WARMA ORGANISATIONAL PLAN AND ITS IMPLICATIONS ON THE IWRMIS

The structure should be in place quickly To avoid capacity building challenge There is already a provisional structure The info system will require people to manage it The RWSS info was just handed over with its functions to MLGH no structure existed to support it (it never worked!!!!) Cooperating partners have confirmed this There was no space for consulting key stakeholders to get their input

If we say 34 members of staff! who is going to do gauge reading Previously we had volunteer gauge readers who where very lowly paid This arrangement caused a lot of problems because the data submitted was questionable Why where the reforms done this way? The structure for WRMA was done without some key stakeholders . This is already a problem There's need for stakeholders to get involved in structure devpt Board came in place in April.

The IWRMIS should be supported by the structure within the project plan and within WRMA for continuity after the project A coordinated transparent approach is need amongst DWA, WRMA, GDC and cooperating partners at every stage There is need to learn on how ZRA and ZESCO have been managing their info system

Need for establishing catchment institutions reflecting the existing situations on the ground
Adopt a structure which could be supported by data users e.g ZRA One advantage with WRMA is that consultation with govt will be very minimal

Need for existing institutions to work with WRMA in data collection

Cooperating partners are saying WRMA is currently not fully autonomous World bank e.g said they have money for WRMA but they are not using it There is need for collective design of WRMAs institutional structure

WRMA will receive full support once there is full transparency in the organization at every stage
The cooperating partners want to see a transparently defined structure at WRMA

WRMA needs to take into account in its system the IWRMIS Both in the Short term and long term How or what are the priorities for WRMA catchment in terms of

By around July 31st the full structure of WRMA will be in place Step by step WRMA will be implementing basin management structures and employing the required personnel

More and more concern was raised about the WRMA structure & the Board by the cooperating partners and the information has not been shared with the stakeholders This has in a way reduced stakeholder participation & support to WRMA Collaboration is highly required with all stakeholders at every stage The stages are going to be equipped very soon, how well will these stations be manned

Equipment previously owned and managed by DWA to be handed over to WRMA but with current structure, will WRMA manage the gauge stations and does each station require a reader? DWR and WRMA will soon have their structures in place