Presentation at Second Annual Conference on Sewage Treatment Plants: Opportunities, Issues, Projects, Technologies ,
October, 17-18,2013
R.V. SINGH
Vice President & Head - Engineering
STRUCTURE OF PRESENTATION
Experience Of The Private Sector In Sewerage Management
Expectations
Way Forward
SEWERAGE MANAGEMENT
It consists of :
Sewer Network Sewage Treatment Plant With Or Without Reuse & Sludge Management O &M
SEWERAGE NETWORK
EXPERIENCE CONSIDERING EPC/TURKEY CONTRACT: Delay in approval of network design House connection is responsibility of ULB which is done poorly by untrained workers resulting into leakage of sewage Generally S/W & RCC pipes are prescribed in bid documents which are prone to breakage due to unequal settlement of soil below sewer owing to ingress of rain water or any other reason Least state level commitment or support
STP/ETP/CETP
EXPERIENCES CONSIDERING BOT PROJECT:
Inadequate considerations for financial viability and lack of project development ability
Delay in appointment in independent engineer Delay in approval due to prescriptive rather than participative technical specifications as well ambiguity in specification & interpretation of codes Sludge disposal mechanism not defined in contract Reuse policy or facility not in place in time; often not in concession agreement Industries discharge effluent in nearby natural course and least bother to take membership of CETP.
Projected revenue not realized as plant is ready but either sewer conveyance network is not ready or users not ready to connect with network/number of users substantially lower than projected at procurement stage
Least involvement of employer during implementation
CASE STUDY
CASE STUDY
Capacity of CETP in CA 8MLD with RO (for Reuse) Plant capacity reduced to 4MLD during development stage & RO system procured but not installed owing to zero demand in local market of treated effluent for reuse Plant is running under capacity as only 1.3MLD influent is available Even BEP sale is not realizing Though Tariff revision based on deviation in Base Effluent Parameters (pH, COD, TDS) is permissible yet deviation measuring mechanism not in place. Hence Tariff revision is always a conflict Private developer is making loss
EXPECTATIONS
EMPLOYER TO CONCEIVE BANKABLE PROJECTS; ENSURE FINANCIAL VIABILITY AND DEVELOPERSS REPAYMENTS THROUGH TAKE OR PAY CLAUSE IN CA. FURTHER, AS LONG -TERM SUSTAINBILITY OF THE PROJECT IS THE ABILITY OF THE ULB TO ASSUME RESPONSIBILTY FOR OPERATION & MAINTENANCE OF THE PROJECT AFTER THE END OF CONCESSION PERIOD .. FOR THIS ULB TO HAVE LONG-TERM PLAN THAT SHOULD INCLUDE THE TRAINING AND STAFFING OF MUNICPAL EMPLOYEES. A VIABLE ALTERNATIVE TO THIS APPROACH WOULD BE FOR THE ULB TO AWRAD A NEW MANAGEMENT CONTRACT AND KEEP O&M WITHIN THE PRIVATE SECTOR.
THANKS
R V Singh
Vice President & Head-Engineering
REFERENCES:
Case studies of bankable water & sewerage project for USAID by ARD Infrastructure In India: A Vast Land Of Construction Opportunities By PWC
JITF WATER INFRASTRUCTURE LTD. Jindal ITF Centre, 28 Shivaji Marg New Delhi-110 015
Mob: