Sie sind auf Seite 1von 57

8th Annual Sucker Rod Pumping Workshop

Renaissance Hotel Oklahoma City, Oklahoma September 25 - 28, 2012

Wave Equation: Derivation and Analysis


Victoria M. Pons, Ph. D. Jeffrey J. DaCunha, Ph. D. Weatherford Pioneer Natural Resources

Reciprocating Rod Lift


The most widely used mean of artificial lift is sucker rod pumping.
In reciprocating rod lift the work done by the generator at the surface is translated downhole through the polished rod and the rod string into work at the pump. The work at the surface of the pumping unit is measured by a surface dynamometer, capable of recording the position and load of the rod string. Energy is irreversibly and continuously lost from the system due to Friction and Elasticity.

Sept. 25 - 28, 2012

2012 Sucker Rod Pumping Workshop

Irreversible Energy losses


Elasticity: Due to the load of the fluid and the load of the rod string below, in the case of a vertical well, the rod string can be compared to an ideal slender bar. It will elongate and contract as stress waves move through it. Viscous Friction: Fluid is constantly opposing the movement of the rods. The well fluids impart a viscous force at the outer surface of the rods resulting in continuous energy loss. Mechanical Friction: Occurs when tubing is in contact with rods and rod couplings, relevant only in the case of deviated wells.
Sept. 25 - 28, 2012

2012 Sucker Rod Pumping Workshop

Surface and Downhole Data


Because of elasticity and friction, the work done at the surface is not directly translated downhole.

To know how much actual work is done downhole, a downhole dynamometer can be used. Drawback: very costly.
A more efficient solution is to calculate the position and load at the pump using the surface position and load. The position and load can be illustrated as a function of two variables and graphed to give a surface and downhole card.
Sept. 25 - 28, 2012

2012 Sucker Rod Pumping Workshop

Conventional pumping unit

Sept. 25 - 28, 2012

2012 Sucker Rod Pumping Workshop

The 1D Damped Wave Equation


Calculating downhole conditions is difficult because of the sucker rods elasticity.
This takes the form of elastic force or stress waves traveling along the string at the speed of sound. The rod string is physically equivalent to an ideal slender bar, therefore the propagation of stress waves is a one dimensional phenomenon.

The wave equation describes the motion and stress wave propagation phenomena in the rod string.
In the one dimensional damped wave equation, the damping term stands for the irreversible energy losses that occur along the rod string.
Sept. 25 - 28, 2012

2012 Sucker Rod Pumping Workshop

Forces acting on a Rod Element


Forces: Buoyant weight of the rod element W, Tension force representing the upward pull on the rod element FX, Tension force representing the pull from below on the rod element FX+X, The damping force opposing the movement, FD, resulting from fluid friction on the rod elements surface.
7

Sept. 25 - 28, 2012

2012 Sucker Rod Pumping Workshop

Newtons Second Law

Sept. 25 - 28, 2012

2012 Sucker Rod Pumping Workshop

Breakdown of Forces (1/2)


Using the stresses present in the rod sections and Hookes law the tension forces can be rewritten as:

The acceleration can be written as:


the mass as Where is the density and g the gravity constant.
Sept. 25 - 28, 2012

2012 Sucker Rod Pumping Workshop

Breakdown of Forces (2/2)


Since the friction force considered is of viscous nature only, it is proportional to the velocity of the rod element:

Where c is the damping coefficient.

Sept. 25 - 28, 2012

2012 Sucker Rod Pumping Workshop

10

The 1D Damped Wave Equation (1/2)


The conservation of energy for the rod element reads:

The acoustic velocity in the rod string is given by


The damping factor is defined as .

Sept. 25 - 28, 2012

2012 Sucker Rod Pumping Workshop

11

The 1D Damped Wave Equation (2/2)


Therefore the condensed form of the above equation reads:

Acceleration

Elasticity

Damping

Cf. Sucker-Rod Pumping Manual, by Gbor Takcs.


