CONTENT
 SCOPE OF WORK
 FACTORY FACILITIES
 PRODUCTION PROCESS
 DELIVERY
 MOCK UP UNIT
UEM Tech Wall

SCOPE OF WORK
 SUPPLY AND DELIVER NON-STRUCTURAL
WALL (FACADE WALL) TO SITE
 TEN (10) TYPES:
1. WALL 01 SERIES
2. WALL 02 SERIES
3. WALL 03 SERIES
4. WALL 04 SERIES
5. WALL 05 SERIES
6. WALL 06 SERIES
7. WALL 08 SERIES
8. WALL 22 SERIES
9. AIR-COND LEDGE
10.WINDOW HOOD
UEM Tech Wall

WALL 01 SERIES
 WALL PANEL 01
 WALL PANEL 1A
 WALL PANEL 1A1
 WALL PANEL 1A1d
UEM Tech Wall

WALL 02 SERIES
 WALL PANEL 2A
 WALL PANEL 2B
UEM Tech Wall

WALL 03 SERIES
 WALL PANEL 3A
UEM Tech Wall

WALL 04 SERIES
 WALL PANEL 4A
 WALL PANEL 4A1
 WALL PANEL 4A2
 WALL PANEL 4B
UEM Tech Wall

WALL 05 SERIES
 WALL PANEL 5A
 WALL PANEL 5B
 WALL PANEL 5C
 WALL PANEL 5D
 WALL PANEL 5E
UEM Tech Wall

WALL 06 SERIES
 WALL PANEL 6
 WALL PANEL 6A2
 WALL PANEL 6A3
 WALL PANEL 6A4
 WALL PANEL 6A5
 WALL PANEL 6A6
 WALL PANEL 6A7
UEM Tech Wall

WALL 08 SERIES
 WALL PANEL 8A
 WALL PANEL 8B
UEM Tech Wall

WALL 22 SERIES
 WALL PANEL 22
 WALL PANEL 22A
UEM Tech Wall

AIR CONDITION LEDGE


 PRECAST ELEMENT AC1
 PRECAST ELEMENT AC2
UEM Tech Wall

WINDOW HOOD
 PRECAST ELEMENT C30
 PRECAST ELEMENT C31
UEM Tech Wall

FACTORY FACILITIES
 FACTORY FLOOR
 BATCHING PLANT
 COMPACTION USING TABLE VIBRATION
SYSTEM
 GANTRY CRANES
factory and batching plant
dedicated factory floor
table vibration system
UEM Tech Wall

PRODUCTION PROCESS
 MOULD PREPARATION
 REINFORCEMENT PREPARATION
 QA/QC CHECK
 CONCRETING PROCESS
 YARDING
UEM Tech Wall

MOULD PREPARATION
spraying water-based
mould oil onto the mould

cleaning of mould
cleaning of formwork with the
water-based mould oil evenly
UEM Tech Wall

REINFORCEMENT
PREPARATION
placing and tying of
reinforcement into the mould
checking of reinforcement
UEM Tech Wall

QA / QC MANAGEMENT
QA & QC LABORATORY
preparing for concrete cube samples

compression machine to test


concrete cube strength
UEM Tech Wall

CONCRETING PROCESS
discharging of concrete from
casting hopper
spreading of concrete

concreting in progress
dismantling of form vibrator

completion of compaction
trowel finishing

trowel of concrete
formwork striking
UEM Tech Wall

YARDING
transferring of panel to
storage yard
temporary stacking of panels
racking of panels

turning of panel
stacking of panels
UEM Tech Wall

DELIVERY
loading of panels in factory
arrival of panels at site
unloading of panels at site

arrival at project site


unloading of panels at site
erection of panels at site

assembly of window hood at site


UEM Tech Wall

MOCK-UP UNIT IN FACTORY


FOUNDATION LAYOUT
MOCK UP UNIT PANEL LAYOUT
MOCK UP UNIT LAYOUT IN 3D VIEW
concreting of ground floor marking prior to installation

installation of panel shim plate for leveling


verticality check

propping of panel
front view

side view

rear view
hall & living room

bedroom 1 & 2
installation of electrical conduits

installation of sanitary pipes


UEM Tech Wall