE PHASE AUTO-RECLOSING: In this, only the faulty phase(only SLG Faults) is reclosed without causing interruption in interchange synchronizing power between two systems through other two healthy phases. 2. BASED ON ATTEMPTS OF RECLOSURE A. SINGLE SHOT AUTO-RECLOSING: In this scheme, Breaker is reclosed only once on a given fault before lockout of Circuit Breaker Occurs. High-Speed Auto-Reclosing for EHT System is invariably Single Shot. B. MULTI-SHOT AUTO-RECLOSING: In this scheme, more than one reclosing attempts made for a given fault before lockout of Circuit Breaker occurs. B.I. DISADVANTAGES: Repeated closure attempts has with high fault level would seriously affect the Circuit Breaker, Equipment and System Stability. B.ii. CIRCUIT BREAKER LIMITATIONS: Ability of Circuit Breaker to Perform several Trip Close operations in quick succession. B. iii. SYSTEM CONDITIONS: In the percentage of the semi-Permanent faults (which could be burnt out) is moderate, For example on the lines through the forest, multi shot Auto-Reclosing is followed. 3. DEPENDING ON SPEED: A. HIGH-SPEED AUTO-RECLOSING: This aids in fast restoration of supply but should be done by taking into account the following factors. I. System disturbance time can be tolerated without loss of system stability. ii. Characteristics of Protection Schemes and Circuit Breaker. B. LOW SPEED OR DELAYED AUTO RECLOSING: This is suitable for highly interconnected systems where the loss of a single line is unlikely to cause two sections of the system to drift apart and loose synchronism.

METHOD OF ADOPTION IN ONE AND HALF BREAKER SYSTEM: The Auto-Reclosure Functions used for the Bus Breakers 1-52CB & 3-52CB are set as Masters and one for the Center Breaker 2-52CB(TIE) as Follower. Co-ordination is required between the Auto-Reclosure Functions. A Synchrocheck function is also loaded in each Relay to permit 3 pole Auto-Reclosing. Each Line Protection relays starts both MAIN & TIE Circuit Breakers to trip for the Concerned line. After a Successful reclosure of the Main Breaker, The Tie Breaker will be reclosed after a supplementary time delay. Should the Main CB AutoReclosure relay not be successful in its reclosing attempts, the Tie CB AutoReclosure is blocked. If the Main CB is Open or its Auto-Reclosure Relay is not ready or Out of service, The TIE CB Auto-Reclosure will reclose The TIE Breaker after its own dead time without any supplementary time delay. CHOICES OF EHV SYSTEM: 1. CHOICE OF DEAD TIME: A. Lower limit is decided by deionising of Circuit Breaker. B. Upper Limit is decided by Transient Stability and Synchronism. C. Longer Transmission Lines Require Longer dead Time. D. The dead time for High Speed Auto-Reclosing scheme with EHV System is 0.3 to 1.2 sec. 2. CHOICE OF RECLAIM TIME: This should not be set to such a low value that the operating cycle of Breaker is exceeded when two faults incident occurs close together. The reclaim time will be in the range of 10 to 30 sec., depending the breaker opening and closing mechanisms. 3. CHOICE OF ZONE: This should normally kept in Zone-1. It is a Zone-1 fault and SLG fault only autoreclosure is comes in to picture. In other zones the auto reclosure is blocked.

AUTO-RECLOSURE FOR ONE & HALF BREAKER SCHEME


TRIP COMMANDS AUTO RECLOSURE COMMANDS

79 (A/R)+ 25(SYNC) RAAAM RASC

79 (A/R)+ 25(SYNC) RAAAM RASC

79 (A/R)+ 25(SYNC) RAAAM RASC

1-52CB

2-52CB

3-52CB

ABB Network Partner AG ABB Network Partner AG REL531

REL531

ABB Network Partner AG

REC 316*4

ABB Network Partner AG

REC 316*4

LINE-1
C E

1 2 3 4 5 6 7 8

9 10 11 12 13 14 15 16

1 2 3 4 5 6 7 8

9 10 11 12 13 14 15 16

LINE-2
C E C E C E

21 MAIN-1 REL 521

21 MAIN-2 REL 316

21 MAIN-1 REL 521

21 MAIN-2 REL 316

AUTO RECLOSING TIMING CHART


INSTANT OF FAULT
OPERATES RESETS PROTECTION

TRANSIENT FAULT

OPERATING TIME

TRIP COIL CONTACTS ARC CONTACTS ENERGISED SEPARATE EXTINGUISHED FULLY OPEN

CLOSING COIL CONTACTS CONTACTS ENERGISED MAKE FULLY CLOSED

CIRCUIT BREAKER
OPENING TIME ARCING TIME RESETS CLOSING TIME DEAD TIME OPERATES RESETS

OPERATING TIME OPERATES

PROTECTION

PERMANENT FAULT

OPERATING TIME

RECLOSE ON TO FAULT

TRIP COIL CONTACTS ARC CONTACTS ENERGISED SEPARATE EXTINGUISHED FULLY OPEN

CLOSING COIL CONTACTS CONTACTS ENERGISED MAKE FULLY CLOSED

CONTACTS ARC CONTACTS SEPARATE EXTINGUISHED FULLY OPEN

CIRCUIT BREAKER

OPENING TIME

ARCING TIME SYSTEM DISTURBANCE TIME

CLOSING TIME DEAD TIME

OPERATING TIME RECLOSE INITIATED BY PROTECTION

TRIP COIL ENERGISED

AUTO RECLOSE RELAY


DEAD TIME CLOSING PULSE TIME RECLAIM TIME

RELAY READY TO RESPOND TO FURTHER FAULT INCIDENTS (AFTER SUCEESFUL RECLOSRE)

TIME

CARRIER INTERTRIPPING SCHEMES ADOPTED IN ONE AND HALF CIRCUIT BREAKER SCHEME
PREPARED BY GOPALA KRISHNA PALEPU ADE/MRT(PROTECTION)

TYPES OF CARRIER TRIPPING SCHEMES


PERMISSIVE TRIPPING
Permissive trip commands are always monitored by a protection relay. The circuit breaker is tripped when receipt of the command coincides with operation of the protection relay at the receiving end responding to a system fault. The receipt of an incorrect signal must coincide with operation of the receiving end protection for a trip operation to take place. Normally, the risk of a spurious trip is lesser. The intention of these schemes is to speed up tripping for faults occurring within the protected zone.

BLOCKING SCHEME
Blocking commands are initiated by a protection element that detects faults external to the protected zone. Detection of an external fault at the local end of a protected circuit results in a blocking signal being transmitted to the remote end. At the remote end, receipt of the blocking signal prevents the remote end protection operating if it had detected the external fault. Loss of the communications channel is less serious for this scheme than in others as loss of the channel does not result in a failure to trip when required. However, the risk of a spurious trip is higher.

TYPES OF CARRIER TRIPPING SCHEMES


Conventional time-stepped distance protection has One of the main disadvantages is that the instantaneous Zone 1 protection at each end of the protected line cannot be set to cover the whole of the feeder length and is usually set to about 80%. This leaves two 'end zones', each being about 20% of the protected feeder length. Faults in these zones are cleared in Zone 1 time by the protection at one end of the feeder and in Zone 2 time (typically 0.25 to 0.5 seconds) by the protection at the other end of the feeder. This situation cannot be tolerated in some applications, for two main reasons: I). Faults remaining on the feeder for Zone 2 time may cause the system to become unstable. II). Where high-speed auto-reclosing is used, the non-simultaneous opening of the circuit. Breakers at both ends of the faulted section results in no 'dead time' during the auto- reclose cycle for the fault to be extinguished and for ionized gases to clear. This results in the possibility that a transient fault will cause permanent lockout of the circuit breakers at each end of the line section. Even where instability does not occur, the increased duration of the disturbance may give rise to power quality problems, and may result in increased plant damage. Unit schemes of protection that compare the conditions at the two ends of the feeder simultaneously positively identify whether the fault is internal or external to the protected section and provide high-speed protection for the whole feeder length. This advantage is balanced by the fact that the unit scheme does not provide the back up protection for adjacent feeders given by a distance scheme. The most desirable scheme is obviously a combination of the best features of both arrangements, that is, instantaneous tripping over the whole feeder length plus back-up protection to adjacent feeders. This can be achieved by interconnecting the distance protection relays at each end of the protected feeder by a communications channel. The purpose of the communications channel is to transmit information about the system conditions from one end of the protected line to the other, including requests to initiate or prevent tripping of the remote circuit breaker. The former arrangement is generally known as a 'transfer tripping scheme' while the latter is generally known as a 'blocking scheme'. However, the terminology of the various schemes varies widely, according to local custom and practice.

TYPES OF CARRIER TRIPPING SCHEMES


1. ZONE 1 EXTENSION SCHEME (Z1X SCHEME) 2. TRANSFER TRIPPING SCHEMES I. DIRECT UNDER REACH TRANSFER TRIP SCHEME (DUTT) II. PERMISSIVE UNDER REACH TRANSFER TRIP SCHEME (PUTT) III. PUTT FWD SCHEME IV. PERMISSIVE UNDER REACH ACCELERATED SCHEME V. PERMISSIVE OVER REACH TRANSFER TRIP SCHEME (POTT) VI. WEEK IN FEED CONDITIONS. 3. BLOCKING OVER REACHING SCHEMES I. BLOCKING OVER-REACHING PROTECTION SCHEME USING ZONE 2.
OR DIRECTIONAL COMPARISION BLOCKING SCHEME

II. BLOCKING OVER-REACHING PROTECTION SCHEME USING ZONE 1. III. WEEK IN FEED CONDITIONS. 4. DIRECTIONAL COMPARISON UNBLOCKING SCHEME

PROPERTIES OF COMMAND PROTECTION SYSTEMS


OPERATING MODE
PERMISSIVE UNDER REACH (PUTT) PERMISSIVE OVER REACH (POTT) DIRECT TRIP ACCELERAT ED UNDER REACH BLOCKING OVER REACH UNDER REACHING SENDING ZONE-1 OVER REACHING SENDING - - PERMISSIVE CRITERIA RECEIVING
UNDER IMPEDENCE UNDER VOLTAGE OVER CURRENT DISTANE & DIRECTION

GENERAL REQUIREMENTS
SECURE & FAST

- - -

ZONE-2

SECURE & FAST DISTANCE & DIRECTION ZONE-2 DISTANCE & DIRECTION SECURE &
DEPENDABLE

ZONE-1 ZONE-1

- - - - -

SECURE & FAST


FAST &
DEPENDABLE

- - -

REVERSE LOCKING

PREFFERED APPLICATIONS OF TELE/ CARRIER TRIPPING SCHEMES


PARAMETERS

PUTT

POTT

BLOCKING

UNBLOCKING

Reliable communication channel (only required during external faults) 1. Power line carrier With amplitude Modulation (ON/OFF). The same frequency may be used on all terminals) 1. Excellent All line types Characteri Best suited for longer coverage On stic lines - where short lines in Preferred the Presence practice in the Of line the Underreach zone of fault USA. provides resistance. sufficient 2. Suitable for

Signal Transmiss ion System

Dependable and secure communication channel 1. Power line carrier with frequency shift modulation. HF signal coupled to 2 phases of the protected line, or even better, to a parallel circuit to avoid transmission of the HF signal through the fault location. 2. Microwave radio, especially digital(PCM) 3. Fibre -optic cables

Dedicated channel With continuous signal Transfer 1. Power line carrier With frequency shift keying. Continuous Signal transmission must be permitted.

Same as POTT

COMPARISION OF TELE/ CARRIER TRIPPING SCHEMES


On normal two-terminal lines the main deciding factors in the choice of the type of scheme, apart from the reliability of the signalling channel, operating speed and the method of operation of the system. Table compares the important characteristics of the various types of scheme.

Criterion
Speed of operation Speed with inservice testing

Transfer Tripping Scheme


Fast Slower

Blocking scheme
Not as Fast As fast

Suitable for auto Re Close


Current reversal Loss of communications

Yes

Yes

Security against mal-operation due to: Special features required Poor Special features required good

ADVANTAGES & DRAWBACKS OF TELE/ CARRIER TRIPPING SCHEMES


PARAMETERS

PUTT
1. Simple technique 2. No coordination Of zones and times With the opposite End required. 3.The combination Of different relay Types therefore presents no Problems.

POTT
1. Can be applied without Under reaching zone1 stage (e.g. overcompensated Series compensated lines). 2. Can be applied on Extremely short lines (impedance less than minimum relay setting) 3. Better for parallel lines as mutual coupling is not critical for the overreach zone 4. Weak in feed terminals are no problem. (Echo and Weak In feed logic is included)

BLOCKING Same as POTT

UNBLO CKING
Same as POTT but: 1. If no signal is Received (no block and no unblock) then tripping by the overreach zone is released after 20 ms

ADVANT AGES

DRAWBA CKS

1. Overlapping of the zone 1 reaches must be ensured. On parallel lines, teed feeders and tapped lines, the influence of zero

1. Zone reach and signal timing coordination with the Remote end is necessary (current reversal).

Same as POTT Same as 1. Slow tripping all POTT Tele-protection trips must be delayed to wait for the eventual blocking signal.

ADVANTAGES & DRAWBACKS OF TELE/ CARRIER TRIPPING SCHEMES


PARAMETERS

PUTT
Not Suitable as the Zone1 Operation is essential and Zone1 setting in X and R direction must be small on Short Lines.

POTT
Suitable as the Z1B setting may be substantially larger than the Line impedance so that signal Transmission is secure for all faults on the Line. Suitable as the Strong end detects all the Line Faults with the OverReaching Z1B. The Weak In-feed end then echos the received Signal.

BLOCKING
Suitable as Reverse Reach Setting is independent of Line Length.

UNBLOCKI NG
Suitable Same as POTT.

Short Line

Weak Infeed
Amplitude Modulated Power Line Carrier Frequency or Phase Modulated Power Line Carrier
Communication

Not Suitable as the Zone1 Operation is essential at Both Ends for 100% Coverage.
Not Suitable as the Signal must be Transmitted through the Fault Location which Attenuates the Signal.

Partially Suitable Suitable Same as as the Reverse Fault POTT. is also Detected at the Weak In-feed end but no trip at Weak In-feed end.

Not Suitable same as PUTT.

Suitable as the Signal is only sent when the Line is not Faulted. Suitable as the Signal can be Transmitted under all Conditions. Suitable.

Not Suitable Same as PUTT.

Suitable as the Signal can be Transmitted through the Fault Location. Suitable.

Suitable same as PUTT.

Suitable Same as PUTT.

Suitable.

Suitable.

PROTECTION COUPLER PANEL


15

ALARM-1 250V DC

NSD 50/ NSD 70


ACTIVE START TRIP

C S

2+
5C R

TX TRIP A(C)

1C S

2+ 5C R

TX TRIP C(A)

6+

RX TRIP A(C)

6+

RX TRIP C(A)

DISPLAY C
7

ALARM-2 250V DC

C S

910+ 1314+

TX TRIP B(D)

9C S

10+ 13C R

TX TRIP D(B)

E
G4AA TB: V9LB

C R

RX TRIP B(D)

14+

RX TRIP D(B)

G4AC TB: V9LC

GA4D TB:V9LC

PROTECTION COUPLERS FOR 400KV LINE


FOR EACH LINE 2Nos PROTECTION COUPLER PANELS PROVIDED. FOR EACH LINE 1NO CARRIER SPEECH PANEL PROVIDED. SO, ONE LINE REQUIRES TOTAL 3 PANELS. CARRIER SPEECH PANEL PURELY FOR VOICE COMMUNICATION BETWEEN TWO SUBSTATIONS, i.e THE LINE CONNECTED SUBSTATIONS. THE VOICE COMMUNICATION ARE TWO METHODS PROVIDED. ONE IS HOTLINE COMMUNICATION/DEDICATED/ LIFT&TALK METHOD. ANOTHER IS DIAL METHOD. IN PROTECTION COUPLER PANEL-1 TOTAL 3 CARDS ARE IMPORTANT FOR SENDING & RECEIVING TRIP SIGNALS. ONE CARD FOR ALARM i.e G4AA. ONE CARD FOR PERMISSIVE/PROTECTION TRIP i.e G4AC & ANOTHER CARD FOR DIRECT TRIPS i.e G4AD. IN PROTECTION COUPLER-2 PANEL ALSO 3 CARDS ARE PROVIDED SIMILAR TO PROTECTION COUPLER-1 PANEL. THE PROTECTION COUPLER PANEL DRAWING IS SHOWN IN PREVIOUS MENU. 1SET TX & RX FOR PERMISSIVE/ PROTECTION TRIP(G4AC) 1SET TX & RX FOR BACKUP FOR PERMISSIVE/ PROTECTION IN ANOTHER PANEL(G4AC). 1SET TX & RX FOR DIRECT TRIP CHANNEL-1( G4AD). 1SET TX & RX FOR SPARE UNDER EMERGENCY(G4AD). THE ABOVE ARRANGEMENT SIMILAR FOR PROTECTION COUPLER PANEL-2. G4AA CARD FOR ALARM.