Sept. 25 - 28, 2012

2012 Sucker Rod Pumping Workshop

12

True Loads vs. Effective Loads


The difference between true loads and effective loads is that when using true loads the buoyant force is added to the load values. The Gibbs method uses true loads, meaning that the resulting downhole card is translated vertically downward by the value of the buoyant force.

The modified Everitt-Jennings method uses effective loads, meaning the resulting downhole card rests on the zero load line.

Sept. 25 - 28, 2012

2012 Sucker Rod Pumping Workshop

13

The Gibbs Method


The Gibbs Method fits a function to the measured surface position data and surface load data using harmonic analysis. From this function, the wave equation is implemented. Advantages include a smoother data set on which to apply the wave equation, unlike taking hundreds of numerical derivatives (finite differences) which can actually add noise to the data. The damping term is set in the field once and the downhole card is then computed.
Sept. 25 - 28, 2012

2012 Sucker Rod Pumping Workshop

14

Polished Rod Position


80

70

60

50

PRP, in

40

30

20

10

0 0 2 4 6 Time, sec 8 10 12

Brex, LLC 2012

Polished Rod Load


20000

18000

16000

14000

12000 PRL, lbs

10000

8000

6000

4000

2000

0 0 2 4 6 Time, sec 8 10 12

Brex, LLC 2012

20000

18000

16000

14000

12000

10000

Measured 1 terms

8000

6000

4000

2000

10

12

Brex, LLC 2012

20000

18000

16000

14000

12000

10000

Measured 2 terms

8000

6000

4000

2000

10

12

Brex, LLC 2012

20000

18000

16000

14000

12000

10000

Measured 3 terms

8000

6000

4000

2000

10

12

Brex, LLC 2012

20000

18000

16000

14000

12000

10000

Measured 4 terms

8000

6000

4000

2000

10

12

Brex, LLC 2012

20000

18000

16000

14000

12000

10000

Measured 5 terms

8000

6000

4000

2000

10

12

Brex, LLC 2012

20000

18000

16000

14000

12000

10000

Measured 7 terms

8000

6000

4000

2000

10

12

Brex, LLC 2012

20000

18000

16000

14000

12000

10000

Measured 9 terms

8000

6000

4000

2000

10

12

Brex, LLC 2012

20000

18000

16000

14000

12000

10000

Measured 11 terms

8000

6000

4000

2000

10

12

Brex, LLC 2012

20000

18000

16000

14000

12000

10000

Measured 15 terms

8000

6000

4000

2000

10

12

Brex, LLC 2012

20000

18000

16000

14000

12000

10000

Measured 20 terms

8000

6000

4000

2000

10

12

Brex, LLC 2012

Polished Rod Position


80

70

60

50

PRP, in

40

30

20

10

0 0 2 4 6 Time, sec 8 10 12

Brex, LLC 2012

Polished Rod Load


20000

18000

16000

14000

12000 PRL, lbs

10000

8000

6000

4000

2000

0 0 2 4 6 Time, sec 8 10 12

Brex, LLC 2012

Surface Dynagraph
20000

18000

16000

14000

12000 PRL, lbs

10000

8000

6000

4000

2000

0 0 10 20 30 40 PRP, in 50 60 70 80

Brex, LLC 2012

Surface Dynagraph - 1 term


20000

15000

10000

Load, lbs

5000

0 0 10 20 30 40 50 60 70 80

-5000

-10000

Stroke, in

Brex, LLC 2012

Surface Dynagraph - 2 terms


20000

15000

10000

Load, lbs

5000

0 0 10 20 30 40 50 60 70 80

-5000

-10000

Stroke, in

Brex, LLC 2012

Surface Dynagraph - 3 terms


20000

15000

10000

Load, lbs

5000

