Beruflich Dokumente
Kultur Dokumente
Presented By,
Present Situation
47% of the total population of
Bangladesh is enjoying the electric facilities
KW hr
Foreign investment is
Generation capacity is nearly
7,000 MW at present
Prospects
and spare parts up to a maximum of ten percent (10%) of the original value
Prospects
years for the expatriate personnel employed under the approved industry. permits to project related foreign nationals and employees.
Problems
Deteriorating financial condition
Inadequate resource availability
MW each are implementing in different places of the country and are expected to initiate
Short term plan liquid fuel based 12-24 months of implementable power stations will be established
Mid term plan government has taken into account to establish 3 to 5 years of implementable coil based power stations with a capacity of 2,600 MW to the total capacity of 7,714 MW.
Wait a Minute!!!
Thanks to all the audiences for your
patience
And a very special thanks to Mr. Tanvir Ahmed Torophder Sir for inspiring us
We will miss you sir