MAIN-1 PROTECTION CARRIER INTER TRIPPING


NSD 50
G4AC V9LC 1 G4AC V9LC 6 G4AC V9LC 5 G4AC V9LC 2 ABB
IN OUT CARRIER RECEIVE

REL521
CR -VE

CS
CARRIER SEND

ABB

G4AA V9LB 5 G4AA V9LB 6


PANEL-1
ALARM

+VE

-VE

NSD 50

G4AC V9LC 10
G4AC V9LC 13 G4AC V9LC 14 G4AC V9LC 9 THIS IS BACKUP FOR PERMISSIVE/ PROTECTION TRIP AND CONNECTED IN ANOTHER PANEL

ABB
PANEL-2

MAIN-2 PROTECTION CARRIER INTER TRIPPING


NSD 50
G4AC V9LC 1 G4AC V9LC 6 G4AC V9LC 5 G4AC V9LC 2 ABB
IN OUT CARRIER RECEIVE

REL316
CR -VE

CS
CARRIER SEND

ABB

G4AA V9LB 5 G4AA V9LB 6


PANEL-2
ALARM

+VE

-VE

NSD 50

G4AC V9LC 10
G4AC V9LC 13 G4AC V9LC 14 G4AC V9LC 9 THIS IS BACKUP FOR PERMISSIVE/ PROTECTION TRIP AND CONNECTED IN ANOTHER PANEL

ABB
PANEL-1

DIRECT TRIP SEND CARRIER CHANNEL-1


96 BUSBAR PROT-2 PANEL 87 BUSBAR TRIP (ZONE-2)

PANEL-1

96 BUSBAR PROT-1 PANEL


87 BUSBAR TRIP (ZONE-1) CONTROL PANEL T NC

ABB NSD 50
DC +VE FROM PANEL

MAIN CB(1-52CB)
T NC

TIE CB (2-52 CB)

TIE CB(2-52CB)
50 LBB/BFR FOR MAIN CB / RAICA 59L1 / OVER VOLTAGE STAGE-1 59L2 / OVER VOLTAGE STAGE-2 87 HZ / TEED-1 PROTECTION 87 LZ / TEED-2 PROTECTION 50 LBB/BFR FOR TIE CB / RAICA

G4AD V9LC 2 G4AD V9LC 1

MAIN CB (1-52 CB)

DC VE FROM PANEL CONDITIONS FOR DIRECT TRIP 1. TIE CB OPEN CONDITION + MAIN CB REMOTE H 2. MAIN CB OPEN CONDITION + TIE CB REMOTE HA 3. TIE CB OPEN CONDITION + 96 BUSBAR-1 OPERA 4. MAIN CB OPEN CONDITION + 96 BUSBAR-2 OPER 5. MAIN CB 50 LBB/BFR OPERATED. 6. TIE CB 50 LBB/BFR OPERATED. 7. 59L1 OVER VOLTAGE STAGE-1 OPERATED. 8. 59L2 OVER VOLTAGE STAGE-2 OPERATED. 9. 87 HZ TEED-1 PROTECTION OPERATED 10. 87 LZ TEED-2 PROTECTION OPERATED.

DIRECT TRIP SEND CARRIER CHANNEL- 2


96 BUSBAR PROT-2 PANEL 87 BUSBAR TRIP (ZONE-2)

PANEL-2

96 BUSBAR PROT-1 PANEL


87 BUSBAR TRIP (ZONE-1) CONTROL PANEL T NC

ABB NSD 50
DC +VE FROM PANEL

MAIN CB(1-52CB)
T NC

TIE CB (2-52 CB)

TIE CB(2-52CB)
50 LBB/BFR FOR MAIN CB / RAICA 59L1 / OVER VOLTAGE STAGE-1 59L2 / OVER VOLTAGE STAGE-2 87 HZ / TEED-1 PROTECTION 87 LZ / TEED-2 PROTECTION 50 LBB/BFR FOR TIE CB / RAICA

G4AD V9LC 2 G4AD V9LC 1

MAIN CB (1-52 CB)

DC VE FROM PANEL CONDITIONS FOR DIRECT TRIP 1. TIE CB OPEN CONDITION + MAIN CB REMOTE H 2. MAIN CB OPEN CONDITION + TIE CB REMOTE HA 3. TIE CB OPEN CONDITION + 96 BUSBAR-1 OPERA 4. MAIN CB OPEN CONDITION + 96 BUSBAR-2 OPER 5. MAIN CB 50 LBB/BFR OPERATED. 6. TIE CB 50 LBB/BFR OPERATED. 7. 59L1 OVER VOLTAGE STAGE-1 OPERATED. 8. 59L2 OVER VOLTAGE STAGE-2 OPERATED. 9. 87 HZ TEED-1 PROTECTION OPERATED 10. 87 LZ TEED-2 PROTECTION OPERATED.

DIRECT TRIP RECEIVE CHANNEL-1&2


PANEL-1

ABB NSD 50
DC +VE
G4AD V9LC 6 G4AD V9LC 5 PANEL-2
DIRECT TRIP-1 CARRIER RECEIVE RELAY

TO 86-A MASTER TRIP RELAY (HIGH SPEED TRIP RELAY) FOR MAIN CB(152CB) TO 86-A MASTER TRIP RELAY (HIGH SPEED TRIP RELAY) FOR TIE CB(252CB)

+VE

-VE TO 86-B MASTER TRIP RELAY (HIGH SPEED TRIP RELAY) FOR MAIN CB(152CB)
TO 86-B MASTER TRIP RELAY (HIGH SPEED TRIP RELAY) FOR TIE CB(252CB)

ABB NSD 50
DC +VE
G4AD V9LC 6 G4AD V9LC 5
DIRECT TRIP-2 CARRIER RECEIVE RELAY

PLCC CARRIER PROTECTION SYSTEM (TELEPROTECTION)


ABB Network Partner AG REL531 ABB Network Partner AG REL531

REL 521 MAIN-1 PROTECTION


C C E E

ELECTRICAL CONNECTION NSD 50 PANEL PLCC PANEL NSD 50 PANEL PLCC PANEL NSD 50 PANEL NSD 50 PANEL

ELECTRICAL POWER LINE

ELECTRICAL CONNECTION
ABB Network Partner AG REC 316*4 ABB Network Partner AG REC 316*4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 9 10 11 12 13 14 15 16

REL 316 MAIN-2 PROTECTION

2 3 4 5 6 7 8

FIBRE OPTIC PROTECTION SYSTEM (TELEPROTECTION)


ABB Network Partner AG REL531 ABB Network Partner AG REL531

REL 521 MAIN-1 PROTECTION


C C E E

ELECTRICAL CONNECTION NSD 70 PANEL


GECOD/ SIFOX GECOD/ SIFOX
ABB Network Partner AG

NSD 70 PANEL TUNOS TUNOS FOX-U FOX-515 FOX-U FOX-515

NSD 70 PANEL

NSD 70 PANEL

ELECTRICAL CONNECTION
ABB Network Partner AG REC 316*4 REC 316*4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 9 10 11 12 13 14 15 16

REL 316 MAIN-2 PROTECTION

2 3 4 5 6 7 8

FIBRE OPTIC CARRIER PROTECTION SYSTEM (TELEPROTECTION) DIGITAL RELAY CONNECTION VIA FIBRE OPTIC
ABB Network Partner AG REL531 ABB Network Partner AG REL531

REL 521 MAIN-1 PROTECTION


C C E E

TUNOS

ABB Network Partner AG

REC 316*4

TUNOS

ABB Network Partner AG

REC 316*4

1 2 3 4 5 6 7 8

9 10 11 12 13 14 15 16

9 10 11 12 13 14 15 16

REL 316 MAIN-2 PROTECTION

2 3 4 5 6 7 8

OTERM
C E

OTERM

FOX-U FOX-515

FOX-U FOX-515

MAIN-1 & MAIN-2 PROTECTION FOR AUTO TRANSFORMER ADOPTED IN ONE AND HALF CIRCUIT BREAKER SCHEME
PREPARED BY GOPALA KRISHNA PALEPU ADE/MRT(PROTECTION)

BASICS OF TRANSFORMER PROTECTION


1. PURPOSE OF POWER TRANSFORMER PROTECTION POWER T/F PROTECTION IS USUALLY INSTALLED TO DISCONNECT THE T/F AT: A. INTERNAL SHORT CIRCUITS AND EARTH FAULTS IN THE T/F AND ITS CONNECTED CIRCUITS. B. EXTERNAL FAULTS ON OTHER CIRCUITS. (BACK-UP PROTECTION) C. ABNORMAL SERVICE CONDITIONS SUCH AS OVERLOAD & OVER VOLTAGE. PROTECTION DEVICES INBUILT OR MOUNTED ON POWER T/F A. OIL IMMERSED POWER T/F USUALLY HAVE A GAS DETECTOR AND OIL SURGE. DETECTOR (BUCHHOLZ ALARAM & TRIP DEVICES), WHICH ARE EXCELLENT FOR DETECTING INTERNAL FAULTS. B. LOAD TAPCHANGER COMPARTMENTS MAY HAVE A SIMILAR OVER PRESSURE DEVICE. C. TEMPARATURE MONITORS FOR OIL & WINDING PROVIDE GOOD OVER LOAD PROTECTION. D. PRESSURE RELIEF DEVICE IS PROVIDED TO SAFE GUARD THE T/F FROM HIGH PRESURES. TRANSFORMER DIFFERENTIAL PROTECTION IT IS WIDELY USED AS INSTANTANEOUS PROTECTION FOR SHORT CIRCUIT FAULTS WITH IN THE DIFFERENTIAL ZONE. THIS IS TREATED AS MAIN-1 PROT FOR T/F. THE MOST COMMON TYPE OF PROTECTION IS THE CURRENT RESTRAINT TYPE. SOME TYPE OF DIFFERENTIAL RELAYS REQUIRE INTERPOSING CTs FOR CT RATIO MATCHING AND/OR PHASE SHIFT. HIGH IMPEDENCE DIFFERENTIAL PROTECTION CAN BE USED ON AUTO T/F & REACTORS. IT COVERS ONE GALVANICALLY INTERCONNECTED WINDING (WDG DIFF). BUT NOT A SEPARATE TERTIARY WINDING. IT REQUIRES A THREE PHASE SET OF CTs AT THE NEUTRAL SIDE OF WINDING.

2.

3.

4.RESTRICTED EARTH FAULT PROTECTION


AT/Fs are used to couple EHV Power Networks, If the Ratio of their Voltages is Moderate. An Alternative to Differential Protection that can be applied to AT/Fs. A Circulating Current System is arranged between Equal Ratio Current Transformers in the Two Groups of Line Connections and the Neutral End Connections. The Line Current Transformers can be connected in Parallel to A Single Element Relay, Thus providing a Scheme Responsive to Earth Faults Only. If Current Transformers are fitted in Each Phase at the Neutral End of the Windings and a Three-Element Relay is used, A Differential System can be provided, giving Full Protection against Phase and Earth Faults. This Provides High-speed Sensitive Protection. It is Unaffected by Ratio Changes on the Transformer due to Tap-changing and is immune to the Effects of Magnetizing In Rush Current. It does not respond to Interturn Faults. In Addition, This Scheme does not respond to any Fault in a Tertiary Winding. Unloaded Delta-connected Tertiary Windings are often not Protected.

5. BACK UP PROTECTION
A VARIETY OF RELAYS ARE AVAILABLE. A. OVER CURRENT & EARTH FAULT PROTECTION. ( 50, 50N, 51, 51N, 67, 67N - ANY COMBINATION OF THESE) B. UNDER IMPEDENCE / DISTANCE ( Z<)(21T). C. NEUTRAL DISPLACEMENT PROTECTION (Un>).

6.OTHER TYPES OF RELAYS


A. OVER VOLTAGE RELAY (U >). B. OVER FLUX/ EXCITATION (V/F >)( INVERSE TIME & DIFENITE TIME). FOR 400KV/220KV & 765/400KV TRANSFORMERS BOTH SIDES( i.e HV & LV) OVER FLUX RELAYS ARE PROVIDED BECAUSE BOTH SIDES HAVING GRID. C. AT/F NEUTRAL CURRENT RELAY (51N).

NORMALLY ADOPTED POWER TRANSFORMERS CAPACITIES IN 400KV / 220KV CAPACITY OF TRANSFORMER HV VOLTAGE HV CURRENT LV VOLTAGE LV CURRENT

315 MVA 500 MVA 630 MVA

400 KV 400 KV 400 KV

454.68 A 721.71 A 909.35 A

220 KV 220 KV 220 KV

0826.68 A 1312.20 A 1653.37 A

NORMS OF PROTECTION FOLLOWED IN APTRANSCO


FOR POWER TRANSFORMERS & AUTO TRANSFORMERS
S.No

CAPA CITY 7.5 MVA 16 MVA 25 MVA 31.5 MVA 16 MVA 31.5 MVA 50 MVA 80 MVA 31.5 MVA 50 MVA

VOLTAGE RATIO

MAIN PROTECTION

BACK UP PROTECTION HV LV

ADDITI ONAL PROTE CTION


BUCHHO LZ, OLTC OSR OIL TEMP WDNG TEMP

SPECIA L PROTE CTION

132KV/11K V

3 OL + 1 DIR EL

3 OL + 1 EL

87T DIFFERENT

132KV/33K V

3 OL + 1 DIR EL

3 OL + 1 EL

NIL

220KV/33K V

3 OL + 1 DIR EL

3 OL + 1 EL

BUCHH OLZ OVER

MAIN / DIFFERENTIAL PROTECTION FOR AT/F


(4 CT METHOD)
P2 P2 P2 CT MB 3-CT
CTR: 2000-1000-500/1A

AUX.CT Y/ 0.91 / 0.577A

CT MB

CLASS: PS
3 CT METHOD : 3-CT & 2-CT 4 CT METHOD : 3-CT & 2-ACT 6 CT METHOD : 3-ACT & 2-ACT

CTR: 2000-1000-500/1A

CLASS: PS

3 3 3

CORE-5

5S3

5S3

5S3 5S4

5S4

5S4

AUX.CT Y/ 0.91 / 0.577A

2-ACT

3 3 3
5S4 5S4 5S3 5S3

CORE-5

5S4 5S3

RET 521/ RET 316 RADSB


ACTIVE START TRIP

AUX.CT Y/ 0.689 / 0.577A

5S1 5S3

3 3 3
5S3 5S3

5S1

5S1

P2 P2 P2 LV-CT

DISPLAY
CT MB

CORE-5
CTR: 1200-800/1A

CLASS: PS IN CASE OF 1&1/2 CB SYSTEM, THE DIFFERENTIAL PROTECTION CTs ASSOCIATED WITH MAIN & TIE CBs SHOULD BE CONNECTED TO SEPARATE BIAS WINDINGS AND THESE SHOULD NOT BE PARALLED IN ORDER TO AVOID FALSE OPERATION DUE TO DISSIMILAR CT TRANSIENT RESPONSE.

P2 P2 P2

MAIN / DIFFERENTIAL PROTECTION FOR AT/F


(5 CT METHOD)
CT MB

P2 P2 P2 CT MB

AUX.CT Y/ 0.91 / 0.577A

3-TCT
CTR: 2000-1000-500/1A

RET 521/ RET 316 RADSB


ACTIVE START TRIP

AUX.CT Y/ 0.689 / 0.577A

5S1 5S3

3 3 3
5S3 5S3

5S1

5S1

CLASS: PS

3 3 3
5S4
5S4 5S3 5S3

CORE-5

5S4 5S3

P2 P2 P2 LV-CT

DISPLAY C

CORE-5
CTR: 1200-800/1A

CLASS: PS

NORMALLY LOW IMPEDENCE BIASED DIFFERENTIAL RELAY IS USED FOR TRANSFORMER DIFFERENTIAL PROTECTION

SELECTION OF AUX.CTs FOR DIFFERENTIAL PROTECTION



NORMALLY 400KV/220KV AUTO TRANSFORMERS ARE OF CAPACITY 315MVA. FOR MERZ PRICE PROTECTION IF TRANSFORMER IS CONNECTED IN STAR/STAR THEN CT SECONDARIES ARE TO BE CONNECTED IN DELTA/DELTA. CORRECT RATIO CTs ARE NOT AVAILABLE, THEN AUX.CTs ARE TO BE PROVIDED FOR ACHEVING SUITABLE CURRENTS. IF AUX CTs ARE USING THEN MAIN CT SECONDARIES ARE CONNECTED IN STAR. THIS IS BROUGHT TO AUX CTs. AUX CTs PRIMARY IS CONNECTED IN STAR & SECONDARIES ARE CONNECTED IN DELTA. NORMALLY THE RELAY RATED CURRRENT IS 1A. AUX.CT s SECONDARIES ARE CONNECTED IN DELTA. FOR ACHIEVING 1A TO RELAY, AUX.CT SECONDARY CURRENT IS TO BE 0.577A. THE FULL LOAD PRIMARY CURRENT OF 315MVA AT/F IS 454.7A. BUT THE 400KV CTs RATIOs ARE AVAILABLE : 2000-1000-500/1A NEAREST VALUE TO FULL LOAD CURRENT IS 500/1A. HENCE IT IS ADOPTED. HENCE AT FULL LOAD HV CURRENT i.e 454.7A, THEN SECONDARY OF CT CURRENT WILL BE 0.91A. SO HV SIDE AUX.CT RATIO IS 0.91/0.577A. THE FULL LOAD SECONDARY CURRENT OF 315MVA AT/F IS 826.7A. BUT THE 220KV CTs RATIOs ARE AVAILABLE: 1200-800/1A. NEAREST VALUE TO FULL LOAD CURRENT IS 1200/1A. HENCE IT IS ADOPTED. HENCE AT FULL LOAD LV CURRENT i.e 826.7A,THEN SECONDARY OF CT CURRENT WILL BE 0.689A. SO LV SIDE AUX CT RATIO IS 0.689/0.577A. SPECIAL INFORMATION: LATEST NUMERICAL RELAYS NEED NOT REQUIRE AUX CTs. IN THESE RELAYS, CT RATIOS MATCHING CAN BE PROGRAMMED.