0 0 10 20 30 40 50 60 70 80

-5000

-10000

Stroke, in

Brex, LLC 2012

Surface Dynagraph - 4 terms


20000

15000

10000

Load, lbs

5000

0 0 10 20 30 40 50 60 70 80

-5000

-10000

Stroke, in

Brex, LLC 2012

Surface Dynagraph - 5 terms


20000

15000

10000

Load, lbs

5000

0 0 10 20 30 40 50 60 70 80

-5000

-10000

Stroke, in

Brex, LLC 2012

Surface Dynagraph - 7 terms


20000

15000

10000

Load, lbs

5000

0 0 10 20 30 40 50 60 70 80

-5000

-10000

Stroke, in

Brex, LLC 2012

Surface Dynagraph - 11 terms


20000

15000

10000

Load, lbs

5000

0 0 10 20 30 40 50 60 70 80

-5000

-10000

Stroke, in

Brex, LLC 2012

Surface Dynagraph - 15 terms


20000

15000

10000

Load, lbs

5000

0 0 10 20 30 40 50 60 70 80

-5000

-10000

Stroke, in

Brex, LLC 2012

Dynagraphs
20000

15000

10000

Load, lbs

5000

0 0 10 20 30 40 50 60 70 80

-5000

-10000

Stroke, in

Brex, LLC 2012

Dynagraphs - Zero Damping


20000

15000

10000

Load, lbs

5000

0 0 10 20 30 40 50 60 70 80

-5000

-10000

Stroke, in

Brex, LLC 2012

Dynagraphs - Too Much Damping


20000

15000

10000

Load, lbs

5000

0 0 10 20 30 40 50 60 70 80

-5000

-10000

Stroke, in

Brex, LLC 2012

Dynagraphs Way Too Much Damping


20000

15000

10000

Load, lbs

5000

0 0 10 20 30 40 50 60 70 80

-5000

-10000

Stroke, in

Brex, LLC 2012

The Everitt-Jennings Method


T.A. Everitt and J.W. Jennings used finite differences to solve the wave equation in 1990, cf. An Improved Finite Difference Calculation of Downhole Dynamometer Cards for Sucker-Rod Pumps, SPE 18189, SPE Annual Technical Conference and Exhibition, Houston Oct. 2-5.

The Everitt-Jennings method incorporates an iteration on the net stroke and damping factor.
Weatherford developed the MEJ method in 2008.

With the MEJ, it is possible to compute position, load and stress at any level down the taper.
It permits the use to manage a large group of wells with the automatic selection of the damping factors.
Sept. 25 - 28, 2012

2012 Sucker Rod Pumping Workshop

42

The Everitt-Jennings Method

Sept. 25 - 28, 2012

2012 Sucker Rod Pumping Workshop

43

Finite Differences
Approximates the solutions to differential equations by replacing derivative expressions with finite difference quotients.

Sept. 25 - 28, 2012

2012 Sucker Rod Pumping Workshop

44

Everitt-Jennings Algorithm (1/2)

Sept. 25 - 28, 2012

2012 Sucker Rod Pumping Workshop

45

Everitt-Jennings Algorithm (2/2)

Sept. 25 - 28, 2012

2012 Sucker Rod Pumping Workshop

46

Hydraulic horsepower
The hydraulic horsepower (hp) obtained as follows:

where Q, production rate in B/D

, fluid specific gravity


Fl, fluid level in feet.

Sept. 25 - 28, 2012

2012 Sucker Rod Pumping Workshop

47

Production Rate
The pump production rate is given by:

Where
SPM, pumping speed in strokes/minute S, net stroke in inches

D, pump diameter in inches.

Sept. 25 - 28, 2012

2012 Sucker Rod Pumping Workshop

48

Damping Factor
The damping factor can be computed through the equation:

Where HPR, polished rod horsepower in hp HH, hydraulic horsepower in hp g, gravity constant , period of a stroke in seconds

S, net stroke in inches.


