OIL RIG
An oil rig, is a large structure with facilities to drill wells, to extract and process oil and natural gas, and to temporarily store product until it can be brought to shore for refining and marketing. Depending on the circumstances, the platform may be fixed to the ocean floor, may consist of an artificial island, or may float.
Eirik Raude
Hull built in Dalian China. First stage outfitting in Pascagoula, Mississippi. Final outfitting: Halifax Shipyard, Nova Scotia, Canada 2002. Upgraded in len Norway. Dimension : length 119.38m , width 85.50m. Additional winterization. Eirik Raude has drilled 28 deepwater wells, 9 of these in harsh environment. Torbrook C 15, Canada , water depth 1674m.
ANCHOR
For monster rig like EIRIK has a four 22 ton anchor. So, need a tug to release each anchor from a sludge. Its a slow process takes nearly 2hrs to lift each anchor
DESIGN
It is design to survive worst kind of weather. A hurricane force 12. Winds over 80 miles/hr. Wave up to 70 feet.
CUT SECTION
COMPARTMENTS
1. BRIDGE 2. SAFETY 3. THRUSTER ROOM (DP) 4. ROV CONTROL ROOM 5. DRILL FLOOR 6. ACCOMMODATION BLOCK
BRIDGE
Main control room. All system are checked before made its voyage from the watch full eye of the captain from the bridge.
SAFETY
Eirik is fitted with latest escape equipment. Including PROD LAUNCH life boat system.
THRUSTER ROOM
THRUSTER ROOM
THRUSTER ROOM
6 thruster each driven by gigantic electric motor. Max. 750 rpm of shaft. If all 6 thruster can run with full power ,EIRIK could produce 600 tonne of thrust & would use 16,500 gallons of fuel a day. At top speed of 7 miles/hr gulp 1000 gallons of fuel/mile. So, it is also a huge guzzler of oil. It uses the system called DYNAMIC POSITIONING (DP) to hold its place above the well. DP uses 6 global positioning satellite at a time to find out exactly where it is. This system is so powerful that EIRIK hold its position within a feet even in 52 foot wave & 60 mile/hr winds.
DRILL FLOOR
DRILL FLOOR
In any rig the heart of operation is the drill floor. First step is to drill a pilot well by using 12inch bit & to check dangerous gas leak & then 42 inch bit for main drill. Section consists of drill bit motor & sensors.
More than 24hrs to lower 66 section of pipe to reach the sea bed 6000 feet below.
ACCOMMODATION BLOCK
ACCOMMODATION BLOCK
It is situated at front of the rig as far as possible from the danger of drilling. Because drill floor is at the center of rig. It contains : 11 OFFICES CABINS BRIDGE CANTEEN AND EIRIKS OWN HOSPITAL 140 ER PERSONS TOTAL CAPACITY GALLEY AND MESS HOUSE DAY ROOM NONE SMOKING & DAY ROOM SMOKING TV LOUNGE SMOKING &NON SMOKING SAUNA GYMNASIUM
SMOKING ROOM
OIL EXPLORATION
Its a huge gamble which cost them a quarter of million US $/day, i.e drilling is very expensive. So geologist take seismic data using survey ship. And using these data , careful planning is done using 3D simulation at NORWAY UNIVERSITY OF SCIENCE & TECHNOLOGY.
Seismic Survey
Special ships equipped with air guns to produce shock waves and reflections are captured by hydrophones (geophone). The speed and strength of the reflected waves depends on the density of the strata they encounter. Rock becomes denser the deeper underground it is located, but pockets of gas and oil have a much lower density. The denser the material is, the faster the waves will be reflected. As the seismic waves encounter lower density materials, more of their energy passes through. By analyzing the time it takes for the waves to be reflected, geologists can build an accurate image of the subsoil by using 3D seismic interpretation software. Analysis of the seismic data provides vital information on petroleum geology of the area of interest. This information can tell us the possibility of hydrocarbon reserve.
Seismic Survey