BACKUP PROTECTION FOR AT/F HV


(4 CT METHOD)
P2 P2 P2 CT MB 3-CT
CTR: 2000-1000-500/1A

CLASS: PS
3 CT METHOD : 3-CT & 2-CT 4 CT METHOD : 3-CT & 2-ACT 6 CT METHOD : 3-ACT & 2-ACT

2-ACT
CTR: 2000-1000-500/1A

CLASS: PS

3 3 3

CORE-4

3 3 3
4S4 4S4 4S3 4S3 4S3 4S3

CORE-4

4S4 4S3

IR4 / C411 IY4 / C431 RAICA IB4 / C451 LBB / BFR IN4 / C471 50Z

VR11 / E111

RAPDK DIR O/L & E/F REL 505


ACTIVE START TRIP

VY11 / E131 VB11 / E151 VN11 / E171

3 3 3
E172 E174

3 3

DISPLAY
CT MB

CVT SELECTION BUS-1 CVT / BUS-2 CVT / LINE CVT CORE-1


VA : 200

C
4S3 4S4

4S4

4S4

IB4 / C451 IY4 / C431 IR4 / C411

CLASS: 3P

P2 P2 P2

BACKUP PROTECTION FOR AT/F HV


(5 CT METHOD)
VR11 / E111

P2 P2 P2 CT MB 3-TCT
CTR: 2000-1000-500/1A

CLASS: PS

3 3 3

CORE-4

IR4 / C411 IY4 / C431 IB4 / C451


4S4 4S4 4S4 4S3 4S3 4S3

RAPDK DIR O/L & E/F REL 505


ACTIVE START TRIP

VY11 / E131 VB11 / E151 VN11 / E171

3 3 3
E172 E174

3 3

IN4 / C471

DISPLAY C

CVT SELECTION BUS-1 CVT / BUS-2 CVT / LINE CVT CORE-1


VA : 200

CLASS: 3P

BACKUP PROTECTION FOR AT/F LV


P1 P1 P1 CT MB LV-CT
CTR: 1200 800 /1A

CLASS: PS

3 3 3
4S2 4S2 4S1 4S1

CORE-4

4S2 4S1

IR4 / C411 IY4 / C431 RAICA IB4 / C451 LBB / BFR IN4 / C471 50Z

VR11 / E111

RAPDK DIR O/L & E/F REL 505


ACTIVE START TRIP

VY11 / E131 VB11 / E151 VN11 / E171

P2 P2 P2

3 3 3
E172 E174

3 3
VOLTAGE

DISPLAY C

SELECTION BUS-1 PT / BUS-2 PT CORE-1


VA : 200

CLASS: 3P

MISCELLENEOUS RELAYS & PROTECTIONS ADOPTED FOR AUTO TRANSFORMER IN ONE AND HALF CIRCUIT BREAKER SCHEME
(OVER FLUX & REF FUNCTIONS) PREPARED BY
GOPALA KRISHNA PALEPU ADE/MRT(PROTECTION)

OVER EXCITATION/FLUX RELAY


{FOR AUTO TRANSFORMER HV & LV}
VOLTAGE SELECTION BUS-1 PT /

RATUB V/F RELAY HV

BUS-2 PT
CORE-1
VA : 200

CLASS: 3P

CVT SELECTION

BUS-1 CVT /
BUS-2 CVT / LINE CVT CORE-1
VA : 200

RATUB V/F RELAY LV

CLASS: 3P

315MVA, 400KV/220KV/33KV AT/F RESTRICTED EARTH FAULT RELAY P2 P2 P2


400KV HV CORE-1
CTR: 1000/1A

CLASS: PS P1 P1 P1 P1 P1 P1 NEUTRAL CORE-1


CTR: 1000/ 1A

CLASS: PS P2 P2 P2 P1 P1 P1 220KV LV BUSHING CT CORE-1


CTR: 1000/1A

CLASS: PS

3 3 3

BUSHING CT

3 3 3
S1 S1 S1 S2 S1

BUSHING CT

RADHD
S2
S2 S2 ACTIVE START TRIP S1

DISPLAY C

S1

S2

S2

3 3 3
S2 S2

S1

S1

S1 S2

P2 P2 P2

315MVA, 400KV/220KV/33KV AT/F 3-PH HIGH IMPEDENCE DIFFERENTIAL RELAY


P2 P2 P2 400KV HV CORE-1
CTR: 1000/1A

CLASS: PS P1 P1 P1 P1 P1 P1 NEUTRAL CORE-1


CTR: 1000/ 1A

CLASS: PS P2 P2 P2 P1 P1 P1 220KV LV BUSHING CT CORE-1


CTR: 1000/1A

CLASS: PS

3 3 3

BUSHING CT

3 3 3
S1 S1 S1 S2 S1

BUSHING CT

RADHA
S2
S2 S2 ACTIVE START TRIP S1

DISPLAY C

S1

S2

S2

3 3 3
S2 S2

S1

S1

S1

S2

P2 P2 P2

315MVA, 400KV/220KV AT/F VOLAGE SELECTION


BUS-1
1-52CB 2-52CB 3-52CB BUS-2

LINE1

AT/F-1

FEEDER HAVING LINE CVTs &BUSES ARE HAVING BUS CVTs BUT AT/Fs ARE NOT HAVING CVTs. FOR TRANSFORMER PANEL, PT SUPPLY IS SELECTED AS PER SELECTION DESCRIBED BELOW FOR METERING AND PROTECTION, WHICH IS FIRST SELECTED .

BUS-1 CVT BUS-2 CVT LINE CVT

If AT/F is feeding from Bus-1 and 1-52CB & 2-52CB is closed. Then Bus-1 CVT is selected and this supply is extended to Control & Relay Panels for Auto Transformer. If AT/F is feeding from Bus-2 and 3-52 CB is closed & 2-52CB is open. Then Bus-2 CVT is selected and this supply is extended to Control & Relay Panels for Auto Transformer. If AT/F is feeding from Direct Line and 2-52CB is closed & 1-52 CB & 3-52 CB is open and 389T ISO is Closed . Then line CVT is selected and this supply is extended to Control & Relay Panels for Auto Transformer.

MAIN-1 & MAIN-2 PROTECTION FOR SHUNT REACTOR ADOPTED IN ONE AND HALF CIRCUIT BREAKER SCHEME
PREPARED BY GOPALA KRISHNA PALEPU ADE/MRT(PROTECTION)

BASICS OF SHUNT REACTOR


1. TYPES OF REACTORS : A. BASED ON REACTOR CONNECTION i. SHUNT REACTOR. ii. SERIES REACTOR. B. BASED ON REACTOR LOCATION i. BUS REACTOR ii. LINE REACTOR C. BASED ON CONTROL i. 3-PH OIL IMMERSED REACTOR WITH GAPPED IRON CORE. ii. THYRISTOR CONTROLLED REACTOR (STATIC VAR COMPENSATOR) (APTRANSCO UTILISING SHUNT REACTORS FOR BUS & LINE IN 400KV NETWORK) 2. NEED OF SHUNT REACTOR: A. LINE REACTOR
SHUNT REACTORS ARE USED IN ORDER TO COMPENSATE FOR THE CAPACITIVE SHUNT REACTANCE OF TRANSMISSION LINES. THE REACTOR IS CONNECTED PARALLEL TO THE LINE. THE LOCATION OF REACTOR IS OUT GOING SIDE OF LINE i.e AFTER CIRCUIT BREAKER. LENGTH OF LINE IS MORE THERE MAY BE VOLTAGE IS RAISING DUE TO FARANTI EFFECT(CAPACITANCE) DURING CHARGING. IN CASE OF ZONE-2 (OPEN JUMPER) FAULT, THE FAULT CLEARED BY REMOTE END IS FAST, BUT THIS END IT WILL TAKE TIME DELAY DUE TO ZONE-2. DURING THIS TIME, VOLTAGE MAY RAISING. SO, LINE REACTOR IS USED FOR CONTROLLING THE SWITCHING OVER VOLTAGES AND SAFEGUARD THE OPERATING EQUIPMENT. NORMALLY IT IS ALWAYS IN SERVICE. NORMALLY BOTH ENDS LINE REACTORS ARE PROVIDED. THE ELECTRICAL INTERLOCK IS PROVIDED THAT IF REACTOR ISOLATOR CLOSSED POSITION ONLY WILL GIVE PERMIT TO CLOSE THE LINE ISOLATOR. SIMILARLY FOR OPENING REACTOR ISOLATOR THE LINE ISOLATOR SHOULD BE IN OPEN POSITION. NEUTRAL REACTOR CONNECTED BETWEEN THE STAR POINT OF EHV SHUNT REACTOR AND THE GROUND, LIMITS THE SECONDARY ARC CURRENT TO A LOW VALUE OF AROUND 10 AMPS TYPICALLY FOR 400KV SYSTEM TO ENSURE COMPLETE DE-IONISATION OF ARC PATH WHEN EHV SYSTEM DEVELOPS A SINGLE LINE TO GROUND FAULT. ARC EXTINCTION DURING LINE SINGLE- PHASE AUTORECLOSE DEAD TIME IS ASSISTED BY THIS NEUTRAL REACTOR.

3.

4.

B. BUS REACTOR THE REACTOR IS CONNECTED PARALLEL TO THE BUS i.e LIKE A FEEDER/LINE. DURING LIGHTLY LOADED CONDITIONS THERE MAY BE POSSIBULITY OF RAISING BUS VOLTAGES. FOR SAFEGUARD THE OPERATING EQUIPMENT BUS REACTORS ARE UTILISING. NORMALLY IT IS NOT IN SERVICE. WHENEVER THE VOLTAGE RAISES TO 4%TO 5% MORE THAN THE RATED VOLTAGE THIS MAY BE KEPT IN SERVICE AND 2% TO 3% LESS THAN THE RATED VOLTAGE THIS MAY BE KEPT OUT OF SERVICE. SELECTION OF REACTOR A. LINE REACTOR NORMALLY LINE REACTORS ARE PROVIDED IF THE LINE IS MORE OR EQUAL TO 250KM. IN APTRANSCO NETWORK MAXIMUM LENTH OF LINE IS 350KM. AS PER SYSTEM STUDIES RECOMANDATIONS IF LINE LENGTH IS 250KM TO 300KM 50MVAR REACTOR IS TO BE USED. IF MORE THAN 300KM 63MVAR REACTOR IS TO BE USED. B. BUS REACTOR NORMALLY BUS REACTORS ARE PROVIDED IF THE SUBSTATION BUS VOLTAGE IS RAISING 5% MORE THAN THE RATED VOLTAGE DURING LIGHTLY LOADED CONDITION. BASED ON THE SYSTEM STUDIES RECOMANDATIONS BUS REACTORS ARE TO BE PROVIDED. CALCULATIONS ARE REQUIRED FOR PROVIDING BUS REACTOR. IN THIS THERE IS NO STANDARDISATION. LOCATION OF REACTORS WITH CAPACITY IN APTRANSCO A. LINE REACTOR 1. 400KV KALAPAKA-KHAMMAM 1 AT BOTH ENDS 63MVAR 2. 400KV KALAPAKA-KHAMMAM 2 AT BOTH ENDS 63MVAR B. BUS REACTOR 1. 400KV KALAPAKA SS 2 X 50 MVAR 2. 400KV NUNNA SS(PGCIL BAYS) 1 x 63 MVAR

5.

6.

7.

8.

9.

PURPOSE OF SHUNT REACTOR PROTECTION THE PURPOSE OF THE PROTECTION RELAYING IS TO DISCONNECT THE REACTOR AND LIMIT DAMAGE IN CASE OF INTERNAL SHORT CIRCUITS, EARTH FAULTS, INTERTURN FAULTS AND OVER VOLTAGE OR OVER LOAD.THE REACTOR FORMS CERTAIN IMPEDENCE FOR RATED FREQUENCY, AND AS IT IS SHUNT CONNECTED, AS OVER LOAD MAY BE CAUSED BY OVER VOLTAGE OR HARMONICS IN VOLTAGE AND CURRENT. PROTECTION DEVICES INBUILT OR MOUNTED ON REACTOR A. OIL IMMERSED REACTOR USUALLY HAVE A GAS DETECTOR AND OIL SURGE. DETECTOR (BUCHHOLZ ALARAM & TRIP DEVICES), WHICH ARE EXCELLENT FOR DETECTING INTERNAL FAULTS. B. TEMPARATURE MONITORS FOR OIL & WINDING PROVIDE GOOD OVER LOAD PROTECTION. C. PRESSURE RELIEF DEVICE IS PROVIDED TO SAFE GUARD THE REACTOR FROM HIGH PRESURES. REACTOR DIFFERENTIAL PROTECTION IT IS WIDELY USED AS INSTANTANEOUS PROTECTION FOR SHORT CIRCUIT FAULTS WITH IN THE DIFFERENTIAL ZONE. THIS IS TREATED AS MAIN-1 PROT FOR REACTOR. IT CAN BE OF HIGH IMPEDENCE TYPE OR OF A SENSITIVE CURRENT STABILISED TYPE. HIGH IMPEDENCE DIFFERENTIAL PROTECTION RELAYS REQUIRE AN EQUAL CT TURNS RATIO ON THE PHASE AND NEUTRAL SIDE. SENSITIVITY IS 5% OF NOMINAL REACTOR CT CURRENT. BACK-UP PROTECTION A VARIETY OF RELAYS ARE AVAILABLE. A. OVER CURRENT & EARTH FAULT PROTECTION. ( 50, 50N, 51, 51N, 67, 67N - ANY COMBINATION OF THESE) B. UNDER IMPEDENCE / DISTANCE ( Z<)(21R). C. NEUTRAL DISPLACEMENT PROTECTION (Un>). RESTRICTED EARTH FAULT PROTECTION IF, FOR SOME REASON, A SENSITIVE DIFFERENTIAL PROTECTION NOT CHOOSEN A RESTRICTED EARTH FAULT PROTECTION CAN BE UTILISED.

SHUNT REACTOR (BUS & LINE)


(4CT METHOD)
BUS-1
IL INTER LOCK FACILITY: WHEN 1-89R CLOSES ONLY PERMIT TO CLOSE 1-89L AND 1-89L OPENS ONLY PERMIT TO OPEN 1-89R.

BUS-2 3-89

1-89

1-52CB

3-52CB
P2 P1 P2

1-CT 3
1-89A 1-89R
P2 P1

P1

3-CT
3-89A

LINE SHUNT REACTOR

1-RCT

P2

IL

2-89A

P1

2-ACT

2-BCT
P1 P2

2-52CB

2-89B

UUU

1-89L

3-89R

1-PH NEUTRAL GROUNDING REACTOR

UUU

LINE 1

UUUU

BUS SHUNT REACTOR

SHUNT REACTOR (BUS & LINE)


(5CT METHOD)
BUS-1
IL INTER LOCK FACILITY: WHEN 1-89R CLOSES ONLY PERMIT TO CLOSE 1-89L AND 1-89L OPENS ONLY PERMIT TO OPEN 1-89R.

BUS-2 3-89

1-89

1-52CB 1-CT 3 1-89A


P2
P1 P2 P1

3-52CB

3-CT 3-89A

1-89R
P2 P1

LINE SHUNT REACTOR

1-RCT

.
IL

2-CT
P1

2-89A

P2

2-52CB

2-89B
P2

3-89R
P1

UUU

1-89L 1-LCT 3
P2 P1

1-PH NEUTRAL GROUNDING REACTOR

UUU

LINE 1

UUUU

3-RCT

BUS SHUNT REACTOR

SHUNT REACTOR PROTECTION


PROTECTIONS
MAIN-1 PROTECTION, MAIN-2 PROTECTION, METERING, BUSBAR & BUSBAR CHECKUP PROTECTION

3,4,6S - CT METHOD LINE PROTECTION


IN THIS REACTOR CT CURRENT IS OPPOSES THE MAIN&TIE CT CURRENT. VECTOR SUM OF CTs i.e. MAIN, TIE & REACTOR IS LINE CURRENT.

5,6T1,6T2 - CT METHOD
AS USUAL IN 5CT METHOD, 6CT(T1) METHOD, 6CT(T2) METHOD

3CT METHOD, 4CT METHOD, 6CT(S) METHOD

LINE SHUNT REACTOR PROTECTION


MAIN PROTECTION ( 87 R ) (DIFFERENTIAL PROTECTION)
HV BUSHING CT CORE-1 & NEUTRAL BUSHING CT CORE-3 OF LINE SHUNT REACTOR IS CONNECTED TO 3-PH HIGH IMPEDENCE DIFFERENTIAL RELAY. 1-RCT CORE-1 & SELECTED CVT IS CONNECTED TO SINGLE STEP REACTOR IMPEDENCE RELAY. HV BUSHING CT CORE-2 & 1-PH NEUTRAL GROUNDING REACTOR EARTH BUSHING CT CORE-1.2 OF LINE SHUNT REACTOR IS CONNECTED TO 1-PH HIGH IMPEDENCE DIFFERENTIAL RELAY(REF). REACTOR STAR SIDE BUSHING CT CORE-1 IS CONNECTED TO REACTOR METERING HV BUSHING CT CORE-1 & NEUTRAL BUSHING CT CORE-3 OF LINE SHUNT REACTOR IS CONNECTED TO 3-PH HIGH IMPEDENCE DIFFERENTIAL RELAY. 1-RCT CORE-5 & SELECTED CVT IS CONNECTED TO SINGLE STEP REACTOR IMPEDENCE RELAY. HV BUSHING CT CORE-2 & I-PH NEUTRAL GROUNDING REACTOR EARTH BUSHING CT CORE-1.2 OF LINE SHUNT REACTOR IS CONNECTED TO 1-PH HIGH IMPEDENCE DIFFERENTIAL RELAY(REF). REACTOR STAR SIDE BUSHING CT CORE-1 IS CONNECTED TO REACTOR METERING

BACK UP PROTECTION(21R) ( SINGLE STEP REACTOR IMPEDENCE PROTECTION ) RESTRICTED EARTH FAULT PROTECTION (64 R )

METERING

SHUNT REACTOR PROTECTION


PROTECTIONS
MAIN PROTECTION (87 R) (DIFFERENTIALPROTECTION)

4 CT METHOD
HV BUSHING CT CORE-1 & NEUTRAL BUSHING CT CORE-3 OF BUS SHUNT REACTOR IS CONNECTED TO 3-PH HIGH IMPEDENCE DIFFERENTIAL RELAY. 3-CT CORE-5 & 2-ACT CORE-5 SECONDARIES ARE CONNECTED PARALLEL & SELECTED CVT IS CONNECTED TO SINGLE STEP REACTOR IMPEDENCE RELAY.

5 CT METHOD
HV BUSHING CT CORE-1& NEUTRAL BUSHING CT CORE-3 OF BUS SHUNT REACTOR IS CONNECTED TO 3-PH HIGH IMPEDENCE DIFFERENTIAL RLY. 3-RCT CORE-5 & SELECTED CVT IS CONNECTED TO SINGLE STEP REACTOR IMPEDENCE RELAY.

