Metrotel works
4-Nov-13
Metrotel works
Physical Verification
Physical Verification is carried out by verifying physical parameter of the New Site with the TSSR (Technical Site Survey Report) such as Address, Lat, Long, Building Height, Antenna Height, Antenna Type, Orientation, Tilt.
Alarm Verification
Alarms are generated mainly due to number of reasons, and these needs to checked before Drive is being carried out for the Site. Alarms are checked from the NOC (Network Operating Centre) and if found needs to be verified before drive being carried out.
4-Nov-13
Metrotel works
4-Nov-13
Metrotel works
Following is the procedure and parameters that need to checked while performing Drive Test for a New Site.
CPC (Cell Parameter Check)
MOC (Mobile Originated Calls) MTC (Mobile Terminated Calls Prepaid to Postpaid) SMS (Short Messaging Service) GPRS Intra Site Handover Inter Site Handover TRX Test Idle Drive (Normal Drive & Frequency Lock Drive) Dedicated Drive
4-Nov-13
Metrotel works
4-Nov-13
Metrotel works
4-Nov-13
Metrotel works
4-Nov-13
Handover is performed for only those cells whose BCCH and BSIC is decoded in the window shown aside
4-Nov-13
TRX Test
TRX Test is done to check whether calls originated are being handled by all the TRXs. Call made during the process is tracked by the MAIO number displayed on the screen for all the TRXs. e.g. for Site of configuration 6 TRX per sector the MAIO values for TRX test shall be 0,1,2,3,4. Call can be originated on the BCCH or the TCH frequencies. Hence MAIO values will be reflected only for calls on TCH frequency and not on BCCH frequency.
Idle Drive
Idle Drive is performed in two fashion Normal Drive
Frequency Lock Drive
Normal Drive
This is done to frame the potential area of the new site planned. It also helps us to get to know the important neighboring sites for which the handover has to take place.
4-Nov-13
Dedicated Drive
Dedicated drive is an important part of Drive Test. Here call is made to a test number and drive is done for the potential areas of the Site. During drive being carried out one has constantly monitor parameters such as RX Level, RX Quality, SQI, DTX, C/I Ratio, Hopping Channel, Neighbor list, TA (Timing Advance). Constant changes in these parameter are helpful for post Optimization of the site.
4-Nov-13
Metrotel works