Sie sind auf Seite 1von 9

By: Anthony George Christian Loregnard

Concurrent activities Specification Initial version

Outline description

Development

Intermediate versions

Validation

Final version

Main characteristics:

The phases of the software construction are interleaved Feedback from the user is used throughout the entire process The software product is refined through many versions

Main characteristics:

The phases of the software construction are interleaved Feedback from the user is used throughout the entire process The software product is refined through many versions

Phases

Define the basic requirements Create a working prototype Verification of prototype Evaluate and deliberate . Advantages Deals constantly with changes Provides quickly an initial version of the system Involves all development teams

Quick fixes may be involved Invisible process, not well-supported by documentation The systems structure can be corrupted by continuous change

Applicable

When requirements are not well understood When the client and the developer agree on a rapid prototype that will be thrown away Good for small and medium-sized software systems

Requirements planning phase (a workshop utilizing structured discussion of business problems) User design phase users to participate in the nontechnical design of the system Construction phase productivity tools, such as code generators, screen generators. Cutover phase -- installation of the system, user acceptance testing and user training

Requirements planning phase

User design phase

Prototyping

Construction phase

Cutover phase

Reduced cycle time and improved productivity with fewer people means lower costs Customer involved throughout the complete cycle minimizes risk of not achieving customer satisfaction and business needs Focus moves from documentation to code

Accelerated development process must give quick responses to the user Requires a system that can be modularized Developers and customers must be committed to rapid-fire activities in an abbreviated time frame. May compromises functionality and performance in exchange for faster development and better application maintenance

Sources

When requirements are not fully understood. User involved throughout the life cycle Functionality delivered in increments High performance not required System can be modularized Ian Sommerville, Software Engineering, 8th Ed., Addison-Wesley, 2006 John Petlicki of DePaul University, USA

Das könnte Ihnen auch gefallen