BUS SHUNT REACTOR PROTECTION

BACK UP PROTECTION (21R ) ( SINGLE STEP REACTOR IMPEDENCE PROTECTION )

RESTRICTED EARTH FAULT PROTECTION ( 64 R )

HV BUSHING CT CORE-2 & EARTH BUSHING CT CORE-2 OF BUS SHUNT REACTOR IS CONNECTED TO 1-PH HIGH IMPEDENCE DIFFERENTIAL RELAY(REF).

HV BUSHING CT CORE-2 & EARTH BUSHING CT CORE-2 OF BUS SHUNT REACTOR IS CONNECTED TO 1-PH HIGH IMPEDENCE DIFFERENTIAL RELAY(REF).

SPECIAL PROTECTION
LINE SHUNT REACTOR
BUS SHUNT REACTOR CVT SELECTION
STUB PROTECTION
TEE DIFFERENTIAL PROTECTION : 3-CT, 2A-CT & REACTOR HV CT LINE SHUNT REACTOR: ACCORDING TO ISOLATORS & BREAKERS POSITION BUS-1/ BUS-2/ LINE CVT WILL BE SELECTED.

TEED-1: 1-CT, 2-CT, 1-LCT & 1-RCT TEED-2: 1-CT, 2-CT, 1-LCT & 1-RCT
TEED-1: 3-CT, 2-CT & 3-RCT TEED-2: 3-CT, 2-CT & 3-RCT BUS SHUNT REACTOR: ACCORDING TO ISOLATORS & BREAKERS POSITION BUS-1/ BUS-2 CVT WILL BE SELECTED.

REACTOR BUSHING CT CONNECTIONS


CORES LINE SHUNT REACTOR
4 CT METHOD HV (400KV SIDE) BUSHING CTs
CORE-1(PS) CORE-2(PS)
CORE-3*(PS)
REACTOR HIGH IMPEDENCE DIFFERENTIAL RELAY RESTRICTED EARTH FAULT PROTECTION REACTOR HIGH IMPEDENCE DIFFERENTIAL RELAY RESTRICTED EARTH FAULT PROTECTION REACTOR HIGH IMPEDENCE DIFFERENTIAL RELAY RESTRICTED EARTH FAULT PROTECTION TEED PROTECTION REACTOR HIGH IMPEDENCE DIFFERENTIAL RELAY RESTRICTED EARTH FAULT PROTECTION

BUS SHUNT REACTOR


4 CT METHOD 5 CT METHOD

5 CT METHOD

SPARE

SPARE

SPARE

NEUTRAL (STAR POINT SIDE) BUSHING CTs


CORE-1
(0.2/0.5)

METERING

METERING

METERING
RESTRICTED EARTH FAULT PROTECTION REACTOR HIGH IMPEDENCE DIFFERENTIAL RELAY

METERING
RESTRICTED EARTH FAULT PROTECTION REACTOR HIGH IMPEDENCE DIFFERENTIAL RELAY

CORE-2(PS) CORE-3(PS)

SPARE
REACTOR HIGH IMPEDENCE DIFFERENTIAL RELAY

SPARE
REACTOR HIGH IMPEDENCE DIFFERENTIAL RELAY

NEUTRAL REACTOR (MAIN REACTOR STAR POINT SIDE) BUSHING CTs


CORE1.1(PS) SPARE SPARE

*NOTE: NORMALLY CORE-3 OF HV


BUSHING CT IS USED FOR REACTOR IMPEDENCE PROTECTION. FOR REACTOR IMPEDENCE PROTECTION EITHER CORE-3 OF HV BUSHING CT OR ONE OF THE PROTECTION CORE OF EXTERNAL CT MAY BE UTILISED.

NEUTRAL REACTOR (EARTH POINT

LINE SHUNT REACTOR PROTECTION


200/ 1A HV BUSHING (400KV SIDE) CTs

P2

LINESHUNT REACTOR
200/ 1A NEUTRAL BUSHING (STAR PONT SIDE) CTs

200/ 1A

P2

1-PH NEUTRAL GROUNDING REACTOR

200/ 1A

P2

. CORE 1.2 .
P1

. . CORE 1.1 .
P2 P1

3 3 3

P1

CORES 3 2 1

3 3 3

P1

(4CT METHOD)
1-RCT

CORES 3 2 1

CORES 4 3 2

CORE-1: CORE-2: CORE-3: CORE-4: CORE-5:

2000-1000-500/1 2000-1000-500/1 2000-1000-500/1 2000-1000-500/1 2000-1000-500/1

. .

1-89R
LINE

3 3 3 3 3

METERING
1-CT 2B-CT LINE 1-CT 2B-CT

UUU

MAIN-2 PROTECTION

. MAIN-1 PROTECTION
LINE

1-CT

2B-CT

REACTOR DIFFERENTIAL PROTECTION RESTRICTED EARTHFAULT PROTECTION

REACTOR IMPEDENCE PROTECTION


SELECTED BUS-1/ BUS-2/ LINE CVT VOLTAGE

REACTOR METERING

UUU

LINE SHUNT REACTOR PROTECTION


200/ 1A HV BUSHING (400KV SIDE) CTs

P2

LINESHUNT REACTOR
200/ 1A NEUTRAL BUSHING (STAR PONT SIDE) CTs

200/ 1A

P2

1-PH NEUTRAL GROUNDING REACTOR

200/ 1A

P2

. CORE 1.2 .
P1

. . CORE 1.1 .
P2 P1

3 3 3

P1

CORES 3 2 1

3 3 3

P1

(5CT METHOD)
1-RCT

CORES 3 2 1

.
P1

CORES 4 3 2

CORE-1: CORE-2: CORE-3: CORE-4: CORE-5:

2000-1000-500/1 2000-1000-500/1 2000-1000-500/1 2000-1000-500/1 2000-1000-500/1

P2 1-LCT CORE-1

1-89R

3 3 3 3 3

TEE.DIFFERENTIAL PROTECTIO
1-CT CORE-5
2-CT CORE-5 1-CT CORE-4

UUU

2-CT TEE DIFFERENTIAL PROTECTION-2 CORE-4

REACTOR IMPEDENCE PROTECTION CORE-2


SELECTED BUS-1/ BUS-2/ LINE CVT VOLTAGE

1-LCT

UUU

REACTOR DIFFERENTIAL PROTECTION

RESTRICTED EARTHFAULT PROTECTION

REACTOR METERING

(4CT METHOD)

BUS-2 3-89

BUS BAR PROTECTION

BUS SHUNT REACTOR PROTECTION


RESTRICTED EARTHFAULT PROTECTION

3-52CB
SELECTED BUS-1/ BUS-2 CVT VOLTAGE P2

TEE DIFFERENTIAL PROTECTION

REACTOR METERING

REACTOR IMPEDENCE PROTECTION

3 3 3
2-89B

5 4 3 CORES

3-CT

2-52CB

P1

3-89A 3-89R

P2

4 3 2 CORES 2A-CT

P1

.
P2 P1 P2

.
P1

3 2 1 CORES NEUTRAL BUSHING CTs

200/ 1ASHUNT (STAR PONT SIDE) BUS

HV BUSHING CTs 200/ 1A REACTOR (400KV SIDE)

. UUU

3 2 1 CORES

BUSBAR CHECKUP PROT REACTOR DIFFERENTIAL PROTECTION

3 3

3 3 3 3 3 3 3 3 3 3 3

BUS BAR PROTECTIO

TEED-2 PROT (BAY 1&2) TEED-1 PROT (BAY 1&2)

TEED-2 PROT (BAY 2&3) TEED-1 PROT (BAY 2&3)

SELECTED BUS-1/ BUS-2 CVT VOLTAGE

REACTOR IMPEDENCE PROTECTION

REACTOR DIFFERENTIAL PROTECTION

RESTRICTED EARTHFAULT PROTECTION

BUS SHUNT REACTOR PROTECTION BUS-2


(5CT METHOD)
3-89

3-52CB
P2

REACTOR METERING

2-52CB P1
5

2-CT
4 3 2 CORES 1

3 3 3
P2

3-CT

3-89A 2-89B 3-89R

P1

. .
3 2 1 CORES NEUTRAL BUSHING CTs
P2 P1 P2

200/ 1ASHUNT (STAR PONT SIDE) BUS

HV BUSHING CTs 200/ 1A(400KV SIDE) REACTOR

. UUU

3 2 1 CORES

P1

3 3 3 3 3

P2

3R-CT

P1

BUSBAR CHECKUP PR

3 3
CORES 3 4 5 1 CORES 2 3 4 5

3 3 3 3 3
3 3 3

3 3 3

CARRIER INTERTRIPPING OF LINE SHUNT REACTOR


LINE SHUNT REACTOR PROTECTION TRIPPINGS WILL BE USED AS DIRECT TRIPPINGS OF LINE IN ADDITION TO OTHER TRIPPINGS. BUS SHUNT REACTOR NEED NOT REQUIRE CARRIER INTER TRIPPING FACILITY.
87R REACTOR DIFFERENTIAL RELAY RADHA 21R REACTOR IMPEDENCE RELAY RAKZB
64R RESTRICTED EARTH FAULT RELAY

ABB NSD 50
DC +VE FROM PANEL

LINE PROTECTION COUPLER PANEL-1

RADHD REACTORS INTERNAL FAULTS GROUP-1/A TRIPPINGS

G4AD V9LC 2 G4AD V9LC 1


DC VE FROM PANEL

87R REACTOR DIFFERENTIAL RELAY


RADHA

21R REACTOR IMPEDENCE RELAY


RAKZB
64R RESTRICTED EARTH FAULT RELAY

ABB NSD 50
DC +VE FROM PANEL

LINE PROTECTION COUPLER PANEL-2

RADHD REACTORS INTERNAL FAULTS GROUP-2/B TRIPPINGS

G4AD V9LC 2 G4AD V9LC 1


DC VE FROM PANEL

ADDITIONAL AND SPECIAL FUNCTIONS ADOPTED IN ONE AND HALF CIRCUIT BREAKER SCHEME
(EVENT LOGGER & DISTURBANCE RECORDER) PREPARED BY
GOPALA KRISHNA PALEPU ADE/MRT(PROTECTION)

400KV SUBSTATION: MAMIDIPALLY


19 MAR 2004 13:00:00 A 13:09:37.090 # 195 A 13:09:37.096 # 188 A 13:09:37.097 # 187 A 13:09:37.100 # 181 A 13:09:37.104 # 162 A 13:09:37.110 # 196 A 13:09:37.110 # 170 A 13:09:37.111 # 161 A 13:09:37.111 # 163 A 13:09:37.111 # 169 A 13:09:37.112 # 168 A 13:09:37.113 # 182 A 13:09:37.126 # 199 A 13:09:37.140 # 185 N 13:09:37.147 # 195 N 13:09:37.148 # 196 N 13:09:37.175 # 187 N 13:09:37.176 # 181 N 13:09:37.176 # 188 N 13:09:37.185 # 182 N 13:09:37.257 # 199 N 13:09:37.279 # 185 19 MAR 2004 14:00:00 N 14:09:48.702 # 163 N 14:09:48.704 # 161 N 14:09:48.720 # 162 N 14:10:00.903 # 169 N 14:10:00.907 # 168 N 14:10:00.907 # 170 19 MAR 2004 15:00:00

EVENT LOGGER EVENTS INFORMATION

400KV SRISAILAM-2 MAIN-2 RAZFE PROT TRIP 400KV SRISAILAM-2 MAIN-1 REL100 PROT STARTY 400KV SRISAILAM-2 MAIN-1 REL100 PROT STARTR 400KV SRISAILAM-2 MAIN-1 REL100 PROT TRIP 400KV SRISAILAM-2 MAIN CB 752 Y-PH OPEN 400KV SRISAILAM-2 MAIN-2 RAZFE CARRIER SEND 400KV SRISAILAM-2 AT/F-2 TIE CB 852 B-PH OPEN 400KV SRISAILAM-2 MAIN CB 752 R-PH OPEN 400KV SRISAILAM-2 MAIN CB 752 B-PH OPEN 400KV SRISAILAM-2 AT/F-2 TIE CB 852 Y-PH OPEN 400KV SRISAILAM-2 AT/F-2 TIE CB 852 R-PH OPEN 400KV SRISAILAM-2 MAIN-1 REL100 CARRIER SEND 400KV SRISAILAM-2 CARRIER PROT CH-2 RECEIVED 400KV SRISAILAM-2 CARRIER PROT CH-1 RECEIVED 400KV SRISAILAM-2 MAIN-2 RAZFE PROT TRIP RESET 400KV SRISAILAM-2 MAIN-2 RAZFE CARRIER SEND RESET 400KV SRISAILAM-2 MAIN-1 REL100 START R RESET 400KV SRISAILAM-2 MAIN-1 REL100 PROT TRIP RESET 400KV SRISAILAM-2 MAIN-1 REL100 START Y RESET 400KV SRISAILAM-2 MAIN-1 REL100 CARRIER SEND RESET 400KV SRISAILAM-2 CARRIER PROT CH-2 RECEIVED RESET 400KV SRISAILAM-2 CARRIER PROT CH-1 RECEIVED RESET 400KV SRISAILAM-2 MAIN CB 752 B-PH CLOSE 400KV SRISAILAM-2 MAIN CB 752 R-PH CLOSE 400KV SRISAILAM-2 MAIN CB 752 Y-PH CLOSE 400KV SRISAILAM-2 AT/F-2 TIE CB 852 Y-PH CLOSE 400KV SRISAILAM-2 AT/F-2 TIE CB 852 R-PH CLOSE 400KV SRISAILAM-2 AT/F-2 TIE CB 852 B-PH CLOSE

DISTURBANCE RECORDER

R PH VOLTAGE
Y PH VOLTAGE B PH VOLTAGE OPEN DELTA VOLTAGE R PH CURRENT Y PH CURRENT B PH CURRENT STAR/NEUTRAL CURRENT
MAIN CB R PH OPEN MAIN CB Y PH OPEN MAIN CB B PH OPEN TIE CB R PH OPEN TIE CB Y PH OPEN TIE CB B PH OPEN MAIN/TIE CB LBB OPTD DIRECT TRIP CH-1/2 OPTD BUSBAR PROT OPTD MAIN-1 PROT OPTD MAIN-2 PROT OPTD OVER VOLTAGE STAGE-1/2 OPTD STUB PROT-1/2 OPTD MAIN-1 PROT CARRIER RECEIVE MAIN-2 PROT CARRIER RECEIVE DF/DT OPTD EVENT NO NAME OF FEEDER DATE & TIME

PREFERRED DISTURBANCE RECORDER


400 KV LINES
ANALOG CHANNELS
1. 2. 3. 4. 5. 6. 7. 8. R-PH VOLTAGE Y-PH VOLTAGE B-PH VOLTAGE OPEN DELTA VOLTAGE R-PH CURRENT Y-PH CURRENT B-PH CURRENT NEUTRAL/STAR CURRENT

400 KV TRANSFORMER
ANALOG CHANNELS
1. HV 2. HV 3. HV 4. HV 5. LV 6. LV 7. LV 8. LV 9. HV 10. HV 11. HV 12. HV 13. LV 14. LV 15. LV 16. LV R-PH VOLTAGE Y-PH VOLTAGE B-PH VOLTAGE OPEN DELTA VOLTAGE R-PH VOLTAGE Y-PH VOLTAGE B-PH VOLTAGE OPEN DELTA VOLTAGE R-PH CURRENT Y-PH CURRENT B-PH CURRENT NEUTRAL/STAR CURRENT R-PH CURRENT Y-PH CURRENT B-PH CURRENT NEUTRAL/STAR CURRENT

DIGITAL CHANNELS
1. HV MAIN CB R-PH OPEN 2. HV MAIN CB Y-PH OPEN 3. HV MAIN CB B-PH OPEN 4. HV TIE CB R-PH OPEN 5. HV TIE CB Y-PH OPEN 6. HV TIE CB B-PH OPEN 7. LV 220 CB R-PH OPEN 8. LV 220 CB Y-PH OPEN 9. LV 220 CB B-PH OPEN 10 87 LZ DIFF RLY OPERATED 11. HV 67 ABCN OPERATED 12. LV 67 ABCN OPERATED 13. 51 O/L RLY OPERATED 14. 64 REF / 87 HZ RLY OPERATED 15. NDR RLY OPERATED 16. HV 99T OVER FLUX OPTD 17. LV 99T OVER FLUX OPTD 18. HV 400 BUSBAR OPERATED 19. LV 220 BUSBAR OPERATED 20. HV MAIN CB LBB OPERATED 21. HV TIE CB LBB OPERATED 22. LV 220 CB LBB OPERATED 23. HV 86 GR-A/B RELAY OPTD 24. LV 86 GR-A/B RELAY OPTD 25. AT/F 21T UZ RELAY OPERATED 26. OIL TEMP HIGH TRIP 27. WNDG TEMP HV/IV/LV TRIP 28. BUCHHOLZ MAIN/OLTC TRIP 29. PRD 1/ 2 TRIP 30. AT/F NEUTRAL CURRENT TRIP

DIGITAL CHANNELS
1. HV MAIN CB R-PH OPEN 2. HV MAIN CB Y-PH OPEN 3. HV MAIN CB B-PH OPEN 4. HV TIE CB R-PH OPEN 5. HV TIE CB Y-PH OPEN 6. HV TIE CB B-PH OPEN 7. 21 MAIN1 REL 521 OPERATED 8. 21 MAIN2 REL 316 OPERATED 9. 87 BUSBAR RELAY OPERATED 10. MAIN CB A/R OPERATED 11. TIE CB A/R OPERATED 12. PSB OPERATED 13. SOTF OPERATED 14. 27 O/V STG-1/2 OPERATED 15. 51 STUB-1/2 OPERATED 16. 87HZ / LZ TEED-1/2 OPERATED 17. MAIN CB LBB OPERATED 18. TIE CB LBB OPERATED 19. DIRECT TRIP CH-1/2 TRIP 20. 21M1 / 21M2 CARRIER RECEIVE 21. 86 GR-A/B RELAY OPERATED 22. 67N DEF/TEF RLY OPERATED 23. DF/DT RELAY OPERATED