Sept. 25 - 28, 2012

2012 Sucker Rod Pumping Workshop

49

Iteration on Single Damping factor

Sept. 25 - 28, 2012

2012 Sucker Rod Pumping Workshop

50

Iteration on Dual Damping factors

Sept. 25 - 28, 2012

2012 Sucker Rod Pumping Workshop

51

Deviated Wells (1/3)


In the case of deviated wells, mechanical friction becomes an non negligeable force.

Sept. 25 - 28, 2012

2012 Sucker Rod Pumping Workshop

52

Deviated Wells (2/3)


The dynamic behavior of the rod string is different for deviated wells than for vertical wells. In vertical wells, the rod string is assumed to not move laterally. The only friction to consider is the friction of viscous nature, since mechanical friction is not consequential enough to be considered. In deviated wells however, mechanical friction becomes non-negligible since there is extensive contact between the rods, the rod couplings and the tubing.
Sept. 25 - 28, 2012

2012 Sucker Rod Pumping Workshop

53

Deviated Wells (3/3)


Also, since the well is deviated, some sections of the rod string can be bent between two couplings in the middle of a dog leg turn, which introduces the concept of curvature of the rod string. While analyzing the behavior of the rod string, it is therefore essential to capture the behavior of the longitudinal stress waves as well as the lateral stress waves of the rod element.

Sept. 25 - 28, 2012

2012 Sucker Rod Pumping Workshop

54

Rod Pumping Book by Sam Gibbs


ROD PUMPING Modern Methods of Design, Diagnosis, and Surveillance Available with Ronda Brewer. Visit www.samgibbs.net

Sept. 25 - 28, 2012

2012 Sucker Rod Pumping Workshop

55

Copyright
Rights to this presentation are owned by the company(ies) and/or author(s) listed on the title page. By submitting this presentation to the Sucker Rod Pumping Workshop, they grant to the Workshop, the Artificial Lift Research and Development Council (ALRDC), and the Southwestern Petroleum Short Course (SWPSC), rights to:
Display the presentation at the Workshop. Place it on the www.alrdc.com web site, with access to the site to be as directed by the Workshop Steering Committee. Place it on a CD for distribution and/or sale as directed by the Workshop Steering Committee.

Other use of this presentation is prohibited without the expressed written permission of the author(s). The owner company(ies) and/or author(s) may publish this material in other journals or magazines if they refer to the Sucker Rod Pumping Workshop where it was first presented.

Sept. 25 - 28, 2012

2012 Sucker Rod Pumping Workshop

56

Disclaimer
The following disclaimer shall be included as the last page of a Technical Presentation or Continuing Education Course. A similar disclaimer is included on the front page of the Sucker Rod Pumping Web Site. The Artificial Lift Research and Development Council and its officers and trustees, and the Sucker Rod Pumping Workshop Steering Committee members, and their supporting organizations and companies (here-in-after referred to as the Sponsoring Organizations), and the author(s) of this Technical Presentation or Continuing Education Training Course and their company(ies), provide this presentation and/or training material at the Sucker Rod Pumping Workshop "as is" without any warranty of any kind, express or implied, as to the accuracy of the information or the products or services referred to by any presenter (in so far as such warranties may be excluded under any relevant law) and these members and their companies will not be liable for unlawful actions and any losses or damage that may result from use of any presentation as a consequence of any inaccuracies in, or any omission from, the information which therein may be contained. The views, opinions, and conclusions expressed in these presentations and/or training materials are those of the author and not necessarily those of the Sponsoring Organizations. The author is solely responsible for the content of the materials. The Sponsoring Organizations cannot and do not warrant the accuracy of these documents beyond the source documents, although we do make every attempt to work from authoritative sources. The Sponsoring Organizations provide these presentations and/or training materials as a service. The Sponsoring Organizations make no representations or warranties, express or implied, with respect to the presentations and/or training materials, or any part thereof, including any warrantees of title, non-infringement of copyright or patent rights of others, merchantability, or fitness or suitability for any purpose.

Sept. 25 - 28, 2012

2012 Sucker Rod Pumping Workshop

57

Das könnte Ihnen auch gefallen