CONFIGUARATION OF CONTROL & RELAY PANELS IN ONE AND HALF CIRCUIT BREAKER SCHEME

PREPARED BY GOPALA KRISHNA PALEPU ADE/MRT(PROTECTION)

CONFIGUARATION OF C & R PANEL


CONTROL PANEL
1. AMMETERS IN 3Phs 2. VOLTMETER WITH SEL. SWITCH 3. WATTMETER 4. VAR METER 5. 20W ANNUCIATION FACIA 6. CB CONTROL (TNC) SWITCH 7. ISO CONTROL (TNC) SWITCH 8. SEMAPHORE FOR EARTH SWITCH 9. INDICATING LAMPS FOR CB G&R 10. INDICATING LAMPS FOR ISO 11. INDICATING LAMPS FOR DC 12. INDICATING LAMPS

CB RELAY PANEL
1. BREAKER FAILURE RELAY 2. AUTO RECLOSURE RELAY 3. CHECK SYNCHRONISING RELAY 4. CB ALARM RELAYS 5. CB TRIP CKT SUPERVISION RELAYS 6. 3-PH TRIP UNITS 86-GA & 86-GB 7. 1-PH TRIP RELAYS M1, M2 - 1 2 Nos 8. DIRECT TRIP RECEIVE RELAYS 9. DC SUPERVISION RELAYS

LINE PROTECTION PANEL


1. MAIN-1 NUM. DIST. PROT 2. MAIN-2 NUM. DIST. PROT. 3. O/V STAGE-1 (EXT/IN
BUILT)

4. O/V STAGE-2 (EXT/IN


BUILT)

5. DISTURBANCE RECORDER(EXT/INB
UILT)

6. DISTANCE TO FAULT (EXT/ INBUILT) 7. DC SUPERVISION RELAYS 8. TEED-1 PROTECTION 9. TEED-2 PROTECTION

CONFIGUARATION OF C & R PANEL


TRANSFORMER PROTECTION PANEL
HV PROTECTION PANEL MV PROTECTION PANEL

REACTOR PROTECTION PANEL

1. T/F DIFFERENTIAL 1. DIRECTIONAL O/L 1. REACTOR PROTECTION E/F RELAYS DIFFERENTIAL 2. REF PROTECTION 2. OVER FLUX PROTECTION RELAY PROTECTION 2. REF PROTECTION 3. DIRECTIONAL O/L 3. NEUTRAL RELAY E/F RELAYS DISPALCEMENT 3. REACTOR 4. OVER FLUX RELAY IMPEDENCE PROTECTION 4. VOLTAGE PROTECTION 5. OVER LOAD SELECTION RELAYS 4. CVT SELECTION PROTECTION FUSE FAILURE RELAYS IN ADDITION TO THE ABOVE THE 5. FOLLOWING PANELS WILL BE AVAILABLE 1. PANELS FOR LINE, RELAY T/F, B/C, TBC, BUS REACTOR (AS5. & WHEN 6. CONTROL VOLTAGE FLAGREQ) RELAYS 2. COMMON CONTROL PANEL 6. AUX RELAYS FOR SELECTION RELAYS 6. AUX RELAYS 3. BUS BAR PROTECTION PANELS 7. FUSE FAILURE T/F TROBLES 7. TIMERS 4. TRANSFER BUS COUPLER PROTECTION PANEL(IN CASE OF DMT/SMT SCHEME) RELAY FLAG RELAYS 8. CIRCUIT LABEL 5. BUS COUPLER PROTECTION 7. PANEL (IN CASE OF DMT/DB SCHEME) 8. NOMINCLATURE AUX RELAYSFOR FOR 8. TIMERS I. PANELS ARE NORMALLY MAIN CB PANEL RLA, TIE CB PANEL RTB,LABEL HV CB PANEL RTRA, LV CB PANEL RTRD T/F TROBLES 9. CIRCUIT PROTECTION 9. LINE FLAG RELAYS PANEL RLB, HV PROTECTION PANEL RTRB, LV PROTECTION PANEL LINE REACTOR PROTECTION PANEL RLRC, BUS REACTOR PROTECTION PANEL 10.RTRC, TIMERS RBRA, BUS BAR PANEL RBBA, CONTROL PANEL CP, KP, KT, KBC, KTBC,KL,CCP 11. CIRCUIT LABEL

MAIN CB RELAY PANEL MAIN CB RELAY PANEL

LINE PROTECTION PANEL

LINE-1 PROTECTION PANEL

LINE REACTOR PROT PANEL

TIE CB RELAY PANEL

TIE CB RELAY PANEL


BUS REACTOR PROT PANEL

DIA WITH TWO LINES


LINE-2 PROTECTION PANEL

DIA WITH LINE & REACTORS


MAIN CB RELAY PANEL MAIN CB RELAY PANEL
LINE PROTECTION PANEL

MAIN CB RELAY PANEL


MAIN CB RELAY PANEL
LINE PROTECTION PANEL
LINE REACTOR PROT PANEL

TIE CB RELAY PANEL HV CB RELAY PANEL

TIE CB RELAY PANEL HV CB RELAY PANEL


HV PROTECTION PANEL MV PROTECTION PANEL

HV PROTECTION PANEL MV PROTECTION PANEL

ARRANGEMENT OF C & R PANELS

DIA WITH LINE & TRANSFORMER

DIA WITH LINE, REACTOR & T/F


MV CB RELAY PANEL

MV CB RELAY PANEL

TRIP LOGICS OF ONE AND HALF CIRCUIT BREAKER SCHEME


PREPARED BY GOPALA KRISHNA PALEPU ADE/MRT(PROTECTION)

GROUP-A & GROUP-B TRIPPINGS


FOR 400KV STATIONS THERE SHALL BE TWO SEPARATE BATTERY SYSTEMS AVAILABLE FOR PROTECTION, CONTROL & TRIPPING/CLOSING OPERATIONS. TO OBTAIN REDUNDENCY AND TO BE ABLE TO TAKE PROTECTION OUT FOR MAINTANENCE, WHILE EQUIPMENT IS IN SERVICE, THE RELAYS ARE ELECTRICALLY AND PHYSICALLY SEGREGATED IN TO TWO GROUPS. GROUPING IS DONE TO THE EXTENT POSSIBLE IN SUCH A WAY THAT EACH GROUP CAN INDEPENDENTLY CARRYOUT PROTECTIVE FUNCTIONS WITH NEAR EQUAL REDUNDENCY. INTER CONNECTION OF THESE TWO GROUPS SHALL NOT BE GENERALLY BE ATTEMPTED. DISTRIBUTION OF DC SUPPLY SHALL BE DONE BAY WISE TO FEED THE FOLLOWING 1. PROTECTION 2. CB CONTROL 3. ISOLATOR / EARTH SWITCH CONTROL 4. ANNUNCIATION / INDICATION

LINE PROTECTION GROUP-A


MAIN-1 PROTECTION M1 BUILT IN FUNCTIONS TEED-1 PROTECTION OVER VOLTAGE STAGE-1 PROT DIRECT TRIP CHANNEL-1 RECEIVED

TRANSFORMER PROTECTION GROUP-A


T/F DIFFERENTIAL RELAY T/F HV BACKUP RELAY T/F IMP / 21T RELAY T/F HV OVERFLUX RELAY OIL TEMP HIGH TRIP PRESURE RELIEF TRIP TERITIARY DELTA WNDG NDR PROT

REACTOR PROTECTION GROUP-A


REACTOR DIFFERENTIAL RELAY REACTOR BACKUP / 21R RELAY OIL TEMP HIGH TRIP PRESURE RELIEF TRIP

GROUP-B
REACTOR REF RELAY BUCHHOLZ TRIP WINDING TEMP HIGH TRIP LOW/ HIGH OIL LEVEL TRIP FIRE PROTECTION TRIP

GROUP-B
MAIN-2 PROTCTION M2 BUILT IN FUNCTIONS TEED-2 PROTECTION OVER VOLTAGE STAGE-2 PROT LBB/BFR RELAY DIRECT TRIP CHANNEL-2 RECEIVED

GROUP-B
T/F REF / HIGH Z DIFF RELAY BUCHHOLZ TRIP T/F LV BACKUP RELAY T/F NEUTRAL CURRENT / 51 O/C RLY T/F LV OVERFLUX RELAY OVER LOAD PROT (ALARM ONLY) OLTC BUCHHOLZ TRIP WINDING TEMP HIGH TRIP LOW/ HIGH OIL LEVEL TRIP

INITIATE M_CB 3PH TRIP

INITIATE T_CB 1PH TRIP

INITIATE T_CB 3PH TRIP

INITIATE T_CB 1PH TRIP INITIATE T_CB 3PH TRIP

INITIATE 400KV B/B PRO

START T_CB A/R RELAY

PROTECTION RELAY

MAIN-1 PROTECTION MAIN-2 PROTECTION SOTF, PSB OVER VOLTAGE STAGE-1 & STAGE-2 (BUILT IN 21 M1) OVER VOLTAGE STAGE-1 & STAGE-2 (BUILT IN 21 M2) STUB, TOC, BOC, TEF, DEF, (BUILT- IN 21M1) STUB, TOC, BOC, TEF, DEF, (BUILT- IN 21M2) TEED PROT-1

21 M1 21 M2

A B

1-PH 1-PH

X X

X X

X X

X X

X X

X X

IN BUILT FUNCTIONS OF DISTANCE SCHEME 59 L1 & L2 A 3-PH X X X X X X X

59 L1 & L2

3-PH

3-PH

B 87T HZ A

3-PH 3-PH X

X X

X X

X X

X X

X X

TEED PROT-2
DIRECT TRIP CH-1 RECD DIRECT TRIP CH-2 RECD M_CB BFR / LBB PROT T_CB BFR / LBB PROT

87T LZ

B
A B B B

3-PH
3-PH 3-PH 3-PH 3-PH X

X
X X

X
X

X X X X X

INITIATE SCADA (DR & S


X X X X X X

START M_CB A/R RELAY

BLOCK M_CB A/R RELA

INITIATE M_CB 1PH TRI

INITIATE M_CB 3PH TRI

INITIATE M_CB 1PH TRI

MAIN-1/MAIN-2 CARRIE

DIRECT TRIP CARRIER

MAIN CB FOR LINE (1-52CB)TRIPPING LOGICS


SYMBOL OUTPUT

BLOCK T_CB A/R RELAY

INITIATE ALARM

GROUP

X
X X

MAIN CB FOR LINE (1-52 CB) TRIPPING LOGICS


INITIATE T_CB A/R PRIORITY INITIATE M_C B TRIP COIL-1 INITIATE M_C B TRIP COIL-2 89LE C LOSE PERMISSION START LBB/BFR M_C B

CLOSE MAIN CB

AUTO RECLOSURE RELAY (BUILT IN 21M1 & 21M2) SYNC CHECK RELAY (BUILT IN 21M1 & 21M2) 1-PH TRIP UNIT GR-A 3-PH TRIP UNIT GR-A 1-PH TRIP UNIT GR-B 3-PH TRIP UNIT GR-B TRIP SIGNAL FROM 400KV BUSBAR PROTECTION LINE UNDER VOLTAGE RELAY

79 A/R

A&B

1-PH & 3PH

INITIATE ALARM
X X X X

PROTECTION RELAY

25 SYNC

A&B

3-PH

186 86 GR A 286 86 GR B

A A B B

1-PH 3-PH 1-PH 3-PH

X X X X

X X X X

X X X X X X

96 BB

3-PH

27 UV

TO SCADA (DR & SOE)


X X

SYMBOL

OUTPUT

GROUP

PROTECTION RELAY

SYNC CHECK RELAY

T_CB BFR / LBB PROT

M_CB BFR / LBB PROT (152 CB & 352 CB)

3-PH TRIP UNIT GR-B 3-PH TRIP UNIT GR-A 1-PH TRIP UNIT GR-A

1-PH TRIP UNIT GR-B

79 A/R

286

186

50 ZT

50 Z

86B

86A

152 INITIATE M_CB 1PH TRIP UNIT

152 INITIATE M_CB 3PH TRIP UNIT

152 INITIATE M_CB 1PH TRIP UNIT


X

152 INITIATE M_CB 3PH TRIP UNIT

252 INITIATE T_CB 1PH TRIP UNIT


X X X X X X X X X X X X X X X X X X X X X X X X X X X X

252 INITIATE T_CB 3PH TRIP UNIT

252 INITIATE T_CB 1PH TRIP UNIT

352 INITIATE M_CB 1PH TRIP UNIT

352 INITIATE M_CB 3PH TRIP UNIT 352INITIATE M_CB 1PH TRIP UNIT 352 INITIATE M_CB 3PH TRIP UNIT 252 INITIATE T_CB TRIPCOIL-1 & C 252 START LBB/BFR OF T_CB 252 CLOSE T_CB DIRECT TRIP CARRIER SEND INITIATE ALARM INITIATE SCADA (DR & SOE)

TIE CB TRIPPING LOGICS

252 INITIATE T_CB 3PH TRIP UNIT

SYMBOL

AUTO RECLOSURE RELAY

3-PH

3-PH

3-PH

1-PH

3-PH

1-PH

3-PH

3-PH

3-PH

1-PH & 3-PH

OUTPUT

GROUP

DIRECT TRIP CH-2 RECD 25 B A A A B B B B A & B

DIRECT TRIP CH-1 RECD

INITIATE M_CB 3PH TRIP

INITIATE M_CBTRIP COIL

START M_CB LBB/BFR R

INITIATE M_CB 3PH TRIP

INITIATE M_CB TRIP COI

INITIATE 400KV B/B PRO

INITIATE T_CB 3PH TRIP

INITIATE 220KV B/B PRO

INITIATE T_CB 3PH TRIP

INITIATE LV_CB 3PH TRI

INTER TRIP CIRCUIT HV

INITIATE LV_CB TRIP CO

INITIATE LV_CB 3PH TRI

START LV_CB LBB/BFR

PROTECTION RELAY

DIFFERENTIAL RELAY HV BACKUP PROTECTION HV OVER FLUX PROT OVER LOAD RELAY HV PROT TRIP UNIT GR-A & B REF PROTECTION TEED PROT-1 / 2 STUB PROT AT/F TROUBLE TRIP HV & LV AT/F TROUBLE ALRM M_CB BFR / LBB PROT T_CB BFR / LBB PROT LV_CB BFR / LBB PROT 400KV B/B PROT 220KV B/B PROT LV BACKUP PROTECTION LV OVER FLUX PROT TERI NEUTRAL DISP PROT LV PROT TRIP UNIT GR-A & B

87T(LZ) 67 ABCN 99T HV 51 O/L 86 GR-A/B 64T(HZ) 87T HZ/LZ 50 STUB 86 GR-A/B

A A A A A/B B A/B A A/B

3-PH 3-PH 3-PH 3-PH 3-PH 3-PH 3-PH 3-PH 3-PH

X X X X X X X X X X X X

X X X X

X X X X X X X X X X X X X X X X

X X X X X X X X X

X X X X X X X X X X

X X X

50Z 50ZT 50Z 87 BB 87 BB 67 ABCN 99T LV 151N 86 GR-A/B

B B B 96 96 B B A A/B

3-PH 3-PH 3-PH 3-PH 3-PH 3-PH 3-PH 3-PH 3-PH X X X X X X

X X

X X X X X X X X X X X

X X X X X X

X X X X X X X X X X X X

X X X X

X X

INITIATE SCADA ( SOE)


X X X X X X X X X X X X X X X X X X X

MAIN CB FOR AT/F (3-52CB)TRIPPING LOGICS


SYMBOL
OUTPUT

INITIATE LV_CBTRIP COI

INITIATE ALARM

GROUP

PROTECTION TRIP SCHEME


86-A MTR/ HSTR ABB REL521 MAIN-1 86-A MTR/ HSTR ABB RET521 MAIN-1 86-A MTR/ HSTR

TRIP COIL-1 1-52CB TRIP COIL-2 BUS-1 86-B ABB REL521 MTR/ MAIN-1 HSTR ABB REL316 MAIN-2

TRIP COIL-1 2-52CB TRIP COIL-2

TRIP COIL-1 3-52CB

TRIP COIL-2 BUS-2


ABB RET316 MAIN-2 86-B MTR/ HSTR

86-B MTR/ HSTR

86-A : GROUP-A MASTER TRIP RELAY / HIGH SPEED TRIP RELAY 86-B : GROUP-B MASTER TRIP RELAY / HIGH SPEED TRIP RELAY

MAIN-1/ MAIN-2 ZONE-1 & SINGLE PHASE FAULT


INITIATE MAIN CB GR-A 1-PH TRIP UNIT ( INTURN IT WILL TRIP 1-POLE )

REL 521
ACTIVE START TRIP

INITIATE TIE CB GR-A 1-PH TRIP UNIT ( INTURN IT WILL TRIP 1-POLE ) START MAIN CB AUTO RECLOSURE START TIE CB AUTO RECLOSURE

DISPLAY

CARRIER SEND INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME) TO DISTURBANCE RECORDER TO EVENT RECORDER ( SOE/ SCADA ) TO LBB/BFR INITIATION

REL 316
ACTIVE START TRIP

INITIATE MAIN CB GR-B 1-PH TRIP UNIT ( INTURN IT WILL TRIP 1-POLE ) INITIATE TIE CB GR-B 1-PH TRIP UNIT ( INTURN IT WILL TRIP 1-POLE ) START MAIN CB AUTO RECLOSURE START TIE CB AUTO RECLOSURE

DISPLAY

CARRIER SEND INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES)

INITIATE ALARM (ANNUNCIATION COME) TO DISTURBANCE RECORDER TO EVENT RECORDER ( SOE/ SCADA ) TO LBB/BFR INITIATION


1. 2. 3. 4. 5. 6. 7. 7. 8. 9.

AUTO RECLOSURE
CONDITIONS REQUIRED FOR A/R OPERATION
CB CLOSE CONDITION. TIME LAPSED MORE THAN RECLAIM TIME. OPERATING PRESSURE OF CB SUITABLE FOR AUTORECLOSURE OPERATION. DC SUPPLY TO AUTORECLOSURE SHOULD BE AVAILABLE. PREPARE 3-PH TRIP RELAY SHOULD BE RELEASED CONDITION. NO BLOCKING SIGNAL TO AUTORECLOSURE RELAY. POLE DISTURBANCE RELAY TIME SHOULD BE MORE THAN TWICE OF DEAD TIME OF AUTO RECLOSURE. CARRIER FAIL SIGNAL SHOULD NOT COME AT BOTH ENDS. CARRIER SWITCH SHOULD BE IN SERVICE CONDITION. SINGLE PHASE & ZONE-1 FAULT ONLY.

1. 2. 3. 4.

AUTO RECLOSURE OPERATION


TRIP MAIN CB SINGLE POLE. TRIP TIE CB SINGLE POLE. CLOSE MAIN CB AFTER DEAD TIME. IF A/R SUCCESS FOR MAIN CB THEN AFTER SUPPLEMENTARY TIME DELAY CLOSE TIE CB.(NORMALLY SUPPLEMENTARY TIME DELAY IS DEAD TIME) IF A/R UNSUCCESS THEN TRIP MAIN & TIE CBs. IF MAIN CB OPEN CONDITION, THEN NO SUPPLEMENTARY DELAY TIME FOR TIE A/R. IT WILL OPERATE ITs OWN DEAD TIME.

5. 6.

MAIN-1/ MAIN-2 ZONE-1 & TWO / THREE PHASE FAULT


INITIATE MAIN CB GR-A 1-PH TRIP UNITS ( INTURN IT WILL TRIP 3-POLES )

REL 521
ACTIVE START TRIP

INITIATE TIE CB GR-A 1-PH TRIP UNITS ( INTURN IT WILL TRIP 3-POLES ) BLOCK MAIN CB AUTO RECLOSURE BLOCK TIE CB AUTO RECLOSURE

DISPLAY

CARRIER SEND INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME) TO DISTURBANCE RECORDER TO EVENT RECORDER ( SOE/ SCADA ) TO LBB/BFR INITIATION

REL 316
ACTIVE START TRIP

INITIATE MAIN CB GR-B 1-PH TRIP UNITS ( INTURN IT WILL TRIP 3-POLES ) INITIATE TIE CB GR-B 1-PH TRIP UNITS ( INTURN IT WILL TRIP 3-POLES ) BLOCK MAIN CB AUTO RECLOSURE BLOCK TIE CB AUTO RECLOSURE

DISPLAY

CARRIER SEND INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES)

INITIATE ALARM (ANNUNCIATION COME) TO DISTURBANCE RECORDER TO EVENT RECORDER ( SOE/ SCADA ) TO LBB/BFR INITIATION

MAIN-1/ MAIN-2 ZONE-2 & 1 / 2 / 3 PHASE FAULT


INITIATE MAIN CB GR-A 1-PH TRIP UNITS ( INTURN IT WILL TRIP 3-POLES ) CARRIER SIGNAL ACTIVE START RECEIVED & ZONE-2 STARTER IS PICKUP CONDITION

REL 521
TRIP

INITIATE TIE CB GR-A 1-PH TRIP UNITS ( INTURN IT WILL TRIP 3-POLES ) BLOCK MAIN CB AUTO RECLOSURE BLOCK TIE CB AUTO RECLOSURE TO LBB/BFR INITIATION INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION CAME) TO DISTURBANCE RECORDER TO EVENT RECORDER ( SOE/ SCADA )

DISPLAY

CARRIER SIGNAL RECEIVED & ZONE-2 STARTER IS PICKUP CONDITION

REL 316
ACTIVE START TRIP

INITIATE MAIN CB GR-B 1-PH TRIP UNITS ( INTURN IT WILL TRIP 3-POLES ) INITIATE TIE CB GR-B 1-PH TRIP UNITS ( INTURN IT WILL TRIP 3-POLES ) BLOCK MAIN CB AUTO RECLOSURE BLOCK TIE CB AUTO RECLOSURE

DISPLAY

CARRIER SEND ( IF PUTT OR2 SCHEME SELECTED ) INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES)

INITIATE ALARM (ANNUNCIATION COME) TO DISTURBANCE RECORDER TO EVENT RECORDER ( SOE/ SCADA ) TO LBB/BFR INITIATION

MAIN-1/ MAIN-2 ZONE- 3/4/5 & 1 / 2 / 3 PHASE FAULT


INITIATE MAIN CB GR-A 1-PH TRIP UNITS ( INTURN IT WILL TRIP 3-POLES )

REL 521
ACTIVE START TRIP

INITIATE TIE CB GR-A 1-PH TRIP UNITS ( INTURN IT WILL TRIP 3-POLES ) BLOCK MAIN CB AUTO RECLOSURE BLOCK TIE CB AUTO RECLOSURE

DISPLAY

TO LBB/BFR INITIATION INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION CAME) TO DISTURBANCE RECORDER TO EVENT RECORDER ( SOE/ SCADA )

REL 316
ACTIVE START TRIP

INITIATE MAIN CB GR-B 1-PH TRIP UNITS ( INTURN IT WILL TRIP 3-POLES ) INITIATE TIE CB GR-B 1-PH TRIP UNITS ( INTURN IT WILL TRIP 3-POLES ) BLOCK MAIN CB AUTO RECLOSURE BLOCK TIE CB AUTO RECLOSURE

DISPLAY

TO LBB/BFR INITIATION INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES)

INITIATE ALARM (ANNUNCIATION COME) TO DISTURBANCE RECORDER TO EVENT RECORDER ( SOE/ SCADA )

DISTANCE SCHEME TRIPPING OUTPUTS


MAIN CB
CO 186 R TO TRIP COIL-1 TO TRIP COIL-2 186 Y TO TRIP COIL-1 TO TRIP COIL-2 186 B TO TRIP COIL-1 TO TRIP COIL-2 CO 286 R CO 186 R

TIE CB
REL 521
ACTIVE START TRIP

TO TRIP COIL-1 TO TRIP COIL-2 186 Y

DISPLAY

C
186 B

TO TRIP COIL-1 TO TRIP COIL-2

E
TO TRIP COIL-1 TO TRIP COIL-2 CO 286 R

TO TRIP COIL-1 TO TRIP COIL-2


286 Y TO TRIP COIL-1 TO TRIP COIL-2 286 B TO TRIP COIL-1 TO TRIP COIL-2

REL 316
ACTIVE START TRIP

TO TRIP COIL-1 TO TRIP COIL-2 286 Y

DISPLAY

C
286 B

TO TRIP COIL-1 TO TRIP COIL-2

E
TO TRIP COIL-1 TO TRIP COIL-2

INITIATION
1-PH TRIP RELAYS OF MAIN-1 PROTECTION

MAIN LBB
INITIATE BUSBAR PROTECTION ( INTURN IT WILL TRIP CONNECTED BUS CBs)

RAICA
ACTIVE START TRIP

INITIATE TIE CB 86-GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
BLOCK MAIN CB & TIE CB AUTO RECLOSURE DIRECT TRANSFER TRIP-1 CARRIER SEND TO OTHER END DIRECT TRANSFER TRIP-2 CARRIER SEND TO OTHER END

1-PH TRIP RELAYS OF MAIN-2 PROTECTION

DISPLAY
86-GR-A MASTER TRIP RELAY 86-GR-B MASTER TRIP RELAY 96 BB BUSBAR RELAY

CLOSE INTERLOCK OF MAIN CB & TIE CB INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES)

INITIATE ALARM (ANNUNCIATION COME) TO DISTURBANCE RECORDER

TO EVENT RECORDER ( SOE/ SCADA )

INITIATION
1-PH TRIP RELAYS OF MAIN-1 PROTECTION OF LINE-1(BAY1) & LINE-2 (BAY3) 1-PH TRIP RELAYS OF MAIN-2 PROTECTION OF LINE-1 (BAY1) & LINE-2 (BAY 3) 86-GR-A MASTER TRIP RELAY

TIE LBB
INITIATE MAIN CB 86-GR-B 3-PH TRIP UNIT (TRIP BAY1 CB 3-POLES )

RAICA
ACTIVE START TRIP

INITIATE MAIN CB 86-GR-B 3-PH TRIP UNIT ( TRIP BAY3 CB 3-POLES ) BLOCK MAIN CB OF BAY1 & BAY3 AUTO RECLOSURE BLOCK TIE CB AUTO RECLOSURE CLOSE INTERLOCK OF MAIN CB OF BAY1 & BAY 3 CLOSE INTERLOCK OF TIE CB

DISPLAY

DIRECT TRANSFER TRIP-1 CARRIER SEND TO BAY1 & BAY3 LINES


DIRECT TRANSFER TRIP-2 CARRIER SEND TO BAY1 & BAY3 LINES

C
86-GR-B MASTER TRIP RELAY

INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME) TO DISTURBANCE RECORDER (BAY1 & BAY3)

TO EVENT RECORDER ( SOE/ SCADA )

BUS BAR PROTECTION


INITIATE ALL CBs TRIP UNITS CONNECTED TO THIS BUS AND OPERATE. TO TRIP COIL-1 CONCERNED BAY CB

REB 521
ACTIVE START TRIP

TO TRIP COIL-2 CONCERNED BAY CB TO CLOSE CIRCUIT INTERLOCK OF CONCERN CB DIRECT TRIP SEND CHANNEL-1 TO OTHER END DIRECT TRIP SEND CHANNEL-2 TO OTHER END

DISPLAY

TO LBB/BFR INITIATION FROM LBB/BFR TO BUS BAR TRIPPING

TO DISTURBANCE RECORDER OF MAIN-1 TO DISTURBANCE RECORDER OF MAIN-2

TO EVENT RECORDER ( SOE/ SCADA ) INITIATE ALARM (ANNUNCIATION COME)

INITIATE ALL CBs TRIP UNITS CONNECTED TO THIS BUS AND OPERATE. TO TRIP COIL-1 CONCERNED BAY CB

RED 521
ACTIVE START TRIP

TO TRIP COIL-2 CONCERNED BAY CB


TO CLOSE CIRCUIT INTERLOCK OF CONCERN CB DIRECT TRIP SEND CHANNEL-1 TO OTHER END DIRECT TRIP SEND CHANNEL-2 TO OTHER END

DISPLAY

TO LBB/BFR INITIATION FROM LBB/BFR TO BUS BAR TRIPPING

TO DISTURBANCE RECORDER OF MAIN-1 TO DISTURBANCE RECORDER OF MAIN-2

TO EVENT RECORDER ( SOE/ SCADA ) INITIATE ALARM (ANNUNCIATION COME)

STUB PROTECTION
INITIATE MAIN CB 86-GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )

REL 521
ACTIVE START TRIP

INITIATE TIE CB 86-GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) BLOCK MAIN CB AUTO RECLOSURE BLOCK TIE CB AUTO RECLOSURE

LINE /AT/F ISOLATOR OPENS

DISPLAY

CLOSE INTERLOCK OF MAIN CB CLOSE INTERLOCK OF TIE CB INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME) TO DISTURBANCE RECORDER TO EVENT RECORDER ( SOE/ SCADA )

REL 316
ACTIVE START TRIP

INITIATE MAIN CB 86-GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE TIE CB 86-GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) BLOCK MAIN CB AUTO RECLOSURE BLOCK TIE CB AUTO RECLOSURE

LINE /AT/F ISOLATOR OPENS

DISPLAY

CLOSE INTERLOCK OF MAIN CB CLOSE INTERLOCK OF TIE CB

INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME) TO DISTURBANCE RECORDER TO EVENT RECORDER ( SOE/ SCADA )

TEED PROTECTION
INITIATE MAIN CB 86-GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )

RADHA
ACTIVE START TRIP

INITIATE TIE CB 86-GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) BLOCK MAIN CB AUTO RECLOSURE BLOCK TIE CB AUTO RECLOSURE

DISPLAY

CLOSE INTERLOCK OF MAIN CB CLOSE INTERLOCK OF TIE CB INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME) TO DISTURBANCE RECORDER TO EVENT RECORDER ( SOE/ SCADA )

RADSB
ACTIVE START TRIP

INITIATE MAIN CB 86-GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE TIE CB 86-GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) BLOCK MAIN CB AUTO RECLOSURE BLOCK TIE CB AUTO RECLOSURE

DISPLAY

CLOSE INTERLOCK OF MAIN CB CLOSE INTERLOCK OF TIE CB

INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME) TO DISTURBANCE RECORDER TO EVENT RECORDER ( SOE/ SCADA )

MAIN-1/ MAIN-2 OVER VOLTAGE STAGE-1


INITIATE MAIN CB 86-GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) 110% OF V 4 SECS FOR FEEDER-1 5 SECS FOR FEEDER-2

REL 521
ACTIVE START TRIP

INITIATE TIE CB 86-GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) BLOCK MAIN CB & TIE CB AUTO RECLOSURE DIRECT TRANSFER TRIP-1 CARRIER SEND TO OTHER END

DISPLAY

DIRECT TRANSFER TRIP-2 CARRIER SEND TO OTHER END CLOSE INTERLOCK OF MAIN CB & TIE CB INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME) TO DISTURBANCE RECORDER TO EVENT RECORDER ( SOE/ SCADA )

110% OF V ACTIVE START 4 SECS FOR FEEDER-1 5 SECS FOR FEEDER-2

REL 316
TRIP

INITIATE MAIN CB 86-GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE TIE CB 86-GR-a 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) BLOCK MAIN CB & TIE CB AUTO RECLOSURE DIRECT TRANSFER TRIP-1 CARRIER SEND TO OTHER END DIRECT TRANSFER TRIP-2 CARRIER SEND TO OTHER END CLOSE INTERLOCK OF MAIN CB & TIE CB

DISPLAY

INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME) TO DISTURBANCE RECORDER TO EVENT RECORDER ( SOE/ SCADA )

OVER VOLTAGE STAGE-2


INITIATE MAIN CB 86-GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )

RXEG 21
ACTIVE START TRIP

INITIATE TIE CB 86-GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) BLOCK MAIN CB & TIE CB AUTO RECLOSURE DIRECT TRANSFER TRIP-1 CARRIER SEND TO OTHER END

120% OF V 20m SECS

DISPLAY

DIRECT TRANSFER TRIP-2 CARRIER SEND TO OTHER END CLOSE INTERLOCK OF MAIN CB & TIE CB INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES)

INITIATE ALARM (ANNUNCIATION COME)


TO DISTURBANCE RECORDER (MAIN-1 & MAIN-2) TO EVENT RECORDER ( SOE/ SCADA )

UNDER VOLTAGE RELAY


RXEG 21
ACTIVE START TRIP

1O% OF V

DISPLAY

LINE EARTH SWITCH CLOSE PERMISSION ONLY.

CARRIER TRIPPING SCHEMES(TELEPROTECTION)


DETAI LS
CHAN NEL-1 SEND CHAN NEL-2 SEND

PERMISSIVE TRIPPING

DIRECT TRIPPING

MAIN-1 PROTECTION : HERE CHANNEL-1 & CHANNEL-2 SIGNALS IT SENDS SIGNAL PARALLEL VIA ARE MAIN & ALTERNATE CHANNEL PLCC PROTECTION COUPLER 1. TIE CB OPEN CONDITION + MAIN CB PANEL-1 AS A MAIN CHANNEL & REMOTE HAND TRIP GIVEN. PLCC PROTECTION COUPLER 2. MAIN CB OPEN CONDITION + TIE CB PANEL-2 AS A ALTERNATE CHANNEL.. REMOTE HAND TRIP GIVEN. 3. TIE CB OPEN CONDITION + 87 BUSBAR-1 MAIN-2 PROTECTION : OPERATED. IT SENDS SIGNAL PARALLEL VIA 4. MAIN CB OPEN CONDITION + 87 BUSBAR-2 PLCC PROTECTION COUPLER OPERATED PANEL-2 AS A MAIN CHANNEL & (FOR HALF DIA ONLY). PLCC PROTECTION COUPLER 5. MAIN CB 50 LBB/BFR OPERATED. PANEL-1 AS A ALTERNATE CHANNEL. 6. TIE CB 50 LBB/BFR OPERATED. 7. 59L1 OVER VOLTAGE STAGE-1 OPERATED. 8. 59L2 OVER VOLTAGE STAGE-2 OPERATED. 9. 87 TEED-1 PROTECTION OPERATED 10. 87 TEED-2 PROTECTION OPERATED

CHAN NEL-1 RECEI VE

MAIN-1 PROTECTION : IT RECEIVES SIGNAL PARALLEL VIA PLCC PROTECTION COUPLER PANEL-1 AS A MAIN CHANNEL & PLCC PROTECTION COUPLER PANEL-2 AS A ALTERNATE CHANNEL.

1. TO 86-A MASTER TRIP RELAY (HIGH SPEED TRIP RELAY) FOR MAIN CB. 2. TO 86-A MASTER TRIP RELAY (HIGH SPEED TRIP RELAY) FOR TIE CB.

21 M1 REL 521
ABB Network Partner AG REL531

CARRIER TRIPPING SCHEMES(TELEPROTECTION)


CARRIER PROTECTION PANEL-1
PT SEND
C E

CARRIER PROTECTION PANEL-1


PT SEND PT RECEIVE PT SEND PT RECEIVE DT SEND

21 M1 REL 521
ABB Network Partner AG REL531

PT RECEIVE PT SEND

DIRECT TRIP SEND CH-1

PT RECEIVE DT SEND DT RECEIVE

DIRECT TRIP SEND CH-1 MAIN CB 86-A TIE CB 86-A

MAIN CB 86-A
TIE CB 86-A

DT RECEIVE

ONE END
CARRIER PROTECTION PANEL-2
PT SEND PT RECEIVE PT SEND

OTHER END
CARRIER PROTECTION PANEL-2
PT SEND PT RECEIVE

21 M2 REL 316
ABB Network Partner AG REC 316*4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

21 M2 REL 316
ABB Network Partner AG REC 316*4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

PT SEND
PT RECEIVE DT SEND DT RECEIVE
DIRECT TRIP SEND CH-2
MAIN CB 86-B TIE CB 86-B

DIRECT TRIP SEND CH-2


MAIN CB 86-B TIE CB 86-B

PT RECEIVE DT SEND DT RECEIVE

PT : PERMISSIVE PROTECTION TRANSFER TRIP DT : DIRECT TRANSFER TRIP

DIRECT TRANSFER TRIP CHANNEL 1 / 2 RECEIVED


INITIATE MAIN CB 86-GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )

85 LO X1
ACTIVE START TRIP

INITIATE TIE CB 86-GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) BLOCK MAIN CB AUTO RECLOSURE BLOCK TIE CB AUTO RECLOSURE

DIRECT TRIP CHANNEL-1 RECEIVED

DISPLAY

CLOSE INTERLOCK OF MAIN CB CLOSE INTERLOCK OF TIE CB INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME) TO DISTURBANCE RECORDER TO EVENT RECORDER ( SOE/ SCADA )

85 LO X2
ACTIVE START TRIP

INITIATE MAIN CB 86-GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE TIE CB 86-GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) BLOCK MAIN CB AUTO RECLOSURE BLOCK TIE CB AUTO RECLOSURE

DIRECT TRIP CHANNEL-2 RECEIVED.

DISPLAY

CLOSE INTERLOCK OF MAIN CB CLOSE INTERLOCK OF TIE CB

INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME) TO DISTURBANCE RECORDER TO EVENT RECORDER ( SOE/ SCADA )

86-GA & 86 GB MASTER TRIP / HIGH SPEED TRIP LOCKOUT RELAY OPERATION
TRIP COIL-1 TRIP COIL -1
86-GA MASTER TRIP / HIGH SPEED TRIP RELAY
OVER VOLTAGE STAGE-1 (INBUILT MAIN-1) DIRECT TRIP CHANNEL-1 RECEIVED SOTF PROTECTION (INBUILT MAIN-1) DEF,TOC, BOC, STUB (INBUILT MAIN-1) TEED-1 PROTECTION

86-GA MASTER TRIP / HIGH SPEED TRIP RELAY

TIE CB

MAIN CB

OVER VOLTAGE STAGE-1 ( IN BUILT MAIN-2 )

TRIP COIL-2

86-GB MASTER TRIP / HIGH SPEED TRIP RELAY

DIRECT TRIP CHANNEL-2 RECEIVED SOTF PROTECTION ( IN BUILT MAIN-2 ) OVER VOLTAGE STAGE-2 DEF, TOC, BOC, STUB ( IN BUILT MAIN-2 ) MAIN LBB OPERATED TIE LBB OPERATED TEED-2 PROTECTION

86-GB MASTER TRIP / HIGH SPEED TRIP RELAY

TRIP COIL -2

MASTER TRIP RELAYS HIGH SPEED TRIP RELAYS LOCKOUT RELAYS


PUSH BUTTON FOR RESETTING. TO CLOSING INTERLOCK OF CONCERNED BAY CB

86-GA MASTER TRIP / HIGH SPEED TRIP RELAY

TO INITIATE LBB/BFR OF CONCERNED BAY BLOCK AUTO RECLOSURE OF CONCERNED BAY TO TRIP COIL-1 CONCERNED BAY CB TO TRIP COIL-2 CONCERNED BAY CB INITIATE FLAG RELAY (FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME) TO DISTURBANCE RECORDER (MAIN-1 & MAIN-2) TO EVENT RECORDER ( SOE/ SCADA )

PUSH BUTTON FOR RESETTING.

TO CLOSING INTERLOCK OF CONCERNED BAY CB

86-GB MASTER TRIP / HIGH SPEED TRIP RELAY

TO INITIATE LBB/BFR OF CONCERNED BAY BLOCK AUTO RECLOSURE OF CONCERNED BAY TO TRIP COIL-1 CONCERNED BAY CB TO TRIP COIL-2 CONCERNED BAY CB INITIATE FLAG RELAY (FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME) TO DISTURBANCE RECORDER (MAIN-1 & MAIN-2) TO EVENT RECORDER ( SOE/ SCADA )

TRANSFORMER PROTECTION
(DIFFERENCIAL & REF / 3-PH HZ DIFF PROTECTION)
INITIATE 400KV MAIN CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )

RADSB

INITIATE 400KV TIE CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 220KV MAIN CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 220KV TBC CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )

87 T
(LZ)

ACTIVE

START

TRIP

DISPLAY

INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME)

TO EVENT RECORDER ( SOE/ SCADA )

64 REF
OR

RADHD
ACTIVE START TRIP

INITIATE 400KV MAIN CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 400KV TIE CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 220KV MAIN CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 220KV TBC CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )

87 T
(HZ)

DISPLAY

INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME)

TO EVENT RECORDER ( SOE/ SCADA )

TRANSFORMER PROTECTION
( BACKUP DIRECTIONAL O/L & E/F PROTECTION FOR HV & LV)
INITIATE 400KV MAIN CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )

RAPDK

INITIATE 400KV TIE CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 220KV MAIN CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 220KV TBC CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )

67 HV ABCN

ACTIVE

START

TRIP

DISPLAY

INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME)

TO EVENT RECORDER ( SOE/ SCADA )

RAPDK
ACTIVE START TRIP

INITIATE 400KV MAIN CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 400KV TIE CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 220KV MAIN CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 220KV TBC CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )

67 LV ABCN

DISPLAY

INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME)

TO EVENT RECORDER ( SOE/ SCADA )

TRANSFORMER PROTECTION
( OVER FLUX PROTECTION FOR HV & LV)
INITIATE 400KV MAIN CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )

RALK

INITIATE 400KV TIE CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 220KV MAIN CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 220KV TBC CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )

99T HV

ACTIVE

START

TRIP

DISPLAY

INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME)

TO EVENT RECORDER ( SOE/ SCADA )

RATUB
ACTIVE START TRIP

INITIATE 400KV MAIN CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 400KV TIE CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 220KV MAIN CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 220KV TBC CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )

99T LV
DISPLAY

INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME)

TO EVENT RECORDER ( SOE/ SCADA )

OVER VOLTAGE (LINE) AND OVER FLUX(TRANSFORMER ) PROTECTION TRIP SCHEME


86-A MTR/ HSTR ABB O/V 1 O/V 2
(BAY 1&2)

86-A MTR/ HSTR

ABB RALK O/F- HV


(BAY 2&3 / HV)

86-A MTR/ HSTR

TRIP COIL-1 1-52CB TRIP COIL-2 BUS-1 86-B ABB REL521 MTR/ MAIN-1 HSTR
(BAY 1&2)

TRIP COIL-1 2-52CB


TRIP COIL-2

TRIP COIL-1 3-52CB TRIP COIL-2 BUS-2 86-B MTR/ HSTR

ABB O/V 1 O/V 2

86-B MTR/ HSTR

OVER VOLTAGE STAGE-1 & STAGE-2 ARE IN BUILT FUNCTIONS OF MAIN-1 & MAIN-2 NUMERICAL RELAYS. IF EXTERNAL RELAYS ARE UTILISED THEN STAGE-1 IS GR-A & STAGE-2 IS GR-B TRIPPING IS TO UTILISED.

TRIP COIL-2

86-B MTR/ HSTR

LV - CB
(BAY LV)

TRIP COIL-1

ABB RATUB O/F- LV

86-A MTR/ HSTR

TRANSFORMER PROTECTION
INITIATE 400KV MAIN CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )

RXIG 21

INITIATE 400KV TIE CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 220KV MAIN CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 220KV TBC CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )

51 O/L

ACTIVE

START

TRIP

DISPLAY

INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME)

TO EVENT RECORDER ( SOE/ SCADA )

RAEDK1
ACTIVE START TRIP

INITIATE 400KV MAIN CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 400KV TIE CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 220KV MAIN CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 220KV TBC CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )

NDR
DISPLAY

INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME)

TO EVENT RECORDER ( SOE/ SCADA )

INITIATION
86-GR-A MASTER TRIP RELAY 86-GR-B MASTER TRIP RELAY 96 BB BUSBAR RELAY

MAIN LBB
INITIATE BUSBAR PROTECTION ( INTURN IT WILL TRIP CONNECTED BUS CBs)

RAICA
ACTIVE START TRIP

INITIATE TIE CB 86-GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
INTER TRIP TO 220KV LV MAIN CB INTER TRIP TO 220KV LV TBC CB CLOSE INTERLOCK OF MAIN CB & TIE CB

DISPLAY

INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME)

TO EVENT RECORDER ( SOE/ SCADA )

INITIATION
1-PH TRIP RELAYS OF MAIN-1 PROTECTION OF LINE-1(BAY1)

TIE LBB
INITIATE MAIN CB 86-GR-B 3-PH TRIP UNIT (TRIP BAY1 CB 3-POLES )

RAICA
ACTIVE START TRIP

INITIATE MAIN CB 86-GR-B 3-PH TRIP UNIT ( TRIP BAY3 CB 3-POLES ) BLOCK MAIN CB OF BAY1 AUTO RECLOSURE BLOCK TIE CB AUTO RECLOSURE CLOSE INTERLOCK OF MAIN CB OF BAY1 & BAY 3 CLOSE INTERLOCK OF TIE CB

1-PH TRIP RELAYS OF MAIN-2 PROTECTION OF LINE-1 (BAY1)

DISPLAY
86-GR-A MASTER TRIP RELAY

DIRECT TRANSFER TRIP-1 CARRIER SEND TO BAY1 & BAY3 LINES


DIRECT TRANSFER TRIP-2 CARRIER SEND TO BAY1 & BAY3 LINES

C
86-GR-B MASTER TRIP RELAY

INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME) TO DISTURBANCE RECORDER (BAY1)

TO EVENT RECORDER ( SOE/ SCADA )

86-GA & 86 GB MASTER TRIP / HIGH SPEED TRIP LOCKOUT RELAY OPERATION
TRIP COIL-1 TRIP COIL -1
86-GA MASTER TRIP / HIGH SPEED TRIP RELAY
T/F DIFFERENTIAL RELAY 87 T B/U O/C & E/F PROTN RLY 67 ABCN INTER TRIP FROM LV SIDE ICT TROUBLES GR-A PROTECTION TRIP ICT HV OVER FLUX RELAY

86-GA MASTER TRIP / HIGH SPEED TRIP RELAY

TIE CB

MAIN CB

RESTRICTED EARTH FAULT RELAY 64 REF/T

TRIP COIL-2

86-GB MASTER TRIP / HIGH SPEED TRIP RELAY

INTER TRIP FROM LV SIDE ICT TROUBLES GR-B PROTECTION TRIP STUB RELAY 50ST MAIN LBB OPERATED TIE LBB OPERATED ICT LV OVER FLUX RELAY INTER TRIP FROM TBC LBB & MANUAL TRIP OF 220KV

86-GB MASTER TRIP / HIGH SPEED TRIP RELAY

TRIP COIL -2

AUTO TRANSFORMER INTER TRIP CIRCUITS


HV INTER TRIP CIRCUITS(TO LV) FOR LV MASTER TRIP RELAY 86 GR-A 1. TIE CB OPEN CONDITION + MAIN CB REMOTE HAND TRIP GIVEN. 2. MAIN CB OPEN CONDITION + TIE CB REMOTE HAND TRIP GIVEN. 3. TIE CB OPEN CONDITION + 96 BUSBAR-1 OPERATED. 4. MAIN CB OPEN CONDITION + 96 BUSBAR-2 OPERATED (FOR HALF DIA ONLY). 5. MAIN CB 50 LBB/BFR OPERATED. 6. TIE CB 50 LBB/BFR OPERATED. 7. PROTECTION FOR87 LVTEED-1 MASTER TRIP RELAY 86 GR-B OPERATED 1. TIE CB OPEN CONDITION + MAIN 8. 87 PROTECTION CBTEED-2 REMOTE HAND TRIP GIVEN. OPERATED. 2. MAIN CB OPEN CONDITION + TIE CB REMOTE HAND TRIP GIVEN. 3. TIE CB OPEN CONDITION + 96 BUSBAR-1 OPERATED. 4. MAIN CB OPEN CONDITION + 96 BUSBAR-2 OPERATED (FOR HALF DIA ONLY). 5. MAIN CB 50 LBB/BFR OPERATED. 6. TIE CB 50 LBB/BFR OPERATED. LV INTER TRIP CIRCUIT(TO HV)

FOR HV M-CB MASTER TRIP RELAY 86 GR-A 1. LV CB REMOTE HAND TRIP GIVEN. 2. LV 87 BB(96) BUSBAR-1/2 (ISO SELECTION) OPERATED. FOR HV M-CB MASTER TRIP 3. LV CB 50 LBB/BFR OPERATED. RELAY 86 GR-B 1. LV CB REMOTE HAND TRIP GIVEN. 2. LV 87 BB(96) BUSBAR-1/2 (ISO SELECTION) OPERATED. FOR HV T-CB MASTER TRIP RELAY 3. LV CB 50 LBB/BFR OPERATED. 86 GR-A 1. LV CB REMOTE HAND TRIP GIVEN. 2. LV 87 BB(96) BUSBAR-1/2 (ISO SELECTION) OPERATED. FOR HV T-CB MASTEROPERATED. TRIP RELAY 3. LV CB 50 LBB/BFR 86 GR-B 1. LV CB REMOTE HAND TRIP GIVEN. 2. LV 87 BB(96) BUSBAR-1/2 (ISO

TRANSFORMER TROUBLES TRIPPING GR-A


86 AX OIL TEMP TRIP
TO 3PH GR-A 400KV MAIN CB TO 3PH GR-A 400KV TIE CB

DIFF RELAY 87T BUCHHOLZ TRIP

TO 3PH GR-A 220KV MAIN CB TO 3PH GR-A 220KV TBC CB

OL RELAY 51OL PRD-1 TRIP 86 AY

HV O/L+E/F PROT 67 PRD-2 TRIP

NDR RELAY 151N

HV O/F RELAY 99T

TRANSFORMER TROUBLES TRIPPING GR-B


86 BX

OLTC BUCHHOLZ-R TRIP


TO 3PH GR-B 400KV MAIN CB TO 3PH GR-B 400KV TIE CB

OLTC BUCHHOLZ-Y TRIP

REF RELAY 64REF

TO 3PH GR-B 220KV MAIN CB TO 3PH GR-B 220KV TBC CB

OLTC BUCHHOLZ B TRIP

STUB RELAY 50ST

LV O/L+E/F PROT 67 WNDG TEMP-HV TRIP

86 BY

LV O/F RELAY 99T

WNDG TEMP-LV TRIP

WNDG TEMP-IV TRIP

TRIP COIL-1 CIRCUITS


TRIP COIL-1
186R1 186Y1 186B1

186R2

186Y2

186B2
186R1, 186R2, 186Y1, 186Y2, 186B1, 186B2 ARE CB 1-PH TRIP UNIT OF GR-A. THESE ARE SELF RESETING. 286R1, 286R2, 286Y1, 286Y2, 286B1, 286B2 ARE CB 1-PH TRIP UNIT OF GR-B. THESE ARE SELF RESETING. THE BELOW ARE HAND RESETING. 86GR-A, 86GR-B ARE 3-PH TRIP UNITS. 96 BB IS BUSBAR TRIPPING RELAY

286R1

286Y1

286B1

286R2

286Y2

286B2

86GR-A

. .

. .

. .

86GR-B

96BB

TRIP COIL 2 CIRCUITS


TRIP COIL-2
186R1 186Y1 186B1

186R2

186Y2

186B2
186R1, 186R2, 186Y1, 186Y2, 186B1, 186B2 ARE CB 1-PH TRIP UNIT OF GR-A. THESE ARE SELF RESETING. 286R1, 286R2, 286Y1, 286Y2, 286B1, 286B2 ARE CB 1-PH TRIP UNIT OF GR-B. THESE ARE SELF RESETING. THE BELOW ARE HAND RESETING. 86GR-A, 86GR-B ARE 3-PH TRIP UNITS. 96 BB IS BUSBAR TRIPPING RELAY

286R1

286Y1

286B1

286R2

286Y2

286B2

86GR-A

. .

. .

. .

86GR-B

96BB

ISOLATOR INTERLOCKS

S.N O

ISOLATOR OPEN/CLO SE

EQUIPME NT-1

EQUIPMEN T-2

EQUIPME NT-3

EQUIPMEN T-4

INTERLOCKS REQUIRED FOR CONCERNED ISOLATOR / EARTH SWITCH OPEN OR CLOSE


BB189 E O 189 AE O 189 E O 152 CB O

BAY - 1 1 1 - 89 IS O

2
3 NOTE: All Earth Switches in the Bay are towards Circuit Breaker side only. The Line and Transformer Earth Switches are towards Line & Transformer. O: OPEN C: CLOSE A: ACTED 4 5 6

1 89 E
1 89 A 1 89 AE 1 89 L 1 89 LE 2 89 A 2 89 AE 2 89 B

ES
IS O ES IS O ES

189 A
189 AE 189 A 189 LE 189 L

O
O O O O

189
189 E 189 152 CB UV RELAY 289 AE 289 A 289 AE

O
O O O A

-152 CB -252 CB --

O O -

------

BAY - 2 7 8 9 IS O ES IS O 289 BE O 289 B O O O O 252 CB -252 CB O O ----

BB189E : BUSBAR-1 EARTH SWITCH . BB289E : BUSBAR2EARTH SWITCH . UV RELAY: UNDER

289 BE O

BB189E 1-89AE 1-89E 1-52CB 1-52CB 1-89AE 1-89E

OPEN OPEN OPEN OPEN OPEN OPEN OPEN

ISOLATOR & CB INTERLOCKS


& OPERATION
1-89
1-89E 1-89AE 2-89AE CLOSE CLOSE CLOSE CLOSE

OPEN OPEN

BB289E 3-89AE 3-89E 3-52CB 3-52CB 3-89AE 3-89E 3-52CB 3-89TE 2-52CB LV89E2 3-89 3-89A 3-89 3-89A 3-89T LV89T

& 1-52CB
& 2-52CB
LOCAL CLOSE

LOCAL CLOSE

3-89

OPERATION

&

OPEN OPEN OPEN

& OPERATION

1-89A

2-89BE 3-89E

3-89A

OPERATION

CLOSE
CLOSE RESET RESET RESET RESET RESET RESET

&

OPEN OPEN OPEN

1-52CB 1-89LE 2-52CB 1-89 1-89A 1-89 1-89A 1-89L U/V RLY

OPEN OPEN OPEN OPEN OPEN OPEN

3-89AE

& 3-52CB
& 1-52CB & 2-52CB & 3-52CB
3-89TE
REMOTE CLOSE REMOTE CLOSE

LOCAL CLOSE

& OPERATION

1-89L

86GR-A 86GR-B 96BB

REMOTE CLOSE

3-89T

OPERATION

OPEN

&

OPEN OPEN OPEN

& & &

OPERATION

1-89E

86GR-A

3-89E

OPERATION

&

OPEN OPEN

86GR-B
OPERATION

OPEN
OPEN

1-89AE

86GR-A 86GR-B 96BB

RESET
RESET

3-89AE

OPERATION

&
&

OPEN
OPEN OPEN

OPERATION

ACTED

1-89LE

OPERATION

2-89A 2-52CB 2-89AE 2-89BE OPEN OPEN OPEN 2-89B

OPEN
OPEN OPEN OPEN

& OPERATION 2-89AE & 2-89BE


OPERATION

2-52CB 2-89AE 2-89BE

OPEN OPEN OPEN

& OPERATION
2-89A

2-89A 2-89B

& OPERATION
2-89B

CLOSING INTERLOCK OF MAIN & TIE CB


96 BB 86 GR-A 86 GR-B + VE T N C

CB REMOTE CLOSE
21M1 AR MAIN CB

21M2 AR

86 GR-A

86 GR-B

+ VE
T N C TIE CB CB REMOTE CLOSE

TIE

AR

ADVANTAGES & DISADVANTAGES OF ONE & HALF BREAKER SYSTEM


A.
1. 2. 3. 4. 5. 6.

ADVANTAGES:
THREE CIRCUIT BREAKERS IN A FULL DIA ARE ALWAYS IN CLOSED POSITION. IF MAIN CB PROBLEM / FOR PERIODICAL MAINTANENCE, DURING THAT PERIOD THE FEEDER IS FEEDING FROM TIE CB & OTHER BUS . NEED NOT REQUIRE TRANSFER THE FEEDER. IF TIE CB PROBLEM / FOR PERIODICAL MAINTANENCE, DURING THAT PERIOD THE FEEDER IS FEEDING FROM MAIN CB & CONNECTED BUS. EVEN IF BOTH MAIN BREAKERS UNDER TROUBLE, DURING THAT PERIOD ONE FEEDER WORKS AS INCOMING AND OTHER FEEDER WORKS AS OUTGOING VIA TIE CB. (WITHOUT INTERUPTION TO FEEDERS) IF BUSBAR-1 OPERATED / FOR PERIODICAL MAINTANENCE, ONLY THE MAIN BREAKERS CONNECTED TO BUSBAR-1 WILL TRIP. DURING THAT PERIOD THE FEEDERS CONNECTED TO BUS-1 ARE FEEDING VIA TIE CB FROM BUS-2. IF BUSBAR-2 OPERATED / FOR PERIODICAL MAINTANENCE, ONLY THE MAIN BREAKERS CONNECTED TO BUSBAR-2 WILL TRIP. DURING THAT PERIOD THE FEEDERS CONNECTED TO BUS-2 ARE FEEDING VIA TIE CB FROM BUS-1. IN THIS BUSBAR PROTECTION IS SIMPLE AND NEED NOT REQUIRE SELECTION OF ISOLATOR. IT IS MORE RELIABLE SYSTEM FOR OPERATION & MAINTANENCE POINT OF VIEW.

7.
8.

B.
1. 2. 3. 4.

DISADVANTAGES
CT CONNECTIONS & PROTECTION TRIP LOGICS ARE SOME WHAT COMPLICATED. COMPLEX CONTROL & PROTECTION PHILOSOPHY COST TOWARDS CTs, CIRCUIT BREAKERS & PANELS ARE TO BE INCREASED DUE TO EXTRA BAY. THE COST COMPARISION TABLE SHOWN IN NEXT PRESENTATION. THE OPERATIONS FOR OPERATOR POINT OF VIEW IS LITTLE BIT COMPLICATED WHEN COMPARED TO CONVENTIONAL SYSTEM. SPACE OCUPATION FOR BAY IS MORE i.e COST OF LAND IS INCREASE.

COST COMPARISION BETWEEN CONVENTIONAL SYSTEM & ONE AND HALF BREAKER SYSTEM FOR FEEDER
ONE & HALF BREAKER SYSTEM S. No EQUIPMENT CONVEN TIONAL SYSTEM FULL DIA (FOR 2 FEEDERS )
3 Nos

% HALF INCREA DIA SE (FOR 1 IN FEEDER) COST


50% 2 Nos

% INCRE ASE IN COST


100%

1.

CIRCUIT BREAKERS

1 No

CURRENT TRANSFORMERS
3 CT METHOD 2. 4 CT METHOD 5 CT METHOD 6 CT METHOD
I SET 1 Set

INCLUDES THE COST OF CT MARSHELLING BOXES. 3 Sets 4 Sets 5 Sets 6 Sets 3 SETS 50% 100% 125% 200% 30% 2 Sets 2 Sets 3 Sets 3 Sets 2 SETS 100% 100% 200% 200% 30%

3.

CONTROL & RELAY PANELS

NORMALLY EXTRA PANEL IS TIE BAY PANEL. IT IS ARROUND 30% COST OF MAIN PANEL. BECAUSE IT IS NOT HAVING PROTECTION RELAYS( M-1 & M-2 AND OTHER RELAYS) . ONLY TIE CB TRIPPING RELAYS & ASSOCIATED RELAYS(A/R +LBB).

4.

BAY MARSHALLING

1 No

3 Nos

50%

2 Nos

30%

OTHER INFORMATION REGARDING RELAYS AND TESTING EQUIPMENT


PREPARED BY GOPALA KRISHNA PALEPU ADE/MRT(PROTECTION)

ABB RELAYS
ABB Network Partner AG

ABB Network Partner AG

REL 521

ABB Network Partner AG

REL 316*4

10

11

12

13

14

15

16

E E

C E

ABB Relays
ABB Network Partner AG

REL 512

c
E

ALSTOM RELAYS

P443

P445

P437

E-PAC

P442

GE MULTILIN RELAYS

SIEMENS RELAYS

SEL RELAYS
ENABLED

IA =250.10 A IB =250.10 A IC =250.10 A VAB =400.0 KV VBC =400.0 KV VCA =400.0 KV


ESC ENT

TRIP

TARGET RESET

SPT ENABLED COMM ENABLED ALT SETTINGS

MC ENABLED RECLOSE ENABLED CB CLOSED

SEL- 421
PROTECTION AUTOMATION CONTROL

INST TIME COMM SOTF ZONE 1 ZONE 2 ZONE 3 ZONE 4

PH - A PH - B PH - C GND
50 51

79 RESET 79 LOCKOUT

RELAY TEST

CB OPEN

SEL

INST TIME COMM SOTF TRIP EN A B C

2ENABLED 3
TRIP

TARGET RESET

SEL- 321- 5 - 2
PROTECTION AUTOMATION CONTROL

ZONE G Q 51 50 O/C

FAULT TYPE

TARGET TARGET FAULT SET RESET NO / YES / CANCELSELECT

METER STATUS OTHER GROUP EXIT

SEL

VA TECH REYROLLE RELAYS

NXT PHASE RELAYS

RELAY HARDWARE
16 / 32 BIT

PC MODEM

IRIG-B RE/CC

NORMALLY 400KV RELAYS SUPPLIED WITH CONFIGUARATION/HARDWARE 1. MIN 4Nos MAX 8Nos COMMAND/TRIP OUTPUTS 2. MIN 24Nos SIGNAL OUTPUTS 3. MIN 14 LED INDICATIONS 4. MIN 24 BINARY INPUTS

FOLLOWING

RELAY SIGNAL DATA FLOW

FUNCTIONS AVAILABLE NUMERICAL DISTANCE RELAYS


1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 4 TO 6 SETTING IMPEDENCE ZONES WITH 4 TO 6 SETTING GROUPS (21 + 21N). DIR / INST / TIME OVERCURRENT & EARTH FAULT FUNCTION( 50 / 51 / 67 P+G). EIGHT COMMUNICATION SCHEMES. SWITCH ON TO FAULT PROTECTION(21 SOTF). PHASE SELECTION(R,Y,B). POWER SWING BLOCKING(PSB)(68 + 68T). FUSE FAILURE SUPERVISION(PT FFR). AUTO RECLOSER WITH CHECK SYNCHRNISATION & VOLTAGE CHECK(79 + 25 +86). WEEK END INFEED LOGIC(27 WI). SYSTEM SUPERVISION. STUB PROTECTION(STUB). OVER VOLTAGE/ UNDER VOLTAGE FUNCTION(27+ 59). LBB/BFR FUNCTION(50 BF). DISTANCE TO FAULT LOCATOR(21 FL).(SHOWS IN 1. %, 2. KM 3. MILES & 4. R+JX ) 16 PROGRAMABLE SIGNALLING RELAYS WITH LEDs. RECORDABLE 10Nos LATEST DISTRUBANCES WITH BASIC EVALUATION DISTURBANCE RECORDER. 17. EVENT RECORDER RELATED TO RELAY EVENTS. 18. PRE-FAULT, FAULT & POST-FAULT VALUES OF ANALOG POINTS WITH IMPEDENCE DETAILS. 19. USER CAN BE CONFIGUARED PROGRAMABLE LOGIC FUNCTIONS. 20. TELE / CARRIER INTER TRIPPING SCHEMES(85 +21)(PUTT, POTT). 21. TRIP CIRCUIT MONITORING(74 TC). 22. METERING FUNCTION (INSTANTANEOUS VALUES DISPLAY FUNCTION). 23. 4 QUADRANT ENERGY METER FUNCTION (KWH,KVAH,KVARH)(KYZ PULSE OUTPUT). 24. MINIMUM 8 COMMOND/ TRIP RELAYS, 24 SIGNAL RELAYS 25. MINIMUM 20 BINARY INPUTS, 14 LEDs

DISTANCE RELAYS CHARACTERESTICS


( MHO CIRCULAR )

DISTANCE RELAYS CHARACTERESTICS


( QUADRILATERAL-1 )

DISTANCE RELAYS CHARACTERESTICS


( QUADRILATERAL-2 )

DISTANCE RELAYS CHARACTERESTICS


( BULLET )

DISTANCE RELAYS CHARACTERESTICS


( TRIANGLER )

DISTANCE RELAYS CHARACTERESTICS


( LENS / OPTICAL )

DISTANCE RELAYS CHARACTERESTICS


( TOMATO )

RELAY MODELS OF LINE (DISTANCE) & TRANSFORMER( M & B ) OF DIFFERENT MANUFACTURERS


MANUFAC TURERS ABB TRANSMISSION LINE PROTECTION MAIN-1
CURV ES
QUAD

T/F PROTECTION

MAIN-2

CURV DIFFEREN ES TIAL


QUAD/
BULLET

DIR O/L,E/F

REL 521 REL 670


MICOM P443/P44 4/ P442/P44 5 SIPROTE C 7SA62/3 SEL 421

REL 316 REL 512


MICOM P437 E-PAC 3000, OPTIMHO SIPROTE C 7SA522 SEL 321 SEL 311C

RET 521 / 670 RET 316


MICOM P633 KBCH/ MBCH 7UT 613/ 2 7UT 513/ 2 SEL 387

REL 505 REX 521


MICOM P141 MICOM P127
7SJ 62/3/4/5 7SJ 52/3/4/5

AREVA (ALSTOM) SIEMENS ( SIPROTEC ) SEL GE MULTILIN

QUAD/ MHO

QUAD/ MHO

QUAD/ MHO

QUAD/ MHO

QUAD/ MHO QUAD/ MHO

QUAD/ MHO QUAD/ MHO

SEL 351

D-60, ALPS

L-60/L-90 D-30
THR 4 PE

T-35 / T-60 F-60 SR 7465 SR 750/60

RELAY TESTING EQUIPMENTS


1. PROGRAMA_GE (MODEL: FREEJA-300) 3. OMICRON (MODEL: CMC 256-6) 2. MANTA TEST SYSTEMS (MODEL: MTS 4000) 4. DOBLE ( MODEL: F 6150)

RELAY TESTING EQUIPMENTS


1. MEEGER_AVO (MODEL: MPRT 8430) 3. KOCOS (MODEL: ARTES 440 II) 2. RES (MODEL: APTS 3) 4. EURO SMC ( MODEL: TRES)

400KV SUBSTATIONS IN APTRANSCO


S.N o
1.

400KV SUBSTATION

CAPAC ITY
(2 + 1**) X 315 MVA (2 + 1**) X 315 MVA 2 X 315 MVA 2 X 315 MVA
(1 + 2**) X 315 MVA (1 + 1**) X 315 MVA 2 X 315 MVA 2 X 315

FEEDERS
1. SRISAILAM 1&2 2. GHANAPUR (PGCIL) 3. KHAMMAM 1&2(PGCIL) 4. YEDDUMAILARAM 1&2**

MAMIDIPALLY (HYDERABAD)

1. SRISAILAM 2. GHANAPUR (PGCIL)

3. GOOTY (PGCIL) 4. NARASARAOPETA**

2.

NURNOOR (KURNOOL)

3. 4.

KALAPAKA (VISHAKHAPATNAM) VEMAGIRI (RAJHAMUNDRY)

1. SIMHADRI 1,2,3&4 (NTPC) 2. GAJUWAKA 1&2 (PGCIL) 1. KALAPAKA 1&2 2. GAJUWAKA 1&2 (PGCIL)* 3. NUNNA 1&2 (PGCIL)* 4. GUNTUR 1&2* 1. TALLAPALLY

3. KHAMMAM 1&2 (PGCIL) 4. VEMAGIRI 1&2 5. GVK EXTN 1&2 (IPP) 6. GOWTHAMI 1&2 (IPP) 7. KONASEEMA 1&2 (IPP) 8. GMR VASAVI 1&2 (IPP) 2. RAICHUR

5.

VELTUR (MB NAGAR)

1. CHENNAI RED HILLS

2. KADAPA

6.

CHITTOR(VEPANJIR)

7.

NELLORE(MANUBOLU) DICHPALLY* (NIZAMABAD)

1. RAMAGUNDAM

400KV SUBSTATIONS OF PGCIL IN AP


S.N o
1.

400KV SUBSTATION

CAPACI TY
2 X 200 MVA 2 X 250 MVA 1 X 315 MVA 3 X 315 MVA (1 + 1*) X 315 MVA (1 + 1*) X 315 MVA 3 X 315 MVA (1 + 1*) X 315 MVA (1 + 1**) X 315 MVA (1 + 1**) X 315

FEEDERS
1. GHANAPUR 1&2 2. GAJWEL(GHNP3) 3. MALKARAM(GHNP4) 4. TALLAPALLY 1&2 5. DICHPALLY* 6. KHAMMAM (WRNGL) 7. CHANDRAPUR 1&2

RAMAGUNDAM(NTPC)

2. 3.

GHANAPUR (HYDERABAD) GAJUWAKA (VISHAKHAPATNAM)

1. RAMAGUNDAM 1&2 2. MAMIDIPALLY 3. GAJWEL(RMGNDM3) 1. NUNNA 2. KALAPAKA1&2

4. NAGARJUNA SAGAR 5. KURNOOL 6. MALKARAM(RMGNDM4) 3. VEMAGIRI 1&2 4. JAIPUR(HVDC)

4. 5. 6.

NUNNA (VIJAYAWADA) TALLAPALLY (NAGARJUNA SAGAR) BUDIDAMPADU (KHAMMAM)

1. GAJUWAKA 2. SRISAILAM 1&2(NRSPT) 3. VEMAGIRI 1&2

4. VEMAGIRI 3&4(VTPS) 5. KHAMMAM 6. NELLORE 1&2

1. RAMAGUNDAM 1&2 2. GHANAPUR 3. MAHABOOBNAGAR 1. RAMAGUNDAM (WRGL) 2. NUNNA

4. GOOTY 5. CHINAKAMPALLY 1&2 4. MAMIDIPALLY 1&2 5. KALAPAKA 1&2

7.

GOOTY

1. TALLAPALLY 2. SOMANAHALLY 3. KURNOOL

4. NEELAMANGALA 5. RAICHUR 1&2*

8.

CHINAKAMPALLY

1. TALLAPALLY 1&2 2. SOMANAHALLY

3. KOLAR 4. CHITTOR

400KV NETWORK IN AP
GAJUWAKA
HVDC

SIMHADRI WARANGAL

RAMAGUNDAM BTPS DICHPALLY TALLAPALLY GAJWEL CHANDRAPUR (MAHARASTRA)

JAIPUR

KALAPAKA

IPP3 VEMAGIRI

IPP4

IPP1

IPP2 YEDDUMAILARAM MBNGR

GHANAPUR

NUNNA VTPS KHAMMAM GUNTUR NELLORE NKRKL

MALKARAM

CHINAKAMPALLY

GOOTY BANGALORE BANGALORE

CHITTOR

ALAMETHI / CHENNAI

SRISAILAM MAMIDIPALLY

RAICHUR

KOLAR

VEMAGIRI SUBSTATION DISPLAY


NUNN AI (PGCI L)
NUNN A II (PGCI L) GAJUWA GAJUWA KA I KA II (PGCIL) (PGCIL) KALAPA KALAPAK GOWTH GOWTHA FUTURE FUTURE KA I A II AMI I MI II I II PHES PHES

315MVA, 315MVA, 400/220KV 400/220KV AUTO AUTO TRANSFOR TRANSFOR MER-II MER-I

GUNTUR GUNTUR I II

VPGCL VPGCL KOPCL KOPCL I II I II GMR GMR KONASE KONASE EMA VASAVI VASAVI EMA

GVK GVK EXT EXT I II